01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 18 February 2026
Resolved
Vessel required to complete Man Over Board, fire and abandon ship drills.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 May 2026
Resolution: conducted sat drills
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 March 2025
Resolved
All vessels except unmanned barges must be provided with a satisfactory bilge pumping plant capable of pumping from and draining any watertight compartment except for ballast, oil, and water tanks. The bilge pumping system must be capable of operation under all practicable conditions after a casualty whether the ship is upright or listed. Vsl was unable to prove satisfactory operation of installed bilge system. Prove proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 March 2025
Resolution: Globe valve renewed. Test of bilge system sat.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 March 2025
Resolved
Fire main piping was leaking above stbd main that leads to fire monitor. Make permanent repairs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 March 2025
Resolution: Portion of leaking pipe renewed. Test of fire system, sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 March 2025
Resolved
Each bilge-manifold valve controlling a bilge suction from any compartment must be of the stop-check type. Install check valves between stop valve and suction during next drydock.
Action required: 705 - Other - as specified
Resolved 20 April 2026
Resolution: check valve installed
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 19 March 2025
Resolved
Distress signals. Each vessel must—(1) Carry not less than 12 rocket parachute flares approved under approval series 160.136
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2025
Resolved 26 March 2025
Resolution: Vsl had 12 parachute flares onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 April 2024
Resolved
Valves and cocks not forming part of a piping system are not permitted in watertight subdivision bulkheads. Vessel was using a sluice valve from the lazarette space to drain water into main engine room. Room sluice valve and cap off pipe. 46 CFR 56.50-1(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2024
Resolved 22 April 2024
Resolution: Sluice valve was capped off.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 April 2024
Resolved
All vessels except unmanned barges shall be provided with a satisfactory bilge pumping plant capable of pumping from and draining any watertight compartment except for ballast, oil and water tanks which have acceptable means for filling and emptying independent of the bilge system. Vessel does not have an approved bilge pumping arrangement for lazarette space. Provide plans for installation of bilge pumping arrangement to MSD Homer. 46 CFR 56.50(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2024
Resolved 22 April 2024
Resolution: Received letter from marine architect for vessel detailing reasoning for no bilge suction in steering space. Sector agreed with marine architect, requirement was rescinded.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 April 2024
Resolved
Each cable installation must meet Section 6, of IEEE 45.8-2016. In accordance with IEEE the cable runs must be supported at intervals not to exceed 24 inches. The electrical cables supplying power to the portable accommodation modules were not supported and laying on the deck. Properly support cables with metallic bands at intervals not to exceed 24 inches.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 April 2024
Resolution: cables supported
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 April 2024
Resolved
After any survey of the vessel, no change shall be made in the vessel's structure, equipment, arrangements, material, or scantling as covered by the survey. Found the steel gooseneck vent from the below deck electrical room as repaired with PVC piping.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2024
Resolved 22 April 2024
Resolution: PVC gooseneck removed and pipe capped
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 30 March 2023
Resolved
Ensure there is a record of inspection of towing gear, in accordance with 46 CFR 140.820.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: log provided
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2023
Resolved
Engineers stateroom: one berth was missing a light, 02 berths were missing light covers
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: repaired
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2023
Resolved
Mate's Stateroom - remove unapproved electrical and ensure berth lights are covered
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: repaired
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2023
Resolved
All cable and wiring must be installed with metal supports spaced not more than 24 inches apart. The use of plastic tie wraps must be limited to bundling or retention of multiple cable installations, and not used as a means of support.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: repaired
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 30 March 2023
Resolved
Update fire control plan to match vessel, ensure proper symbolization is used.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 13 April 2023
Resolution: FCP updated and approved.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2023
Resolved
Remove outlet in cabinet of bridge aft weather deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: removed
09 - Working and Living Conditions › 091 - Living Conditions › No direct openings into sleeping rooms cargo/mach.
