MAURY USCG vessel records
← All vessels

AMERICAN PATRIOT

Built
1978
Last inspected
17 December 2025
Documentation
Expired · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 17 December 2025
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDL3405
Flag
UNITED STATES
Maury page id
psix-49615

Documentation record

Registered dimensions (L × B × D)120.0 ft × 27.0 ft × 8.0 ft
Registered tonnagegross 95 / net 64
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPUTNAM SHIPBUILDING CORP · PALATKA, FL, UNITED STATES · built 1978
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHOLLYWOOD, FL
Endorsements, as the file codes themcw_un, fi, rec, reg
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it95 - Regulatory (Subpart C or D), Gross Ton
64 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 23 inspections, each with its date, unit and type; 50 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 23

17 December 2025 Internal Structural Exam · Hull Examination · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8292392
8 October 2025 Administrative Inspection · COI Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 8238940
29 January 2025 Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 8071386
21 February 2024 Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7865341
4 January 2024 Internal Structural Exam · Drydock Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7846865
4 December 2023 Administrative Inspection
Administrative · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7840552
11 May 2023 Administrative Inspection
Administrative · USCG Northeast District (dp) · USCG Northeast District (CGD-NE) · Activity 7686200
25 January 2023 Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7626393
12 October 2022 Administrative Inspection
Administrative · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7575757
31 January 2022 In-Service Inspection · Administrative Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7388074
22 January 2022 Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7384054
6 January 2022 Administrative Inspection · Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7376294
23 August 2021 Administrative Inspection · In-Service Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7291404
8 May 2021 In-Service Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7192285
3 March 2021 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7149537
13 November 2020 Administrative Inspection · In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7099900
18 March 2019 Inclining Experiment · Examination of Repairs · COI Inspection · Administrative Inspection · Spot Check · Construction Oversight · In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6650875
17 October 2018 Internal Structural Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6559364
30 April 2018 Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6404958
26 October 2017 Administrative Inspection
Administrative · Navigation Center · Activity 6295671
17 April 2017 Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6125990
15 November 2016 Administrative Inspection · Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6040872
23 March 2016 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5859606

