Records from 2016 to 2026. Most recent: inspection, 19 March 2026.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Documentation record
Registered dimensions (L × B × D)106.4 ft × 21.5 ft × 4.4 ft
Registered tonnagegross 91 / net 62
ITC dimensions (L × B × D)106.4 ft × 21.5 ft × 4.4 ft
ITC tonnagegross 127 / net 38
BuilderCAMCRAFT INC · JEAN LAFITTE, LA, UNITED STATES · built 1978
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portDICKINSON, TX
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 5 August 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it127 - Convention (Subpart B), Gross Ton
91 - Regulatory (Subpart C or D), Gross Ton
38 - Convention (Subpart B), Net Ton
62 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 12
19 March 2026
Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8328715
14 August 2025
Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8209690
7 November 2024
Annual Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8031976
2 April 2024
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7906055
17 August 2023
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7770408
8 September 2022
COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7554269
5 April 2022
Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7424816
22 June 2021
Internal Structural Exam · Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7246550
8 December 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7108468
8 October 2020
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7087177
19 May 2020
Hull Examination · DAPI Audit · Administrative Inspection · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6951317
8 March 2016
Administrative Inspection
Administrative · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 5865399
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 November 2024
Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment other than a small buoyancy compartments, under all practical conditions. Vessels aft bilge compartment suction was not operational.
46 CFR 182.25-1
Old T
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 November 2024
Resolution: [name withheld] video evidence of proper operation of bilge pump and valve operations.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 November 2024
Resolved
At least one ring life buoy must be fitted with a lifeline. Vessel did not have ring lifebuoy with a lifeline. Also lifebuoy was missing corrosion-resistant clip for floating water light.
46 CFR 180.70 (c)
Old T
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 November 2024
Resolution: Crew added lifeline to lifebuoy.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 7 November 2024
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery or equipment, shall be made without the knowledge and approval of Officer in Charge, Marine Inspections.
USCG Marine Inspectors discovered Port side aft most station to have a cracked weld where station meets the deck. Enact permanent repairs to the satisfaction of the USCG Marine Inspector.
46 CFR 176.20-1(a)
Old T
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 November 2024
Resolution: Aft stantion was welded. MI witnessed fixed stantion.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 7 November 2024
Resolved
The intent of this part is to insure that each vessel is provided with safe, readily available and sufficient fire fighting equipment of the type necessary.
During inspection, vessel crew could not provide heat gun to test heat detectors to ensure proper operations.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 November 2024
Resolution: MI verified vessel has heat gun on board and tested engine room heat detector for proper operatoin.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 August 2023
Resolved
No major repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge and approval of the Officer in Charge, Marine Inspection.
USCG Marine Inspector discovered a cracked weld on the auxiliary machinery space ventilation supply duct, located on the port side aft main deck. Enact permanent repairs to the satisfaction of a USCG Marine Inspector.
Old T - 46 CFR 176.20-1(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 October 2023
Resolved 26 September 2023
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 17 August 2023
Resolved
The following vessels must have on board a properly installed, operational Coast Guard type-approved AIS Class A device: A self-propelled vessel of 65 feet or more in length, engaged in commercial service.
Vessel is currently operating with a class B AIS.
33 CFR 164.46
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 October 2023
Resolved 26 September 2023
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 14 September 2022
Resolved
Adequate emergency lighting automatically actuated upon failure of the main 'lighting system shall be fitted along the line of escape in vessels having lounge areas below the main deck as per §177.3Q--7 of this subchapter.
Marine Inspector discovered two (02) emergency lights extinguished during testing.
Replace or repair to the satisfaction of a Coast Guard Marine Inspector.
46 CFR 184.30-5(a)
16 C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2022
Resolved 28 September 2022
Resolution: Emergency lighting replaced and operational.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 14 September 2022
Resolved
Lighting fixtures shall be constructed in accordance with the requirements of Underwriters Laboratories,
Inc. Standard for Marine Type Electric Lighting Fixtures, Subject 595, or shall bear the proper Underwriters Laboratories, Inc. "Marine Type" label. or shall be constructed in accordance with the requirements of other recognized testing laboratories.
