Records from 1981 to 2021. Most recent: inspection, 9 September 2021.
Inspection history · 222
9 September 2021
COI Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7308122
4 May 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7188791
25 February 2021
COI Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7121155
28 June 2020
Periodic Inspection · Deficiency Check · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6989104
23 March 2020
MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6930475
26 February 2020
Periodic Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6917571
14 February 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6902723
1 January 2020
In-Service Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6881453
19 November 2019
Damage Survey · Examination of Repairs · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6858495
24 October 2019
Administrative Inspection · Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6832935
11 September 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7068512
18 July 2019
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6751818
3 April 2019
COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6646920
23 January 2019
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6613852
23 October 2018
Deficiency Check · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6566931
11 July 2018
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6449875
20 June 2018
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6450412
9 April 2018
Deficiency Check · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6385313
26 February 2018
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6361895
22 December 2017
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6324068
27 September 2017
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6276097
21 September 2017
Damage Survey · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6275225
11 August 2017
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6235216
15 June 2017
Examination of Repairs · Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6176920
9 March 2017
Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6101829
18 July 2012
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4377586
12 July 2012
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4376652
8 May 2012
Re-Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4287827
2 May 2012
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4300275
20 January 2012
Damage Survey · Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4171407
9 September 2011
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4133773
2 September 2011
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4133619
29 August 2011
Deficiency Check · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4130031
8 February 2011
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3941698
21 December 2010
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3914324
18 December 2010
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3913591
9 December 2010
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3907697
9 December 2010
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3910604
8 December 2010
DAPI Audit · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3903786
18 November 2010
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3894248
19 October 2010
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3868206
17 March 2010
Periodic Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3689375
12 February 2010
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3680913
20 July 2009
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3569565
1 April 2009
Administrative Inspection · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3428680
16 December 2008
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3380647
10 December 2008
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3364653
26 September 2008
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3333205
17 September 2008
COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3264427
25 June 2008
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3196413
21 May 2008
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3212982
19 March 2008
Deficiency Check · Re-Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3148156
23 January 2008
Deficiency Check · Administrative Inspection · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3128178
31 October 2007
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3090377
12 October 2007
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3055974
22 May 2007
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2936630
7 May 2007
MTSA Verification · Administrative Inspection · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2921634
13 February 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2871684
3 February 2007
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2866424
19 January 2007
Administrative Inspection · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2858521
25 October 2006
MTSA Verification · Administrative Inspection · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2806314
30 August 2006
Construction Oversight · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2763767
10 August 2006
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2743340
11 May 2006
Administrative Inspection · Drydock Extension
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2646583
1 March 2006
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2592831
20 January 2006
Examination of Repairs · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2571474
21 September 2005
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2498336
29 July 2005
Periodic Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2441769
25 April 2005
COI Inspection · MTSA Verification
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2341956
6 January 2005
Periodic Inspection · MTSA Verification
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2268630
28 October 2004
Periodic Inspection · MTSA Verification
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2229537
14 October 2004
Damage Survey
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2221010
27 July 2004
Periodic Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2145521
26 May 2004
Internal Structural Exam · Hull Examination
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2078572
29 April 2004
COI Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2052922
5 April 2004
Administrative Inspection
Administrative · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2174172
5 February 2004
Quarterly Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2000267
30 January 2004
Security Plan Review - ASP
Administrative · Commandant (CG-FAC) · Activity 2000422
28 October 2003
Quarterly Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1937385
27 August 2003
Quarterly Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1888527
25 May 2003
Damage Survey
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1801757
25 May 2003
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1808994
30 April 2003
COI Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1782218
5 February 2003
Quarterly Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1739652
6 November 2002
Quarterly Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1700607
19 August 2002
Quarterly Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1657169
7 May 2002
COI Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1613436
11 February 2002
Quarterly Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1485425
22 January 2002
Examination of Repairs
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1481203
9 November 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1444646
9 August 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1429602
18 June 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1070651
17 May 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 106637
9 May 2001
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1366330
29 March 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1060575
7 March 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1061369
9 February 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1420460
24 August 2000
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1464311
10 May 2000
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1413723
22 February 2000
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1372938
13 December 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 811676
10 November 1999
Re-Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1399222
17 August 1999
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1404818
6 July 1999
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1365233
14 May 1999
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1447949
22 April 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1124875
24 February 1999
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1472824
28 January 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1126765
16 December 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 807828
4 December 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 807223
18 November 1998
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1402733
6 November 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 186706
6 November 1998
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1457609
23 October 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1449109
26 August 1998
Re-Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1446684
30 June 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 794118
14 May 1998
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1461873
1 April 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 787046
12 February 1998
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1424528
19 September 1997
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1364381
11 June 1997
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1110712
15 May 1997
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1456482
12 March 1997
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1390467
29 January 1997
Re-Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1414739
5 September 1996
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1367902
20 June 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1454343
29 May 1996
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1438440
22 April 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1437074
22 March 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1371334
1 March 1996
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1456337
11 December 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 184097
27 October 1995
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1461666
6 October 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1383064
13 August 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 108209
7 June 1995
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1371088
14 March 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1459163
29 December 1994
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1450924
4 December 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 53776
30 August 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1396168
15 June 1994
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1423934
11 April 1994
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1463079
17 March 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 855054
1 March 1994
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 852975
11 February 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 853447
22 December 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1398004
6 October 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1438102
20 August 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 846078
8 July 1993
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 23271
18 June 1993
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1379806
3 May 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1149208
24 March 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1445967
16 December 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1141038
18 September 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 959468
9 July 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 951901
19 June 1992
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 953462
17 June 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 50794
13 March 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1009914
30 January 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1261726
20 December 1991
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 954220
20 September 1991
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1002974
21 June 1991
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 904961
22 March 1991
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 899330
6 February 1991
Excursion Permit
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1304190
30 January 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 930634
21 December 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 913795
28 September 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1232653
13 August 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 905698
20 July 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 901291
29 June 1990
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1236625
17 May 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1241336
26 April 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 917470
17 April 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1241937
6 April 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1229230
19 March 1990
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1236454
1 March 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1227137
21 February 1990
Excursion Permit
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 904278
19 January 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1214017
5 January 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 912307
15 November 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 913363
6 October 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1022005
26 July 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1344224
7 July 1989
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1346186
19 May 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1352605
12 April 1989
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 894723
7 April 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1201276
9 March 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1201769
28 February 1989
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1199472
2 February 1989
Excursion Permit
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1209566
6 January 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1198287
3 November 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1202080
7 October 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1045280
16 September 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1043379
24 August 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1345000
9 August 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1343940
15 July 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1034581
8 July 1988
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1033584
8 April 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 998099
10 February 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1327475
5 February 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1325749
6 January 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1009129
7 October 1987
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1015192
8 July 1987
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1023896
3 May 1987
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1024164
26 February 1987
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1014352
25 February 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1014509
10 July 1986
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1306233
6 February 1986
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1295666
22 July 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 978342
10 July 1985
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1289389
14 February 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1290177
27 July 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 974392
11 July 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1281493
25 April 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1280856
1 March 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1280034
4 February 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 971146
3 January 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1280169
13 July 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 965612
13 July 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1273669
28 June 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1272010
29 January 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1281621
11 January 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 965635
17 June 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 968228
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 May 2021
No resolution recorded
Vessels that operate in fresh water at least six months in every 12 month period since the last dry-dock examination must undergo dry-dock and internal structural examinations not to exceed five years.
The Levy's dry-dock interval expired on 30April2021. Prior to carrying passengers this vessel must be dry-docked for credit dry-docking and internal structural examinations. Note, the next five year cycle will be calculated from the 30April2021 due date.
Contact SECTOR New Orleans dispatcher to schedule an inspection for this vessel. [email withheld] or phone [phone withheld].
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 August 2021 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 25 February 2021
Resolved
46CFR62.25-1(a)-Vital systems that are automatically or remotely controlled must be provided with (4) Instrumentation to monitor system parameters necessary for the safe and effective operation of the system. STBD main propulsion engine J/W alarm sensor was relocated to the cold side of the system. This prevents proper monitoring of high engine temperatures. Relocate sensor to location intended by manufacturer.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 17 March 2021
Resolved 4 March 2021
Resolution: Received tech report that stated the heat probe sensor was replaced on the hot side of the J/W system. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 25 February 2021
Resolved
46CFR11.05-3 -An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. A ground was identified on ground detection panel located near emergency generator. Identify location and make appropriate repairs isolate ground.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Due 17 March 2021
Resolved 4 March 2021
Resolution: Received tech report that found the ground fault on neutral, removed and insulated. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 25 February 2021
No resolution recorded
46CFR199.153(k)-If a survival craft is recovered by any means using power, including a portable power source, safety devices must be provided that automatically cut off power before the davit arms or falls reach stops in order to avoid overstressing the falls or davits.Install safety device (anti 2-block device) to rescue boat davit winch.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 March 2021 — due date passed with no resolution recorded
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 25 February 2021
Resolved
46CFR199.190- Operational readiness. Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. (b) The manufacturers instruction for onboard maintenance of lifesaving appliances must be on board the vessel. Lifesaving maintenance was last conducted in NOV2020. Maintenance must be conducted IAW CFR and Manufacturers recommendations including intervals.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 March 2021
Resolved 3 March 2021
Resolution: Onboard representatives created a maintenance plan in their online management program.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 February 2021
Resolved
46CFR199.70(a)- Each vessel must carry lifebuoys approved under approval series 160.150. Port bridge wing buoy had no approval markings. Replace with approved buoys.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 17 March 2021
Resolved 3 March 2021
Resolution: Vessel representative replaced lifebouy with a new approved lifebuoy.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 1 July 2020
Resolved
During todays In Service Inspection, the engineering logs were examined and found to be deficient, there is a problem with Battery weekly checks not being completed which lead to the EDG failure on 23Jun2020. These weekly checks that were last done on 13Jun2020 should have been done again on 20Jun2020 and were not completed until the day after the EDG failure. The EDG failure could have been prevented had the weekly battery checks been completed when required by your logs.
This problem must be investigated by your staff to determine the root cause for this failure in the PMS schedule and the lack of attention by the engineers involved. A written policy that corrects this issue which must include detailed training for the engineers on proper watch standing, log entries and PMS completion. This all must be completed within 14 days and prior to getting the vessel underway and submitted to USCG SECTOR New Orleans.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 15 July 2020
Resolved 30 November 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 June 2020
Resolved
Each generator must meet applicable requirements for construction and testing.
Action required: 60 - Rectify deficiencies prior to movement
Due 28 June 2020
Resolved 28 June 2020
Resolution: Deficiency is cleared and rewritten to reflect further issues found during the in-service inspeciton.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 June 2020
Resolved
For the power failure that occured on 23Jun20 with the Port SSDG. Current tech Report from Coastwide Electric is not satisfactory. Provide a detailed root cause analysis for this power loss that determines exactly what happened and the steps to taken to correct the issue. An "unknown answer" is not acceptable. Provide this analysis prior to getting this vessel underway from its current location. This analysis must include all thest conducted to determine the root cause of the failure.
Action required: 60 - Rectify deficiencies prior to movement
Due 13 July 2020
Resolved 30 November 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 June 2020
Resolved
For the power failure that occured on 23Jun20 with the loss of the Port SSDG and the failure of the EDG to start automatically and provide power. Provide a root cause analysis for the issue and document the corrective action taken to prevent this from happening again. Provide basic engineering check off sheets that deals with starting and checking of the EDG prior to getting the vessel underway. This analysis must include all tests conducted to determine the root cause of the failure. An "Unknown answer" is not acceptable. Must be completed prior to moving the vessel.