Deficiency record · 50

03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 29 January 2025 Resolved
A hatch cover must:be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Hatches were not secured to prevent loss. 46 CFR 179.360(b)(2)
Action required: 10 - Deficiency Rectified
Resolved 29 January 2025
Resolution: Hatches were tied to the ladder just under them.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 29 January 2025 Resolved
Spanner wrenches must be provided where a 40 millimeter (1.5 inch) diameter firehose is required by § 181.320(b). Existing vessels as of July 22, 2016 have 180 days to comply with this requirement. No spanner wrench is proved at 1.5 in firehose. 46 CFR 181.310(d)
Action required: 10 - Deficiency Rectified
Resolved 29 January 2025
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 29 January 2025 Resolved
Each survival craft must be: Secured to the vessel by a painter line with a float-free link permanently attached to the vessel. Liferafts painter line was not properly attached to the weak link. 46 CFR 180.130(a)(1)
Action required: 10 - Deficiency Rectified
Resolved 29 January 2025
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 29 January 2025 Resolved
Each survival craft must be: Stowed so that when the vessel sinks the survival craft floats free. A line is tied over 02 life rafts preventing it from floating free if the vessel sinks. 46 CFR 180.130(a)(2)
Action required: 10 - Deficiency Rectified
Resolved 29 January 2025
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 30 April 2018 Resolved
First aid kit has expired items. First aid kit no longer meets the requirements set forth by 46 CFR 160.041
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Purchased 3 new first aid kits to replace expired items.
Electrical › Electrical Distribution System (service) › Cable
Issued 30 April 2018 Resolved
Dead end cables was discovered under bridge console. Electrical installation is required to be installed and maintained to protect crew, passenger, and other persons from electric hazards such as electric shock.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 30 April 2018 Resolved
Receptacle outlet cover missing. Electrical installation is required to be installed and maintained to protect crew, passenger, and other persons from electric hazards such as electric shock.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Replaced receptacle outlet cover to protect crew and passengers from potential electric hazards.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 30 April 2018 Resolved
Portable fire extinguisher was not properly mounted or fasten. Portable fire extinguishers are required to be stowed IAW NFPA 10 to prevent dislodgement
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: A new bracket was installed to properly secure portable fire extinguisher.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 30 April 2018 Resolved
Portable fire extinguisher was not serviced IAW NFPA intervals
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Provided proof of fire extinguisher servicing with current servicing tag.
Electrical › Lighting (service) › Lighting Fixture
Issued 30 April 2018 Resolved
Electrical light fixture was discovered broken. Electrical installation is required to be installed and maintained to protect crew, passenger, and other persons from electric hazards such as electric shock.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Broken electrical light fixtures were replaced and properly installed.
Electrical › Lighting (service) › Lighting Fixture
Issued 30 April 2018 Resolved
Lighting fixture missing protective guard. Protective guards are required where possible damage to the light may occur
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Missing light fixture covers were replaced.
Stability › Watertight Integrity › General
Issued 30 April 2018 Resolved
Penetration through watertight bulkhead must maintain its water tight integrity. New piping for fresh water was replaced and the integrity of watertightness is compromised.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Compromised watertight integrity in way of forward bulkhead was repaired to maintain watertight integrity.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 30 April 2018 Resolved
Receptacle in lazarette discovered without cover. Electrical installation is required to be installed and maintained to protect crew, passenger, and other persons from electric hazards such as electric shock.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 July 2018
Resolution: Placed cover over receptacle located in lazarette.
Fire Fighting › Miscellaneous Items › Waste Receptacles
Issued 30 April 2018 Resolved
Plastic waste receptacles was discovered throughout the vessel. Waste receptacles are required to be constructed of non combustible material unless other means are provided to ensure that a potential waste receptacle fire would be limited to the waste receptacle
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: All plastic waste receptacles were replaced with non combustible material waste receptacles for fire prevention.
Engineering › Fuel Oil Service System › Piping
Issued 30 April 2018 Resolved
Fuel fill pipe was discovered inside the vessel. Fill pipes must be so arranged so that overflow of liquid or vapors cannot escape to the inside the space.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2018
Resolved 11 July 2018
Accommodation/Occupational Safety › Occupational Safety › Receptacle Outlet
Issued 30 April 2018 Resolved
Receptacle outlets installed in wet bar is required to be drip proof
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Installed drip proof cover over receptacle outlets in way of wet bar.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 30 April 2018 Resolved
Electrical cables penetrations through water tight bulkhead is required to maintain the integrity of watertightness.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Electrical cable penetrations through watertight bulkhead were fixed with proper sealant to maintain watertight integrity.
Accommodation/Occupational Safety › Potable Water System › General
Issued 30 April 2018 Resolved
Ice maker was deemed unsanitary
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Witnessed sanitized ice maker in way of galley.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Exhaust Manifold
Issued 30 April 2018 Resolved
Exhaust gas leaking from engine. All unsafe condition must be corrected
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Exhaust gas leak from engine was corrected ensuring proper ventilation and exhaust system maintenance.
Engineering › Pressure Vessel › Marking and Stamping
Issued 30 April 2018 Resolved
Pressure vessel on board was discovered not meeting the requirements of ASME. Did not have the "U" or "UM marking.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: U type pressure vessel installed.
Electrical › Electric Generation Source (service) › Ground Detection
Issued 30 April 2018 Resolved
Vessel distribution system is not of the ungrounded type that is prescribed for the installation based on keel laid date IAW 46 CFR 183.10-30(old "T") OCMI may require vessel to comply with Sub ch "J" for dual voltage systems
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2018
Resolved 11 July 2018
Resolution: Vessel meets requirements with SubChapter "J" dual voltage systems.
Electrical › Electric Supply System (service) › Battery Charger
Issued 30 April 2018 Resolved
Battery charger did not have an ammeter. Battery chargers are required to have an ammeter
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Installed ammeter for battery charger.
Electrical › Electrical Distribution System (service) › Wiring
Issued 30 April 2018 Resolved
Electrical connection throughout the vessel was discovered installed outside junction boxES. All electrical connections shall be made in an enclosure
