Built
1975
Last inspected
10 March 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WZC3886
Flag
UNITED STATES
366963980
Maury page id
psix-49348

Inspections, by type

…with no type recorded45
Years with a record 41 calendar years (1984–2026)
The 185 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)152.0 ft × 32.0 ft × 5.8 ft
Registered tonnagegross 99 / net 56
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCAMPBELL INDUSTRIES · SAN DIEGO, CA, UNITED STATES · built 1975
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portLARKSPUR, CA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 2 May 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it0 - Dead Weight, Ton
99 - Regulatory (Subpart C or D), Gross Ton
56 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WZC3886MMSI 366963980 · active · compulsorily equipped · granted 14 May 2024, expires 27 July 2034 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 185

10 March 2026 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8326944
17 February 2026 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8311814
17 February 2026 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8316531
21 November 2025 Damage Survey · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8272277
15 September 2025 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8250015
2 September 2025 Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8210779
13 May 2025 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8136158
7 February 2025 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8076448
6 February 2025 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8077520
22 January 2025 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8067670
18 December 2024 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8048705
17 December 2024 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8054305
30 August 2024 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7992748
11 July 2024 Drydock Extension
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7961577
12 June 2024 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7933614
31 May 2024 Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7924475
4 March 2024 Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7873844
14 November 2023 Internal Structural Exam · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7823044
16 October 2023 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7809437
20 April 2023 In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7672557
15 September 2022 Internal Structural Exam · Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7553515
22 July 2022 Examination of Repairs · Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7513853
18 July 2022 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7509950
18 May 2022 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7454136
25 April 2022 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7437602
30 March 2022 In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7421371
24 February 2022 Administrative Inspection · Deficiency Check · Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7401956
25 August 2021 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7296451
4 August 2021 In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7277358
28 June 2021 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7248863
19 April 2021 Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7178626
28 September 2020 Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7060328
30 July 2020 Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7031040
11 May 2020 Inclining Experiment · Internal Structural Exam · Examination of Repairs · Drydock Exam · In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6950582
5 February 2020 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6904401
17 September 2019 MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6813502
23 February 2019 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6631918
22 February 2019 Administrative Inspection · Drydock Exam · Internal Structural Exam · In-Service Inspection · Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6632939
5 December 2018 Administrative Inspection · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6593267
24 November 2018 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6585648
23 November 2018 Plan Review (Other than "T") · Damage Survey · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6585772
23 November 2018 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6586080
1 November 2018 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6572979
14 September 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6540355
13 August 2018 Deficiency Check · Annual Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6511182
11 July 2018 Administrative Inspection · Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6475482
22 September 2017 Drydock Exam · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6272724
5 September 2017 Administrative Inspection · MTSA Verification · Internal Structural Exam · Deficiency Check · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6256459
10 August 2017 Examination of Repairs · Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6236194
24 January 2017 Damage Survey · Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6076868
10 November 2016 Annual Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6038870
29 January 2016 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5949763
1 December 2015 DAPI Audit · Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5779949
28 September 2015 Annual Inspection · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5730645
29 June 2012 Drydock Extension
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4361405
28 June 2012 Deficiency Check · DAPI Audit
Physical examination · USCG Southwest District (dp) · USCG Southwest District (CGD-SW) · Activity 4361169
20 July 2011 Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4088733
22 February 2011 Drydock Exam · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3949897
15 February 2011 DAPI Audit
Administrative · USCG Southwest District (dp) · USCG Southwest District (CGD-SW) · Activity 4008669
24 January 2011 Drydock Extension · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3930543
7 January 2011 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3922496
3 December 2010 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3903964
16 November 2010 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3892708
21 March 2010 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3700030
1 March 2010 Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3687695
11 January 2010 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3661897
3 January 2010 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3658042
2 January 2010 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3657849
8 December 2009 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3646037
13 May 2009 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3474407
18 February 2009 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3414693
6 January 2009 Hull Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3388645
27 December 2008 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3385366
2 December 2008 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3372403
18 September 2008 Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3323178
10 June 2008 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3233079
28 May 2008 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3220630
7 May 2008 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3201195
4 April 2008 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3177704
20 March 2008 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3168455
8 March 2008 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3160741
18 October 2007 MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3082459
7 January 2007 Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2851672
6 January 2007 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2852506
18 September 2006 Hull Examination · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2781071
27 January 2006 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2574515
28 November 2005 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2543337
21 January 2005 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2269985
23 November 2004 Annual Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2211073
2 October 2004 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2211711
29 September 2004 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2208988
30 August 2004 Drydock Extension · MTSA Verification
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2175542
23 February 2004 Administrative Inspection
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2011735
23 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1980465
10 December 2003 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1959673
4 November 2003 Annual Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1922246
6 March 2003 In-Service Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1753424
19 February 2003 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1767114
11 February 2003 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1743023
14 January 2003 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1730484
6 January 2003 Damage Survey
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1728284
18 December 2002 Administrative Inspection
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1720679
23 October 2002 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1695076
1 October 2002 Inclining Experiment
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1683247
20 August 2002 Examination of Repairs · Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1673868
24 April 2002 Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1609112
26 March 2002 Administrative Inspection
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1597919
15 November 2001 Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1395841
3 October 2001 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1073790
11 April 2001 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1062464
14 March 2001 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1467735
30 October 2000 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 69061
17 December 1999 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 150154
9 November 1999 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1440215
7 May 1999 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1128404
15 April 1999 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1369129
20 November 1998 Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 805357
30 June 1998 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 796384
17 June 1998 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 75003
17 June 1998 Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 792630
26 November 1997 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 776071
20 November 1997 Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1452344
22 April 1997 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1368189
7 March 1997 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 88147
23 November 1996 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1092326
18 November 1996 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1367990
11 November 1996 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 92194
11 November 1996 Damage Survey
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1173066
12 April 1996 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1081309
19 December 1995 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1193628
20 November 1995 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 878878
7 November 1995 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 883070
4 November 1995 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 159296
4 November 1995 Damage Survey
