Records from 2016 to 2026. Most recent: inspection, 10 March 2026.
Inspection history · 21
10 March 2026
Internal Structural Exam · Examination of Repairs · Deficiency Check · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8323614
12 January 2026
Administrative Inspection · Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8294639
6 January 2025
Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8058654
14 February 2024
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7864791
24 January 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7850029
9 November 2022
COI Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7575415
17 February 2022
Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7397670
16 December 2021
Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7369168
12 April 2021
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7173439
10 February 2021
In-Service Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7138945
23 November 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7100279
26 February 2020
Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6914441
9 January 2020
Administrative Inspection · Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6885968
24 September 2019
Administrative Inspection · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6819606
4 February 2019
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6619685
13 December 2018
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6596690
15 February 2018
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6355499
11 January 2018
Administrative Inspection · Deficiency Check
Physical examination · Navigation Center · Activity 6336116
11 October 2017
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6284989
2 November 2016
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6033775
25 February 2016
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5821600
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 12 January 2026
Resolved
Each survival craft on a vessel must be in good working order and ready for immediate use before the vessel leaves port and at all times when the vessel is underway. Vessel's center liferaft painter was missing a shackle and disconnected from its hydrostatic unit. Vessel is restricted to carry a maximum 50 total persons on board.
46 CFR 185.700(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2026
Resolved 29 January 2026
Resolution: Received objective evidence hydrostatic link is properly connected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 January 2026
Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment. Observed water leak on bilge piping for FWD engine room bilge suction piping. Located at threaded connection FWD of bilge manifold.
46 CFR 182.25-1
(OLD T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2026
Resolved 29 January 2026
Resolution: Received objective evidence threaded connection have been properly repaired.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 12 January 2026
Resolved
All piping, valves, and fittings shall be in accordance with good marine practice and suitable for the purpose intended. Observed fire main water leak from check valve in engine room, above fire pump.
46 CFR 181.15-5(c)
(OLD T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2026
Resolved 29 January 2026
Resolution: Received objective evidence of check valve properly repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 January 2026
Resolved
Switchboards shall have non-conductive mats or grating and shall be provided on deck in front and rear of switchboards. Missing rubber mat under switchboard in generator room.
46 CFR 183.10-15(b)
(OLD T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2026
Resolved 2 February 2026
Resolution: Observed rubber mat properly placed under switchboard.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 12 January 2026
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible. Vessel has outdated charts, most recent from 2023.
46 CFR 184.420(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2026
Resolved 19 February 2026
Resolution: Extended to get new charts and/or echarts.
New charts uploaded on def documents
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 6 January 2025
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge of Marine Inspection. 1.) Pilot house engine rpm gauges not functioning as designed.
Gages to indicate engine cooling water discharge temperature and lubricating oil pressure shall be provided for all propulsion engines and located so as to be in view of the operator. Pilot house engine gauges not functioning as designed
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 February 2025
Resolved 27 January 2025
Resolution: Gages installed and observed working.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 24 January 2024
Resolved
All observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Significant oil leak was observed on outboard side turbocharger of Port Main Diesel Engine (MDE). Correct oil leak prior to carrying passengers.
46CFR46CFR115.830(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 February 2024
Resolution: Observed leak free turbo with port MDE running, approx. 10-15min at approx. 135-150deg F. Clearing def and Op Control.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 24 January 2024
Resolved
The following spaces must be equipped with a fire detection and alarm system of an approved type installed in accordance with 46 CFR part 76...(1)A space containing propulsion machinery. (2) A space containing an internal combustion engine of more than 50 hp...Vessel has no installed fire detection system in required machinery spaces. Owner / operator is required to submit intended fire detection system plans to OCMI for review, prior to commencing any installation.
46CFR181.405(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 February 2024
Resolution: See Narrative remarks. Determined that vsl is NOT required a type apprvd detection syst. therefore resolving def. Vsl rep will be notified.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 24 January 2024
Resolved
Vessels described by 46 CFR 175.110(c) must have an interconnected fire detection system in compliance with § 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. Vessel has no interconnected fire detection system in required spaces. Owner / operator is required to submit intended interconnected fire detection system plans to OCMI for review, prior to commencing any installation.
46CFR181.405(c)
46CFR181.450
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 March 2024
Resolution: 01 detector in the pilothouse,01 detector i the upper salon, 01 detector in the galley, 01 detector in the lower salon, 01 detector in each crew accommodation (02 crew accommodation's total), 03 detectors in the ME space (01 detector over each engine, 03
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 January 2024
Resolved
All observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Significant oil leak was observed on outboard side turbocharger of Port Main Diesel Engine (MDE). Correct oil leak prior to carrying passengers.
