MAURY USCG vessel records Sign in
← All vessels

ARCTIC SEAL

ARCTIC SEAL is a 1978 freight ship. The Coast Guard has recorded 108 inspections since 1987, most recently in February 2026, along with 168 deficiencies and 1 casualty investigation in 2012.

Records from 1987 to 2026. Most recent: inspection, 11 February 2026.

Built
1978
Last inspected
11 February 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7716945 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDP7492
Flag
UNITED STATES
367631050
Maury page id
psix-49719

Inspections, by type

…with no type recorded24
Years with a record 33 calendar years (1987–2026)
The 108 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Registered dimensions (L × B × D)120.7 ft × 32.0 ft × 9.8 ft
Registered tonnagegross 193 / net 131
ITC dimensions (L × B × D)120.7 ft × 32.0 ft × 9.8 ft
ITC tonnagegross 305 / net 91
BuilderLANTANA BOATYARD INC · LANTANA, FL, UNITED STATES · built 1978
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portHOMER, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 25 June 2026 · expires 30 June 2027
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it305 - Convention (Subpart B), Gross Ton
353 - Dead Weight, Ton
91 - Convention (Subpart B), Net Ton
193 - Regulatory (Subpart C or D), Gross Ton
131 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDQ9086MMSI 367631050 · active · compulsorily equipped · granted 16 April 2026, expires 16 April 2036
WDP7492MMSI 367631050 · cancelled · compulsorily equipped · granted 7 August 2024, cancelled 13 April 2026
WDH5747MMSI 367631050 · terminated · compulsorily equipped · granted 4 July 2014, cancelled 5 August 2024
WCP4174MMSI 366981750 · expired · compulsorily equipped · granted 5 October 2004, cancelled 21 February 2015
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 108

11 February 2026 Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8309405
11 February 2026 Administrative Inspection
Administrative · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8309573
4 December 2025 Examination of Repairs
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8290613
19 March 2025 Annual Inspection · MTSA Verification · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8096592
15 April 2024 Deficiency Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7891965
30 November 2023 Examination of Repairs · Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7831442
30 March 2023 Deficiency Check · MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7658847
15 November 2022 Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7596482
29 August 2022 Deficiency Check · Examination of Repairs · Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7548011
24 August 2022 Administrative Inspection
Administrative · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7542729
26 April 2022 Drydock Extension · Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7427366
13 April 2021 Administrative Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7174270
16 January 2021 COI Inspection · Administrative Inspection · Examination of Repairs · Spot Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7125499
30 April 2020 Administrative Inspection
Administrative · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6950533
30 May 2019 Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6885752
23 May 2019 Administrative Inspection · MTSA Verification · Drydock Exam · Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6691767
21 September 2018 Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6545380
17 April 2018 Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6394987
5 April 2018 Periodic Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6389983
21 December 2017 Administrative Inspection
Administrative · Navigation Center · Activity 6327436
20 October 2017 Administrative Inspection
Administrative · Navigation Center · Activity 6291870
15 September 2017 Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6360581
23 August 2017 Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6247603
13 June 2017 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6180567
8 May 2017 Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6141789
14 September 2016 Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6016789
5 July 2016 Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 5930652
13 June 2012 MTSA Verification · Annual Inspection
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 4343104
13 June 2012 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 4343211
29 July 2011 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4098595
26 February 2010 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 3690105
19 February 2010 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3682578
8 January 2010 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3662039
8 May 2008 Annual Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 3208591
29 May 2007 Deficiency Check
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 2945165
3 April 2007 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2905819
19 January 2007 Hull Examination · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2858606
23 May 2005 COI Inspection
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 2366254
18 May 2005 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 2361777
12 May 2005 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 2356797
6 January 2005 Internal Structural Exam · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2270662
12 July 2004 Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 2131043
8 February 2004 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 2003878
24 December 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1969213
29 May 2003 Periodic Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1804702
8 January 2003 Examination of Repairs · Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1730479
3 December 2002 Damage Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1716972
28 May 2002 Periodic Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1621915
31 May 2001 Re-Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1462961
1 February 2001 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 483047
1 June 2000 COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1430871
23 February 2000 Damage Survey · Examination of Repairs
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1391277
13 February 2000 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 76326
13 February 2000 Damage Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1399276
3 February 2000 Administrative
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 814389
2 February 2000 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1420274
21 September 1999 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1341712
23 July 1999 Administrative
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1103565
26 May 1999 Re-Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 802941
5 August 1998 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1131030
23 June 1998 Administrative
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 793511
23 June 1998 Damage Survey
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1444024
16 June 1998 Damage Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 793506
13 June 1998 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 50757
13 June 1998 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 222631
13 June 1998 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 227976
2 June 1998 COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1127631
20 February 1998 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1413313
26 June 1997 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 777209
29 May 1997 Re-Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1107592
14 January 1997 Administrative
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1098329
19 June 1996 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1078723
4 June 1996 COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1082925
8 August 1995 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 216566
1 August 1995 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1188722