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1183131
12 July 1995 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 77250
12 May 1995 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1357153
11 May 1995 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 923545
17 April 1995 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1094069
17 April 1995 Hull Examination · Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1363246
21 November 1994 COI Inspection · Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1181583
2 November 1994 Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1174306
1 February 1994 Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1168953
11 January 1994 Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1160915
23 November 1993 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 844199
21 May 1993 Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1135050
21 May 1993 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1135052
20 April 1993 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1132952
26 February 1993 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1148782
23 November 1992 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 827686
13 January 1992 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1266002
20 December 1991 Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 962361
11 December 1991 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 947096
11 December 1991 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1262819
25 November 1991 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1251263
30 October 1991 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 940759
10 October 1991 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 936773
16 April 1991 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1227509
7 March 1991 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 999516
4 December 1990 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 906197
27 November 1990 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 921179
29 October 1990 Drydock Extension
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1233575
9 October 1990 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1226745
28 November 1989 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1213947
30 April 1989 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1030609
29 November 1988 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1207474
2 May 1988 Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1040765
4 February 1988 Deficiency Check · Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1019234
15 December 1987 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1311881
1 December 1987 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1308153
21 November 1987 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1337416
10 September 1987 Drydock Extension
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1003794
23 January 1987 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1315017
21 December 1986 Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1335725
10 December 1986 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1023142
3 December 1986 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1331364
13 November 1986 Deficiency Check · Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1016993
8 March 1986 Credit Drydock
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1012736
16 February 1986 Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 989487
4 February 1986 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1295150
9 December 1985 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1295919
13 August 1985 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1294308
3 May 1985 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 982760
24 December 1984 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 976445
20 December 1984 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 976653
12 December 1984 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 976055

Deficiency record · 184

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 February 2026 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel reported port main engine inoperable due to fuel oil leak. Vessel is authorized a one-time transit from Sausalito to Larkspur in accordance with submitted dead ship tow plan. Provide root cause, effect repairs, and conduct sea trials to the satisfaction of the Marine Inspector. 46 CFR 119.200(a)
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 February 2026
Resolution: Vessel identified root cause as HP fuel end cap leak and affected repairs to the satisfaction of the MI
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 September 2025 Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. A penetration on the aft watertight bulkhead of void #3 to starboard of centerline is not watertight. 46 CFR 171.114(a)(2)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2025
Resolved 26 September 2025
Resolution: Operator sent work order tracking report indicating repair completed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 2 September 2025 Resolved
In systems and applications where flexible hoses are permitted to be clamped, double hose clamping is required on each end of the hose, where practicable. Flexible hose runs feeding into port and starboard mufflers were single clamped. 46 CFR 119.410(c)(1)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2025
Resolved 26 September 2025
Resolution: Operator sent report of correction, uploaded to documents.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 2 September 2025 Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be suitably insulated where necessary to prevent injuries. Port and starboard exhaust pipes are not insulated upstream of water injection in vicinity of coupling flanges. 46 CFR 116.970
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2025
Resolved 2 October 2025
Resolution: MI received report and photos of lagging installation. Report with photos uploaded to documents.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 2 September 2025 Resolved
At each inspection... have ready for inspections... tank vents, piping, and pipe fittings. Starboard lube oil replenishment tank drain pipe was leaking at valve coupling. 46 CFR 115.804(d)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2025
Resolved 26 September 2025
Resolution: Operator sent report of correction, uploaded to documents.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 2 September 2025 Resolved
Non-conducting mats or grating shall be provided on deck in front and rear of switchboards. Non-conducting mats are not placed in front of engine room switchboards. Old T 183.10-15(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2025
Resolved 26 September 2025
Resolution: Operator sent report of correction, uploaded to documents.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 February 2025 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Vessel self reported hitting a dead head, which caused one of the starboard propeller blades to become damaged. Vessel is authorized a one time transit from Larkspur to Bay Ship Dry Dock. Complete repairs to the satisfaction of the marine inspector. 46 CFR 116.100
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 February 2025
Resolution: Witnessed blue fit of new propeller installation. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 August 2024 Resolved
The part of the exhaust system between the point of cooling water injection and the engine manifold must be water-jacketed or effectively insulated and protected in compliance with §§ 116.400(b) and 116.970 of this chapter. STBD main exhaust cooling water leaking from weld seam. Temporary repair authorized. Permanent repair to be completed at next dry dock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: MI attended vessel and verified corrections.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 August 2024 Resolved
The part of the exhaust system between the point of cooling water injection and the engine manifold must be water-jacketed or effectively insulated and protected in compliance with §§ 116.400(b) and 116.970 of this chapter. STBD main exhaust cooling water leaking from hose connection on exhaust side. Permanent repair to be completed at next dry dock.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: MI attended vessel and verified corrections.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 August 2024 Resolved
The part of the exhaust system between the point of cooling water injection and the engine manifold must be water-jacketed or effectively insulated and protected in compliance with §§ 116.400(b) and 116.970 of this chapter. Port main exhaust cooling water leaking from pipe on outboard side. Temporary repair completed, permanent repair to be completed at next dry dock.
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: MI attended vessel and verified corrections.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 August 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Multiple extension cords/power strips connected to battery back-up under bridge console.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2024
Resolved 2 September 2025
Resolution: MI attended vessel and verified corrections.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 31 May 2024 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Vessel SAN FRANCISCO reported a disengagement of the starboard gearbox and experienced a reduction of propulsion. Submit diagnostics of issues and plans for repair to the satisfaction of the marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 June 2024
Resolution: Fuel injectors and head gasket for stbd m/e replaced and sat sea trials conducted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 March 2024 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel has coolant leak on port main engine. Vessel to repair coolant leak to the satisfaction of the marine inspector. 46 CFR 119.20(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 March 2024
Resolution: Vessel completed repairs on engine w/ sea trials.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 25 April 2022 Resolved
1.) Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Vessel SAN FRANCISCO reported that port engine reduction gear lube oil cooler was found leaking internally after noticing sheen coming out of exhaust. Determine cause and make repairs as necessary. Repairs are to be completed to the satisfaction of the OCMI prior to carrying passengers. 46 CFR 119.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 April 2022
Resolution: Received call from vessel rep that engineers installed a new lube oil cooler. Received video of satisfactory testing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 February 2022 Resolved
Propulsion machinery must be suitable for propulsion requirements of the hull. Vessels engine mounted drive shaft coupling has failed. Determine cause and make repairs as necessary. Repairs and seatrial are to be completed to the satisfaction of the OCMI prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2022
Resolution: Shaft coupling replaced. Sea trial successful.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 September 2021 Resolved
All vessels shall be provided with an approved adult life preserver for each person carried on board. Vessel missing seven life preservers on aft deck.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 9 September 2021
Resolution: Missing jackets replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 September 2021 Resolved
Life preservers shall be in protected places convenient to the persons on board. Access blocked in life preserver storage space on second deck.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 9 September 2021
Resolution: Blocked storage space fixed.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 9 September 2021 Resolved