46CFR46CFR115.830(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 February 2024
Resolution: Observed leak free turbo with port MDE running, approx. 10-15min at approx. 135-150deg F. Clearing def and Op Control.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 January 2024
Resolved
A space containing diesel machinery must be fitted with adequate means...to provide sufficient air for proper operation of main engines and auxiliary engines.
Engine Room (E/R) ventilation blower(s) are missing. Replace missing blowers within seven (07) days.
46CFR182.465
Action required: 705 - Other - as specified
Due 31 January 2024
Resolved 26 January 2024
Resolution: Verified E/R blowers were installed and operating properly.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 24 January 2024
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. Replace expired hydrostatic release prior to operating beyond 3 miles from shore.
Action required: 705 - Other - as specified
Resolved 5 February 2024
Resolution: Verified current EPIRB HRU properly installed. Cleared def.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 November 2022
Resolved
The means provided for pumping bilges shall be tested by operation. All suction strainers shall be examined. The bilge line in most forward crew accommodation void had a hole preventing from proper bilge discharge.
46 CFR 176.25-10(a)(7)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 November 2022
Resolved 16 December 2022
Resolution: Vessel made required repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 9 November 2022
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc. The center main diesel engine was missing safety guard for rotating gears.
46 CFR 177.35-15(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 November 2022
Resolved 16 December 2022
Resolution: Vessel made required repairs.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 9 November 2022
Resolved
At each initial and subsequent inspection for certification and reinspection the inspector shall examine and test all items in the ship's outfit, such as ground tackle, navigation lights, compass, etc., which are required to be carried by the regulations in this subchapter. Vessel’s port side navigation light wires were severely frayed.
46 CFR 176.25-40(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 November 2022
Resolved 16 December 2022
Resolution: Vessel made required repairs.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 9 November 2022
Resolved
Each vessel must meet the applicable requirements in Subchapter S of this chapter. Vessel had a VCG calculation sheet posted that was less restrictive than stability letter requirements. Submit calculations to MSC to have VCG included into stability letter.
46 CFR 177.13-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 December 2022
Resolved 27 December 2022
Resolution: Received MSC approved stability letter addendum.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 December 2021
Resolved
Vessel has no ability to secure ventilation to engine room in the event of a fire. Port-Side vent covers cannot slide into place as designed.
Condition: Design Flaw
Action required: 60 - Rectify deficiencies prior to movement
Due 16 December 2021
Resolved 16 December 2021
Resolution: Vessel submitted information to exhibit proper ventilation shutdown.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 16 December 2021
Resolved
Starboard main engine has an exhaust leak into the engine room. Attached bellow is dry-rotted and requires replacement prior to movement.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 16 December 2021
Resolved 16 December 2021
Resolution: Vessel submitted information to exhibit replaced bellow on stbd main engine.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 9 January 2020
Resolved
Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed. The circuit board for the throttle on the starboard engine was broken and did not allow the operator to give any throttle to the engine, only clutch in or out. Parts had been previously ordered and were on the way.
46CFR182.05-1
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 January 2020
Resolved 22 January 2020
Resolution: Part replaced, witnessed satisfactory test.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 9 January 2020
Resolved
Each hatch exposed to the weather must be watertight. The emergency escape scuttle from the ENGINE room had daylight showing through from the forward hinge and from the gasket material on the inboard side of the hatch. Required vessel to adjust the scuttle and gaskets to make a watertight seal.
46CFR171.124(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 February 2020
Resolved 22 January 2020
Resolution: verified repair
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 9 January 2020
Resolved
Each hatch exposed to the weather must be watertight. The emergency escape scuttle from the GENERATOR room had daylight showing through from the forward part of the coaming. Required vessel to adjust the scuttle to make a watertight seal.
46CFR171.124(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 February 2020
Resolved 22 January 2020
Resolution: verified repair
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 January 2020
Resolved
Exhaust piping shall be gas tight throughout its length. The PORT SIDE CENTER exhaust pipe leading overboard had a flex hose coupling that was cracked through and allowed for a major exhaust leak. Required vessel to replace the flex hose coupling.
46CFR182.20-20
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 February 2020
Resolved 22 January 2020
Resolution: verified repair
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 January 2020
Resolved
Exhaust piping shall be gas tight throughout its length. The PORT SIDE CENTER exhaust pipe leading overboard had a flex hose coupling that was cracked through and allowed for a major exhaust leak. Required vessel to replace the flex hose coupling.
