Records from 2016 to 2026. Most recent: inspection, 2 March 2026.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 17
2 March 2026
Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 8309998
25 March 2025
MTSA Verification · Administrative Inspection · Deficiency Check · Periodic Inspection · Examination of Repairs
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 8099032
29 February 2024
Examination of Repairs · Hull Examination · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7873858
7 February 2024
Administrative Inspection · Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7858394
16 January 2024
Annual Inspection · Administrative Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7849628
27 November 2023
Administrative Inspection
Administrative · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7829995
1 March 2023
Deficiency Check · Annual Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7618096
9 March 2022
Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7408662
1 March 2022
Internal Structural Exam · Annual Inspection · Underwater Inspection in lieu of Drydock
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7392391
7 January 2022
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7377024
2 March 2021
DAPI Audit · COI Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7148683
21 January 2020
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6886850
15 March 2019
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6642807
6 December 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6593242
12 December 2017
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6315017
29 November 2016
Internal Structural Exam · MTSA Verification · Examination of Repairs · Drydock Exam · Deficiency Check · Cargo Tank Internal · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6048324
8 January 2016
Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5793778
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 2 March 2026
Resolved
Each cargo tank of a tank barge must have one of the following liquid overfill protection arrangements: A system that is powered by generators on the barge. The port generator was found to be inoperable.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2026
Resolved 5 March 2026
Resolution: The generator and it's emergency shutdown were successfully tested.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 2 March 2026
Resolved
On a tank barge, each cargo tank must be equipped with an overfill device that meets the requirements of 46 CFR 39.2007. The overfill alarm for tank 2P was found to be inoperable.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2026
Resolved 5 March 2026
Resolution: The overfill alarm for tank 2P was successfully tested.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 2 March 2026
Resolved
Each end of each transfer hose on board which is not connected for the transfer of oil or hazardous material must be blanked off with butterfly valves, wafer-type resilient seated valves, blank flanges, or other acceptable means. The barge's two transfer hoses were not blanked off.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2026
Resolved 5 March 2026
Resolution: The two transfer hoses have been blanked off.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 2 March 2026
Resolved
Appropriate equipment and supplies for the containment and removal of on-deck oil spills must include scupper plugs. Numerous scuppers were noted to not fit properly to provide containment.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2026
Resolved 5 March 2026
Resolution: All scuppers are now fitted tight against the coaming.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 25 March 2025
Resolved
When inspecting oil-burning vessels, either internal-combustion type or steam-driven type, the marine inspector shall examine the tank tops and bilges in the fire room and engine room to see that there is no accumulation of oil which might create a fire hazard. Saturated sorbent pads and pooled hydraulic oil were noted in the hydraulic machinery space.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 March 2025
Resolution: Excessive oil was cleaned up prior to the end of the inspection.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 25 March 2025
Resolved
Flame arresters must be of a type and size suitable for the purpose intended and meet ASTM F 1273. The flame screens for tanks 3P and 4S were deteriorated or torn.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2025
Resolved 16 April 2025
Resolution: Flame screens for tanks 3P and 4S have been repaired.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 March 2025
Resolved
Approved portable and semi-portable extinguishers must be installed in accordance with Table 1 to § 34.50-10(a). The sole portable extinguisher in the generator room was found to be past due on annual servicing.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 3 April 2025
Resolution: The portable fire extinguisher was serviced by CaribSupply.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2025
Resolved
Boilers, main and auxiliary machinery, and piping systems shall conform to the requirements of subchapter F (Marine Engineering). Each pressure vessel listed on the Certificate of Inspection that is fitted with a manhole or other inspection opening so it can be satisfactorily examined internally, must be opened for internal examination every 5 years. The vessel's two unfired pressure vessels (air receivers) were not available for internal inspection.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2025
Resolved 3 April 2025
Resolution: MI internally inspected the barge's two air receivers.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 25 March 2025
Resolved
Cargo hose carried on tank vessels must be suitable for oil service. For additional requirements concerning cargo hose, see 33 CFR 154.500. Each hose must be marked with the following, except that the information required by paragraphs (f)(2) and (3) of this section need not be marked on the hose if it is recorded in the hose records of the vessel or facility, and the hose is marked to identify it with that information: maximum allowable working pressure, date of manufacture, and date of the latest test required by 33 CFR 156.170. The MAWP was not stenciled on the hoses and records of their date of manufacture could not be produced.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 16 April 2025