Equipment installed but not required, except as further modified in this section, where fire extinguishing systems or equipment are not required, but are installed, the system or equipment and its installation shall meet the requirements of this part. Fire door second deck port side inoperable.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2021
Resolved 23 September 2021
Resolution: Received service report for fixed fire door. Def cleared.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 28 September 2020 Resolved
Each survival craft must be secured to the vessel by a painter with a float free link so that when the vessel sinks the survival craft floats free and inflates. The hydrostatic release on all 4 of the IBA's are not properly installed and do not meet their intended purpose.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 September 2020
Resolved 30 September 2020
Resolution: Verified hydrostatic release units are properly installed on all four IBAs.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 September 2020 Resolved
The lockout valve on a fixed extinguishing system must be a manually operated valve located in the discharge manifold. When in the closed position, the valve must provide complete isolation of the system, making it impossible for carbon dioxide to discharge during maintenance. There is a bypass pipe for the isolation valve and the system is not installed in accordance with the manufacturer's instructions.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 September 2020
Resolved 30 September 2020
Resolution: Verified that the pipe was removed which bypassed the isolation valve.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 September 2020 Resolved
Each vessel must be provided with a visual and audible alarm at the operating station to indicate a high water level in each of the following unmanned spaces: a machinery space bilge. Vessel was unable to produce an audible alarm for any of the high water level alarms installed.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 September 2020
Resolved 30 September 2020
Resolution: Witnessed satisfactory test of vessel's high water level alarm.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 September 2020 Resolved
Complete but simple instructions for the operation of a fixed extinguishing system must be located in a conspicuous place near each pull box and in the space where the cylinders are stored. The instructions must also contain a schematic diagram of the instructions detailing alternate methods of releasing the extinguishing agent should the local controls fail to operate. The fixed CO2 system installed in the machienry space does not have a schematic diagram posted.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2020
Resolved 4 November 2020
Resolution: Received pictures via email of updated alarm placard with simple instructions for activation.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 September 2020 Resolved
An alarm for a fixed gas fire extinguishing system must be clearly and conspicuously marker "WHEN ALARM SOUNDS-VACATE AT ONCE. CARBON DIOXIDE IS BEING RELEASED." A warning placard is not posted in the machinery space of the vessel.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2020
Resolved 9 October 2020
Resolution: Received picture via email of required alarm placard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 September 2019 Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment under all practicable conditions. The individual suction valves on the piping for the bilge manifold system are labeled as "fill" rather than "suction." Relabel valves to reflect accurate function. 46CFR119.500
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2019
Resolved 16 July 2020
Resolution: Verified corrected deficiency through photo documentation sent in by the operator.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 September 2019 Resolved
Each ring life buoy must be approved in accordance with 160.050 in subchapter Q. The vessel's port side sun deck lifebuoy was missing retro reflective tape. Replace retroflective tabe IAW 160.050. 46CFR117.70(b)(1)
Action required: 10 - Deficiency Rectified
Due 17 September 2019
Resolved 18 September 2019
Resolution: Corrected on the spot.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 March 2019 Resolved
Pentrations in A-Class fire control boundaries for electrical cables must be constructed to prevent the passage of flame and smoke for one hour. Cable transits on forward and aft bulkheads of fuel void are open and missing structural fire protection. Install proper fire protection to maintain boundaries. 46 CFR 116.415(a)(2)(ii)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 April 2019
Resolved 15 May 2019
Resolution: Received photo for installed SFP in fuel void bulkheads.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 23 November 2018 Resolved
Machinery must be installed and maintained in such a manner as to afford adequate protection against machinery failure. Throttles failed resulting in allision with pier. Troubleshoot and repair throttle failure. 46 CFR 182.01-5
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 December 2018
Resolution: Code revised from 60 to 701 due to lack of proof of any faiulre to onboard equipment. 835V to be clear upon reicept of tech reports. Conducted sat DVTP tests.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 23 November 2018 Resolved
Arrangement of each vessel are such as to provide safe operation with special consideration given to the provision of a seaworhty hull. Hole in Forepeak of vessel caused by allision. Provide repair proposal and repair damaged areas of bow.46 CFR 177.01-5
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 December 2018
Resolution: Code revised from 60 to 705 due to limited transit needed to repair facility. Final repairs witnessed by Sector SF MI.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 14 September 2018 Resolved
IMO: Vsl is broadcasting invalid IMO #, NAME: Vsl is broadcasting NAME with Vsl type precursor (NAME must not include Vsl type precursors, e.g. F/V, M/V), ZERO DRAFT: no static draft information
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 19 November 2020
Resolution: Draft and vessel name errors corrected; IMO number still incorrectly entered.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2018 Resolved
The installation of fuel lines must comply with the following: Shutoff valves installed so as to close against the fuel flow must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. The two fuel shutoff valves at the tank which service both generators are not fitted to be manually operable from outside the compartment.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 August 2018
Resolved 14 September 2018
Resolution: Witnessed proper operation of new valves.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 13 August 2018 Resolved
A weathertight door must be provided for each opening located in a deck house or companionway. Both aft doors on the second deck have worn-down gaskets, making them no longer weathertight. 46 CFR 116.1160(d)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 September 2018
Resolved 3 October 2018
Resolution: New weathertight gaskets were installed.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 18 September 2017 Resolved
Review and revise DVTP/PSTP to accurately reflect vessel configuration. 46CFR121.620d
Action required: 705 - Other - as specified
Due 18 October 2017
Resolved 31 October 2017
Resolution: Reviewed DVTP.
Construction/Loadline › Structures › Door
Issued 18 September 2017 Resolved
Prove proper operation of fire screen doors upon loss of power. Vessel shall have (2) additional deckhands until corrected. 46CFR116.435c6
Due 18 September 2017
Resolved 1 November 2017
Resolution: Observed closure of fire screen doors upon loss of power.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 18 September 2017 Resolved
Label ring buoy on sun deck with vessel name. 46CFR122.604
Due 2 October 2017
Resolved 31 October 2017
Resolution: Observed proper labelling of ring buoy.
Engineering › Bilge Water Management System › Not Operational
Issued 18 September 2017 Resolved
Prove proper operation of suction from fuel void. Vessel shall have written plan with alternate means for pumping fuel void until deficiency is cleared. 46CFR119.510
Due 18 September 2017
Resolved 1 November 2017
Resolution: Witnessed bilge suction from fuel void.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 18 September 2017 Resolved
Replace emergency light on main deck by cash register. 46CFR120.432
Due 2 October 2017
Resolved 31 October 2017
Resolution: Observed new emergency light.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 10 August 2017 Resolved
Prove proper operation of propulsion system following repairs of damage caused by strike of underwater object.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2017
Resolution: Sat dock trials following repairs.
Construction/Loadline › Structures › Door
Issued 24 January 2017 Resolved
Replace stbd foward main deck sliding door.
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 14 August 2018
Resolution: New door was installed satisfactorily.
Documentation › Logs/Records › Drug Test Records
Issued 28 June 2012 Resolved
Documentation of pre-employment testing not kept for entire employment period as required by 46 CFR 16.260 for casual/union employees.
Due 28 July 2012
Resolved 16 November 2012
Resolution: Negotiated agreement between union (ILWU) and Golden Gate Bridge Highway & Transportation District completed and copy sent to D11 DAPI.
Documentation › Logs/Records › Drug Test Records
Issued 28 June 2012 Resolved
All required personnel are not in the random drug testing pool as required by 46 CFR 16.230. No documentation of random testing for casual/union employees available.
Due 28 July 2012
Resolved 16 November 2012
Resolution: Negotiated agreement between union (ILWU) and Golden Gate Bridge Highway & Transportation District completed and copy sent to D11 DAPI.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 22 February 2011 Resolved
Replace port propeller at next drydock, no later than 31 MAR 2012.
Action required: 705 - Other - as specified
Due 10 March 2012
Resolved 19 October 2012
Resolution: Completed satisfactory Dry Dock Exam.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 22 February 2011 Resolved
Provide for visual inspection of stbd shaft at propeller coupling/taper at next drydock, no later than 31 MAR 2012.
Action required: 705 - Other - as specified
Due 10 March 2012
Resolved 19 October 2012
Resolution: Completed satisfactory Dry Dock Exam.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 7 January 2011 Resolved
Prove proper operation of AFT generator shutdown IAW 46 CFR 118.410(b)(10).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 January 2011
Resolution: Observed satisfactory operation of aft generator shutdown.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 7 January 2011 Resolved
Prove proper operation of port E/R exhaust fan shut down IAW 46 CFR 118.410(b)10).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 January 2011
Resolution: Observed satisfactory operation of port E/R exhaust fan shut down.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 7 January 2011 Resolved
Prove proper operation of main deck port side exit door and stbd side sun deck ext door IAW 46 CFR 116.435.
Due 31 January 2011
Resolved 24 January 2011
Resolution: Observed satisfactory operation of main deck port side exit door and stbd side sun deck ext door.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 7 January 2011 Resolved
Repair/Renew P+S hydraulic control box latches for aft pax access door.
Due 31 January 2011
Resolved 24 January 2011
Resolution: Observed satisfactory operation of P&S hydraulic control box latches for aft pax access door.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 7 January 2011 Resolved
Renew welding cables on batteries with marine grade cables.
Action required: 705 - Other - as specified
Due 31 January 2011
Resolved 28 March 2011
Resolution: Vessel replaced non-marine grade cable with proper marine grade cable.