Issued 30 March 2023
Resolved
Ensure the through holes in port and stbd PAMS are weathertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: repaired
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 30 March 2023
Resolved
Ensure the emergency lighting in the stbd PAMS is operational.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 April 2023
Resolution: operational
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 30 March 2023
Resolved
Provide proof of Merchant Mariner Credentials for the crew prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2023
Resolution: sat
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 30 March 2023
Resolved
Demonstrate proper operation of the machinery pneumatic shutdown function of the fixed fire extinguishing system in the engine room upon pressurization of the system piping upstream of the time delay in accordance with the manufacturer's testing procedures in the presence of a Coast Guard marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 April 2023
Resolution: System demonstrated propely in presence of CG MI.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 May 2022
Resolved
Received request for drydock extension. Conducted ISE on 16MAY22. ISE sata. Granted drydock extension. Vessel must be hauled out of the water and made available for drydock and ISE no later than 25AUG22.
Action required: 705 - Other - as specified
Due 25 August 2022
Resolved 29 August 2022
Resolution: Conduct drydock and ISE
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 11 May 2022
Resolved
Conduct satisfactory MOB, fire, and abandon ship drills in the presence of a USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2022
Resolution: conducted
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022
Resolved
Port Bridge Wing - ensure battery is secured to prevent movement.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 12 May 2022
Resolution: secured
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022
Resolved
Aft 02 deck - provide an approved outlet for the appliances.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 12 May 2022
Resolution: provided
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022
Resolved
Sewage for port PAM is powered by an extension cord. Provide permanent power.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 16 May 2022
Resolution: provided
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 11 May 2022
Resolved
Port and stbd PAM - renew gasket in fwd watertight door.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 29 August 2022
Resolution: repaired
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 11 May 2022
Resolved
Stbd PAM - E-light extinguished, repair
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 16 May 2022
Resolution: repaired
08 - Alarms › N/A - No Subsystem › General alarm
Issued 11 May 2022
Resolved
Port and Stbd PAM - general alarm is not operational, repair prior to using PAM.
Action required: 705 - Other - as specified
Resolved 16 May 2022
Resolution: repaired
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 May 2022
Resolved
Provide one-line diagram for fwd and engine room fixed fire fighting systems as per NFPA 12/NVIC 6-72
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 16 May 2022
Resolution: provided
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 11 May 2022
Resolved
Engine room - install plugs or caps on fuel oil filter water drains
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 16 May 2022
Resolution: provided
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022
Resolved
Engine room - j-box in overhead near stbd generator missing cover, provide.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 12 May 2022
Resolution: provided
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 11 May 2022
Resolved
Ensure sewage overboard discharge is labeled
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 16 May 2022
Resolution: provided
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 May 2022
Resolved
Prove proper operation of overspeed trips for John Deere generators
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 8 December 2022
Resolution: Vessel rep installed an after market device that simulates overspeed. Cleared def, but still waiting for more guidance from USCG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 May 2022
Resolved
Prove proper operation of lube oil shutdown on MDEs
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 2 September 2022
Resolution: Witnessed satisfactory operational test.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 May 2022
Resolved
Provide foam analysis report for fire fighting foam
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 10 August 2023
Resolution: Removed authorization to carry liquid fuel in bulk from COI and vessel to meet Subchapter D prior to carrying fuel in bulk.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 11 May 2022
Resolved
2 E-lights extinguished (engine room and electrical room), repair
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 12 May 2022
Resolution: repaired
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022
Resolved
Engine room - mount outlet that is left of sound powered phone
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 12 May 2022
Resolution: mounted
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022
Resolved
Engine room - remove extension cord that is left of sound powered phone
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 12 May 2022
Resolution: removed
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 11 May 2022
Resolved
Conduct E-lighting and E-power system testing as per 46 CFR 97.15-30 and log it as per 46 CFR 97.35-5(g) (3hr function test)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 16 May 2022
Resolution: conducted and logged
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 11 May 2022
Resolved
Weather deck - mount light fixture that is located above stbd PAM
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 16 May 2022
Resolution: mounted
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 May 2022
Resolved
Ensure fire nozzles #3 and #6 are operational (straight stream and fog pattern)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2022
Resolution: renewed
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 2 February 2021
Resolved
Provide emergency training and drills with crew that will be operating vessel
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 April 2021
Resolution: completed
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 2 February 2021
Resolved
Provide certification of current crane testing
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 April 2021
Resolution: verified
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 30 May 2019
Resolved
Crop and renew bulkheads and frame as described in letter dated 30May19.