Action required: 60 - Rectify deficiencies prior to movement
Due 13 July 2020
Resolved 30 November 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 June 2020
Resolved
For the power loss that occured on 27Jun20 with the Port SSGD, provide a root cause analysis that determines why the SSDG failed. This analysis must include all tests conducted to determine the root cause of the failure. an "Unknown answer" is not acceptable. Must be completed prior to moving the vessel.
Action required: 60 - Rectify deficiencies prior to movement
Due 13 July 2020
Resolved 30 November 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 June 2020
Resolved
For the power loss that occured on 27Jun20 with the Port SSDG, provide a root cause analysis to determine why the SSDG could not be restarted or even turned over once the vessel returned to the dock. This analysis must include all tests conducted to determine the root cause of the failure. an "Unknown answer" is not acceptable. Must be completed prior to moving the vessel.
Action required: 60 - Rectify deficiencies prior to movement
Due 13 July 2020
Resolved 30 November 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 June 2020
Resolved
For the power loss that occured on 27Jun20 with the SSDG, provide a root cause analysis that determines why the Port SSDG could not be started on 28Jun20 during the Coast Guard visit. This analysis must include all tests conducted to determine the root cause of the failure. An "Unknown answer" is not acceptable. Must be completed prior to moving the vessel.
Action required: 60 - Rectify deficiencies prior to movement
Due 13 July 2020
Resolved 30 November 2020
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 24 March 2020
Resolved
During testing of the emergency generator, E-generator would not automatically start during loss of power. Provide technician’s report attesting to proper operation of emergency generator and provide cause of inoperable generator.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 24 March 2020
Resolution: New battery installed and testing of the e-generator with a load was verified by attending USCG MI.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 1 January 2020
Resolved
Any casualty or accident involving any vessel other than a public vessel that occurs upon the navigable waters of the United States, its territories or possessions involves any United States vessel wherever such casualty or accident occurs. CAPN NEVILLE LEVY was involved in an allision with the MARGARET LAB and failed to report this to CG Sector Office within a timely manner. CAPN NEVILLE LEVY shall update the training plans regarding the reporting of a Marine Casualty within 7 days.
Action required: 705 - Other - as specified
Due 8 January 2020
Resolved 8 January 2020
Resolution: Company training performed, USCG questioned and received satisfactory responses to questions regarding marine casualty reporting.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 November 2019
Resolved
A survey, either general or partial, according to the circumstances shall be made every time an accident occurs or defect is discovered which affects the safety of the vessel. The survey shall be such to insure that the necessary repairs or renewals have been sufficiently made, and that the vessel complies in all respects with the regulations in this subchapter. Vessel is not permitted to operate in any capacity until repairs are made to the hydraulic piping system which operates the vehicle ramps, and the system is sufficiently tested to the satisfaction of a CG Marine Inspector.
46 CFR 71.40
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2020
Resolution: Witnessed satisfactory operation of vehicle ramps.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 November 2019
Resolved
All tubing and pipe materials shall be suitable for handling hydraulic fluid. Discovered significant leak on aft starboard hydraulic system controlling vehicle ramps. Leak was located in #5 stbd ballast tank on threaded piping connection to gear housing for hydraulic ramps. Replace affected piping to satisfaction of CG Marine Inspector, flush all hydraulic piping, hydro-statically test lines to working pressure, and make all hydraulic lines available for inspection.
46 CFR 70-20.1
46 CFR 58.30-15(a)
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2020
Resolution: Witnessed satisfactory operation of vehicle ramps.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 19 November 2019
Resolved
On vehicular ferries, suitable chains, cables, or other barriers shall be installed at the ends of the vehicle runways. Discovered no locking mechanism on ramps. Install mechanical permanent means to secure all vehicle ramps on board the vessel to the satisfaction of USCG Marine Inspector.
46 CFR 72.40-15(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2020
Resolution: Verified use of ramp securing chains.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019
Resolved
All tubing and pipe materials shall be suitable for handling hydraulic fluid. Discovered hydraulic leak at valve and fitting for port aft ramp system. Make repairs to satisfaction of USCG Marine Inspector.
46 CFR 70-20.1
46 CFR 58.30-15(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2020
Resolution: Witnessed satisfactory operation of vehicle ramps.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 5 November 2019
Resolved
After loading and prior to departure and at all other times necessary to assure the safety of the vessel, the master shall determine that the vessel complies with all applicable stability requirements in the vessel's trim and stability book, stability letter, Certificate of Inspection, and Load Line Certificate, as the case may be, and then enter an attestation statement of the verification in the log book. The vessel may not depart until it is in compliance with these requirements.
Following the discovery of engineering log entries surrounding steering space de-watering, Inspectors observed rudder posts while operating. Observed substantial water ingress into steering space, significantly affecting the vessel's stability.
Prior to vessel operating, properly de-water space and complete repairs to satisfaction of attending CG Marine Inspector.
46 CFR 78.17-22(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 November 2019
Resolution: Space properly dewatered, witnessed satisfactory testing of rudder posts underway, leaks corrected.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 24 October 2019
Resolved
Engine room fire dampers on stack not in operational condition. Safety pin is extremely difficult to remove and dampers do not fully close. Correct to satisfaction of CG Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 24 October 2019
Resolution: Operator cleaned and conditioned dampers. Verified proper operation. All SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 24 October 2019
Resolved
All tubing and pipe materials shall be suitable for handling hydraulic fluid used. Discovered significant leaks throughout Bow Thruster system; oil accumulating in bilge, on deck plates, and in catch basin of shaft tube. Prior to operating bow thruster, properly remove standing hydraulic fluid and correct all leaks to satisfaction of CG Marine Inspector. Provide repair plan within 7 days.
46 CFR 70.20-1
46 CFR 58.30-15(a)
Action required: 705 - Other - as specified
Due 6 February 2020
Resolved 8 February 2020
Resolution: Witnessed satisfactory operation of bow thruster unit following repairs to multiple leaks and replacement of oil pump and seals.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 24 October 2019
Resolved
Fire hazards shall be minimized insofar as is reasonable and practicable. Oil found accumulating in several areas of the engine room. Within seven days, properly remove standing oil and correct excessive oil leaks.
46 CFR 72.03-5
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Bilges free and clear of standing oil.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 October 2019
Resolved
Approved portable fire extinguishers must be installed in accordance with 46 CFR Table 76.50-10(a). Portable extinguisher 15 was found to have a damaged bracket. Within seven days, correct damaged bracket to satisfaction of CG Marine Inspector.
46 CFR 76.50-10
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Bracket repaired/remounted.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 October 2019
Resolved
The Vessel Security Officer must ensure adequate security training for vessel personnel. Vessel crew found to have limited knowledge on MARSEC levels and how to respond to security incidents. Within seven days, perform satisfactory vessel security drill to satisfaction of CG Marine Inspector.
33 CFR 104.215(e)(7)
Action required: 705 - Other - as specified
Resolved 5 November 2019
Resolution: Operator conducted satisfactory training as evident in drills and discussion in presence of Inspectors.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 October 2019
Resolved
Each device must have a nameplate showing the device's function. Main switchboard is missing labels on multiple breakers. Within seven days, correct to satisfaction of CG Marine Inspector.
46 CFR 111.30-15(a)
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Labels placed on switchboard breakers.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 24 October 2019
Resolved
All doors shall be capable of operation from either side by 1 person. STBD Pilothouse bridge wing weather-tight door improperly functioning. Within seven days, correct to satisfaction of CG Marine Inspector.
46 CFR 72.05-25(a)(1)
Action required: 705 - Other - as specified
Resolved 5 November 2019
Resolution: Door mechanism replaced and tested. Opens from inside for egress, locks from outside for security. All SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 24 October 2019
Resolved
All tubing and pipe materials shall be suitable for handling hydraulic fluid used. Discovered hydraulic leak at valve and fittings for STBD AFT ramp system. Provide repair plan within 7 days, correct to satisfaction of USCG Marine Inspector.
46 CFR 58.30-5(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 November 2019
Resolution: STBD aft ramp hydraulic lines/valve replaced. No leaks visibile.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 24 October 2019
Resolved
Storage batteries for emergency lighting and power systems shall be tested at least once each 6-month period that the vessel is navigated to demonstrate the ability of the storage battery to supply the emergency loads for the period of time specified in table 112.05-5(a) of this chapter. Discovered corrosion on battery terminals and immediate wiring for the GE alarm battery system. Within seven days, correct to satisfaction of CG Marine Inspector.
46 CFR 78.17-45(c)
Action required: 705 - Other - as specified
Resolved 5 November 2019
Resolution: Corroded wiring replaced, system energized. All SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 October 2019
Resolved
It shall be the duty of the chief engineer when assuming charge of the boilers and machinery of a vessel to examine them thoroughly. If any parts thereof are in bad condition, the fact shall immediately be reported to the master, owner or agent, and the Officer in Charge, Marine Inspection. Discovered non-functioning Jacket Water temperature gauge on #2 Generator. Within seven days, correct to satisfaction of CG Marine Inspector.
46 CFR 78.17-30
Action required: 705 - Other - as specified
Resolved 24 March 2020
Resolution: Witnessed satisfactory testing during COI (AN# 6930475).
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 October 2019
Resolved
It shall be the duty of the master to see that the emergency lighting and power systems are operated and inspected at least once in each week that the vessel is navigated to be assured that the system is in proper operating condition. Discovered non-functioning Emergency Light on STBD side main deck. Correct within 7 days to satisfaction of CG Marine Inspector.
46 CFR 78.17-45(a)
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Light bulbs and ballast replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 24 October 2019
Resolved
Each lifesaving appliance must be in working order and ready for immediate use. Cloth line holding tether lines to in a bundle on Life Floats have failed, correct within 7 days to satisfaction of CG Marine Inspector.
46 CFR 199.190(a)
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Lines bundled to satisfaction of inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 October 2019
Resolved
All engine installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Discovered fuel leak at supply valve for PORT Main Diesel Engine. Correct within 7 days to satisfaction of CG Marine Inspector.
46 CFR 58.10-5(a)
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Valve and hoses repaired. No leaks present.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 October 2019
Resolved
All engine installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this Subchapter. Discovered oil leak at sending unit for STBD Generator, correct to satisfaction of CG Marine Inspector. Within seven days, correct to satisfaction of CG Marine Inspector.
46 CFR 58.10-5(a)
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Leak repaired, all SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 24 October 2019
Resolved
Each lifesaving appliance must be in working order and ready for immediate use. Discovered 1 non-serviceable adult life jacket on 2nd deck, replace within 7 days to satisfaction of CG Marine Inspector.
46 CFR 199.190(a)
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Life Jakcet replaced with new.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 October 2019
Resolved
Drills must, as far as practicable, be conducted as if there were an actual emergency. Discovered inconsistency with Fire Drill training witnessed compared to frequency of documentation. Conduct adequate fire drill training to satisfaction of CG Marine Inspector.
46 CFR 199.180(c)
Action required: 705 - Other - as specified
Resolved 5 November 2019
Resolution: Operators conducted adequate training, displayed in drills conducted in presence of Inspectors.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 October 2019
Resolved
The chief engineer shall be responsible only for the sanitary condition of the engineering department. Discovered leaking chemicals on Sewage tank chemical feed tank. Within seven days, correct to satisfaction of CG Marine Inspector.
46 CFR 78.17-25(a)
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Repaired fiitings and leaks.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 24 October 2019
Resolved
Each self-propelled vessel must have duplicate light sources for the side, masthead, and stern lights. Discovered that upon testing anchor lights at operating station, aft anchor light did not work and alarm sounded at operating station indicating failure. Correct within 7 days to satisfaction of CG Marine Inspector.
46 CFR 111.75-17
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Repairs conducted, anchor lights operational with no alarms.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 24 October 2019
Resolved
Each lifesaving appliance must be in working order and ready for immediate use. Found rescue boat bow light containing port and starboard navigation lights broken. Correct within 7 days to satisfaction of CG Marine Inspector.