Lifesaving › Inflatable Buoyant Apparatus › Stowage
Issued 1 March 2010 Resolved
Make adjustments to the stowage arrangements of all IBAs on board to comply with manufacturer recommendations and to ensure float free arrangement is made.
Action required: 705 - Other - as specified
Due 5 March 2010
Resolved 12 May 2010
Resolution: Corrected length of bowsing lines by adding an additional 90ft in length, removed improper float free links from bowsing lines, w/only 1 bowsing line attached using mfr approved string type weak link.
Electrical › Lighting (service) › Conductor
Issued 8 December 2009 Resolved
Permanently wire in both port and starboard reduction gear lights.
Action required: 705 - Other - as specified
Due 8 January 2010
Resolved 13 January 2010
Electrical › Lighting (emergency) › Lighting Fixture
Issued 8 December 2009 Resolved
Prove proper operation of emergency exit light in 3rd deck foyer space.
Action required: 705 - Other - as specified
Due 8 January 2010
Resolved 13 January 2010
Electrical › Electrical Distribution System (service) › Switchboard
Issued 8 December 2009 Resolved
Provide proper safety cap for for pilothouse switchboard connection.
Action required: 705 - Other - as specified
Due 8 January 2010
Resolved 13 January 2010
Electrical › Electrical Distribution System (service) › Switchboard
Issued 8 December 2009 Resolved
Provide proper blank to cover missing breaker opening on main switchboard.
Action required: 705 - Other - as specified
Due 8 January 2010
Resolved 13 January 2010
Electrical › Lighting (service) › Lighting Fixture
Issued 8 December 2009 Resolved
Provide proper operation of light, starboard side aft ladder on third deck.
Action required: 705 - Other - as specified
Due 8 January 2010
Resolved 13 January 2010
Engineering › Bilge Water Management System › Piping
Issued 20 February 2009 Resolved
Make repairs to ballast tank # 3 bilge suction piping (chaffed through and sucking air).
Action required: 705 - Other - as specified
Due 20 March 2009
Resolved 20 February 2009
Lifesaving › Inflatable Buoyant Apparatus › Stowage
Issued 18 February 2009 Resolved
Propose replacement IBA release mechanisms for all four (4) 100-person IBA's, with corrosion resistant marine grade components.
Action required: 705 - Other - as specified
Due 20 March 2009
Resolved 20 March 2009
Engineering › Diesel Engine (propulsion-reduction gear) › Gear/Clutch Starter (hydraulic)
Issued 7 January 2007 Resolved
Prove proper operation of port side main engine to the satisfaction of the attending Marine Inspector. Vessel is restricted from carrying passengers for hire.
Action required: 705 - Other - as specified
Due 14 January 2007
Resolved 9 January 2007
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 18 September 2006 Resolved
Replace/repair port and starboard bearing retainer cover plates.
Action required: 705 - Other - as specified
Due 18 October 2006
Resolved 22 September 2006
Engineering › Shafting/Propeller Arrangements › Strut
Issued 18 September 2006 Resolved
Repair deteriorated areas in way of port and starboard strut arms.
Action required: 705 - Other - as specified
Due 18 October 2006
Resolved 22 September 2006
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 18 September 2006 Resolved
Make repairs to damaged areas on the port and starboard propellers.
Action required: 705 - Other - as specified
Due 18 October 2006
Resolved 22 September 2006
Construction/Loadline › Hull › Hull Plating
Issued 18 September 2006 Resolved
Provide ultrasonic testing results for hull gauging.
Action required: 705 - Other - as specified
Due 18 October 2006
Resolved 22 September 2006
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 18 September 2006 Resolved
Provide megohmmeter testing results for port and starboard shafts.
Action required: 705 - Other - as specified
Due 18 October 2006
Resolved 22 September 2006
Construction/Loadline › Penetrations › Weld
Issued 18 September 2006 Resolved
Make repairs to cracked welds: port aft quarter chock, port bow main deck chock, starboard bow main deck chock, and port bow main deck railing/gunwale (all stanchions and support post).
Action required: 705 - Other - as specified
Due 18 October 2006
Resolved 14 November 2006
Construction/Loadline › Penetrations › Gasket
Issued 18 September 2006 Resolved
Clean gasket track and replace worn gaskets for port and starboard port light windows.
Action required: 705 - Other - as specified
Due 18 October 2006
Resolved 14 November 2006
Stability › Watertight Integrity › Deadlight Cover
Issued 18 September 2006 Resolved
Replace/repair broken dog on starboard port light window.
Action required: 705 - Other - as specified
Due 18 October 2006
Resolved 14 November 2006
Accommodation/Occupational Safety › Ventilation › General
Issued 18 September 2006 Resolved
Make all internal voids and compartments available for inspection; all areas must be certified gas free by a Marine Chemist.
Action required: 705 - Other - as specified
Due 20 September 2006
Resolved 20 September 2006
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 18 September 2006 Resolved
Make permanent repairs to the starboard sewage pump discharge piping.
Action required: 705 - Other - as specified
Due 18 October 2006
Resolved 14 November 2006
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 23 November 2004 Resolved
Replace 3 electrical outlet covers in way of Sun Deck seating area. One is on the starboard side aft, two are amidships on portside and starboard sides of seating area.
Action required: 705 - Other - as specified
Due 23 December 2004
Resolved 7 February 2005
Electrical › Electrical Distribution System (service) › Cable
Issued 23 November 2004 Resolved
Replace frayed electrical cable between battery charger & batteries in way of starboard side engine room.
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 December 2004
Resolved 7 February 2005
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 23 November 2004 Resolved
Affix Life Jacket placard in way of bow, starboard side storage area.
Action required: 705 - Other - as specified
Due 23 December 2004
Resolved 7 February 2005
Lifesaving › Inflatable Buoyant Apparatus › Stowage
Issued 23 November 2004 Resolved
Renew broken aluminum chafing gear in way of aft, starboard IBA.
Action required: 705 - Other - as specified
Due 23 December 2004
Resolved 7 February 2005
Electrical › Lighting (service) › Lighting Fixture
Issued 23 November 2004 Resolved
Install fluorescent light fixture cover in way of starboard side over main diesel engine, outboard, aft of engine room.
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 December 2004
Resolved 7 February 2005
Construction/Loadline › Penetrations › Valve Flange
Issued 23 November 2004 Resolved
Install isolation washers on top flange bolts for sewage tank vent check valve, issued during drydock inspection.
Action required: 705 - Other - as specified
Due 23 November 2004
Resolved 23 November 2004
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 23 November 2004 Resolved
Renew port side waterlight battery due to no expiration date.
Due 23 November 2004
Resolved 23 November 2004
Construction/Loadline › Hull › Side Shell
Issued 10 November 2004 Resolved
Clad weld isolated pitting in port side shell in fuel tank wing void identified between frames 46-47 and 48-49.
Due 16 November 2004
Resolved 17 November 2004
Deck/Cargo › Ballast › Tank
Issued 10 November 2004 Resolved
Clean calcium deposits from surface of zincs in #1 Ballast tank.
Due 16 November 2004
Resolved 17 November 2004
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 10 November 2004 Resolved
Draw stbd shaft for inspection and provide a report of condition and repair proposal due to significant pitting.
Due 16 November 2004
Resolved 17 November 2004
Resolution: Shaft was renewed with refurbished Aquamet 19 shaft.
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 10 November 2004 Resolved
Install isolation washers on bolts for sewage tank vent check valve.
Due 16 November 2004
Resolved 11 February 2005
Construction/Loadline › Hull › Weld
Issued 9 November 2004 Resolved
Grind out and re-weld cracked weld of aft port quarter chock on upper deck.
