ADIRONDACK II is a 1999 passenger vessel (inspected). The Coast Guard has recorded 22 inspections since 2016, most recently in October 2025, along with 23 deficiencies and 3 casualty investigations between 2008 and 2017.

Records from 2008 to 2025. Most recent: inspection, 15 October 2025.

Built
1999
Last inspected
15 October 2025
Documentation
Case Pending · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 15 October 2025
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDF2517
496027
Flag
UNITED STATES
Maury page id
psix-496027

Documentation record

Registered dimensions (L × B × D)64.9 ft × 16.0 ft × 7.0 ft
Registered tonnagegross 36 / net 32
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSCARANO BOATBUILDING INC · ALBANY, NY, UNITED STATES · built 1999
Hull materialWood
PropulsionAuxiliary Sail
Hull shapeSail (Distinct Keel)
Hull configurationMonohull
Hailing portNEWPORT, RI
Trade endorsementsCoastwise, unrestricted
DocumentationCase Pending · issued 3 October 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it36 - Simplified, Gross Ton
32 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

22 inspections, each with its date, unit and type; 23 deficiencies with the resolution recorded against each; 3 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 22

15 October 2025 Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8230146
4 March 2025 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8087726
8 October 2024 Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8008973
2 July 2024 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7947386
28 December 2023 Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7842988
30 October 2023 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7818673
12 October 2023 Annual Inspection · Administrative Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7807716
8 March 2023 Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7648143
11 October 2022 Deficiency Check · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7567798
9 February 2022 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7394694
12 October 2021 COI Inspection · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7319756
18 March 2021 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7156313
1 October 2020 Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7062899
17 June 2020 Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6981076
25 February 2020 Plan Review "T" Boat
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6915525
10 October 2019 DAPI Audit · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6821624
26 March 2019 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6651456
11 October 2018 Annual Inspection · Administrative Inspection · Internal Structural Exam · DAPI Audit · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6537910
6 October 2017 DAPI Audit · Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6277370
23 July 2017 Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6347793
17 April 2017 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6162487
18 October 2016 COI Inspection · DAPI Audit
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6018314