46 CFR 199.190(a)
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Light repaired and spare on hand if issues arise.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 24 October 2019
Resolved
Rescue boats must be stowed in a position suitable for launching and recovery. MI discovered exposed wire rope on rescue boat causing a safety hazard for personnel when launching rescue boat. Within seven days, provide suitable chafing gear on wire rope to the satisfaction of CG Marine Inspector.
46 CFR 199.140(a)(2)
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Added chaffing gear and removed exposed wire ends.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 24 October 2019
Resolved
The life jacket stowage positions must be marked with the words “ LIFEJACKETS” or “CHILD LIFEJACKETS” as appropriate, or with the appropriate symbol from IMO Resolution A.760(18). Discovered improper life jacket stowage label for 15 child size life jackets on second deck passenger seating area. Correct within 7 days to satisfaction of CG Marine Inspector.
46 CFR 199.70(b)(2)(iii)
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Label corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 October 2019
Resolved
Each lifebuoy stowage position must be marked with either the words “LIFEBUOY” or “LIFE BUOY”, or with the appropriate symbol from IMO Resolution A.760(18). Each lifebuoy must be marked in block capital letters with the name of the vessel and the name of the port required to be marked on the stern of the vessel. Found bridge wing life buoys missing required markings and reflective tape, correct within 7 days to satisfaction of CG Marine Inspector.
46 CFR 199.70(a)(1)(iii) and (2)
Action required: 705 - Other - as specified
Resolved 1 November 2019
Resolution: Markings corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 October 2019
Resolved
The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of Subchapter F (Marine Engineering) of this chapter. The following plans must be submitted to the Coast Guard for approval in accordance with §50.20-5 and §50.20-10 of this chapter: Design Verification and Periodic Safety test procedures described in subpart 61.40 of this chapter. Update and resubmit PSTP's for local OCMI approval within 60 days.
46 CFR 77.03-1(a)
46 CFR 62.20-1(a)(7)
Action required: 705 - Other - as specified
Resolved 9 December 2019
Resolution: Witnessed satisfactory testing of Maine Engine Low L/O shutdowns and Main Engine Overrides. PSTP revisions reviewed and submitted to Command for signature.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 October 2019
Resolved
In all ventilation systems, manually operated dampers or other suitable means shall be provided in accessible locations, outside the spaces served by the system, for shutting off the passage of air in the event of fire. Engine room ventilation dampers should be regularly maintained, and reflected in vessel's Preventative Maintenance System. Add Fire Dampers to vessel's Preventitive Maintenance program within 60 days.
Action required: 705 - Other - as specified
Resolved 2 December 2019
Resolution: Reviewed PSTP revisions and maintenance plan. Vessel added fire dampers to maintenance schedule.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 18 July 2019
Resolved
2)[name withheld] for the days log entry the day after 09Jul2019 and before 14Jul2019 needs to date this page of the ships log. Currently no date is written for this log entry.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 19 July 2019
Resolved 1 August 2019
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 18 July 2019
Resolved
3)The pilot house log book is missing the weekly fire drills as required by the log. Last drill logged was on 06Jul2019 and today’s inspection date is 18Jul2019. Correct by the end of this inspection today. Today’s Coast Guard Drill has corrected this missing drills. Deficiency issued and cleared the same day.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 19 July 2019
Resolved 1 August 2019
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 18 July 2019
Resolved
4)Grab lines on the life floats need to be bundled back up to the correct position, currently there are some loose and getting tangled. Correct by 19Jul2019.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 July 2019
Resolved 1 August 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 July 2019
Resolved
5)2nd deck outside life jacket locker has an A/C drain line that drains back into the life jacket locker. Repair/Modify this line so that it does not drain into the locker. Complete by 25Jul2019.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 July 2019
Resolved 1 August 2019
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 18 July 2019
Resolved
6)The access to the stack fire dampers is hindered by a sticking access gate latch that allows access to the area. You can gain access by climbing over the gate but the gate does require repairs. Complete by 25Jul2019.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 July 2019
Resolved 1 August 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 July 2019
Resolved
7)Located inside the second deck, the life jacket storage in the overheads have had their quantity numbers painted over. These are required to be re-stenciled with the correct numbers. Complete by 25Jul2019.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 19 July 2019
Resolved 1 August 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 July 2019
Resolved
8)There are some old life jacket donning instruction placards located throughout the vessel, these placards do not apply to the current life jackets on board the vessel. Remove the old placards and install current applicable placards. Complete by 25Jul2019.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 19 July 2019
Resolved 1 August 2019
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 July 2019
Resolved
9)Some fire extinguishers numbers do not match the numbers on the blkhds, check all extinguishers and correct the numbering system on board. Complete by 23Jul2019.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 July 2019
Resolved 23 March 2020
Resolution: Item's corrected and verified by MI.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 July 2019
Resolved
10)The following life jacket lockers had life jacket failures.
Upper Deck 3 Adult and 1 child failed.
2nd Deck STBD 9 adult failed.
2nd deck port 7 adult and 1 child failed.
For a total of 19 adult and 2 child.
Failures were due to rotten fabric and rotten floatation material. Correct by 18Jul2019.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 18 July 2019
Resolved 18 July 2019
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 3 April 2019
Resolved
Prior to getting the vessel U/W with passengers corrections are required to be made to the periodic test procedures as discussed with the Chief Engineer and Port engineer. Also there are various eng. alarms that either show no alarm light and or don't provide same alarms on each alarm repeater panel. Correction required within 30 days. 46CFR's 61.40-6 and 61.40-10.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 May 2019
Resolved 9 April 2019
Resolution: Alarm panel repair, loose wires, tested all alarms related to problem, all satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 31 October 2018
Resolved
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 November 2018
Resolved 13 November 2018
Resolution: Verified and tested proper repair of the burst sprinkler pipe.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 9 April 2018
Resolved
Emergency lighting is nonoperational in 5 fixtures on 02 deck (inside) and in 1 fixture on 02 deck aft at life jacket station.
Action required: 60 - Rectify deficiencies prior to movement
Due 9 April 2018
Resolved 11 April 2018
Resolution: Replaced light bulbs.
Construction/Loadline › Structures › Ventilators
Issued 9 April 2018
Resolved
On 03 deck, flex coupling on port side gooseneck vent is torn.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 2 May 2018
Resolution: Flex coupling repaired.
Communications › Public Address System › Announcing Station
Issued 9 April 2018
Resolved
PA system non-operational on 01 deck at both bow and stern.
Action required: 60 - Rectify deficiencies prior to movement
Due 9 April 2018
Resolved 2 May 2018
Resolution: Call back system repaired.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 9 April 2018
Resolved
Bridge bow thruster indicator non-operational.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 2 May 2018
Resolution: Indicator repaired.
Electrical › Lighting (service) › Lighting Fixture
Issued 9 April 2018
Resolved
Alarm panel light bulb out on bridge.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 2 May 2018
Resolution: Repaired.
Navigation › Piloting/Steering › Maneuverability Rating
Issued 9 April 2018
Resolved
Bridge port tachometer non-operational.
Action required: 705 - Other - as specified
Due 9 April 2018
Resolved 2 May 2018
Resolution: Demonstrated redundancy for tachometer reading on bridge. Originally issued as prior to movement; now extended to 09 May 2018. Tach repaired completely 02May18.
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 April 2018
Resolved
2 permanent extension cords found (1 on bridge; 1 at air receiver in E/R). Determine needs and repair as necessary.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 2 May 2018
Resolution: Extension Chords removed.
Electrical › Electric Supply System (service) › Battery Installation
Issued 9 April 2018
Resolved
Battery box for AIS behind bridge had 2 dead end wires and 2 live wires that were chaffed and cracked. Remove and replace.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 11 April 2018
Resolution: Removed and renewed wires.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 9 April 2018
Resolved
Cables wire tied to ladder above bridge, impeding ladder access.
Action required: 60 - Rectify deficiencies prior to movement
Due 9 April 2018
Resolved 11 April 2018
Resolution: Removed from ladder-way; installed correctly.
Construction/Loadline › Hull › Side Shell
Issued 9 April 2018
Resolved
Vertical stanchion on 01 deck (port aft) hydraulic ramp station: bottom is wasted at attachment to deck.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 11 April 2018
Resolution: Cropped and renewed.
Electrical › Electric Supply System (service) › Cable
Issued 9 April 2018
Resolved
3" gash in shore tie cable near connection on vessel.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 11 April 2018
Resolution: Verified cable intact and used heat shrink to protect area from further damage.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 9 April 2018
Resolved
Electrical junction box (forward starboard) identified as containing PA wiring and is missing a cover.
Action required: 60 - Rectify deficiencies prior to movement
Due 9 April 2018
Resolved 11 April 2018
Resolution: Renewed junction box.
Fire Fighting › Ventilation Systems › Operating Controls
Issued 9 April 2018
Resolved
Ventilation shutdown for engine room appears to be jury-rigged.
Action required: 60 - Rectify deficiencies prior to movement
Due 9 April 2018
Resolved 11 April 2018
Resolution: Replaced.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Nozzles
Issued 9 April 2018
Resolved
Sprinkler system unable to provide adequate deck coverage.
Action required: 60 - Rectify deficiencies prior to movement
Due 9 April 2018
Resolved 11 April 2018
Resolution: Serviced all sprinkler heads.
Engineering › Compressed Air System (start air) › Compressor
Issued 9 April 2018
Resolved
#2 air compressor does not energize.
Action required: 60 - Rectify deficiencies prior to movement
Due 9 April 2018
Resolved 11 April 2018
Resolution: Replaced liner.
Construction/Loadline › Penetrations › Gasket
Issued 9 April 2018
Resolved
Bow thruster hatch not installed correctly, compromising watertight integrity.
Action required: 60 - Rectify deficiencies prior to movement
Due 9 April 2018
Resolved 11 April 2018
Resolution: Cleaned out silicone sealant and installed new bolts.
Electrical › Electric Generation Source (emergency) › Generator
Issued 9 April 2018
Resolved
Belt on emergency generator starting to fray.
Action required: 60 - Rectify deficiencies prior to movement
Due 9 April 2018
Resolved 11 April 2018
Resolution: Belt replaced.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 22 December 2017
Resolved
Demonstrate a proper man overboard drill prior to loading passengers.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 December 2017
Resolved 22 December 2017
Resolution: Conducted man over board training.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 22 December 2017
Resolved
Properly label and install CO2 activation instruction for the engine room CO2 system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 2 March 2018
Resolution: Labels installed.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 22 December 2017
Resolved
Replace both forward and aft main deck engine room doors with approved self closing fire doors or provide proof that doors should not be self closing.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 January 2018
Resolved 2 March 2018
Resolution: self closing mechanisms installed and tested; all sat.
Operations/Management › Drills/Instruction › Fire
Issued 22 December 2017
Resolved
Conduct training for all crew members on basic fire fighting systems onboard.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 December 2017
Resolved 22 December 2017
Resolution: Fire fighting training conducted.
Engineering › Engine Controls (Electric/Electronic) › Circuit Board
Issued 21 September 2017
Resolved
Received report of loss of power on the port engine. Provide proof of proper operation prior to movement.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 September 2017
Resolution: Received report indicating a faulty jumper in the ECM, replaced, tested; all sat.