Due 16 November 2004
Resolved 17 November 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 9 November 2004 Resolved
Repair following cracked weld in #2 Ballast tank: cracked weld in overhead at FR 22 on the centerline stbd side, cracked weld in overhead at FR 23 outboard aft side of transverse frame, between FR 16-17 stbd side re-weld noncontinuous longitudinal seam in side shell.
Due 16 November 2004
Resolved 17 November 2004
Construction/Loadline › Hull › Side Shell
Issued 9 November 2004 Resolved
Provide gauging report for identified pitting on port and stbd bow.
Due 16 November 2004
Resolved 17 November 2004
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 9 November 2004 Resolved
Pump out and clean oily bilges in engine room/lazarette.
Due 16 November 2004
Resolved 23 November 2004
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 2 September 2004 Resolved
Make repairs to sewage system vent valve in #4 starboard void.
Action required: 705 - Other - as specified
Due 10 September 2004
Resolved 2 October 2004
Engineering › Steering Gear System › Rudder
Issued 2 September 2004 Resolved
Provide repair proposal to make repairs to rudder stops.
Action required: 705 - Other - as specified
Due 30 November 2004
Resolved 23 November 2004
Operations/Management › Pollution › Retention of Oily Mixture
Issued 30 August 2004 Resolved
Clean oil and water from engine room bilges and make engine room available for inspection.
Action required: 705 - Other - as specified
Due 2 September 2004
Resolved 2 September 2004
Construction/Loadline › Hull › Weld
Issued 30 August 2004 Resolved
Repair small fractures in overhead deck long welds in the #2 ballast tank. This deficiency must be corrected at next drydock.
Due 30 November 2004
Resolved 17 November 2004
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 30 August 2004 Resolved
Renew wasted plumbing below the deck drains positioned underneath the male and female heads, located in the #2 voids. This deficiency must be corrected at next drydock.
Due 30 November 2004
Resolved 7 February 2005
Construction/Loadline › Structures › Deck Plating
Issued 30 August 2004 Resolved
Repair 1/2" holes in overhead between frames 1 & 3 in #3 void. This deficiency must be corrected at next drydock.
Due 30 November 2004
Resolved 17 November 2004
Electrical › Electrical Distribution System (service) › Wiring
Issued 10 December 2003 Resolved
Properly secure wiring for faintail talk back system.
Action required: 705 - Other - as specified
Due 12 December 2003
Resolved 26 February 2004
Electrical › Electrical Distribution System (service)
Issued 4 November 2003 Resolved
Remove and cap dead-end cable located on port side aft main weather deck, out board side of door. LEGACY COMPONENT DESC: Cable
Action required: 705 - Other - as specified
Due 4 December 2003
Resolved 26 February 2004
Electrical › Electrical Distribution System (service)
Issued 4 November 2003 Resolved
Replace or provide cover for 110 Volt receptacle located on forward bulkhead outside of main deck passenger cabin. LEGACY COMPONENT DESC: Outlet Box
Action required: 705 - Other - as specified
Due 4 December 2003
Resolved 10 December 2003
Electrical › Electrical Distribution System (service)
Issued 4 November 2003 Resolved
Provide cover for blank circuit breaker in electrical distribution panel labeled, "Feeder Distribution Panel 2 PM", located in pilot house. LEGACY COMPONENT DESC: Circuit Breaker
Action required: 705 - Other - as specified
Due 4 December 2003
Resolved 10 December 2003
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 4 November 2003 Resolved
Provide a general description of training per 46 CFR 122.420 (c) (2).
Action required: 705 - Other - as specified
Due 4 December 2003
Resolved 4 November 2003
Lifesaving › Lifejacket/PFD (Type III)
Issued 4 November 2003 Resolved
Provide retroreflective material for 3 PFD's on upper deck. LEGACY COMPONENT DESC: Retroreflective Material
Action required: 705 - Other - as specified
Due 4 December 2003
Resolved 4 November 2003
Fire Fighting › Combustible Materials
Issued 4 November 2003 Resolved
Remove and properly store all combustible materials, such as Brasso, from hydraulic control boxes located in main passenger cabin. LEGACY COMPONENT DESC: Paints/Varnishes/Other Finishes
Action required: 705 - Other - as specified
Due 4 November 2003
Resolved 4 November 2003
Lifesaving › Visual Distress Signals (General)
Issued 4 November 2003 Resolved
Make visual distress signal storage container brightly colored. LEGACY COMPONENT DESC: Storage
Action required: 705 - Other - as specified
Due 4 November 2003
Resolved 4 November 2003
Construction/Loadline › Hull
Issued 6 January 2003 Resolved
Vessel may not operate with passengers until internal structural hull exam completed by USCG Marine Inspector. LEGACY COMPONENT DESC: Bottom Plating
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 January 2003
Resolved 9 January 2003
Resolution: Hull-ISE conducted Sat.
Stability
Issued 18 December 2002 Resolved
If by 15 January 2003 a copy of a current and approved stability letter is not provided, the above vessels shall be restricted to not more than 49 passengers until this requirement is met.
Action required: 705 - Other - as specified
Due 15 January 2003
Resolved 14 January 2003
Electrical
Issued 31 October 2002 Resolved
Two dead-end wires in #1 Void near forward bulkhead. One dead end-wire leads from the tranducer, the other supplies the transducer. LEGACY COMPONENT DESC: Dead-end wires to Fathometer
Condition: Unknown
Due 31 October 2002
Resolved 31 October 2002
Resolution: Corrected during inspection.
Deck/Cargo
Issued 31 October 2002 Resolved
Port portal in forepeak missing a nut for fastening portal window LEGACY COMPONENT DESC: Forepeak port portal
Condition: Unknown
Due 31 October 2002
Resolved 31 October 2002
Resolution: Corrected during inspection.
Deck/Cargo
Issued 31 October 2002 Resolved
Drainpipe located behind shelf port side of forepeak is missing screen or plug. LEGACY COMPONENT DESC: Forepeak drainpipe
Condition: Unknown
Due 31 October 2002
Resolved 31 October 2002
Resolution: Corrected during inspection.
Electrical
Issued 31 October 2002 Resolved
Microwave oven in forepeak daisy-chained with a 3' extension cord to receptacle. LEGACY COMPONENT DESC: Microwave oven extension cord
Due 31 October 2002
Resolved 31 October 2002
Resolution: Extension cord was removed and the microwave oven was moved closer to the receptacle during the inspection.
Deck/Cargo
Issued 31 October 2002 Resolved
Port Ramp Control Box has a rag and 2 cans of flammable Brasso. LEGACY COMPONENT DESC: Port Ramp Control Box
Due 31 October 2002
Resolved 31 October 2002
Resolution: Brasso and rag removed during inspection.
Navigation › Piloting/Steering
Issued 31 October 2002 Resolved
Port rudder leaking excessively due to loose or un-tightened packing gland around rudder post. LEGACY COMPONENT DESC: Port rudder
Condition: Unknown
Due 31 October 2002
Resolved 31 October 2002
Resolution: Corrected during inspection.
Lifesaving › Lifejacket/PFD (General)
Issued 31 October 2002 Resolved
Retro-reflective tape on 9 PFDs on bow, and 2 PFDs on 3rd deck or sun deck are worn and need to be replaced. LEGACY COMPONENT DESC: Retro-reflective Material
Condition: Unknown
Due 31 October 2002
Resolved 31 October 2002
Resolution: Corrected during inspection.