46CFR182.20-20
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 February 2020
Resolved 22 January 2020
Resolution: verified repair
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 January 2020
Resolved
All electrical installations shall be to the satisfaction of the OCMI. The main switchboard was reading 2 amps to ground. Required vessel to track down the ground and rectify.
46CFR183.01-15(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 February 2020
Resolved 22 January 2020
Resolution: verified repair
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 January 2020
Resolved
Adequate means for ground detection shall be provided on the ship service generator and distribution switchboard. The ground detection button was not working (did not go to 0 when pushed and the AMP to ground was showing 2 amps). Required vessel to rectify the issue and return to normal working condition.
46CFR111.30-15(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 February 2020
Resolved 22 January 2020
Resolution: verified repair
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 January 2020
Resolved
MUST COMPLETE MOB DRILL AFTER PROPULSION MACHINERY IS BROUGHT BACK INTO SERVICE TO COMPLETE 2ND ANNUAL INSPECTION.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 January 2020
Resolved 22 January 2020
Resolution: conducted MOB drill, all sat.
01 - Certificates & Documentation › 013 - Documents › Ship specific plans for the recovery of persons from the water
Issued 24 September 2019
Resolved
Emergency Instructions need to re-done to show what is represented on the vessel and posted at the operating station. Review and ensure Emergency instructions are complete with title, procedure, and detailed description.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 September 2019
Resolved 24 September 2019
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 24 September 2019
Resolved
Vessel must carry First-Aid Kit with approved medical equipment. First-Aid was found with items that were expired;review,remove, and replace expired items in First-Aid Kit.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 September 2019
Resolved 24 September 2019
Electrical › Electric Generation Source (service) › Panelboard
Issued 11 October 2017
Resolved
Label breaker panel in galley and throughout vessel.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 October 2017
Resolved 1 November 2017
Resolution: Breaker panels labeled properly.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 11 October 2017
Resolved
Thoroughly clean all bilges.
Action required: 705 - Other - as specified
Due 18 October 2017
Resolved 1 November 2017
Resolution: Bilges satisfactorily cleaned.
Communications › Radio Communications › VHF Radiotelephone
Issued 11 October 2017
Resolved
Replace ground wire for radio antenna on port side.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 October 2017
Resolved 1 November 2017
Resolution: Ground wire replaced.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 11 October 2017
Resolved
Provide eye wash for first aid kit.
Condition: Invalid
Action required: 705 - Other - as specified
Due 18 October 2017
Resolved 1 November 2017
Resolution: Eye wash provided for first aid kit.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Exhaust Manifold
Issued 2 November 2016
Resolved
Replace center main exhaust hose at the split below the hose clamp.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 November 2016
Resolved 18 November 2016
Resolution: Lead inspector attended vessel and saw the newly replaced center main exhaust hose.
Engineering › Pressure Vessel › Relief Valve
Issued 2 November 2016
Resolved
Provide required relief valve on hydro-pneumatic tank for potable water.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 November 2016
Resolved 18 November 2016
Resolution: Vessel operator provided a relief valve on hydro-pneumatic tank for potable water.
Engineering › Electric Propulsion System › Battery
Issued 2 November 2016
Resolved
Install ammeter for the battery charger under the chart table.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 November 2016
Resolved 18 November 2016
Resolution: Vessel operator provided an ammeter for the battery charger on the bridge below the chart table.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 2 November 2016
Resolved
Install breaker or blank on stbd panel open slot in the generator room to prevent electric shock.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 November 2016
Resolved 18 November 2016
Resolution: A breaker was installed on the STBD panel open slot on the generator.
Communications › Radio Communications › VHF Radiotelephone
Issued 2 November 2016
Resolved
Install MMSI number into VHF radio.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 November 2016
Resolved 18 November 2016
Resolution: The operator installed the MMSI number into the VHF radio.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 2 November 2016
Resolved
Ground all electrical boxes throughout the vessel.
Condition: Invalid
Action required: 705 - Other - as specified
Due 2 December 2016
Resolved 18 November 2016
Resolution: All electrical boxes on the vessel have been grounded.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 November 2016
Resolved
Properly attach dead end wire in stbd AC compartment.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 November 2016
Resolved 18 November 2016
Resolution: Dead end wire was properly attached in the STBD AC compartment.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 2 November 2016
Resolved
Provide cover on electrical box in the galley bilge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 November 2016
Resolved 18 November 2016
Resolution: A cover on the electrical box in the galley bilge was installed.
Engineering › Diesel Engine (propulsion-electric) › Exhaust Manifold
Issued 2 November 2016
Resolved
Stbd main and center main exhaust hoses are not double clamped.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 November 2016
Resolved 18 November 2016
Resolution: STBD main and center main exhaust hoses are properly double clamped.