7 July 1995 Re-Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1192145
26 June 1995 Excursion Permit
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1191936
7 June 1995 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1184872
6 June 1995 Examination of Repairs
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 880342
5 June 1995 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 156329
10 March 1995 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 376087
28 February 1995 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 443523
2 February 1995 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 908132
2 February 1995 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1173097
11 January 1995 Administrative
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1171054
26 August 1994 Excursion Permit
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 869133
22 June 1994 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 867236
6 June 1994 COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1172086
29 July 1993 Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1157050
23 July 1993 Re-Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1382647
6 July 1993 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 663599
1 July 1993 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 128841
1 March 1993 Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 838793
22 January 1993 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 663600
21 August 1992 Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 183304
11 August 1992 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 52525
11 August 1992 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 132834
26 May 1992 COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 954967
5 May 1992 COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 947715
8 November 1991 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 942597
10 September 1991 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 935950
16 July 1991 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 937568
12 December 1990 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 924584
11 June 1990 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 904453
7 May 1990 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 917440
7 May 1990 Inclining Experiment · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1216432
14 February 1990 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1237308
14 April 1987 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1325479

Deficiency record · 168

01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 18 February 2026 Resolved
Vessel required to complete Man Over Board, fire and abandon ship drills.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 May 2026
Resolution: conducted sat drills
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 March 2025 Resolved
All vessels except unmanned barges must be provided with a satisfactory bilge pumping plant capable of pumping from and draining any watertight compartment except for ballast, oil, and water tanks. The bilge pumping system must be capable of operation under all practicable conditions after a casualty whether the ship is upright or listed. Vsl was unable to prove satisfactory operation of installed bilge system. Prove proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 March 2025
Resolution: Globe valve renewed. Test of bilge system sat.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 March 2025 Resolved
Fire main piping was leaking above stbd main that leads to fire monitor. Make permanent repairs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 March 2025
Resolution: Portion of leaking pipe renewed. Test of fire system, sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 March 2025 Resolved
Each bilge-manifold valve controlling a bilge suction from any compartment must be of the stop-check type. Install check valves between stop valve and suction during next drydock.
Action required: 705 - Other - as specified
Resolved 20 April 2026
Resolution: check valve installed
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 19 March 2025 Resolved
Distress signals. Each vessel must—(1) Carry not less than 12 rocket parachute flares approved under approval series 160.136
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2025
Resolved 26 March 2025
Resolution: Vsl had 12 parachute flares onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 April 2024 Resolved
Valves and cocks not forming part of a piping system are not permitted in watertight subdivision bulkheads. Vessel was using a sluice valve from the lazarette space to drain water into main engine room. Room sluice valve and cap off pipe. 46 CFR 56.50-1(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2024
Resolved 22 April 2024
Resolution: Sluice valve was capped off.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 April 2024 Resolved
All vessels except unmanned barges shall be provided with a satisfactory bilge pumping plant capable of pumping from and draining any watertight compartment except for ballast, oil and water tanks which have acceptable means for filling and emptying independent of the bilge system. Vessel does not have an approved bilge pumping arrangement for lazarette space. Provide plans for installation of bilge pumping arrangement to MSD Homer. 46 CFR 56.50(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2024
Resolved 22 April 2024
Resolution: Received letter from marine architect for vessel detailing reasoning for no bilge suction in steering space. Sector agreed with marine architect, requirement was rescinded.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 April 2024 Resolved
Each cable installation must meet Section 6, of IEEE 45.8-2016. In accordance with IEEE the cable runs must be supported at intervals not to exceed 24 inches. The electrical cables supplying power to the portable accommodation modules were not supported and laying on the deck. Properly support cables with metallic bands at intervals not to exceed 24 inches.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 April 2024
Resolution: cables supported
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 April 2024 Resolved
After any survey of the vessel, no change shall be made in the vessel's structure, equipment, arrangements, material, or scantling as covered by the survey. Found the steel gooseneck vent from the below deck electrical room as repaired with PVC piping.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2024
Resolved 22 April 2024
Resolution: PVC gooseneck removed and pipe capped
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 30 March 2023 Resolved
Ensure there is a record of inspection of towing gear, in accordance with 46 CFR 140.820.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: log provided
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2023 Resolved
Engineers stateroom: one berth was missing a light, 02 berths were missing light covers
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: repaired
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2023 Resolved
Mate's Stateroom - remove unapproved electrical and ensure berth lights are covered
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: repaired
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2023 Resolved
All cable and wiring must be installed with metal supports spaced not more than 24 inches apart. The use of plastic tie wraps must be limited to bundling or retention of multiple cable installations, and not used as a means of support.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: repaired
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 30 March 2023 Resolved
Update fire control plan to match vessel, ensure proper symbolization is used.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 13 April 2023
Resolution: FCP updated and approved.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 March 2023 Resolved
Remove outlet in cabinet of bridge aft weather deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: removed
09 - Working and Living Conditions › 091 - Living Conditions › No direct openings into sleeping rooms cargo/mach.