Engineering › Steering Gear System › Rudder Stock
Issued 15 June 2017
Resolved
Currently the vessel is having problems with the flanking rudder sticking at hard port, the vessel is currently out of service and is restricted to its dock and not permitted to move or carry passengers until the problem has been identified and corrected. Once problem has been identified, contact the Coast Guard to schedule an inspection of the problem found and to the repairs to the problem,
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 July 2017
Resolved 11 August 2017
Resolution: Witnessed satisfactory steering tests for both the regular and flanking rudders.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 26 April 2017
Resolved
1.Complete proper and permanent repairs to the EDG fuel system above the F/O tank which is still leaking after a previous attempt to repair. Make repairs to this leak and then pressure test the fuel lines in the EDG room to check the repairs. Repairs and testing to be completed to the satisfaction of the attending USCG Marine Inspector.Pictures were sent with this 835 requirement to show the leak
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 May 2017
Resolved 6 June 2017
Resolution: Routed Tank vent to outside with containment.
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 10 March 2017
Resolved
Gas free the #5 ballast tank and make ready for coast guard examination prior to the moving of the vessel. A company rep. is required for the internal examination.
Condition: Damaged By Earlier Event
Due 10 March 2017
Resolved 10 March 2017
Resolution: #5 ballast tank was gas freed.
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2017
Resolved
The vessel will be required to be dry docked for an internal and external exam, all spaces will need to have a gas free certificate and made safe for entry. A company rep. is required for these internal and external examinations.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 April 2017
Resolved 6 June 2017
Construction/Loadline › Hull › Bottom Plating
Issued 10 March 2017
Resolved
A P.E. (Naval Arch) report will be required that notes the damage and any and all recommended repairs that will be required to be completed.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 10 April 2017
Resolved 6 June 2017
Construction/Loadline › Hull › Bottom Plating
Issued 10 March 2017
Resolved
A complete repair proposal will be required for all the damaged areas on the vessel and the repairs that are required must be completed, examined and be tested prior to the vessel being placed back into service.
Condition: Damaged By Earlier Event
Due 10 April 2017
Resolved 6 June 2017
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 10 March 2017
Resolved
Complete repairs to holed main deck in way of stairwell leading to 2nd deck and make ready for inspection
Condition: Improper/Lack of Maintenance
Due 10 April 2017
Resolved 6 June 2017
Engineering › Diesel Engine (auxiliary) › Crankcase
Issued 9 March 2017
Resolved
Complete proper and permanent repairs to the EDG so that the current oil leak problem is solved. Provide a sort time frame on accomplishing this repair. Until repaired constant watch on tis engine to keep the leaking oil wiped up. Apparently the engine does not have to be running to leak.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 6 June 2017
Resolution: New Oil Pan Installed.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 9 March 2017
Resolved
IAW the referenced Cite, 46CFR 56.50-85, make sure the tank piping is in compliance and provide a plan to correct the problem of overfilling the EDG fuel tank when using the F/O transfer pump and to comply with the provisions of the Referenced cite. Especially parts (a) 4 and (a) 11, this must be completed -prior to carrying passengers and to the satisfaction of the attending marine inspector.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 15 May 2017
Resolved 6 June 2017
Construction/Loadline › Structures › Deck Plating
Issued 2 August 2012
Resolved
Noted several areas of heavy scaling/corrosion nmost notably the aft port corner of the pilothouse has a hole that is leaking water and aft of the fwd stbd a/c unit has several holes. Make temp repiars to these areas by 02Aug. Provide gage report of the these areas by 02Sep. Remove scaling rust from ovhd on open pax decks.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 September 2012
Resolved 3 September 2012
Resolution: Temp repairs made, received gage reports.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 18 July 2012
Resolved
Repair CO2 bell in bow thruster space.
Action required: 705 - Other - as specified
Due 25 July 2012
Resolved 17 August 2012
Resolution: New CO2 alarm bell installed and tested SAT.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 18 July 2012
Resolved
Repair/replace structural fire protection insulation in engineroom in overhead above starboard MDE and forward of switchboard.
Action required: 705 - Other - as specified
Due 7 January 2013
Resolved 10 December 2012
Resolution: Inspected new A-60 insulation above starboard MDE and switchboard. All Sat.
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 18 July 2012
Resolved
Clean/ remove all oil from starboard MDE turbocharger
Action required: 705 - Other - as specified
Due 25 July 2012
Resolved 17 August 2012
Resolution: New turbo supply line oil seals replaced and oil cleaned.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 18 July 2012
Resolved
Sound all voids, record soundings on Engineering Equipment Inspection checklist. Sounding plugs are frozen and will not open.
Action required: 705 - Other - as specified
Due 25 July 2012
Resolved 17 August 2012
Resolution: New sounding plugs have been added and sounding completed. Requested that the soundings be added to the vessel inspection checklist.
Engineering › Steering Gear System › Valve
Issued 18 July 2012
Resolved
Provide technicians report attesting to the proper operation of the #1 steering pumps in all modes of operation. Masters of vessel are concerned that when running either pump the returning fluid returns to the online pump leaving the unused pumps reservoir level low (not low enough to sound low level alarm)
Action required: 705 - Other - as specified
Due 18 August 2012
Resolved 1 August 2012
Resolution: Received tech report stating that the steering system in properly operating, witnessed SAT steering test.
Construction/Loadline › Structures › Superstructure
Issued 18 July 2012
Resolved
Passengers are restricted to the vehicle deck and enclosed passenger spaces. This item to remain open until it is determined by an attending Marine Inspector that the exterior passenger spaces have been made safe for passengers.
Action required: 705 - Other - as specified
Due 27 July 2017
Resolved 27 July 2017
Resolution: Passenger spaces made safe for passengers.
Construction/Loadline › Structures › Superstructure
Issued 18 July 2012
Resolved
Provide report of all thickness gauging from 23AUG12 to [name withheld]. [email withheld] Complete by 31AUG12
Action required: 705 - Other - as specified
Due 31 August 2012
Resolved 31 October 2012
Resolution: Gage report received, plans for repair of wasted areas to follow after bridge toll election.
Construction/Loadline › Structures › Superstructure
Issued 18 July 2012
Resolved
Crop and renew wasted sections of the 3 legs of the radar mast. Complete no later than 21SEP12, to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 21 September 2012
Resolved 31 October 2012
Resolution: 3 leg sections of mast have been replaced by croping and inserting a new section of pipe approx 3".
Engineering › Compressed Air System (control) › Hose
Issued 2 May 2012
Resolved
Hole in Air Hose on #1 Air Compressor
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 May 2012
Resolved 2 May 2012
Resolution: High pressure hose coming off the start air compressor was replaced and inspected for service suitability.
Engineering › Lubricating Oil Service System › Piping
Issued 20 January 2012
Resolved
The aft stbd hyd ramp piping is leaking and poorly temp repaired. The ramp is prohibited from being used until properly repaired. This 835 is issued with a due date of the next scheduled dry-dock of 14Oct14. See activity number 4171407 for further details. Care should be taken to operate this vessel where the aft ramps do not require use.
Action required: 705 - Other - as specified
Due 14 October 2014
Resolved 8 May 2012
Resolution: New Hyd Piping installed thru deck and tested sat.
Electrical › Electric Generation Source (emergency) › Switch
Issued 18 October 2011
Resolved
During pre -passenger boarding checks at the Chalmette dock, vsl engineer observed that vsl generator was unable to switch over to the emergency generator due to a faulty crossover switch. DMI issued a no-sail CG-835 directing LA DOTto provide a tech report attesting to proper repair and operation of generator cutover switch and also state root casual factors.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 October 2011
Resolved 20 January 2012
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 9 September 2011
Resolved
1. To be completed prior to 09Oct2011: Refuel hose located aft has two serial numbers one on the certificate that does not match the one stenciled on the hose. Correct problem.
Action required: 705 - Other - as specified
Due 9 October 2011
Resolved 18 October 2011
Engineering › Lubricating Oil Service System › Hose
Issued 9 September 2011
Resolved
2. To be completed prior to 09Oct2011: Clean and find and repair the hyd leaks on the main deck aft port and stbd side and the ramp controls.
Action required: 705 - Other - as specified
Due 9 October 2011
Resolved 16 February 2012
Resolution: Cleared and re issued with further restrictions explained and to note the due date of the next Dry-docking.
Engineering › Lubricating Oil Service System › Piping
Issued 9 September 2011
Resolved
3. To be completed prior to Oct09, 2011: IAW the engineers inspection reports , 8/10/11, 8/22/11, and 9/5/11 by replacing the leaking hyd rams on the vessel.
Action required: 705 - Other - as specified
Due 9 October 2011
Resolved 18 October 2011
Engineering › Steering Gear System › Piping
Issued 9 September 2011
Resolved
4. To Be completed prior to 09Oct2011: Clean and rrepair hyd leaks on the valves for the #1 Steering pump.
Action required: 705 - Other - as specified
Due 9 October 2011
Resolved 18 October 2011
Fire Fighting › Ventilation Systems › Ducts
Issued 9 September 2011
Resolved
5. To be completed prior to 09Oct2011: Repair supply ventilation duct in the tunnel to the bow thruster,
Action required: 705 - Other - as specified
Due 9 September 2011
Resolved 18 October 2011
Engineering › Steering Gear System › Power Unit
Issued 9 September 2011
Resolved
6. To be completed prior to 09Oct2011: Bow thruster has a hanging wire from the overhead that went to soething, find and repair.
Action required: 705 - Other - as specified
Due 9 October 2011
Resolved 18 October 2011
Engineering › Compressed Air System (control) › Compressor
Issued 29 August 2011
Resolved
Repair or replace the #2 air Compressor
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 August 2011
Engineering › Steering Gear System › Piping
Issued 8 February 2011
Resolved
Repair hydraulic leaks on steering gear system including the leak on the #2 steering pump filter housing.
Action required: 705 - Other - as specified
Due 11 February 2011
Resolved 17 February 2011
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 21 December 2010
Resolved
Navigation Rule requirements of having 2 Mast head lights, 2 anchor lights, a stern light and running lights. Currently the Mast Head lights are missing screens and appear as all around lights and a stern light is not on the vessel.
Action required: 705 - Other - as specified
Due 21 January 2011
Resolved 9 February 2011
Engineering › Steering Gear System › Pin
Issued 18 December 2010
Resolved
Repair, replace worn shaft in the #2 steering pump.
Action required: 705 - Other - as specified
Due 18 January 2011
Resolved 9 February 2011
Resolution: Shaft was replaced, OPTEST was SAT.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 8 December 2010
Resolved
To be completd prior to 08Jan2011: Replace port SSDG L/O Pressure failure switch. Engine must be closely monitored until repairs completed.
Due 8 January 2011
Resolved 8 February 2011
Resolution: Port SSDG L/O pressure failure switch was replaced.
Communications › Alarms/Indicators › High Water Alarm
Issued 8 December 2010
Resolved
To be completed prior to 08Jan2011: Replace stbd MDE high temp alarm. Engine must be closely monitored until replaced.
Due 8 January 2011
Resolved 9 February 2011
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 8 December 2010
Resolved
To be completed prior to 08Jan2011: Provide a copy of the company drug and aclhol policy onboard and posted.
Due 8 January 2011
Resolved 8 February 2011
Resolution: Drug and Alcohol Policy was observed to be onboard (in pilothouse).
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 8 December 2010
Resolved
To be completed prior to 08Jan2011: Post drig and alcohol EAP hotline numbers as required.
Due 8 January 2011
Resolved 8 February 2011
Resolution: Drug and alcohol EAP hotline numbers were placed onboard (in pilothouse).
Engineering › Fuel Oil Service System › Hose
Issued 19 October 2010
Resolved
Flammable liquid flexible fuel hoses do not comply with SAE J-1942 standard as required by 46 CFR 56.60-25. Replace flexible fuel hoses on MDE's, SSDG's, EDG and Bowthruster.
Action required: 705 - Other - as specified
Due 19 December 2010
Resolved 11 May 2011
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 19 October 2010
Resolved
Provide piping/valve diagram for engine room CO2 system at remote valve location and CO2 room.