Marine Inspector discovered light fixture in engine room without a cover.
Replace cover for lighting fixture to the satisfaction of a Coast Guard Marine Inspector.
46 CFR 183.10-20(l)
16 C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2022
Resolved 28 September 2022
Resolution: New light fixture covers installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 September 2022
Resolved
The cable shall be examined as far as practicable without undue disturbance of the cable or electrical
apparatus.
MI discovered multiple dead ended wires located under the operating station console and fly bridge console.
Remove or cap with crimping cover to the satisfaction of a Coast Guard Marine Inspector.
46 CFR 176.25-15
16 C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2022
Resolved 28 September 2022
Resolution: All dead-ended wires removed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 September 2022
Resolved
Wiring where subject to mechanical damage shall be protected in accordance with the National Electrical
Code: article 352 for metal raceways; article 346.for conduit and article 348 for metallic tubing.
MI discovered light fixture in engine room plugged into receptacle.
Hard wire light fixture to ship thru junction box to the satisfaction of a Coast Guard Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2022
Resolved 28 September 2022
Resolution: Lighting fixture hard wired into junction box.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 14 September 2022
Resolved
Additional control equipment and measuring instruments
shall be provided as necessary to insure satisfactory operation of the generator or generators.
MI discovered power available light on distribution panel extinguished.
Replace or repair to the satisfaction of a Coast Guard Marine Inspector.
46 CFR 183.10-5(g)
16 C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2022
Resolved 28 September 2022
Resolution: Power available light replaced and operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 September 2022
Resolved
The setting of safety valves or relief valves on boilers and unfired pressure vessels shall be checked.
MI discovered both air receiver relief valves did not have relief settings available for inspection.
Replace in kind relief valves and test to appropriate settings to the satisfaction of a Coast Guard Marine Inspector.
46 CFR 176.25-30(b)(2
16 C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2022
Resolved 28 September 2022
Resolution: New pressure relief valves installed and operational.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 14 September 2022
Resolved
The master of a vessel fitted with loading doors shall assure that all loading doors, are closed watertight and secured during the entire voyage.
MI discovered the gasket of the main watertight door could not seal due to gaps in the gasket.
Replace gasket to the satisfaction of a Coast Guard Marine Inspector.
46 CFR 185.20-17(a)
16 C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2022
Resolved 28 September 2022
Resolution: New gasket installed.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 22 June 2021
Resolved
Survival craft on a vessel must be in good working order and ready for immediate use. Life Float shows damage from birds. Repair IAW manufacturers instructions within 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 August 2021
Resolved 29 July 2021
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 June 2021
Resolved
A vessel must be fitted with ground tackle necessary for the vessel to be safely anchored. Noted that Anchor fair lead was bent and roller broken. Repair within 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 August 2021
Resolved 29 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 19 May 2020
Resolved
Replace life float painter line.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2020
Resolved 27 May 2020
Resolution: Owner replaced life float painter line.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 19 May 2020
Resolved
Install AIS system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2020
Resolved 27 May 2020
Resolution: Owner installed and tested , all sat.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 May 2020
Resolved
Prove proper operation of ships whistle.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2020
Resolved 27 May 2020
Resolution: Owner repaired ships whistle and tested, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 19 May 2020
Resolved
Prove proper operation of the port generator.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2020
Resolved 27 May 2020
Resolution: Owner provided proof of operation of port generator, tested all sat.
08 - Alarms › N/A - No Subsystem › Closing water-tight doors alarm
Issued 19 May 2020
Resolved
Provide proof of engine room and galley water tight door alarm.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2020
Resolved 27 May 2020
Resolution: Owner provide proof of engine room and galley water tight door alarm, tested all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 May 2020
Resolved
Label breakers on Galley and generator power panel.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2020
Resolved 27 May 2020
Resolution: Breaker and generator panel labeled, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 19 May 2020
Resolved
Install smoke detector in galley.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2020
Resolved 27 May 2020
Resolution: Owner installed smoke detector in Galley.