Issued 30 March 2023 Resolved
Ensure the through holes in port and stbd PAMS are weathertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 12 April 2023
Resolution: repaired
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 30 March 2023 Resolved
Ensure the emergency lighting in the stbd PAMS is operational.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 April 2023
Resolution: operational
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 30 March 2023 Resolved
Provide proof of Merchant Mariner Credentials for the crew prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2023
Resolution: sat
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 30 March 2023 Resolved
Demonstrate proper operation of the machinery pneumatic shutdown function of the fixed fire extinguishing system in the engine room upon pressurization of the system piping upstream of the time delay in accordance with the manufacturer's testing procedures in the presence of a Coast Guard marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 April 2023
Resolution: System demonstrated propely in presence of CG MI.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 May 2022 Resolved
Received request for drydock extension. Conducted ISE on 16MAY22. ISE sata. Granted drydock extension. Vessel must be hauled out of the water and made available for drydock and ISE no later than 25AUG22.
Action required: 705 - Other - as specified
Due 25 August 2022
Resolved 29 August 2022
Resolution: Conduct drydock and ISE
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 11 May 2022 Resolved
Conduct satisfactory MOB, fire, and abandon ship drills in the presence of a USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2022
Resolution: conducted
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022 Resolved
Port Bridge Wing - ensure battery is secured to prevent movement.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 12 May 2022
Resolution: secured
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022 Resolved
Aft 02 deck - provide an approved outlet for the appliances.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 12 May 2022
Resolution: provided
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022 Resolved
Sewage for port PAM is powered by an extension cord. Provide permanent power.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 16 May 2022
Resolution: provided
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 11 May 2022 Resolved
Port and stbd PAM - renew gasket in fwd watertight door.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 29 August 2022
Resolution: repaired
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 11 May 2022 Resolved
Stbd PAM - E-light extinguished, repair
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 16 May 2022
Resolution: repaired
08 - Alarms › N/A - No Subsystem › General alarm
Issued 11 May 2022 Resolved
Port and Stbd PAM - general alarm is not operational, repair prior to using PAM.