Action required: 705 - Other - as specified
Due 2 November 2010
Resolved 8 December 2010
Navigation › Piloting/Steering › Magnetic Compass
Issued 17 March 2010
Resolved
2. To be completed prior to 24Mar2010: Repair and or replace the ships compass, currently not operating properly.
Origianl Due Date 3/24/10, extended until 4/24/10.
Condition: Unknown
Action required: 705 - Other - as specified
Due 24 April 2010
Resolved 23 April 2010
Fire Fighting › Ventilation Systems › Operating Controls
Issued 17 March 2010
Resolved
3. To be completed prior to 24Mar2010: On the stack the vent louvers are bolted open with a wing nut, replace the bolt with a "pull pin" and add instructions on what to do to close the louvers in the event of CO2 activation.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 March 2010
Resolved 9 April 2010
Fire Fighting › Ventilation Systems › Operating Controls
Issued 17 March 2010
Resolved
4. To be completed prior to 24Mar2010: At the CO2 pull station for the engine room add instructions to close the stack louvers.
Action required: 705 - Other - as specified
Due 24 March 2010
Resolved 9 April 2010
Engineering › Steering Gear System › Power Unit
Issued 1 April 2009
Resolved
Prove proper operation of all alarms for both steering pumps. Provide procedures for test; if not currently in automation procedures, provide changes/new procedures to Coast Guard for approval.
Due 1 May 2009
Resolved 9 December 2009
Resolution: Witnessed proper oepration of the steering failure alarm for both pumps using the testing procedure in their PSTP.
Engineering › Lubricating Oil Service System › Piping
Issued 10 December 2008
Resolved
1. To be completed prior to 17Dec08: remove leaking Hyd. oil from the #2 port void, gas free and remove all oil residue from void. Prior to placing vessel back into service.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 December 2008
Resolved 5 January 2009
Engineering › Lubricating Oil Service System › Piping
Issued 10 December 2008
Resolved
2. To be completed prior to 10Jan09: Make repairs to the Hyd. line leaks in the #2 port void. This Hyd.. system runs the port fwd ramps. Prior to placing vessel back into service.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 January 2009
Resolved 5 January 2009
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 10 December 2008
Resolved
3. To be completed prior to 10Jan09: Make repairs and install muffler on emergency generator. Prior to placing vessel back into service.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 January 2009
Resolved 5 January 2009
Engineering › Compressed Air System (control) › Compressor
Issued 10 December 2008
Resolved
4. To be completed prior to 10Jan09: Make proper repairs to #1 Control Air compressor. Prior to placing vessel back into service.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 January 2009
Resolved 5 January 2009
Fire Fighting › Automatic Sprinkler System › Sprinklers
Issued 10 December 2008
Resolved
5. to be completed prior to 10jan09: Prove proper operation on the deck sprinkler system. Prior to placing the vessel back into service.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 January 2009
Resolved 5 January 2009
Electrical › Electrical Distribution System (service) › Ground Indicator
Issued 10 December 2008
Resolved
6. To be completed prior to 10Jan09: Clear the grounds on the upper deck A/C units. Prior to operating the units.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 January 2009
Resolved 1 April 2009
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 10 December 2008
Resolved
7. To be completed prior to 10Jan09: Repair the leaking chloring tank for the sewage system located in the engine room fwd. Prior to placing the vessel back into service.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 January 2009
Resolved 5 January 2009
Navigation › Piloting/Steering › Magnetic Compass
Issued 17 September 2008
Resolved
Fix light on magnetic compass. Vessel will be restricted to daylight operation only until cleared by a marine inspector.
Due 24 September 2008
Resolved 26 September 2008
Fire Fighting › Fire Hydrants › Location/Position
Issued 17 September 2008
Resolved
Secure fire extinquishers in CO2 room.
Due 24 September 2008
Resolved 26 September 2008
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 17 September 2008
Resolved
Line diagrams are needed for the CO2 system and Halon system.
Due 24 September 2008
Resolved 26 September 2008
Engineering › Generator (propulsion/auxiliary-electric) › Wiring
Issued 17 September 2008
Resolved
Provide tech report for overspeed alarm malfunction on the #1 Generator. Vessel to operate on #2 Generator. If #2 Generator fails, vessel is not to operate.
Due 19 September 2008
Resolved 19 September 2008
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 25 June 2008
Resolved
Install correct bridle for rescue boat.
Due 10 July 2008
Resolved 17 September 2008
Resolution: Correct bridle is installed.
Navigation › Piloting/Steering › Magnetic Compass
Issued 25 June 2008
Resolved
Mount or remove compass in wheelhouse, if it will be mounted, swing it.
Due 10 July 2008
Resolved 17 September 2008
Resolution: Compass is mounted.
Personnel › Training › Fast Rescue Boat
Issued 19 March 2008
Resolved
Prior to returning to service, conduct satisfactory rescue boat drill in presence of USCG marine inspector. Vessel shall not carry passengers until this deficiency is cleared.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2008
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 23 January 2008
Resolved
CO2 bottle room key is not functional. Door must be kept unlocked until a new key is procured and properly installed behind the break proof glass.
Due 23 February 2008
Resolved 19 March 2008
Resolution: New key installed and sat. operation proven.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 23 January 2008
Resolved
Replace pin on anchor release bar. Conduct crew training with actual anchor release to prove proper operation.
Due 23 February 2008
Resolved 19 March 2008
Resolution: Anchor pin installed and sat. crew performance demonstrated.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 23 January 2008
Resolved
Clearly identify children's lifejacket area in aft passenger area.
Due 23 February 2008
Resolved 19 March 2008
Resolution: Children''s lifejackets stowed separately and identified.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 23 January 2008
Resolved
On Texas Deck, install easy to release pin on forward lifejacket locker.
Due 23 February 2008
Resolved 19 March 2008
Resolution: Easy release pin installed on lifejacket locker.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 January 2008
Resolved
Prove proper operation of aft anchor light.
Due 23 February 2008
Resolved 19 March 2008
Resolution: Aft anchor light operated sat.
Lifesaving › Lifefloat › Markings
Issued 23 January 2008
Resolved
Re-stencil and replace retro-reflective material on all lifefloats.
Due 23 February 2008
Resolved 19 March 2008
Resolution: All lifefloats re-stencilled and new retro tape applied.
Lifesaving › Lifefloat › Float-free Link
Issued 23 January 2008
Resolved
Replace weak link on lifefloats with Coast Guard approved weaklink.
Due 10 February 2008
Resolved 19 March 2008
Resolution: Coast Guard-approved weak link installed on lifefloats.
Lifesaving › Lifebuoys › Stowage
Issued 23 January 2008
Resolved
Replace both bridge wing lifebuoy IMO stickers with proper symbology.
Due 23 February 2008
Resolved 16 April 2008
Electrical › Electric Generation Source (emergency) › Generator
Issued 12 October 2007
Resolved
Prove proper operation of emergency diesel generator.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 October 2007
Resolved 17 October 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 12 October 2007
Resolved
Re-locate instruction placard in CO2 bottle room to a more accessible location. 17Oct07 extended this requirement uyntil 26Oct07.
Due 26 October 2007
Resolved 26 October 2007
Electrical › Electric Generation Source (emergency) › Panelboard
Issued 12 October 2007
Resolved
Prove proper operation of engine room alarm panel battery backup. 17Oct07 extended this requirement until 26Oct07.
Due 26 October 2007
Resolved 26 October 2007
Engineering › Compressed Air System (start air) › Valve
Issued 12 October 2007
Resolved
Renew relief valve on #2 air compressor.
Due 19 October 2007
Resolved 17 October 2007
Electrical › Electric Generation Source (service) › Generator
Issued 12 October 2007
Resolved
Repair fuel oil leak on #4 nozzle on #1 generator.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 October 2007
Electrical › Lighting (emergency) › Lighting Branch Circuit
Issued 12 October 2007
Resolved
Prove proper operation of emergency lighting in Emergency Diesel Generator room.
Due 19 October 2007
Resolved 17 October 2007
Engineering › Thrusters › Motor
Issued 12 October 2007
Resolved
Prove proper operation of bow thruster. Extended until 15Jan08, parts on order for replacement.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2008
Electrical › Electric Generation Source (emergency) › Generator
Issued 12 October 2007
Resolved
Repair leak on EDG radiator.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 October 2007
Resolved 17 October 2007
Engineering › Fuel Oil Service System › Valve, Control
Issued 12 October 2007
Resolved
Provide open/close direction indicator labels for remote-operated valves to all bilge and fuel spaces. Extended until 26 Oct 07, signs on order.
Due 26 October 2007
Resolved 26 October 2007
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 7 May 2007
Resolved
Each distribution panel should have on the circuit directory the name of circuit protected and the amperage of the circuit breaker. Check each distribution panel throughout vessel.
Due 7 June 2007
Resolved 22 May 2007
Resolution: Each distribution panel labeled appropriately.
Electrical › Electric Generation Source (emergency) › Generator
Issued 7 May 2007
Resolved
Clean radiator on Emergency Generator.
Due 7 June 2007
Resolved 22 May 2007
Resolution: Radiator on emergency generator cleaned.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 7 May 2007
Resolved
Clean- general housekeeping in Emergency Generator Room.
Due 7 June 2007
Resolved 22 May 2007
Resolution: Emergency generator room neatened.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 7 May 2007
Resolved
Replace Halon warning signs in Engine Room with CO2 warning signs.
Due 7 June 2007
Resolved 22 May 2007
Resolution: Halon signs in engine room replaced with CO2 signs.
Engineering › Lubricating Oil Service System › Hose
Issued 7 May 2007
Resolved
Replace lube oil line on outboard of stbd main propulsion engine.
Due 7 June 2007
Resolved 22 May 2007
Resolution: Lube oil line on stbd main propulsion engine replaced.
Construction/Loadline › Structures › Door
Issued 7 May 2007
Resolved
Repair or replace stbd door on exterior of Texas deck.
Due 7 June 2007
Resolved 22 May 2007
Resolution: Exterior stbd door on Texas deck repaired.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 3 May 2007
Resolved
Display current Certificate of Documentation. COD displayed expired 30APR07.
Due 7 June 2007
Resolved 22 May 2007
Resolution: Current COD displayed on bridge.
Engineering › Steering Gear System › Piping
Issued 19 January 2007
Resolved
Excessive leaking around steering gear pumps.
Action required: 705 - Other - as specified
Due 2 February 2007
Resolved 2 February 2007
Resolution: All fittings tightened excess oil cleaned up.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 19 January 2007
Resolved
Low Lube Oil Shutdown failed to operate on Stbd Main.
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 February 2007
Resolved 2 February 2007
Resolution: Low Lube Oil shutdown initially wired incorrectly. Wiring problems corrected and shutdown works as expected.
Engineering › Diesel Engine (propulsion-reduction gear) › Pump, Positive Displacement
Issued 19 January 2007
Resolved
Lube Oil line broke due to vibration.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 2 February 2007
Resolved 2 February 2007
Resolution: Lube Oil line replaced and routed to prevent chaffing.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 30 August 2006
Resolved
Prior to carrying passengers provide approved plans for the newly installed CO2 system.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 October 2006
Resolution: Approval letter received from MSC for CO2 fire suppression system. Serial # E1-0602741. system inspected and tested on 30 Aug 06
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 25 April 2005
Resolved
Remove excessive oil from engine room bilge spaces, as well as sludge from the bilges.
Due 25 May 2005
Resolved 29 July 2005
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 27 October 2004
Resolved
Renew lifeline on STBD lighted ring bouy.
Due 28 November 2004
Resolved 6 January 2005
Lifesaving › Lifefloat › Float-free Link
Issued 27 October 2004
Resolved
Renew retaining line on lifefloats to include a weak link tag.
Due 28 November 2004
Resolved 6 January 2005
Fire Fighting › Fire Hoses › Condition
Issued 27 October 2004
Resolved
Replace fire hose on 03 deck aft.