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Identified electrical connections installed outside the junction box were rerouted and properly connected within a junction box.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 30 April 2018 Resolved
Upon reviewing log book vessel didn't log when drills were conducted. Drills are required to be logged
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 11 July 2018
Resolution: Vessel conducted drills and made proper entry in the log book.
Operations/Management › Drills/Instruction › Not Conducted
Issued 17 April 2017 Resolved
Vessel needs to provide log book containing proof of all drills.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 28 April 2017
Resolution: Vessel provided logbook with drills recorded.
Operations/Management › Drills/Instruction › Safety Orientation
Issued 17 April 2017 Resolved
Vessel needs to provide method/instructions for passenger orientation.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 28 April 2017
Resolution: Operators provided written passenger orientation for vessel.
Operations/Management › Vessel Activity › Other
Issued 17 April 2017 Resolved
Vessel needs to provide method for recording/reporting the passenger count for each trip.
Condition: Invalid
Action required: 705 - Other - as specified
Due 28 April 2017
Resolved 28 April 2017
Resolution: Operator provided passenger count method.
Electrical › Electric Generation Source (service) › Panelboard
Issued 17 April 2017 Resolved
Vessel needs to properly label all electrical panels and breakers.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 28 April 2017
Resolution: Electrical panels and breakers were labeled.
Engineering › Steam Boiler (auxiliary/waste heat) › Water Level Indicator
Issued 17 April 2017 Resolved
Vessel needs to fix inoperable visual indicator for the low water cutoff on the boiler.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 28 April 2017
Resolution: Operator replaced boiler low cutoff alarm, had tech report and demonstrated low cutoff alarm.
Deck/Cargo › Cargo Stowage › General
Issued 17 April 2017 Resolved
Vessel needs to secure all equipment in the galley.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 28 April 2017
Resolution: Operator rearranged equipment in galley to ensure safer placement.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 17 April 2017 Resolved
Properly mount all fire extinguishers with approved brackets.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 28 April 2017
Resolution: Operator replaced portable extinguishers with new extinguishers and mounts.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 17 April 2017 Resolved
Vessel had a deep fat fryer and griddle in the galley space and no fixed extinguishing system was proved for the hood.
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 17 April 2017
Resolution: Vessel elected to remove all cooking equipment from the galley. No fixed system is needed anymore.
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 17 April 2017 Resolved
Vessel needs to repair junction box on the stbd side, mid body, on outside main deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 28 April 2017
Resolution: Junction box was installed.
Electrical › Electric Supply System (service) › Cable
Issued 17 April 2017 Resolved
Vessel is to remove all extension cables from vessel.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 28 April 2017
Resolution: All extenstion cords were removed.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 17 April 2017 Resolved
Vessel needs to provide protective guards on all rotating parts on the main engines and generators.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 28 April 2017
Resolution: operator install guards on all engines and generators.
Documentation › Markings/Placards › Warning Signs
Issued 17 April 2017 Resolved
Vessel needs to properly mark all the emergency exits for the galley and engine room.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 28 April 2017
Resolution: All emergency exits and hatches were labeled.
Fire Fighting › Fire Pumps › Pressure
Issued 17 April 2017 Resolved
Vessel's fixed fire pump cannot produce the required 60 psi.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2017
Resolved 28 April 2017
Resolution: Operator installed new guage and test fire hose to 60psi.
Documentation › Certificates/Documents › FCC SSL
Issued 23 March 2016 Resolved
Provide FCC SSL.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 April 2016
Resolved 13 April 2016
Resolution: Vessel found FCC SSL.
Engineering › Steering Gear System › Hydraulic Hose
Issued 23 March 2016 Resolved
Repair Hydraulic Leak for the steering system in the E/R starboard side.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 April 2016
Resolved 13 April 2016
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 March 2016 Resolved
Renew all expired items in First Aid kit.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 April 2016
Resolved 13 April 2016
Resolution: Vessel replace first aid kit.
Documentation › Manuals/Policy Documentation › Maneuvering Information
Issued 23 March 2016 Resolved
Provide up to date charts for vessels route. Charts must be large enough scale to make safe
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 28 April 2016
Resolved 13 April 2016
Resolution: Vessel provided proper charts.
Documentation › Manuals/Policy Documentation › Maneuvering Information
Issued 23 March 2016 Resolved
Vessel must provde current Coast Pilot.
Condition: Invalid
Action required: 705 - Other - as specified
Due 28 April 2016
Resolved 13 April 2016
Resolution: Vessel provided current Coast Pilot.
Documentation › Manuals/Policy Documentation › Maneuvering Information
Issued 23 March 2016 Resolved
Vessel needs to provide Light List.
Action required: 705 - Other - as specified
Due 28 April 2016
Resolved 13 April 2016
Resolution: Vessel provide light list.
Electrical › Electric Generation Source (service) › Overcurrent Device
Issued 23 March 2016 Resolved
Prove proper operation of generator Voltmeter.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 13 April 2016
Resolution: Voltmeter found satisfactory.
Accommodation/Occupational Safety › Heating › Piping
Issued 23 March 2016 Resolved
Remove heat insulation on all heating system pipes in the engine room that is melted.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 13 April 2016
Resolution: Vessle replaced/removed melted insulation.
Electrical › Electric Generation Source (service) › Generator
Issued 23 March 2016 Resolved
Provide exhaust insulationon both generators, all the way to the turbos.
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 13 April 2016
Resolution: Vessel provided insulation.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 23 March 2016 Resolved
Remove old COI thats posted on the main deck. Replace with current COI.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 13 April 2016
Resolution: COI was replaced and posted.
Engineering › Sea-water System (primary cooling) › Piping
Issued 23 March 2016 Resolved
Repair R/W leak on port main engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 13 April 2016
Resolution: R/W leak repaired.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Exhaust Manifold
Issued 23 March 2016 Resolved
Repair water leak on the port generator exhaust in the lazarette at the muffler.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 13 April 2016
Resolution: Leak was repaired.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 23 March 2016 Resolved
100 Kapok Life jackets failed inspection. Replace Life jackets.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 13 April 2016
Resolution: Vessel replaced 100 lifejackets.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.