Action required: 705 - Other - as specified
Resolved 16 May 2022
Resolution: repaired
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 May 2022 Resolved
Provide one-line diagram for fwd and engine room fixed fire fighting systems as per NFPA 12/NVIC 6-72
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 16 May 2022
Resolution: provided
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 11 May 2022 Resolved
Engine room - install plugs or caps on fuel oil filter water drains
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 16 May 2022
Resolution: provided
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022 Resolved
Engine room - j-box in overhead near stbd generator missing cover, provide.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 12 May 2022
Resolution: provided
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 11 May 2022 Resolved
Ensure sewage overboard discharge is labeled
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 16 May 2022
Resolution: provided
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 May 2022 Resolved
Prove proper operation of overspeed trips for John Deere generators
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 8 December 2022
Resolution: Vessel rep installed an after market device that simulates overspeed. Cleared def, but still waiting for more guidance from USCG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 May 2022 Resolved
Prove proper operation of lube oil shutdown on MDEs
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 2 September 2022
Resolution: Witnessed satisfactory operational test.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 May 2022 Resolved
Provide foam analysis report for fire fighting foam
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 10 August 2023
Resolution: Removed authorization to carry liquid fuel in bulk from COI and vessel to meet Subchapter D prior to carrying fuel in bulk.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 11 May 2022 Resolved
2 E-lights extinguished (engine room and electrical room), repair
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 12 May 2022
Resolution: repaired
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022 Resolved
Engine room - mount outlet that is left of sound powered phone
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 12 May 2022
Resolution: mounted
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2022 Resolved
Engine room - remove extension cord that is left of sound powered phone
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 12 May 2022
Resolution: removed
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 11 May 2022 Resolved
Conduct E-lighting and E-power system testing as per 46 CFR 97.15-30 and log it as per 46 CFR 97.35-5(g) (3hr function test)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 16 May 2022
Resolution: conducted and logged
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 11 May 2022 Resolved
Weather deck - mount light fixture that is located above stbd PAM
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2022
Resolved 16 May 2022
Resolution: mounted
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 May 2022 Resolved
Ensure fire nozzles #3 and #6 are operational (straight stream and fog pattern)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2022
Resolution: renewed
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 2 February 2021 Resolved
Provide emergency training and drills with crew that will be operating vessel
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 April 2021
Resolution: completed
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 2 February 2021 Resolved
Provide certification of current crane testing
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 April 2021
Resolution: verified
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 30 May 2019 Resolved
Crop and renew bulkheads and frame as described in letter dated 30May19.
Action required: 705 - Other - as specified
Due 30 November 2019
Resolved 26 February 2020
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 5 April 2018 Resolved
Vessel's lifebuoy on portside bridge wing must be remarked with name and homeport.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 April 2018
Resolved 20 September 2018
Electrical › Electrical Distribution System (service) › Cable
Issued 5 April 2018 Resolved
Electrical cable to power radar was spliced inproperly.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 April 2018
Resolved 20 September 2018
Personnel › Certificates/Documents/Licenses › License, Master
Issued 5 April 2018 Resolved
Vessel has not been operating and unmanned. Prior to operating vessel must show proof of licensing for entire vessel and conduct drills.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 September 2018
Resolution: Witnessed satisfactory drills
Documentation › Certificates/Documents › Proof of Consortium Enrollment (DAPI)
Issued 23 August 2017 Resolved
Vessel did not have proof of enrollment.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 23 August 2017
Resolution: Vessel owner submitted enrollment certification letter.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 23 August 2017 Resolved
Vessel needs to replace retroreflective material on port and stbd liferings on bridger wings and remark with vessels name and homeport.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 15 September 2017
Resolution: Vessel replaced retro and marked liferings accordingly.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 August 2017 Resolved
Oxygen bottles expired and must be sent for oxygen analysis.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 August 2017
Resolved 15 September 2017
Resolution: Vessel replaced oxygen bottles as required.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 August 2017 Resolved
AED battery expired and must be replaced.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 September 2017
Resolved 23 August 2017
Resolution: Vessel replaced AED battery.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 August 2017 Resolved
First Aid Chest on bridge has expired medicine and must be removed from the vessel.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 15 September 2017
Resolution: Vessel replaced first aid equipment as required.
Electrical › Electrical Distribution System (service) › Wiring
Issued 23 August 2017 Resolved
Vessel had two dead end wires on superstructure that must be pulled and removed or placed inside a junction box.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 15 September 2017
Resolution: Vessel removed dead end wires.
Lifesaving › Immersion Suits › General
Issued 23 August 2017 Resolved
Vessels immersion suits are past the manufactors date for service and required to be hydrotestested to remain in service.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2017
Resolution: Vessel sent immersion suits to eagle enterprise for hydrotesting as required by manufactores instruction.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 23 August 2017 Resolved
Vessel's storage locker for lifejackets is not easily accessible and must be configured to open easily in case of an emergency.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2017
Resolution: Vessel fixed lifejacket locker to ensure easy access for passengers.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 23 August 2017 Resolved
[name withheld] 6 lifejackets for not being in servicable condition and limited the amount of passengers until new ones brought aboard.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 September 2017
Resolution: Vessel replaced six lifejackets.
Fire Fighting › Fire Hydrants › Condition
Issued 23 August 2017 Resolved
Vessels fire hydrant on port side stern was leaking when pressurized with valve secured.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 15 September 2017
Resolution: Vessel replaced valve on fire main and pressurized to ensure fire main was not leaking.