Resolution: Hose information and manufacture date was uncovered on the hose ends and is now maintained in documentation.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 25 March 2025
Resolved
All tank vessels are subject to the regulations contained in subchapter J (Electrical Engineering) of this chapter. Lighting for engine rooms, boiler rooms, and auxiliary machinery spaces must be supplied from two or more feeders. One of these feeders must be a ship's service feeder. The two lights illuminating the hydraulic machinery room were found to be inoperable.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2025
Resolved 9 April 2025
Resolution: The lighting switch for the hydraulic machinery room was replaced; the lights are now operable.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 25 March 2025
Resolved
At exposed peripheries of the freeboard and superstructure decks the rails shall be in at least three courses including the top. The opening below the lowest course shall not be more than 9 inches. The courses shall not be more than 15 inches apart. Rail courses on the starboard side and starboard quarter were were found to be either loose or missing entirely.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2025
Resolved 3 April 2025
Resolution: Rail courses have been repaired and tightened.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 22 January 2024
Resolved
On a tank barge, each cargo tank must be equipped
with an overfill device that has a visual alarm. Tank
3S and 3P has an inop light for high level and no
alarm for overfill on 3P. Cannot use 3S/3P until repaired.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 February 2024
Resolved 7 February 2024
Resolution: Alarms have been fixed and work properly now.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 22 January 2024
Resolved
Each loading arm and each transfer pipe system
must not leak under static liquid pressure at least 1.5
times the maximum working pressure. Provide paper
work from last test and correct dates located on
cargo lines.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 February 2024
Resolved 7 February 2024
Resolution: Lines have been tested and marked properly.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 22 January 2024
Resolved
Pressure-vacuum relief values may be inspected and
tested at the plant of the manufacturer. Provide
documentation of the last time the pressure-vacuum
relief values and cargo pump valves have been
tested.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 February 2024
Resolved 7 February 2024
Resolution: P/V values have been tested and marked.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 22 January 2024
Resolved
Each hose assembly must be tested and labeled in
accordance with 33 CFR 154.500. Label the three
new hoses located in the SOPEP locker that will be
used for "Oil Service".
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 February 2024
Resolved 7 February 2024
Resolution: Hoses have been labeled.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 22 January 2024
Resolved
Placards containing instructions for the donning and
use of the life jackets aboard the vessel must be
posted in conspicuous places that are regularly
accessible and visible to the crew. Replace
worn donning signs located on life jacket
storage box.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 February 2024
Resolved 7 February 2024
Resolution: New placards have been placed on life jacket storage box.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 1 March 2023
Resolved
On a tank barge, each cargo tank must be equipped with an overfill device that has a visual alarm. Tank 2S has a inop light for overfill.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2023
Resolved 20 March 2023
Resolution: Tank 2S overfill alarm has been tested and is in working order.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 1 March 2023
Resolved
Each loading arm and each transfer pipe system must not leak under static liquid pressure at least 1.5 times the maximum working pressure. Provide paper work from last test and correct dates located on cargo lines.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2023
Resolved 20 March 2023
Resolution: Transfer pipes have been labeled with correct date.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 1 March 2023
Resolved
Pressure-vacuum relief values may be inspected and tested at the plant of the manufacturer. Provided documentation of the last time the pressure-vacuum relief values have been tested.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2023
Resolved 20 March 2023
Resolution: Received copy of the safety relief valve test certificate.
08 - Alarms › N/A - No Subsystem › Emergency signal
Issued 1 March 2022
Resolved
Activate a visible and audible alarm so that it can be seen and heard on the vessel where cargo transfer is controlled and in the cargo deck area.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 March 2022
Resolved 9 March 2022
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 2 March 2021
Resolved
Valve open/close indicators missing from all cargo tanks.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2021
Resolved 23 March 2021
Resolution: Many of the valves has been labeled, this will be an ongoing process.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 2 March 2021
Resolved
Several cargo control valves have deteroiated bolts securing the body to the bonnet.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2021
Resolved 23 March 2021
Resolution: The bolts identified have been renewed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 2 March 2021
Resolved
Port side vapor control line was not labled as such.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2021
Resolved 23 March 2021
Resolution: Painted as required.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 21 January 2020
Resolved
Each cargo tank of a tank barge must have a high level indicating devide. The high level alarm on the #2 port cargo tank is only intermittently working. Vessel is prohibited from loading cargo in the tank until high level alarm is shown to work in all condition.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 30 January 2020
Resolution: Witnessed satisfactory test of high level alarm.