Fire Fighting › Fire Hoses
Issued 31 October 2002 Resolved
Two hoses on sun deck, 1 1/2 " each, are worn and need to be replaced with as-new hoses. LEGACY COMPONENT DESC: Condition
Due 31 October 2002
Resolved 31 October 2002
Resolution: Corrected during inspection.
Deck/Cargo
Issued 23 October 2002 Resolved
Cleaning locker/closet, 2nd deck, men's head has 10 cans of flammable Brasso in milkcrate. LEGACY COMPONENT DESC: Cleaning Locker/closet
Due 31 October 2002
Resolved 31 October 2002
Resolution: Brasso was removed during the inspection.
Lifesaving › Buoyant Apparatus
Issued 26 March 2002 Resolved
Make the access panels for each inflatabe buoyant apparatus (IBA) capable of being removed locally by the crew members so each IBA can be manually released IAW 46 CFR 117.130(a)(4).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 26 April 2002
Resolved 11 February 2003
Resolution: Recieved digital images of access panels. Panels secured with wing nuts, to facilitate removal by crew members.
Lifesaving › Buoyant Apparatus
Issued 26 March 2002 Resolved
Install hydrostatic release mechanism on the IBA's correctly. They are currently appear to be installed backwards.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 26 April 2002
Resolved 26 March 2002
Resolution: Hydrostatic releases were actually installed correctly.
Documentation
Issued 26 March 2002 Resolved
Submit plans for the installation of the vessel's new IBA's.
Action required: 705 - Other - as specified
Due 26 April 2002
Resolved 11 February 2003
Resolution: Plans received and approved by [name withheld].
Construction/Loadline
Issued 14 March 2001 Resolved
Make number one water ballast tank available for internal structural exam.
Condition: Unknown
Due 14 March 2001
Resolved 14 March 2001
Construction/Loadline
Issued 14 March 2001 Resolved
Provide hull gauging report or evidence of recent gauging report to marine inspector for review prior to departing drydock.
Condition: Unknown
Due 15 April 2001
Resolved 21 March 2001
Construction/Loadline
Issued 15 April 1999 Resolved
Make #1 forward water ballest tank available for internal inspection.
Condition: Unknown
Due 15 April 1999
Resolved 15 April 1999
Electrical
Issued 17 June 1998 Resolved
REPLACE REPAIRED WIRE WITH NEW FOR PERMANENT REPAIR
Condition: Unknown
Due 17 June 1998
Resolved 17 June 1998
Fire Fighting
Issued 20 November 1997 Resolved
STENCIL VESSEL NAME ON FIRE HOSES.
Condition: Unknown
Due 20 November 1997
Resolved 20 November 1997
Engineering
Issued 20 November 1997 Resolved
REPAIR LEAK ON PORT SHAFT COOLING WATER SUPPLY LINE.
Condition: Unknown
Due 20 November 1997
Resolved 20 November 1997
Fire Fighting
Issued 20 November 1997 Resolved
ROTATE VALVES AT FIRE HOSE STATIONS #1 AND #4 TO THE HORIZONTAL OR LOWER POSITION.
Condition: Unknown
Due 20 November 1997
Resolved 20 November 1997
Construction/Loadline
Issued 22 April 1997 Resolved
PRESENT NUMBER 1 BALLAST TANK FOR INSPECTION TO THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 23 May 1997
Resolved 23 May 1997
Construction/Loadline
Issued 18 November 1996 Resolved
REMOVE OIL FROM E/R BILGES.
Condition: Unknown
Due 15 December 1996
Resolved 16 December 1996
Unknown
Issued 18 November 1996 Resolved
PROVIDE FUEL TANK AND SPACES AFT FOR INSPECTION AND TESTING OF BILGE SUCTIONS.
Condition: Unknown
Due 23 November 1996
Resolved 13 December 1996
Unknown
Issued 18 November 1996 Resolved
COMPLETE REMAINDER OF INSPECTION ITEMS FOR COI CREDIT.
Condition: Unknown
Due 23 November 1996
Resolved 13 December 1996
Unknown
Issued 18 November 1996 Resolved
CONDUCT UNDERWAY TEST OF RUDDERS, ENGINES, AND MAN OVERBOARD DRILL.
Condition: Unknown
Due 23 November 1996
Resolved 13 December 1996
Lifesaving
Issued 18 November 1996 Resolved
REPLACE ALL B/A WEAKLINKS WITH "21 AND OVER" SIZED WEAKLINKS.
Condition: Unknown
Due 15 December 1996
Resolved 13 December 1996
Lifesaving
Issued 18 November 1996 Resolved
REPLACE LIFEJACKET PLACARDS FOR CHILD STOWAGE ON AFT UPPER DECK WITH "16 CHILD" FOR BOTH PORT & STBD PLACARDS.
Condition: Unknown
Due 15 December 1996
Resolved 16 December 1996
Engineering
Issued 11 November 1996 Resolved
CONDUCT OPERATIONAL AND UNDERWAY TEST OF PORT ENGINE.
Condition: Unknown
Due 18 November 1996
Resolved 14 November 1996
Construction/Loadline
Issued 20 November 1995 Resolved
SEWAGE THRU-HULL VENT FITTING IN STARBOARD AFT WING TANK WAS WASTED AROUND THE THREADS TO ITS PIPING, ALLOWING DAYLIGHT TO BE SEEN FROM OUTSIDE THE HULL.
Condition: Unknown
Due 20 December 1995
Resolved 19 December 1995
Construction/Loadline
Issued 4 November 1995 Resolved
CLEAN ENGINEROOM BILGES.
Condition: Unknown
Due 4 December 1995
Resolved 9 November 1995
Accommodation/Occupational Safety
Issued 4 November 1995 Resolved
REPAIR DAMAGE TO PORT FANTAIL RAILING (PRIOR TO CARRYING PASSENGERS).
Condition: Unknown
Due 4 December 1995
Resolved 9 November 1995
Engineering
Issued 4 November 1995 Resolved
MAKE REPAIRS TO PORT MAIN DIESEL ENGINE AND PROVE PROPER OPERATION DURING UNDERWAY TEST PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 4 December 1995
Resolved 9 November 1995
Fire Fighting
Issued 4 November 1995 Resolved
SERVICE AND PROVIDE SERVICING REPORT FOR INSTALLED ENGINEROOM HALON SYSTEM.(PRIOR TO CARRYING PASSENGERS).
Condition: Unknown
Due 4 December 1995
Resolved 9 November 1995
Construction/Loadline
Issued 17 April 1995 Resolved
FOR PIPING IN OVHD PORT SIDE (3) IN WELD 1 1/2' TO STBD OF PORT LONG ON FWDSIDE OF 3RD TRANSVERSE OVHD DECK BEAM FROM AFT. (4) JOINTS BTWN STBD DECK LONG AND 3RD/4TH TRANSVERSE OVHD DECK BEAMS FROM AFT. AFT WING (PORT): W/IN TUNNEL AREA BTWN P/S AFT WING TANKS, FWD BHD BY PROBE ON OVHD DECK
Condition: Unknown
Due 17 May 1995
Resolved 16 May 1995
Construction/Loadline
Issued 17 April 1995 Resolved
WELD PIPE BRACKET TO 3RD FRAME AFT IN AFT STBD WING TANK.
Condition: Unknown
Due 17 May 1995
Resolved 16 May 1995
Accommodation/Occupational Safety
Issued 17 April 1995 Resolved
REMOVE DUCT TAPE FROM ALL PIPES IN AFT STBD WING TANK (11+ PIPES; THIS WAS ALSO CITED IN NOV '94).