Documentation › Logs/Records › Drug Test Records
Issued 23 August 2017 Resolved
Vessel must provide proof of drug testing.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 23 August 2017
Resolution: Vessel showed proof of enrollment and random and pre-employment testing.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 23 August 2017 Resolved
Vessel was missing light list and all required pubs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2017
Resolution: Vessel had new pubs for area.
Operations/Management › Drills/Instruction › Not Conducted
Issued 23 August 2017 Resolved
Vessel does not currently been operating and has no crew experienced with vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 September 2017
Resolved 15 September 2017
Resolution: Vessel had crew and conducted fire drill and abandon ship drill and created log for conducting drills.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 23 August 2017 Resolved
Vessels door to machinery space is not sealing properly and must adjust door to seal properly.
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 15 September 2017
Resolution: Vessel reset door and conducted chalk test to ensure it was sealing properly.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 13 June 2017 Resolved
Buckled transverse bulkhead in #3 void on stbd side.
Condition: Damaged By Earlier Event
Due 30 June 2017
Resolved 23 June 2017
Resolution: Operator completed satisfactory repair IWO cropping and renewing 2'x 3' in transverse bulkhead.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 13 June 2017 Resolved
Draft Marks not painted in contrasting colors of hull.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 23 August 2017
Resolution: Vessel repainted draft marks.
Construction/Loadline › Markings › Load Line Mark
Issued 13 June 2017 Resolved
Load Line Mark needs to be repainted and permanently scribed to the satisfaction of issuing agency.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 23 August 2017
Resolution: Vessel repainted loadline marks.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 8 May 2017 Resolved
Crane is out of service via red tagged and locked out IAW procedures.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 June 2017
Resolved 17 April 2018
Resolution: Witnessed satisfactory inspection of crane.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 7 July 2016 Resolved
Install light covers in both temp quarters.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: New lights were installed in temp quarters.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 7 July 2016 Resolved
Provide emergency lighting in both temp quarters.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Emergency lights were installed in temp quarters.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 7 July 2016 Resolved
Provide 2 smoke detectors in stbd temp quarters.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Smoke detectors were installed.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 7 July 2016 Resolved
Provide general alarm bell in temp quarters.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: General alarm bell was installed.
Fire Fighting › Fire Hoses › Condition
Issued 7 July 2016 Resolved
Replace the 3 fire hoses that failed during pressure test.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: New fire hoses were installed on vessel.
Deck/Cargo › Cargo Stowage › General
Issued 7 July 2016 Resolved
Provide 3rd party annual crane service report.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2017
Resolution: Vessel has red tagged & locked out crane until 3rd party annual servicing can be done. Reissued CG 835 for 30 days.
Accommodation/Occupational Safety › Ventilation › General
Issued 7 July 2016 Resolved
Replace melted galley range cover and install J-box where wire splice is located.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 14 September 2016
Resolution: Light was removed.
Lifesaving › Inflatable Liferafts › Servicing
Issued 7 July 2016 Resolved
Provide proof of annual maintenance service for life rafts.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Verified annual maintenance service was conducted.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 7 July 2016 Resolved
Remove hair dryer that is permanently installed as a defrost unit located on bridge.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Hair dryer was removed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 7 July 2016 Resolved
Bridge has multiple electrical issues to include splices in power cables and dead end cables. Install J-box's in all spliced power cables and remove dead end cables or terminate cables in J-box's.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 14 September 2016
Resolution: J-boxes were installed.
Engineering › Sea-water System (primary cooling) › Piping
Issued 7 July 2016 Resolved
Engine room port side sea chest vent is wasted and weeping water above valve. Replace wasted section of vent.
Action required: 705 - Other - as specified
Due 8 May 2017
Resolved 8 May 2017
Resolution: Vessel replaced piping and vent and no longer is leaking.
Stability › Watertight Integrity › General
Issued 7 July 2016 Resolved
Fwd engine room bulkhead needs to be made watertight iwo the new switchboard/fuel transfer room. Multiple large holes in the upper section of the bulkhead and several abandoned electrical fittings that need plugged.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 14 September 2016
Resolution: All holes were plugged.