Due 6 January 2005
Resolved 28 October 2004
Engineering › Lubricating Oil Service System › Filter
Issued 27 October 2004
Resolved
Correct excessive leaking on #1 main diesel engine lube oil filter housing.
Due 6 January 2005
Resolved 6 January 2005
Engineering › Lubricating Oil Storage/Transfer System › Valve
Issued 27 October 2004
Resolved
correct leaking hydraulic hand pump valve and piping portside engine room.
Due 28 November 2004
Resolved 6 January 2005
Engineering › Compressed Air System (control) › Compressor
Issued 27 October 2004
Resolved
Correct all hydraulic oil leaks on both starting air compressors.
Due 28 November 2004
Resolved 6 January 2005
Electrical › Electric Generation Source (emergency) › Panelboard
Issued 27 October 2004
Resolved
Repair emergency generator frequency board.
Due 28 November 2004
Resolved 6 January 2005
Operations/Management › Pollution › Retention of Oily Mixture
Issued 27 October 2004
Resolved
Remove excessive oil from all engine room compartment bilges.
Due 28 November 2004
Resolved 6 January 2005
Engineering › Steering Gear System › Rudder
Issued 14 October 2004
Resolved
Port Ruder and post sheared off at bottom of vessel. New rudder and post installed.
Condition: Unknown
Due 14 October 2004
Resolved 14 October 2004
Resolution: New rudder and post installed.
Engineering › Shafting/Propeller Arrangements
Issued 27 August 2003
Resolved
Replace packing on the port shaft and port rudder.
Action required: 705 - Other - as specified
Due 27 September 2003
Resolved 5 February 2004
Electrical › Electric Generation Source (emergency)
Issued 27 August 2003
Resolved
Prove proper operaqtion of the emergency alarms for the emergency generator ( high jacket water temp). Replace protective guard over the movable belts for the fan. Also secure loose wires on the engine.
Due 27 September 2003
Resolved 5 February 2004
Electrical
Issued 7 May 2002
Resolved
Make repairs to the engine room automated alarm panel and test in the present of the attending Marine Inspector (Alarm panel gives false indications and/or does not work at all. i.e. Generator/Main diesel engine overspeeds, low lube oil and j/w alarms). LEGACY COMPONENT DESC: Engineering room automated alarm panel
Condition: Unknown
Due 7 June 2002
Resolved 6 November 2002
Resolution: Observed satisfactory test of engine over speed, loss of lube oil press and j/w high temp audible and visual alarm activation on both propulsion engines and both diesel generators.
Engineering
Issued 9 May 2001
Resolved
Prove proper operation of the high jacket water temperatur alarm on the port main engine.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Engineering
Issued 9 May 2001
Resolved
Prove proper operation of the low lube oil pressure shutdown on the port main engine.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Engineering
Issued 9 February 2001
Resolved
Repair or replace the valve leading to the port shaft tube seal.
Condition: Unknown
Due 9 February 2001
Resolved 9 February 2001
Fire Fighting
Issued 9 February 2001
Resolved
Repair the A-60 boundry in the engine room overhead fwd of the alarm panel.
Condition: Unknown
Due 9 February 2001
Resolved 9 February 2001
Electrical
Issued 9 February 2001
Resolved
Repair the overspeed trip on stbd generator.
Condition: Unknown
Due 9 February 2001
Resolved 9 February 2001
Engineering
Issued 9 February 2001
Resolved
Repair leaking seal on attached L/O pump on fwd end of stbd MDE.
Condition: Unknown
Due 9 February 2001
Resolved 9 February 2001
Engineering
Issued 9 February 2001
Resolved
Replace missing lagging on port MDE exhaust.
Condition: Unknown
Due 9 February 2001
Resolved 9 February 2001
Lifesaving › Rescue Boat › Propulsion Engine
Issued 10 November 1999
Resolved
PROVIDE SUITABLE RESCUE BOAT TO THE SATISFACTION OF THE OCMI.
Condition: Unknown
Due 27 July 2004
Resolved 27 July 2004
Electrical
Issued 10 November 1999
Resolved
PROVE PROPER OPERATION OF PORT GENERATOR LUBE OIL ALARM.
Condition: Unknown
Due 10 November 1999
Resolved 10 November 1999
Construction/Loadline
Issued 24 February 1999
Resolved
REPAIR MAINDECK DOORS AS NECESSARY.
Condition: Unknown
Due 24 February 1999
Resolved 24 February 1999
Fire Fighting
Issued 24 February 1999
Resolved
REPAIR VALVE ON HOSE STATION 10.
Condition: Unknown
Due 24 February 1999
Resolved 24 February 1999
Engineering
Issued 18 November 1998
Resolved
RENEW FLEXIBLE HOSES TO PNEUMATIC CONTROL SELECTOR VALVES ON PORT AND STBD REDUCTION GEARS.
Condition: Unknown
Due 18 November 1998
Resolved 18 November 1998
Engineering
Issued 18 November 1998
Resolved
PROVE PROPER OPERATION OF STBD MAIN ENGINE LOSS OF LUBE OIL ALARM AND SHUTDOWN.
Condition: Unknown
Due 18 November 1998
Resolved 18 November 1998
Engineering
Issued 18 November 1998
Resolved
RENEW FLEXIBLE HOSES ON CRANKCASE LUBE OIL LEVEL ALARM UNITS ON PORT AND STBD GENERATORS.
Condition: Unknown
Due 18 November 1998
Resolved 18 November 1998
Fire Fighting
Issued 26 August 1998
Resolved
FREE STICKING LOUVERS ON STACK VENT.
Condition: Unknown
Due 26 August 1998
Resolved 26 August 1998
Lifesaving
Issued 26 August 1998
Resolved
PROVIDE TAG FOR FLOAT FREE LINK ON LIFEFLOATS.
Condition: Unknown
Due 26 August 1998
Resolved 27 August 1998
Lifesaving
Issued 26 August 1998
Resolved
PROVIDE SUITABLE RESCUE BOAT TO THE SATISFACTION OF THE OCMI.
Condition: Unknown
Due 26 August 1998
Resolved 26 August 1998
Navigation
Issued 26 August 1998
Resolved
REPAIR STEERING BULBS ON CONTROL PANEL AND DETERMINE CAUSE OF BURNING BULBS.
Condition: Unknown
Due 26 August 1998
Resolved 26 August 1998
Fire Fighting
Issued 26 August 1998
Resolved
CLEAN SPRINKLER HEADS.
Condition: Unknown
Due 26 August 1998
Resolved 26 August 1998
Navigation
Issued 26 August 1998
Resolved
REPAIR SECONDARY MASTHEAD LIGHT.
Condition: Unknown
Due 26 August 1998
Resolved 26 August 1998
Electrical
Issued 26 August 1998
Resolved
REPLACE OR LINE BATTERY BOX ON BRIDGE.
Condition: Unknown
Due 26 August 1998
Resolved 26 August 1998
Lifesaving
Issued 26 August 1998
Resolved
PROVIDE PROPOSAL TO REPLACE RESCUE BOAT WITH BOAT AND MOTOR ACCEPTABLE TO THE OCMI.
Condition: Unknown
Due 26 August 1998
Resolved 26 August 1998
Fire Fighting
Issued 26 August 1998
Resolved
REPAIR OR REPLACE STBD ENGINE ROOM ACCESS DOOR FROM WEATHERDECK TO CONTAIN HALON DISCHARGE. THIS 835 IS A COPY OF ONE WRITTEN IN MI98016626 AND IS REISSUED HERE FOR PURPOSES OF EXTENDING THE COMPLIANCE DATE; IT IS THE SAMEDISCREPANCY AND DOOR AS BEFORE.
Condition: Unknown
Due 26 August 1998
Resolved 26 August 1998
Engineering
Issued 14 May 1998
Resolved
PROVE PROPER OPERATION OF STBD GENERATOR OVERSPEED._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 May 1998
Resolved 14 May 1998
Fire Fighting
Issued 14 May 1998
Resolved
REPLACE FIRE STATION NR 9 VALVE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 May 1998
Resolved 14 May 1998
Engineering
Issued 14 May 1998
Resolved
PROVE PROPER OPERATION OF PORT AND STBD MAIN ENGINE LUBE OIL ALARMS AND TRIPS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 May 1998
Resolved 14 May 1998
Lifesaving
Issued 14 May 1998
Resolved
MAKE PERMANENT REPAIRS TO DIRTY OIL PUMP AND REMOVE OILY WASTE FROM UNDERNEATH MAIN ENGINES AND GENERATORS TO SHORE FACILITY.
Condition: Unknown
Due 14 May 1998
Resolved 14 May 1998
Lifesaving
Issued 14 May 1998
Resolved
PERFORM GENERAL HOUSEKEEPING OF ENGINEERING SPACES TO INCLUDE REMOVAL OF CARDBOARD BEHIND SWITCHBOARD, WORKBENCH CLUTTER AND LADDERS._x001C_
Condition: Unknown
Due 14 May 1998
Resolved 14 May 1998
Lifesaving
Issued 14 May 1998
Resolved
REPAIR OR REPLACE STBD ENGINE ROOM ACCESS DOOR FROM WEATHERDECK TO CONTAIN HALON DISCHARGE.
Condition: Unknown
Due 14 May 1998
Resolved 14 May 1998
Engineering
Issued 14 May 1998
Resolved
PROVE PROPER OPERATION OF PRESSURE RELIEF VALVES FOR SERVICE AIR TANKS 1 AND 2, AND PROVE OPERATION OF SERVICE AIR COMPRESSORS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 May 1998
Resolved 14 May 1998
Construction/Loadline
Issued 12 February 1998
Resolved
RENEW GASKET IN BOW THRUSTER ESCAPE HATCH AND READJUST SAME.
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Lifesaving
Issued 12 February 1998
Resolved
RELABLE PLACARD FOR EMERGENCY GENERATOR HALON SYSTEM TO READ "EMERGENCY GENERATOR ROOM" VICE "ENGINE ROOM."
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Navigation
Issued 12 February 1998
Resolved
TIGHTEN STEERING RUDDERS' PACKING.
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Navigation
Issued 12 February 1998
Resolved
RENEW WITH LONGER FLEXIBLE HOSE (ROD END) OF THE PORT AFT RUDDER HYDRAULIC RAM.
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Lifesaving
Issued 15 May 1997
Resolved
PROVIDE 61 ADDITIONAL ADULT LIFE JACKETS AND 6 ADDITIONAL CHILD LIFE JACKETS. COI REQUIRES 1006 ADULT AND 101 CHILD LIFE JACKETS. VESSEL IS RESTRICTED TO 945 ADULT PASSENGES AND 95 CHILDREN._x001C_
Condition: Unknown
Due 13 August 1997
Resolved 13 August 1997
Fire Fighting
Issued 15 May 1997
Resolved
REPLACE ALL FIRE HOSE AND NOZZELS TO COMPLY WITH 46 CFR 76-10-10 )K) (1). ALL HOSES AND NOZZELS CARRIED ON BOARD SHALL BE NINE THREDS PER INCH.
Condition: Unknown
Due 13 August 1997
Resolved 13 August 1997
Engineering
Issued 15 May 1997
Resolved
CALIBRATE ALL JACKET WATER ALARMS/SHUTDOWNS/LOW LUBE OIL ALARMS AND LOSS OFLUBE OIL SHUT DOWNS.
Condition: Unknown
Due 19 September 1997
Resolved 1 October 1997
Unknown
Issued 29 January 1997
Resolved
PROVE PROPER OPERATION OF CALL SYSTEM AT ALL STATIONS.
Condition: Unknown
Due 29 January 1997
Resolved 29 January 1997
Navigation
Issued 29 January 1997
Resolved
INSTALL RUNNING LIGHTS IAW 72 COLREGS.