Condition: Unknown
Due 17 May 1995
Resolved 16 May 1995
Engineering
Issued 17 April 1995 Resolved
COMPLETE 20 PSI HYDRO TEST ON NEW S/W COOLING PIPING (FROM SEACHEST VALVES TO PROPULSION ENGINES AND AUXILLARIES).
Condition: Unknown
Due 17 May 1995
Resolved 16 May 1995
Construction/Loadline
Issued 17 April 1995 Resolved
REPAIR HAIRLINE CRACKS IN FOLLOWING AREAS: #2 BALLAST: STBD SIDE @ WELDS ONWELDER ACCESS HOLES OVHD JOINT BTWN AFTMOST/4TH FRAMES FROM AFT AND DECK LONG. #1 VOID: (1) STBD SIDE @ WELDS ON WELDER'S ACCESS HOLES OVHD JOINT BTWN AFTMOST/5TH FRAMES FROM AFT & DECK LONG. (2) TOP OF AFTMOST SUPPORT
Condition: Unknown
Due 17 May 1995
Resolved 16 May 1995
Construction/Loadline
Issued 17 April 1995 Resolved
JOINT AND SAME AREA ONE FRAME TO PORT.
Condition: Unknown
Due 17 May 1995
Resolved 16 May 1995
Construction/Loadline
Issued 17 April 1995 Resolved
FILL IN MISSING WELDS IN #2 BALLAST: BTWN 3RD/4TH FRAMES FROM AFT, PORT SIDE AND #1 VOID: BTWN 3RD/4TH FRAMES FROM AFT, PORT SIDESHELL TO DECK JOINT.
Condition: Unknown
Due 17 May 1995
Resolved 16 May 1995
Construction/Loadline
Issued 17 April 1995 Resolved
MAKE #1 BALLAST TANK AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 17 May 1995
Resolved 16 May 1995
Accommodation/Occupational Safety
Issued 17 April 1995 Resolved
BLANK OFF SECTION OF SINK DRAINAGE SYSTEM PIPING WITHIN THE AFT PORT WING TANK. PIPING IS NO LONGER IN USE.
Condition: Unknown
Due 17 May 1995
Resolved 16 May 1995
Engineering
Issued 17 April 1995 Resolved
PERFORM PRESSURE TEST ON FUEL TANK IN THE PRESENCE OF A USCG MARINE INSPECTOR. THE TANK SHALL BE FILLED TO NORMAL OPERATING CAPACITY.
Condition: Unknown
Due 1 June 1995
Resolved 31 May 1995
Lifesaving
Issued 21 November 1994 Resolved
REPLACE FOUR ORANGE SMOKES WHICH EXPIRE 12/94. TWO REMAINING ORANGE SMOKESTO BE REPLACED BY 1/95.
Condition: Unknown
Due 21 December 1994
Resolved 5 December 1994
Construction/Loadline
Issued 21 November 1994 Resolved
CAP OFF OLD OPENING FOR WAVE GUIDE PORT SIDE OF FALSE STACK WITH A WEATHER TIGHT CAP.
Condition: Unknown
Due 21 December 1994
Resolved 5 December 1994
Lifesaving
Issued 11 December 1991 Resolved
PROVIDE MEANS OF BETTER MANEUVERABILITY BY PERSON TETHERED FOR MAN O/B RECOVERY. SUBMIT PLANS FOR THIS SYSTEM TO [name withheld]. STRAIGHT LADDER TO WATER LINES IN NOT SUFFICIENT.
Condition: Unknown
Due 11 December 1991
Resolved 11 December 1991
Lifesaving
Issued 25 November 1991 Resolved
PROVIDE MEANS OF BETTER MANEUVERABILITY FOR PERSON ON LADDER FOR RESCUE PLATFORM._x001C_ _x001C_ REISSUED 11DEC91. See MI91042955._x001C_
Condition: Unknown
Due 2 January 1992
Resolved 2 January 1992
Engineering
Issued 25 November 1991 Resolved
OPEN PRESSURE VESSELS FOR INSPECTION._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 January 1992
Resolved 2 January 1992
Navigation
Issued 25 November 1991 Resolved
PROVIDE CURRENT COMPASS DEVIATION CARD._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 January 1992
Resolved 2 January 1992
Construction/Loadline
Issued 25 November 1991 Resolved
REPAIR CRACKS IN TOES OF WELDS #1 VOID._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 December 1991
Resolved 17 December 1991
Engineering
Issued 25 November 1991 Resolved
PROVE PROPER OPERATION OF HIGHWATER TEMP SHUTDOWNS FOR M/E._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 December 1991
Resolved 17 December 1991
Lifesaving
Issued 25 November 1991 Resolved
REPLACE PARAMETER LINE RING BUOY_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 January 1992
Resolved 2 January 1992
Engineering
Issued 25 November 1991 Resolved
PROVE HIGH SPEED SHUTDOWN STBD MAIN ENGINE_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 January 1992
Resolved 2 January 1992
Construction/Loadline
Issued 10 October 1991 Resolved
REMOVE WATER FROM FRESH WATER BALLAST TANK TO ALLOW A MARINE INSPECTOR TO CHECK FOR EXCESSIVE PITTING.
Condition: Unknown
Due 30 October 1991
Resolved 12 December 1991
Construction/Loadline
Issued 10 October 1991 Resolved
REPAIR CRACKS ON 4TH, 5TH, 6TH, 7TH, AND 8TH TRANSVERSAL IN WAY OF STBD LONGITUDINAL AND 2NE, 4TH, AND 7TH TRANSVERSAL IN WAY OF PROT LONGITUDINAL.
Condition: Unknown
Due 12 December 1991
Resolved 2 January 1992
Construction/Loadline
Issued 10 October 1991 Resolved
INSURE PROPER OPPERATION OF REACH ROD FOR BILGE SYSTEM IN FIRST COMPARTMENT.
Condition: Unknown
Due 30 October 1991
Resolved 12 December 1991
Accommodation/Occupational Safety
Issued 10 October 1991 Resolved
REPAIR MSD OVERBOARD DISCHARGE PIPING-REMOVE SOFT PATCHES.
Condition: Unknown
Due 30 October 1991
Resolved 12 December 1991
Lifesaving
Issued 27 November 1990 Resolved
REPLACE RETRO-REFLECTIVE TAPE AS NECESSARY ON LIFE VESTS.
Condition: Unknown
Due 27 November 1990
Resolved 27 November 1990
Engineering
Issued 27 November 1990 Resolved
PROVE THE PROPER OPERATION OF THE TEMPERATURE OVERHEAT SENSORS ON BOTH MAINENGINES AND GENERATOR DIESELS.
Condition: Unknown
Due 27 November 1990
Resolved 27 November 1990
Fire Fighting
Issued 27 November 1990 Resolved
PROVIDE SERVICING REPORT FOR PORTABLE FIRE ENTINGUISHERS.
Condition: Unknown
Due 27 November 1990
Resolved 27 November 1990
Deck/Cargo
Issued 4 February 1988 Resolved
PROVIDE LENGTTH OF GROUND TACKLE LINE.
Condition: Unknown
Due 4 February 1988
Resolved 4 February 1988
Construction/Loadline
Issued 4 February 1988 Resolved
MAKE #1 BALLAST TANK AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 4 February 1988
Resolved 4 February 1988
Lifesaving
Issued 15 December 1987 Resolved
SECURE BUOYANT APPARATUS IN SUCH A WAY THAT THEY WILL RELEASE UNASSISTED IN THE EVENT OF VESSEL SINKING ON M/V SONOMA, M/V MARIN, AND M/V SAN FRANCISCO.