Electrical › Electrical Distribution System (service) › Cable
Issued 7 July 2016 Resolved
Remove dead end wire bundle behind switchboard in overhead.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 14 September 2016
Resolution: The wires were not dead ended but was excessive wires. Wire run was cleaned up and strapped neatly.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 7 July 2016 Resolved
Provide Periodic Safety Test Procedures for all automation testing. Submit to OCMI for approval.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 20 September 2018
Resolution: Test procedures were submitted to our office but returned for revision.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 7 July 2016 Resolved
Complete Fire, Abandon Ship and Man Overboard drills in the presence of a CG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 May 2017
Resolved 8 May 2017
Resolution: Vessel conducted all drills to the satisfaction of the attending MI.
Construction/Loadline › Structures › Machinery Space Opening
Issued 7 July 2016 Resolved
Emergency hatch in rudder room is inop. Make repairs to hatch.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Hatch is properly working.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 7 July 2016 Resolved
Emergency lighting is inop in rudder room. Make repairs to emergency lighting.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 September 2016
Resolution: Light was repaired and is working.
Electrical › Lighting (service) › Outlet Box
Issued 7 July 2016 Resolved
Repair/Replace overhead electrical receptacle in port bow locker.
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 14 September 2016
Resolution: Electrical box was repaired.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 3 April 2007 Resolved
EPIRB registratin sticker missing.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2007
Resolution: EPIRB registration sticker provided.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 3 April 2007 Resolved
No liferaft servicing certificate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2007
Resolution: Liferaft servicing certificate provided.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 3 April 2007 Resolved
Provide proof of enrollment in drug and alcohol program.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2007
Resolution: Vessel provided proof of enrollment in drug and alcohol prevention program.
Fire Fighting › Fixed Halon Fire Extinguishing System › Quantity of Halon
Issued 3 April 2007 Resolved
Demonstrate adequate agent in bottle or provide servicing certificates for fixed Halon system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2007
Resolution: Satisfactory Fire Fighting Equipment servicing certificates provided.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 3 April 2007 Resolved
Provide copy of valid SOPEP.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2007
Resolution: Satisfactory and valid SOPEP provided.
Accommodation/Occupational Safety › Occupational Safety › Storm Rail
Issued 3 April 2007 Resolved
Provide a storm rail for stove top.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2007
Resolution: Storm rails provided for installation.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 3 April 2007 Resolved
Repair main engine exhuast leak.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2007
Resolution: Vessel satisfactorily replaced leaking dry exhaust pipe sections.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 3 April 2007 Resolved
Crew not available for conducting drills. 15 May 07 Vessel crew satisfactorily conducted all drills satisfactorily w/ the exception of the MOB Recovery drill.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2008
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 3 April 2007 Resolved
Hydro test air receivers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2007
Resolution: Attending Coast Guard inspector witnessed satisfactory hydro test of pressure vessels.
Engineering › Steering Gear System › Motor
Issued 3 April 2007 Resolved
Conduct operational test of steering system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2007
Resolution: Satisfactorily conducted test of steering system.
Lifesaving › Rescue Boat › Hull (rigid)
Issued 3 April 2007 Resolved
Vessel rescue boat arrangement not stisfactory. Rigid hull rescue boat does not have approved USCG stamp, has no platform specifically designed for launching, securing and recovering boat. Rescue boat procedures not established.
Action required: 705 - Other - as specified
Due 15 June 2007
Resolved 8 May 2008
Deck/Cargo › Ballast › Vents
Issued 23 May 2005 Resolved
Replace holed flame safety screen on port ballast tank vent.
Due 23 June 2005
Resolved 29 May 2007
Resolution: Corrected by Sector Seattle as per e-mail from [name withheld].
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 23 May 2005 Resolved
Renew weathered lifelines on foward--starboard ring buoy.
Due 23 June 2005
Resolved 29 May 2007
Resolution: Corrected by Sector Seattle as per e-mail from [name withheld].
Accommodation/Occupational Safety › Other Accommodation Spaces › Laundry
Issued 12 July 2004 Resolved
Dryer hose vent not made of non-flammable material.
Action required: 705 - Other - as specified
Due 15 August 2004
Resolved 27 July 2004
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 12 July 2004 Resolved
No Lifejacket donning placard.
Action required: 705 - Other - as specified
Due 15 August 2004
Resolved 27 July 2004
Electrical › Electric Supply System (service) › Cable
Issued 12 July 2004 Resolved
Dead ended wires hanging in the accmodation space
Action required: 705 - Other - as specified
Due 15 August 2004
Resolved 27 July 2004
Electrical › Lighting (service) › Lighting Fixture
Issued 12 July 2004 Resolved
Engine room entrance lighting is a drop light. Lighting should be suitable style and design.