Action required: 705 - Other - as specified
Due 30 November 2019
Resolved 26 February 2020
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 5 April 2018
Resolved
Vessel's lifebuoy on portside bridge wing must be remarked with name and homeport.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 April 2018
Resolved 20 September 2018
Electrical › Electrical Distribution System (service) › Cable
Issued 5 April 2018
Resolved
Electrical cable to power radar was spliced inproperly.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 April 2018
Resolved 20 September 2018
Personnel › Certificates/Documents/Licenses › License, Master
Issued 5 April 2018
Resolved
Vessel has not been operating and unmanned. Prior to operating vessel must show proof of licensing for entire vessel and conduct drills.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 September 2018
Resolution: Witnessed satisfactory drills
Documentation › Certificates/Documents › Proof of Consortium Enrollment (DAPI)
Issued 23 August 2017
Resolved
Vessel did not have proof of enrollment.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 23 August 2017
Resolution: Vessel owner submitted enrollment certification letter.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 23 August 2017
Resolved
Vessel needs to replace retroreflective material on port and stbd liferings on bridger wings and remark with vessels name and homeport.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 15 September 2017
Resolution: Vessel replaced retro and marked liferings accordingly.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 August 2017
Resolved
Oxygen bottles expired and must be sent for oxygen analysis.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 August 2017
Resolved 15 September 2017
Resolution: Vessel replaced oxygen bottles as required.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 August 2017
Resolved
AED battery expired and must be replaced.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 September 2017
Resolved 23 August 2017
Resolution: Vessel replaced AED battery.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 August 2017
Resolved
First Aid Chest on bridge has expired medicine and must be removed from the vessel.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 15 September 2017
Resolution: Vessel replaced first aid equipment as required.
Electrical › Electrical Distribution System (service) › Wiring
Issued 23 August 2017
Resolved
Vessel had two dead end wires on superstructure that must be pulled and removed or placed inside a junction box.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 15 September 2017
Resolution: Vessel removed dead end wires.
Lifesaving › Immersion Suits › General
Issued 23 August 2017
Resolved
Vessels immersion suits are past the manufactors date for service and required to be hydrotestested to remain in service.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2017
Resolution: Vessel sent immersion suits to eagle enterprise for hydrotesting as required by manufactores instruction.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 23 August 2017
Resolved
Vessel's storage locker for lifejackets is not easily accessible and must be configured to open easily in case of an emergency.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2017
Resolution: Vessel fixed lifejacket locker to ensure easy access for passengers.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 23 August 2017
Resolved
[name withheld] 6 lifejackets for not being in servicable condition and limited the amount of passengers until new ones brought aboard.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 September 2017
Resolution: Vessel replaced six lifejackets.
Fire Fighting › Fire Hydrants › Condition
Issued 23 August 2017
Resolved
Vessels fire hydrant on port side stern was leaking when pressurized with valve secured.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 15 September 2017
Resolution: Vessel replaced valve on fire main and pressurized to ensure fire main was not leaking.
Documentation › Logs/Records › Drug Test Records
Issued 23 August 2017
Resolved
Vessel must provide proof of drug testing.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 23 August 2017
Resolution: Vessel showed proof of enrollment and random and pre-employment testing.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 23 August 2017
Resolved
Vessel was missing light list and all required pubs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2017
Resolution: Vessel had new pubs for area.
Operations/Management › Drills/Instruction › Not Conducted
Issued 23 August 2017
Resolved
Vessel does not currently been operating and has no crew experienced with vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 September 2017
Resolved 15 September 2017
Resolution: Vessel had crew and conducted fire drill and abandon ship drill and created log for conducting drills.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 23 August 2017
Resolved
Vessels door to machinery space is not sealing properly and must adjust door to seal properly.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 15 September 2017
Resolution: Vessel reset door and conducted chalk test to ensure it was sealing properly.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 13 June 2017
Resolved
Buckled transverse bulkhead in #3 void on stbd side.
Condition: Damaged By Earlier Event
Due 30 June 2017
Resolved 23 June 2017
Resolution: Operator completed satisfactory repair IWO cropping and renewing 2'x 3' in transverse bulkhead.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 13 June 2017
Resolved
Draft Marks not painted in contrasting colors of hull.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 23 August 2017
Resolution: Vessel repainted draft marks.