Construction/Loadline › Hull › Side Shell
Issued 8 March 2017
Resolved
Port cargo tank #2, insert new side shell plate in 02 locations (Bay 3 and Bay 4) Pickup weld side longitudinal in bay 4 as marked onboard.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 April 2017
Resolved 18 March 2017
Resolution: Fitup, repairs and testing witnessed by ABS and local USCG [name withheld] repairs approved by ABS & local USCG MI.
Construction/Loadline › Hull › Side Shell
Issued 8 March 2017
Resolved
Port cargo tank #3, insert new side shell plate in 03 locations (Bay 1, Bay 3 and Bay 6) as marked onboard.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 8 April 2017
Resolved 18 March 2017
Resolution: Fitup, repairs and testing witnessed by ABS and local USCG [name withheld] repairs approved by ABS & local USCG MI.
Construction/Loadline › Hull › Side Shell
Issued 8 March 2017
Resolved
Port cargo tank #4, insert new side shell plate in 02 locations, (Bay 1 and Bay 3) as marked onboard.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 8 April 2017
Resolved 18 March 2017
Resolution: Fitup, repairs and testing witnessed by ABS and local USCG [name withheld] repairs approved by ABS & local USCG MI.
Construction/Loadline › Hull › Side Shell
Issued 8 March 2017
Resolved
STBD cargo tank #1, insert new side shell plates in 02 locations, (Bay 3 and Bay 4), as marked on board.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 8 April 2017
Resolved 18 March 2017
Resolution: Fitup, repairs and testing witnessed by ABS and local USCG [name withheld] repairs approved by ABS & local USCG MI.
Electrical › Lighting (service) › Lighting Fixture
Issued 29 November 2016
Resolved
Number 2 PORT and Number 3 PORT light wiring is currently not intrinsicly safe and needs to be replaced, bracket fitting is broken. 46 CFR 111.105-17
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 December 2016
Resolved 13 December 2016
Resolution: Verified replacement of seal for wiring entering high level lighting of No's 2 and 3 port cargo tanks and tested to the satisfaction of the attending marine inspector.
Construction/Loadline › Penetrations › Gasket
Issued 29 November 2016
Resolved
Gasket to forepeak needs to be replaced. 46 CFR 42.15-20
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2016
Resolved 13 December 2016
Resolution: Verified that gasket to forepeak tank was replaced.
Lifesaving › Lifebuoys › Serviceable
Issued 29 November 2016
Resolved
STBD Ring Buoy needs to be replaced. 46 CFR 182.10
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2016
Resolved 13 December 2016
Resolution: Verified that ring buoy on the starboard bow was replaced.
Deck/Cargo › Cargo Condition › Contamination
Issued 29 November 2016
Resolved
Containment on deck contains gaps and needs to be repaired- submit repair plan by 29DEC16 or prior to conducting cargo operations, which ever is earlier. 33 CFR 155.310
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 December 2016
Resolved 13 December 2016
Resolution: Metal piece fitted to the underside of the front of the port side doghouse to act as containment for cargo aft of the cargo deck. Witnessed plugs fitted in containment gaps previously noted.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 14 January 2016
Resolved
Inflatable life raft hydrostatic release expired. Life raft shall be in a float free arrangement. Vessel is restricted from the carriage of personnel until hydrostatic release has been replaced to the satisfaction of attending Marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2016
Resolution: Installed new hydrostatic release.
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 14 January 2016
Resolved
Connectors for barge overflow control system must be labeled w/ total inductance and capacitance of the connection switch. Label to the satisfaction of attending Marine Inspector.
Condition: Placed in Improper Service
Due 13 February 2016
Resolved 1 March 2016
Resolution: Vessel provided satasfactory labeling for overflow control.
Electrical › Lighting (service) › Lighting Fixture
Issued 8 January 2016
Resolved
01 stern deck light waterlogged and presenting a hazardous electrical condition. Repair to the satisfaction of attending marine inspector.
Condition: Improper/Lack of Maintenance
Due 13 February 2016
Resolved 27 January 2016
Resolution: Drained, repaired, and proved safe operation to the satasfaction of attending marine inspector.