Records from 2016 to 2022. Most recent: inspection, 1 November 2022.
Inspection history · 12
1 November 2022
Administrative Inspection
Administrative · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7587280
6 July 2022
COI Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7496635
6 October 2021
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7327687
28 April 2021
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7196827
13 November 2020
Administrative Inspection
Administrative · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7094690
12 August 2020
DAPI Audit · Administrative Inspection · Annual Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7026539
4 September 2019
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6807762
29 April 2019
Administrative Inspection · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6673207
4 September 2018
Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6532568
28 April 2017
Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6134684
12 April 2017
DAPI Audit · Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6123136
15 June 2016
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 5904207
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 4 September 2019
Resolved
Conduct man overboard and fire drill undrway in presence of attending Coast Guard Marine Inspector
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 November 2019
Resolution: Conducted drills, all sat.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 4 September 2018
Resolved
A vessel must be provided with a main steering gear of adequate strength and capability. The vessel has two cracks on the STBD rudder table and the rudder arm is hitting the stop on the STBD side. G/W the two fractures and adjust the the rudder arm.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 September 2018
Resolved 10 September 2018
Resolution: Corrected, all SAT.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 4 September 2018
Resolved
The vessel is required to have an operational bilge alarm system. The vessel's bilge alarm system was not operational. Conduct repairs to the bilge alarm system.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 September 2018
Resolved 10 September 2018
Resolution: Corrected, all SAT.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 12 April 2017
Resolved
Life ring line needs to be changed out.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 18 April 2017
Resolved 28 April 2017
Resolution: Line was replaced.
Fire Fighting › Fire Hoses › Condition
Issued 12 April 2017
Resolved
Fire hose had a leak
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 April 2017
Resolved 28 April 2017
Resolution: Fire hose was replaced.
Communications › Audible Communications › SPD (Other)
Issued 12 April 2017
Resolved
Intercomm system was malfunctioning.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 18 April 2017
Resolved 28 April 2017
Resolution: Intercomm system was replaced
Engineering › Bilge Water Management System › Manifold
Issued 12 April 2017
Resolved
Bilge system was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 April 2017
Resolved 8 June 2017
Resolution: Bilge system was replaced and satisfactory tested