Construction/Loadline › Markings › Load Line Mark
Issued 13 June 2017
Resolved
Load Line Mark needs to be repainted and permanently scribed to the satisfaction of issuing agency.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 23 August 2017
Resolution: Vessel repainted loadline marks.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 8 May 2017
Resolved
Crane is out of service via red tagged and locked out IAW procedures.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 June 2017
Resolved 17 April 2018
Resolution: Witnessed satisfactory inspection of crane.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 7 July 2016
Resolved
Install light covers in both temp quarters.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: New lights were installed in temp quarters.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 7 July 2016
Resolved
Provide emergency lighting in both temp quarters.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Emergency lights were installed in temp quarters.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 7 July 2016
Resolved
Provide 2 smoke detectors in stbd temp quarters.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Smoke detectors were installed.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 7 July 2016
Resolved
Provide general alarm bell in temp quarters.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: General alarm bell was installed.
Fire Fighting › Fire Hoses › Condition
Issued 7 July 2016
Resolved
Replace the 3 fire hoses that failed during pressure test.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: New fire hoses were installed on vessel.
Deck/Cargo › Cargo Stowage › General
Issued 7 July 2016
Resolved
Provide 3rd party annual crane service report.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2017
Resolution: Vessel has red tagged & locked out crane until 3rd party annual servicing can be done. Reissued CG 835 for 30 days.
Accommodation/Occupational Safety › Ventilation › General
Issued 7 July 2016
Resolved
Replace melted galley range cover and install J-box where wire splice is located.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 14 September 2016
Resolution: Light was removed.
Lifesaving › Inflatable Liferafts › Servicing
Issued 7 July 2016
Resolved
Provide proof of annual maintenance service for life rafts.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Verified annual maintenance service was conducted.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 7 July 2016
Resolved
Remove hair dryer that is permanently installed as a defrost unit located on bridge.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Hair dryer was removed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 7 July 2016
Resolved
Bridge has multiple electrical issues to include splices in power cables and dead end cables. Install J-box's in all spliced power cables and remove dead end cables or terminate cables in J-box's.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 14 September 2016
Resolution: J-boxes were installed.
Engineering › Sea-water System (primary cooling) › Piping
Issued 7 July 2016
Resolved
Engine room port side sea chest vent is wasted and weeping water above valve. Replace wasted section of vent.
Action required: 705 - Other - as specified
Due 8 May 2017
Resolved 8 May 2017
Resolution: Vessel replaced piping and vent and no longer is leaking.
Stability › Watertight Integrity › General
Issued 7 July 2016
Resolved
Fwd engine room bulkhead needs to be made watertight iwo the new switchboard/fuel transfer room. Multiple large holes in the upper section of the bulkhead and several abandoned electrical fittings that need plugged.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 14 September 2016
Resolution: All holes were plugged.
Electrical › Electrical Distribution System (service) › Cable
Issued 7 July 2016
Resolved
Remove dead end wire bundle behind switchboard in overhead.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 14 September 2016
Resolution: The wires were not dead ended but was excessive wires. Wire run was cleaned up and strapped neatly.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 7 July 2016
Resolved
Provide Periodic Safety Test Procedures for all automation testing. Submit to OCMI for approval.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 20 September 2018
Resolution: Test procedures were submitted to our office but returned for revision.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 7 July 2016
Resolved
Complete Fire, Abandon Ship and Man Overboard drills in the presence of a CG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 May 2017
Resolved 8 May 2017
Resolution: Vessel conducted all drills to the satisfaction of the attending MI.
Construction/Loadline › Structures › Machinery Space Opening
Issued 7 July 2016
Resolved
Emergency hatch in rudder room is inop. Make repairs to hatch.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Hatch is properly working.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 7 July 2016
Resolved
Emergency lighting is inop in rudder room. Make repairs to emergency lighting.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Light was repaired and is working.
Electrical › Lighting (service) › Outlet Box
Issued 7 July 2016
Resolved
Repair/Replace overhead electrical receptacle in port bow locker.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 14 September 2016
Resolution: Electrical box was repaired.