Condition: Unknown
Due 15 December 1987
Resolved 15 December 1987
Fire Fighting
Issued 1 December 1987 Resolved
REPAIR/RENEW DISCHARGE PRESSURE GAGE ON FIRE PUMP
Condition: Unknown
Due 1 December 1987
Resolved 1 December 1987
Engineering
Issued 1 December 1987 Resolved
PROVE PROPER OPERATION OF LOW LUBE OIL ALARM AND TRIP ON PORT AND STBD MAINDIESEL ENGINES AND #1 AND #2 SHIP SERVICE DIESEL GENERATORS
Condition: Unknown
Due 1 December 1987
Resolved 1 December 1987
Engineering
Issued 1 December 1987 Resolved
PROVE PROPER OPERATION OF RELIEF VALVE TO SHIP SERVIVE AIR RECEIVER
Condition: Unknown
Due 1 December 1987
Resolved 1 December 1987
Engineering
Issued 1 December 1987 Resolved
CLEAN OIL RESIDUE FROM ENGINE ROOM BILGES.
Condition: Unknown
Due 1 December 1987
Resolved 1 December 1987
Electrical
Issued 1 December 1987 Resolved
PROVIDE SUITABLE BOXES FOR BATTERIES OF MATERIAL RESISTANT TO THE DETERIOR-ATING ACTION OF THE ELECTROLYTE.
Condition: Unknown
Due 1 December 1987
Resolved 1 December 1987
Electrical
Issued 1 December 1987 Resolved
RENEW DAMAGED BATTERY CHARGER WIRE TO #1GENERATOR BATTERY BANK
Condition: Unknown
Due 1 December 1987
Resolved 1 December 1987
Construction/Loadline
Issued 1 December 1987 Resolved
PERMANENTLY PLUG FOUR BULKHEAD PENITRATIONS BETWEEN #5 VOID AND ENGINEROOM
Condition: Unknown
Due 1 December 1987
Resolved 1 December 1987
Construction/Loadline
Issued 21 November 1987 Resolved
CROP OUT AND REPAIR DAMAGED AREA TO PORT BOW FLARE.
Condition: Unknown
Due 21 November 1987
Resolved 21 November 1987
Engineering
Issued 3 December 1986 Resolved
REPLACE OR REPAIR INOPERABLE TACHOMETERS ON BOTH MAIN DIESEL ENGINES AND #1 SHIPS SERVICE GENERATOR.
Condition: Unknown
Due 3 December 1986
Resolved 3 December 1986
Navigation
Issued 9 December 1985 Resolved
OPEN SHIP SERVICE AIR RECEIVER FOR EXAMINATION BY CG INSPECTOR.
Condition: Unknown
Due 9 December 1985
Resolved 9 December 1985
Electrical
Issued 9 December 1985 Resolved
PROVE OPERATION OF LIGHTS ABOVE STEERING GEAR
Condition: Unknown
Due 9 December 1985
Resolved 9 December 1985
Lifesaving
Issued 9 December 1985 Resolved
RENEW AS REQUIRED PENNANTS FOR ALL BOUYANT APPARATUS.
Condition: Unknown
Due 9 December 1985
Resolved 9 December 1985
Electrical
Issued 9 December 1985 Resolved
PROVE PROPER OPERATION OF PA/GENERAL ALARM SYSTEM.
Condition: Unknown
Due 9 December 1985
Resolved 9 December 1985
Electrical
Issued 9 December 1985 Resolved
PROVIDE GUARD FOR OVERHEAD LIGHTS IN ENGINEROOM.
Condition: Unknown
Due 9 December 1985
Resolved 9 December 1985
Electrical
Issued 9 December 1985 Resolved
REPAIR TACHOMETER FOR #1 GENERATOR.
Condition: Unknown
Due 9 December 1985
Resolved 9 December 1985
Engineering
Issued 12 December 1984 Resolved
HYDRO TEST OR INTERNALLY EXAMINE SHIPS SERVICE AIR FLASK
Condition: Unknown
Due 12 December 1984
Resolved 12 December 1984
Documentation
Issued 12 December 1984 Resolved
PROVIDE SATISFACTORY DOCUMENTATION RESULTS OF STABILITY EXPERIMENT/TEST.
Condition: Unknown
Due 12 December 1984
Resolved 12 December 1984
Documentation
Issued 12 December 1984 Resolved
PROVIDE MARINE DOCUMENT REFLECTING CHANGE IN VESSEL'S LENGTH.
Condition: Unknown
Due 12 December 1984
Resolved 12 December 1984
Lifesaving
Issued 12 December 1984 Resolved
PROVIDE CORRECT AMOUNT OF RETROREFLECTIVE TAPE ON ALL LIFE PRESERVERS.
Condition: Unknown
Due 12 December 1984
Resolved 12 December 1984
Fire Fighting
Issued 12 December 1984 Resolved
SERVICE ALL PORTABLE AND SEMI-PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 12 December 1984
Resolved 12 December 1984
Lifesaving
Issued 12 December 1984 Resolved
PROPERLY ATTACH FLOAT FREE LINKS TO BUOYANT APPS
Condition: Unknown
Due 12 December 1984
Resolved 12 December 1984
Lifesaving
Issued 12 December 1984 Resolved
REPLACE LIFELINES AND PENDANTS ON BUOYANT APPS AS NEEDED
Condition: Unknown
Due 12 December 1984
Resolved 12 December 1984
Lifesaving
Issued 12 December 1984 Resolved
PROVE OPERATION OF FLOAT LIGHT ON RING BUOY
Condition: Unknown
Due 12 December 1984
Resolved 12 December 1984
Lifesaving
Issued 12 December 1984 Resolved
PROVIDE 1 ADDITIONAL RED AND 1 ADDITIONAL ORANGE HAND HELD FLARE
Condition: Unknown
Due 12 December 1984
Resolved 12 December 1984
Lifesaving
Issued 12 December 1984 Resolved
REPLACE TENDING LINES ON ALL RING BUOYS
Condition: Unknown
Due 12 December 1984
Resolved 12 December 1984

Casualty record · 16

19 February 2003Routine · role: Involved in a Marine Casualty · activity 1767114
6 January 2007Routine · role: Involved in a Marine Casualty · activity 2852506
13 August 2009Routine · role: Involved in a Marine Casualty · activity 3578552
19 September 2009Routine · role: Involved in a Marine Casualty · activity 3600874
25 May 2010Routine · role: Involved in a Marine Casualty · activity 3750154
26 March 2011Routine · role: Involved in a Marine Casualty · activity 3989426
17 February 2013Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · 1 injured · activity 4534824
29 January 2016Routine · role: Involved in a Marine Casualty · 1 injured · activity 5949763
23 November 2018Routine · role: Involved in a Marine Casualty · 1 injured · activity 6586080
23 February 2019Routine · role: Involved in a Marine Casualty · activity 6631918
17 December 2024Routine · role: Involved in a Marine Casualty · activity 8054305
6 February 2025Routine · role: Involved in a Marine Casualty · activity 8077520
13 May 2025Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 8136158
15 September 2025Routine · role: Involved in a Marine Casualty · 1 injured · activity 8250015
17 February 2026Routine · role: Involved in a Marine Casualty · activity 8316531
10 March 2026Routine · role: Acknowledged Pollution Source · activity 8326944
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.