Action required: 705 - Other - as specified
Due 15 August 2004
Resolved 27 July 2004
Documentation › Certificates/Documents › Stability Letter
Issued 29 May 2003 Resolved
Provide USCG stability letter.
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 June 2003
Resolved 6 January 2005
Resolution: Verified item onboard.
Documentation › Certificates/Documents
Issued 29 May 2003 Resolved
Provide ABS Classification Document
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 June 2003
Resolved 3 June 2003
Documentation › Logs/Records
Issued 29 May 2003 Resolved
Provide documentation for recent load test for cargo crane. LEGACY COMPONENT DESC: Transfer Equipment Test/Inspection Records
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 June 2003
Resolved 3 June 2003
Construction/Loadline › Penetrations › Gasket
Issued 29 May 2003 Resolved
Renew gasket for watertight door on starboard.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 29 June 2003
Resolved 6 January 2005
Resolution: Gasket renewed.
Engineering › Lubricating Oil Service System › Piping
Issued 29 May 2003 Resolved
Tighten leaking hydraulic hoses in pump room.
Action required: 705 - Other - as specified
Due 29 June 2003
Resolved 6 January 2005
Resolution: Corrected.
Electrical › Electrical Distribution System (service)
Issued 6 December 2002 Resolved
Provide electrical analysis of vessel's electrical system to determine source of electrolysis or other electrical losses as determined by the electrician. Requirement shall be completed to the satisfaction of the attending Marine Inspector.
Action required: 705 - Other - as specified
Due 18 December 2002
Resolved 8 December 2002
Resolution: Electrical analysis provided with discrepencies listed.
Construction/Loadline › Hull
Issued 6 December 2002 Resolved
Prior to vessel sailing, provide certified welder to conduct clad welding of all deep pits as identified by Marine Inspector. Ensure all areas where welding will be conducted are "safe for hotwork". All work shall be completed to the satisfaction of the attending Marine Inspector. LEGACY COMPONENT DESC: Hull Plating
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 December 2002
Resolution: Vessel welded temp doubler plates over pits.
Construction/Loadline › Hull
Issued 6 December 2002 Resolved
Upon completion of next Vessel Dry-Dock, provide the attending Marine Inspector a Audio Gauging Report of entire vessel bottom to determine if wastage is localized or widespread. LEGACY COMPONENT DESC: Hull Plating
Action required: 705 - Other - as specified
Resolved 10 January 2003
Resolution: Received copy of report
Engineering
Issued 3 December 2002 Resolved
Replace #2 Hydraulic Motor in Bosun Locker as per Electrical Analysis performed on 12/8/02.
Action required: 705 - Other - as specified
Resolved 8 January 2003
Resolution: Verified replaced
Engineering
Issued 3 December 2002 Resolved
Clean #1 Hydraulic Motor in Bosun Locker as per Electrical Analysis provided on 12/8/02.
Action required: 705 - Other - as specified
Resolved 8 January 2003
Resolution: Verified clean
Electrical › Electrical Distribution System (service)
Issued 3 December 2002 Resolved
Vessel's route is restricted to Lakes, Bays, and Sounds until either completion of Dry-Dock or satisfactory repair of electrical problem as defined by Electrical Analysis.
Action required: 705 - Other - as specified
Resolved 8 December 2002
Resolution: Electrical problem has been resolved to reduce the leaking amps from 7-8 to one tenth.
Navigation › Piloting/Steering
Issued 28 May 2002 Resolved
Provided updated copy of tidal current tables. LEGACY COMPONENT DESC: Tide/Tidal Current Tables
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 May 2002
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 28 May 2002 Resolved
Install guard over exposed rotating shaft on emergency compressor.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 29 May 2002
Engineering › Bilge Water Management System
Issued 28 May 2002 Resolved
Pump out oily water mixture from engineroom bilge.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 May 2002
Fire Fighting › Means of Escape › Escape Route Signs
Issued 28 May 2002 Resolved
Label lazzarette emergency escape.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 29 May 2002
Electrical › Electric Generation Source (service)
Issued 28 May 2002 Resolved
Demonstrate proper operation of port generator overspeed trip.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 May 2002
Stability › Watertight Integrity
Issued 28 May 2002 Resolved
Adjust all watertight doors.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 May 2002
Lifesaving › Inflatable Liferafts
Issued 28 May 2002 Resolved
Remove and replace expired liferaft.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 May 2002
Lifesaving
Issued 1 June 2000 Resolved
Prove proper operation of port air receiver relief valve and starboard generator lube oil shutdown.