Condition: Unknown
Due 29 January 1997
Resolved 29 January 1997
Unknown
Issued 29 May 1996
Resolved
Install containment plug on vent containment, forward starboard.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Accommodation/Occupational Safety
Issued 29 May 1996
Resolved
Label all vents, remote operational valves and dampeners.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 May 1996
Resolved
Properly label all circuit breakers on main switch board.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 May 1996
Resolved
Install cover on fuse box, located port console, on bridge.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Accommodation/Occupational Safety
Issued 29 May 1996
Resolved
Make permanent repairs to engine room door automatic closure device to allow door to shut. Door located forward, midships.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Construction/Loadline
Issued 29 May 1996
Resolved
Make permanent repairs to ballast pump discharge valve, to eliminate leakage onto ballast pump motor.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Navigation
Issued 29 May 1996
Resolved
Remove flexible hoses in excess of thirty(30) inches from bow thruster and emergency generator, hydraulic/lube oil lines.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Accommodation/Occupational Safety
Issued 29 May 1996
Resolved
Prove proper operation and closure of engine room emergency escape hatch.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Unknown
Issued 29 May 1996
Resolved
Prove proper operation of aft port talkback system, main deck.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Lifesaving
Issued 22 March 1996
Resolved
RIG LIFE FLOATS WITH AT LEAST 12 FEET OF SEPARATION LINE BETWEEN EACH.
Condition: Unknown
Due 22 March 1996
Resolved 22 March 1996
Lifesaving
Issued 22 March 1996
Resolved
TOTAL ADULT CAPACITY IS REDUCED BY 54 UNTIL SECOND DECK IS OPEN TO THE PUBLIC AND LIFE JACKETS STOWED IN THAT AREA ARE AVAILABLE FOR EMERGENCY USE.
Condition: Unknown
Due 22 March 1996
Resolved 22 March 1996
Lifesaving
Issued 22 March 1996
Resolved
TOTAL CHILD CAPACITY IS REDUCED BY 25 UNTIL SECOND DECK IS OPEN TO THE PUBLIC AND LIFE JACKETS STOWED IN THAT AREA ARE AVAILABLE FOR EMERGENCY USE.
Condition: Unknown
Due 22 March 1996
Resolved 22 March 1996
Lifesaving
Issued 1 March 1996
Resolved
STENCIL CAPACITY ON LIFE FLOATS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Deck/Cargo
Issued 1 March 1996
Resolved
REPLACE ALL HYDRAULIC HOSES ON BOW THRUSTER SYSTEM IN EXCESS OF 30 INCHES WITH HARD PIPE SYSTEM.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Engineering
Issued 1 March 1996
Resolved
REPLACE CRACKED PORT MAIN REDUCTION GEAR HYDRAULIC HOSES.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Lifesaving
Issued 1 March 1996
Resolved
REPLACE RING BUOY ON PORT SIDE OF VEHICLE DECK.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Electrical
Issued 1 March 1996
Resolved
REPLACE BURNED OUT BULBS; ON VEHICLE DECK (6 SETS), BOTTOM OF STAIRS TO WHEELHOUSE, & STBD SIDE PASSENGER RAMP SPACE.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Electrical
Issued 1 March 1996
Resolved
PROVE PROPER OPERATION OF LUBE OIL SHUT DOWNS ON BOTH S/S GENERATORS & EMERGENCY GENERATORS.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Engineering
Issued 1 March 1996
Resolved
PROVE PROPER OPERATION OF LUBE OIL SHUTDOWNS ON BOTH MAIN ENGINES.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Construction/Loadline
Issued 1 March 1996
Resolved
STENCIL VESSEL NAME ON BOW.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Fire Fighting
Issued 1 March 1996
Resolved
CLEAR SPRINKLER SYSTEM NOZZLE HEADS ON VEHICLE DECK; PROVE PROPER OPERATIONOF SYSTEM TO CG INSPECTOR.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Navigation
Issued 6 October 1995
Resolved
PROVE PROPER OPERATION OF #1 STEERING GEAR PUMP'S POWER FAILURE ALARM
Condition: Unknown
Due 6 October 1995
Resolved 6 October 1995
Electrical
Issued 6 October 1995
Resolved
PROVE PROPER OPERATION OF EMERGENCY GENERATOR'S HIGH JACKET WATER ALARM
Condition: Unknown
Due 6 October 1995
Resolved 6 October 1995
Engineering
Issued 6 October 1995
Resolved
PROVE PROPER OPERATION OF STARBOARD MAIN ENGINE'S LOW OIL SHUTDOWN
Condition: Unknown
Due 6 October 1995
Resolved 6 October 1995
Navigation
Issued 6 October 1995
Resolved
PROPERLY COTTER PIN OR DOUBLE NUT ALL STEERING GEAR LINKAGES AND HYDRAULIC RAM SUPPORTS
Condition: Unknown
Due 6 October 1995
Resolved 6 October 1995
Engineering
Issued 6 October 1995
Resolved
REMOVE/REPLACE STARBOARD (ME) REFINING L.O. FILTERS NON-METALLIC FLEXIBLE LINES THAT ARE GREATER THAN 30 INCHES
Condition: Unknown
Due 6 October 1995
Resolved 6 October 1995
Fire Fighting
Issued 7 June 1995
Resolved
REPLACE NON-STANDARD FIRE HOSES WITH U.S. COAST GUARD APPROVED FIRE HOSES THAT MEET THE THREAD REQUIREMENTS IN 46CFR 76.10-10(K)(I).
Condition: Unknown
Due 7 June 1995
Resolved 7 June 1995
Lifesaving
Issued 7 June 1995
Resolved
REPLACE BURNT OUT BULBS ON THE REMOTE ALARM PANEL IN THE VESSEL'S PILOTHOUSE.
Condition: Unknown
Due 7 June 1995
Resolved 7 June 1995
Lifesaving
Issued 7 June 1995
Resolved
REPLACE MISSING EMERGENCY LIGHTING "E" LABELS THROUGHOUT THE VESSEL.
Condition: Unknown
Due 7 June 1995
Resolved 7 June 1995
Electrical
Issued 7 June 1995
Resolved
CLEAR GROUND FAULT ON "A" PHASE 480V CIRCUIT FOR AIR CONDITIONER UNIT #3.
Condition: Unknown
Due 7 June 1995
Resolved 7 June 1995
Construction/Loadline
Issued 14 March 1995
Resolved
Replace/repair weather-tight door from car deck to upper stairway.
Condition: Unknown
Due 14 March 1995
Resolved 14 March 1995
Electrical
Issued 14 March 1995
Resolved
Replace broken light covers as needed on outside decks.
Condition: Unknown
Due 14 March 1995
Resolved 14 March 1995
Lifesaving
Issued 30 August 1994
Resolved
PROPERLY MARK ALL LIFE PRESERVER STOWAGE LOCKERS WITH NUMBER OF PRESERVERS AND TYPE (ADULT/CHILD) IAW 46CFR 75.40-20
Condition: Unknown
Due 30 August 1994
Resolved 30 August 1994
Lifesaving
Issued 30 August 1994
Resolved
REMOVE ALL SIGNS ON OLD LIFE PRESERVER CABINETS, WHERE LIFE PRESERVERS ARE NOT BE STOWED.
Condition: Unknown
Due 30 August 1994
Resolved 30 August 1994
Lifesaving
Issued 15 June 1994
Resolved
PROVIDE SUITABLE CONTAINERS ON 01/02 EXTERIOR DECKS FOR CHILDREN LIFE JACKETS. LABLE AS CHILDRENS LIFE JACKETS.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Electrical
Issued 15 June 1994
Resolved
MAKE REPAIRS TO AND DEMONSTRATE PROPER OPERATION OF REMOTE SHUTDOWNS FOR EMERGENCY GENERATOR.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Engineering
Issued 15 June 1994
Resolved
MAKE REPAIRS TO AND DEMONSTRATE PROPER OPERATION OF PORT MAIN ENGINE OVERSPEED TRIP.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Electrical
Issued 15 June 1994
Resolved
MAKE REPAIRS TO AND DEMONSTRATE PROPER OPERATION OF THE EMERGENCY GENERATORLOW LUBE OIL TRIP.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Lifesaving
Issued 11 February 1994
Resolved
PROVIDE SUITABLE CONTAINERS OR SECURING DEVICES TO CONTAIN LIFEJACKETS STOWED ON EXTERIOR DECKS.
Condition: Unknown
Due 11 February 1994
Resolved 11 February 1994
Documentation
Issued 11 February 1994
Resolved
PROVIDE FIRE AND SAFETY PLAN IAW 46CFR78.45 AS APPLICABLE.
Condition: Unknown
Due 11 February 1994
Resolved 11 February 1994
Electrical
Issued 22 December 1993
Resolved
Prove proper operation of low lube oil pressure shutdowns on both ship's service diesel generators.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Electrical
Issued 22 December 1993
Resolved
Mark electrical panel circuit breakers on bridge.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Lifesaving
Issued 22 December 1993
Resolved
Provide suitable containment that allows passenger access to weather deck life jackets.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Fire Fighting
Issued 6 October 1993
Resolved
Install Coast Guard approved insulation over starboard generator where sameis missing.
Condition: Unknown
Due 6 November 1993
Resolved 16 November 1993
Engineering
Issued 6 October 1993
Resolved
Renew both large air receiver relief valves with ASME labeled valves.
Condition: Unknown
Due 6 November 1993
Resolved 16 November 1993
Electrical
Issued 18 June 1993
Resolved
REPAIR AND DEMONSTRATE PROPER OPERATION OF EMERGENCY GENERATOR LOSS OF L/O SHUTDOWN.
Condition: Unknown
Due 18 June 1993
Resolved 18 June 1993
Construction/Loadline
Issued 24 March 1993
Resolved
PROVE PROPER OPERATION OF FORWARD BILGE PUMP.
Condition: Unknown
Due 24 March 1993
Resolved 24 March 1993
Lifesaving
Issued 19 June 1992
Resolved
MARK ALL GENERAL ALARM LIGHTS WITH WARNING.
Condition: Unknown
Due 19 June 1992
Resolved 19 June 1992
Lifesaving
Issued 19 June 1992
Resolved
DEMONSTRATE OPERATION OF GENERAL ALARM CONTACT MAKER IN ENGINE ROOM.
Condition: Unknown
Due 19 June 1992
Resolved 19 June 1992
Fire Fighting
Issued 19 June 1992
Resolved
MARK OPERATING VALVES FOR MACHINERY SPACE FIXED HALON SYSTEM.
Condition: Unknown
Due 19 June 1992
Resolved 19 June 1992
Electrical
Issued 19 June 1992
Resolved
PROVIDE PROTECRIVE GUARD ON EMERGENCY DIESEL GENERATOR BELTS.
Condition: Unknown
Due 19 June 1992
Resolved 19 June 1992
Electrical
Issued 19 June 1992
Resolved
DEMONSTRATE OPERATION OF PORT GENERATOR OVERSPEED ALARM.
Condition: Unknown
Due 19 June 1992
Resolved 19 June 1992
Electrical
Issued 20 December 1991
Resolved
REPAIR AND PROVE PROPER OPERATION OF EMERGENCY GENERATOR OVERSPEED AND LOW LUBE OIL TRIP IN ACCORDANCE WITH 46CFR112.50.
Condition: Unknown
Due 20 December 1991
Resolved 20 December 1991
Navigation
Issued 20 December 1991
Resolved
REPAIR AND PROVE PROPER OPERATION OF MAIN RUDDER INDICATOR IN THE ENGINEROOM IN ACCORDANCE WITH 46CFR77.05.