Deficiency record · 23

03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 8 October 2024 Resolved
Through hull fittings and shutoff valves must be metallic. In the case of nonmetallic hulls, materials that will afford an equal degree of safety and heat resistivity as that afforded by the hull may be approved. A plastic through hull fitting with no valve on the stbd sideshell within the engine room space was found with duct tape and sealant squeezed inside. Provide a wooden plug that can be placed in the through hull, in an emergency, the plug should be stowed immediately adjacent to the thru hull. This is accepted as a temporary means to prevent any water ingress, if needed.
Action required: 705 - Other - as specified
Due 10 October 2024
Resolved 10 October 2024
Resolution: A wooden plug was provided for the through hull in case of emergency until permanent repairs are completed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 8 October 2024 Resolved
Through hull fittings and shutoff valves must be metallic. In the case of nonmetallic hulls, materials that will afford an equal degree of safety and heat resistivity as that afforded by the hull may be approved. A plastic through hull fitting with no valve on the stbd sideshell within the engine room space was found with sealant squeezed inside. Place a metallic through hull fitting and shutoff valve on the identified starboard through hull or provide a repair proposal to permanently remove the through hull.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 November 2024
Resolved 25 April 2025
Resolution: Vessel replaced plastic valve with metallic valve
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 8 October 2024 Resolved
Gauges to indicate engine revolutions per minute (RPM), jacket water discharge temperature, and lubricating oil pressure must be provided for all propulsion engines installed in the vessel. The gauges must be readily visible at the operating station. No lubricating oil pressure gauge was available at the operating station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 November 2024
Resolved 17 April 2025
Resolution: Oil pressure gauges installed.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 12 October 2023 Resolved
Each item of lifesaving equipment determined by the Marine Inspector to NOT be in serviceable condition must be repaired or replaced. The grab line on the ring buoy is in need of replacement due to UV deterioration.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 October 2023
Resolved 16 October 2023
Resolution: The grab line on the life buoy has been replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 October 2023 Resolved
For the purpose of flexibility only, flexible hose may be installed in lengths not to exceed 30" if installed with a suitable compression type connection (hose clamp). Install a hose clamp on the port main diesel engine (MDE) jacket water expansion line and crank case breather line. Install a hose clamp on the stbd MDE crankcase breather line.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 October 2023
Resolved 16 October 2023
Resolution: Hose clamps have been installed on the port MDE jacket water expansion line and port/stbd crankcase breather line.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 October 2023 Resolved
The owner or managing operator shall have the vessel ready for inspections of machinery including all machinery essential to the routine operation of the vessel including cooling systems, replace the missing port jacket water expansion tank cap.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 October 2023
Resolved 16 October 2023
Resolution: New cap has been placed on the port jacket water expansion tank.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 October 2023 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons and the vessel from electrical hazards including fire, caused by or originating in electrical equipment, and electrical shock. Replace the cracked fire/bilge switch cover plate.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 October 2023
Resolved 16 October 2023
Resolution: The cover plate fo the fire/bilge switch has been replaced and labeled.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 12 October 2023 Resolved
A hatch exposed to the weather must be watertight. Repair or replace the cracked engine room water tight hatch.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 November 2023
Resolved 28 December 2023
Resolution: See Activity Number 7842988
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 October 2023 Resolved
At each initial and subsequent inspection of a vessel the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following; Masts and similar arrangement constructed on the hull and on a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails. Although the vessel hauls out and down rigs every year, the last documented Coast Guard attendance and inspection of the masts when unstepped was 2012. In accordance with NVIC 02-16, wood masts, spars and appendages should be unstepped once every 10 years. Prior to the vessel operating in 2024, the vessel will need to down rig, unstep and make available for inspection for the Coast Guard all masts, spars, standing rigging, running rigging, blocks, fittings, and sails.
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 March 2024
Resolved 30 October 2023
Resolution: Vessel's operator unstepped its masts and made all standard riggings availble for CG inspection. Vessel's masts and sail rigging components appear to be in satisfactory condition.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 11 October 2022 Resolved
On a vessel of at least 26' in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each unmanned space. Found the visual indicators inoperable for each compartment's high level alarm. While underway, the crew is directed to make visual inspection of each compartment on a half hour schedule & make an appropriate entry in the vessel's log book. 46 CFR 182.530(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 October 2022
Resolved 8 March 2023
Resolution: MI verified that all high water level alarms had a visual/audible indicator.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 October 2022 Resolved
All cable and wire must be installed with metal supports spaced not more than 24 inches apart, and in such a manner as to avoid chafing and other damage. Wiring on aft bulkhead of forward tool space is supported with plastic zip ties and not the proper metal supports. Replace to the satisfaction of CG marine inspector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2022
Resolved 18 October 2022
Resolution: Wires properly secured
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 October 2021 Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. No life jacket donning placard onboard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 October 2021
Resolved 15 October 2021
Resolution: Provided. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 October 2021 Resolved
Shut off valves must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line. Valve at the tank connection not properly connected.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2021
Resolved 9 February 2022
Resolution: Complete
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 October 2021 Resolved
A submersible electric bilge pump must have a positive shutoff valve installed at the hull penetration. No valve is installed in the engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 October 2021
Resolved 15 October 2021
Resolution: Pump removed. Not required. All sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 12 October 2021 Resolved
Flexible non-metallic hose may be used in a pneumatic system if each penetration is made using an acceptable metallic through bulkhead fitting that is welded or otherwise attached to the bulkhead and a metallic shut off valve must be installed at the bulkhead. Port side head space has a flexible hose going directly through the bulkhead.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2021
Resolved 9 February 2022
Resolution: Complete
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 12 October 2021 Resolved
Deck rails must be designed and constructed to withstand a point load of 200lbs. applied at any point in any direction. Vessel stanchions are loose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 October 2021
Resolved 15 October 2021
Resolution: Stanchions tighten. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 October 2021 Resolved
All unfired pressure vessels must be installed to the satisfaction of the OCMI. Provide manufacturer documentation to ensure pressure vessel meets type approval.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2021
Resolved 9 February 2022
Resolution: air receiver was replaced with an ASME approved tank.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 October 2021 Resolved
The design, materials, and construction of standing rigging must be suitable for the intended service. Inner forestay deck attachment found with lead to load misalignment. Correct path to load on the inner forestay. Provide nondestructive testing (NDT) for the deck attachment. Replace bolts on the this attachment.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2021
Resolved 31 March 2022
Resolution: Attended vessel, dye pen testing of the inner forestay chain plate was conducted and the four bolts were replaced. All sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 12 October 2021 Resolved
Portable fire extinguishers must be inspected and maintained in accordance with NFPA 10. Monthly inspections may be conducted by the owner, operator, person in charge, or a designated member of the crew. No monthly fire extinguisher inspections have been conducted.
Action required: 10 - Deficiency Rectified
Due 12 October 2021
Resolved 12 October 2021
Resolution: vessel will now do monthly fire extinguisher checks.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 March 2021 Resolved
Chainplates (8) at weather deck show signs of potential failure points. Clean to bright, provide a report on company letterhead that attests to the condition and continued serviceability of each. Vessel shall not operate under sail prior to satisfaction of this requirement.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2021
Resolved 5 April 2021
Resolution: Recieved condition report on Scarono letterhead, all were sat. see pdf "SCARANO - ADIRONDACK II CHAINPLATE ASSESSMENT 2021"
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 10 October 2019 Resolved
MOB drills not completed due to hazderous weather conditions. Complete in spring before passenger operations.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 May 2020
Resolved 17 June 2020
Resolution: Drills completed when vessel returned from winter storage.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Medical Equipment, medical chest, medical guide
Issued 11 October 2018 Resolved
First aide kit missing contents.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2018
Resolved 12 October 2018
Resolution: New first aide kit installed on vessel.
Lifesaving › Lifebuoys › Serviceable
Issued 6 October 2017 Resolved
Provide reflective material for the ring buoys
Action required: 705 - Other - as specified
Due 6 November 2017
Resolved 19 October 2017

Casualty record · 3

15 September 2008Routine · role: Involved in a Marine Casualty · activity 3377498
25 July 2012Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 4391382
23 July 2017Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6347793
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.