Condition: Unknown
Due 20 December 1991
Resolved 20 December 1991
Electrical
Issued 20 December 1991
Resolved
REPAIR AND PROVE PROPER OPERATION OF #2 (STBD) SHIP SERVICE GENERATOR OVERSPEED INDICATOR AND LOW LUBE OIL TRIP IN ACCORDANCE WITH46CFR111.12-1.
Condition: Unknown
Due 20 December 1991
Resolved 20 December 1991
Fire Fighting
Issued 21 June 1991
Resolved
REPAIR ALL CLOGGED OR MISSING SPRINKLER HEADS/PIPING OIN VEHICLE DECK. PROVIDE (1) ONE ADDITIONAL CREW MEMBER AS A FIRE PATROLMAN. MAINTAIN CHARGED FIREMAIN SYSTEM AND PROVIDE 3 ADDITIONAL B-II PORTABLE FIRE EXTINGUISHERS ON VEHICLE DECK DURING REPAIR PERIOD.
Condition: Unknown
Due 21 June 1991
Resolved 21 June 1991
Lifesaving
Issued 21 December 1990
Resolved
PROVIDE 5 CHILDREN AND 3 ADULT LIFE PRESERVERS. TOTAL PERSONS ON BOARD IS LIMITED TO 1001 UNTIL COMPLIANCE.
Condition: Unknown
Due 21 December 1990
Resolved 21 December 1990
Construction/Loadline
Issued 21 December 1990
Resolved
RENEW FLAME SCREENS FOR FUEL OIL TANKS AS NECESSARY.
Condition: Unknown
Due 21 December 1990
Resolved 21 December 1990
Fire Fighting
Issued 29 June 1990
Resolved
PROPERLY LABEL AND PROVIDE GLASS BREAKER BARS FOR ALL PORTABLE FIRE EXTINGUISHER STATIONS. 46 CFR 78.47
Condition: Unknown
Due 29 June 1990
Resolved 29 June 1990
Fire Fighting
Issued 29 June 1990
Resolved
REPAIR FIRE HOSE RACK TO FIRE STATION NUMBER 8. 46 CFR 76.10-10
Condition: Unknown
Due 29 June 1990
Resolved 29 June 1990
Construction/Loadline
Issued 29 June 1990
Resolved
GRIND OUT AND REWELD FRACTURED WELD TO STARBOARD RUDDER POST FOUNDATION. 46 CFR 71.25-50
Condition: Unknown
Due 29 June 1990
Resolved 29 June 1990
Fire Fighting
Issued 29 June 1990
Resolved
REPAIR AND PROVE PROPER OPERATION TO FIRE SCREEN DOORS TO ENGINE ROOM AND PASSENGER LOUNGE FROM VEHICLE DECK. 46 CFR 72.05-25
Condition: Unknown
Due 29 June 1990
Resolved 29 June 1990
Fire Fighting
Issued 29 June 1990
Resolved
LABEL EMERGENCY EXIT FROM ENGINE ROOM. 46 CFR 78.47-40
Condition: Unknown
Due 29 June 1990
Resolved 29 June 1990
Fire Fighting
Issued 6 April 1990
Resolved
REMOVE COUPLING AND ADAPTER FROM FIRE HOSE AT FIRE STATION #2 IN ENGINE ROOM. THIS ITEM IS TO BE CORRECTED PRIOR TO CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 6 April 1990
Resolved 6 April 1990
Fire Fighting
Issued 6 April 1990
Resolved
RENEW PUMP PACKING FOR FIRE PUMP.
Condition: Unknown
Due 6 April 1990
Resolved 6 April 1990
Navigation
Issued 6 April 1990
Resolved
REMOVE OIL AND CLEAN BILGE IN STEERING GEAR COMPARTMENT.
Condition: Unknown
Due 6 April 1990
Resolved 6 April 1990
Lifesaving
Issued 5 January 1990
Resolved
PROVIDE 18 ADDITIONAL ADULT AND 5 ADDITIONAL CHILD LIFEJACKETS. TOTAL NUMBER OF PERSONS ALLOWED IS REDUCED TO 998 UNTIL THIS ITEM IS CORRECTED. 46 CFR 75.40-10
Condition: Unknown
Due 5 January 1990
Resolved 5 January 1990
Fire Fighting
Issued 5 January 1990
Resolved
PROVE OPERATION OF SPANNER WRENCHES ON ALL FIRE STATIONS. 46 CFR 76.10-10.
Condition: Unknown
Due 5 January 1990
Resolved 5 January 1990
Fire Fighting
Issued 5 January 1990
Resolved
DRAIN WATER FROM HOSES AND PROVE FIRE STATIONS VALVES TIGHT ON FIRE STATIONS 9 AND 11. 46 CFR 76.10-10
Condition: Unknown
Due 5 January 1990
Resolved 5 January 1990
Electrical
Issued 5 January 1990
Resolved
REPAIR AND PROVE OPERATION OF PILOT HOUSE GENERAL ALARM SWITCH. (SWITH DOESNOT SOUND IN ACTIVATED DETENT POSITION.) 46 CFR 113.25
Condition: Unknown
Due 5 January 1990
Resolved 5 January 1990
Fire Fighting
Issued 5 January 1990
Resolved
REMOVE ALL LATCHES THAT HOLD FIRE DOORS IN OPEN POSITION AND PROVE PROPER OPERATION (CLOSURE) OF ALL FIRE DOORS. 46 CFR 72.05-25
Condition: Unknown
Due 5 January 1990
Resolved 5 January 1990
Navigation
Issued 5 January 1990
Resolved
REPAIR AND PROVE OPERATION OF ENGINE ROOM SOUND POWERED PHONE VISUAL INDICATING LIGHT. 46 CFR 113.30
Condition: Unknown
Due 5 January 1990
Resolved 5 January 1990
Fire Fighting
Issued 7 July 1989
Resolved
CLEAN OUT AND PROVE PROPER OPERATION OF VEHICULAR DECK SPRINKLER SYSTEM.
Condition: Unknown
Due 7 July 1989
Resolved 7 July 1989
Engineering
Issued 7 July 1989
Resolved
PROVE PROPER OPERATION OF OVERSPEED TRIP TO OPERATE AT OR BELOW 15% ABOVE RATED RPM 1200 RPM.
Condition: Unknown
Due 7 July 1989
Resolved 7 July 1989
Unknown
Issued 7 July 1989
Resolved
PROVE PROPER OPERATION OF DAY TANK REACH ROD.
Condition: Unknown
Due 7 July 1989
Resolved 7 July 1989
Fire Fighting
Issued 7 April 1989
Resolved
REPLACE OR REPAIR FIRE HOSE NOZZLE AT FIRE STATION NO. 5. 46 CFR 76.10-10 (J)
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Fire Fighting
Issued 7 April 1989
Resolved
REPAIR OR REPLACE FIRE DOOR AT 01 LEVEL WHICH LEADS TO STAIRWAY GOING UP TO02 LEVEL. 46 CFR 72.05-25
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Engineering
Issued 7 April 1989
Resolved
REPLACE SCREEN ON FUEL OIL NO. 1-P1 CONTAINMENT. 46 CFR 56.50-85 (A)(7)
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Electrical
Issued 7 April 1989
Resolved
MAKE REPAIRS TO AND DEMONSTRATE PROPER OPERATION OF PORT S/S GENERATOR LOW LUBE OIL ALARM. 46 CFR 111.12-1 (C)
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Electrical
Issued 7 April 1989
Resolved
DEMONSTRATE PROPER OPERATION OF OVERSPEED TRIPS, LOW LUBE OIL ALARM AND HIGH JACKET WATER TEMP ALARMS ON VSL'S PORT & STBD S/S GENERATORS AND VSL'SEMERGENCY GENERATOR. 46 CFR 111.12-1 AND 46 CFR 112.50-1 (IV)(I)
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Engineering
Issued 7 April 1989
Resolved
DEMONSTRATE PROPER OPERATION OF OVERSPEED TRIPS, LOW LUBE OIL ALARMS, AND HIGH JACKET WATER TEMP ALARMS ON VSL'S MAIN PROPULSION DIESEL ENGINES. 46 CFR 58.10-10 AND ABS RULES SECTION 34.11.6
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Deck/Cargo
Issued 7 April 1989
Resolved
MAKE REPAIRS TO AND DEMONSTRATE PROPER OPERATION OF VESSEL'S BOW THRUSTER. 46 CFR 61.01-1
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Fire Fighting
Issued 2 February 1989
Resolved
REINSTALL DOOR FROM 01 DECK TO 02 DECK WHERE MISSING; LOWER PASSENGER DECK,FORWARD CENTERLINE. 46 CFR 72.05-25
Condition: Unknown
Due 2 February 1989
Resolved 2 February 1989
Lifesaving
Issued 7 October 1988
Resolved
PROVIDE REPLACEMENT FOR BROKEN OARLOCK ON PORTSIDE OF RESCUE BOAT. 46CFR75.20-15
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Accommodation/Occupational Safety
Issued 7 October 1988
Resolved
REPAIR OR REPLACE ENGINE ROOM EXHAUST BLOWER. 46CFR72.05-50;72.15-10
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Accommodation/Occupational Safety
Issued 7 October 1988
Resolved
REPLACE THE FOREWARD VENT COVER WITH IT'S INTEGRAL DAMPER WHICH IS LOCATED ON PORTSIDE OF THE STACK. 46CFR72.05-50;72.15-10
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Lifesaving
Issued 8 July 1988
Resolved
DEMONSTRATE OPERATION OF RESCUE BOAT AND WINCH AFTER BOAT IS RENEWED.
Condition: Unknown
Due 8 July 1988
Resolved 8 July 1988
Fire Fighting
Issued 8 July 1988
Resolved
REPLACE OR REPAIR AND DEMONSTRATE PROPER OPERATION OF EMERGENCY DIESEL GENERATOR SHUTDOWN PRESSURE SWITCH.
Condition: Unknown
Due 8 July 1988
Resolved 8 July 1988
Fire Fighting
Issued 8 July 1988
Resolved
TEST OR REPLACE 10% OF FLEXIBLE LOOPS OR PROVIDE EVIDENCE THAT THEY WERE PRESSURE TESTED/ RENEWED.
Condition: Unknown
Due 8 July 1988
Resolved 8 July 1988
Electrical
Issued 8 July 1988
Resolved
REPAIR OR REPLACE THE THREE (3) NON-OPERABLE GENERAL ALARM BELLS.
Condition: Unknown
Due 8 July 1988
Resolved 8 July 1988
Electrical
Issued 8 July 1987
Resolved
REPAIR REMOTE SHUTDOWN FOR PILOT HOUSE A/C UNIT AND PROVE PROPER OPERATION.
Condition: Unknown
Due 8 July 1987
Resolved 8 July 1987
Construction/Loadline
Issued 29 January 1982
Resolved
PROVIDE MEANS TO SECURE LIFE PRESERVERS IN EXTERIOR STORAGE CABINETS
Condition: Unknown
Due 29 January 1982
Resolved 29 January 1982
Construction/Loadline
Issued 29 January 1982
Resolved
REMOVE SHARP EDGES FROM EXTERIOR OF LIFE PRESERVER STORAGE CABINETS.
Condition: Unknown
Due 29 January 1982
Resolved 29 January 1982
Navigation
Issued 11 January 1982
Resolved
REPAIR STEERING RUDDER ANGLE INDICATOR
Condition: Unknown
Due 28 February 1982
Resolved 11 January 1982
Navigation
Issued 11 January 1982
Resolved
REPAIR AFT ANCHOR LIGHT
Condition: Unknown
Due 11 January 1982
Resolved 11 January 1982
Construction/Loadline
Issued 11 January 1982
Resolved
REPAIR DOORS ON LIFEJACKET STORAGE CABINETS ON PASSENGER DECK
Condition: Unknown
Due 28 February 1982
Resolved 11 January 1982