Condition: Unknown
Due 16 June 2000
Resolved 16 June 2000
Construction/Loadline
Issued 23 February 2000 Resolved
Complete permanent repairs as approved by marine inspector.
Condition: Unknown
Due 23 February 2000
Resolved 13 April 2000
Construction/Loadline
Issued 26 May 1999 Resolved
Reinstall Watertight door between E/R and potable water tank compartment w/Class 1 wtd and alarm that meets 46 CFR 170.270(e) or provide documentationthat stability calculations were conducted w/ due consideration that door was removed.
Condition: Unknown
Due 26 May 1999
Resolved 26 May 1999
Deck/Cargo
Issued 5 August 1998 Resolved
Install coaming to prevent oil on deck from entering machinery, accomodation and service spaces in accordance with MVI Policy Letter 1-95, Figure 10-4, note #26.
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Construction/Loadline
Issued 16 June 1998 Resolved
Make repairs to bottom damage suffered as the result of vessel grounding.
Condition: Unknown
Due 16 June 1998
Resolved 16 June 1998
Engineering
Issued 2 June 1998 Resolved
Prove proper operation of overspeed of port & stbd main engines and stbd generator.
Condition: Unknown
Due 19 June 1998
Resolved 24 June 1998
Lifesaving
Issued 2 June 1998 Resolved
Add additional retro reflective tape to port fwd, stbd fwd, and stbd aft life rings.
Condition: Unknown
Due 19 June 1998
Resolved 24 June 1998
Fire Fighting
Issued 20 February 1998 Resolved
Repair and prove operational the fixed foam system ofr completely remove the system from the vessel. (46 CFR 95.01-5)
Condition: Unknown
Due 20 February 1998
Resolved 20 February 1998
Construction/Loadline
Issued 20 February 1998 Resolved
Repair/replace framing in way of stbd independent potable water tank or completely removvve tank.
Condition: Unknown
Due 20 February 1998
Resolved 20 February 1998
Lifesaving
Issued 29 May 1997 Resolved
Two forward ring life buoys required to be replaced due to failure of protective outer covering. RLBs are susceptible to waterlogging if not replaced.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Fire Fighting
Issued 29 May 1997 Resolved
Pressure switches on fixed halon system protecting E/R not connected to E/Rventilation system.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Electrical
Issued 29 May 1997 Resolved
Explosion proof fixture in paint locker missing required guard.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Fire Fighting
Issued 29 May 1997 Resolved
Numerous nozzles require lubrication and replacement of tip chains.
Condition: Unknown
Due 29 May 1997
Resolved 29 May 1997
Electrical
Issued 4 June 1996 Resolved
PROVE PROPER OPERATION OF LOW LUBE OIL TRIPS FOR BOTH SHIP SERVICE GENERATORS.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Engineering
Issued 4 June 1996 Resolved
PROVE PROPER OPERATION OF STARBOARD AIR RECEIVER RELIEF VALVE.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Engineering
Issued 4 June 1996 Resolved
MAKE BOTH AIR RECEIVERS READY FOR INTERNAL INSPECTION.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Fire Fighting
Issued 4 June 1996 Resolved
PROVIDE SPANNER WRENCH AT FIRE STATION LOCATED ON PORTSIDE BOW.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Fire Fighting
Issued 4 June 1996 Resolved
PROVE PROPER OPERATION OF RELIEF VALVES FOR BOTH FIRE PUMPS.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Lifesaving
Issued 4 June 1996 Resolved
RELOCATE PERSONAL FLOATATION DEVICES SO THEY ARE STOWED AT EACH BERTH AND CREW STATION AS REQUIRED BY 46 CFR 94.40-15 (A).
Condition: Unknown
Due 20 June 1996
Resolved 12 June 1996
Lifesaving
Issued 4 June 1996 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 4 June 1996
Resolved 12 June 1996
Lifesaving
Issued 4 June 1996 Resolved
PROVIDE HIGH RIDER COLLAR FOR EXPOSURE SUIT.
Condition: Unknown
Due 4 June 1996
Resolved 12 June 1996
Lifesaving
Issued 4 June 1996 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 20 June 1996
Resolved 12 June 1996
Documentation
Issued 4 June 1996 Resolved
PROVIDE ONBOARD VESSEL OIL TRANSFER PROCEDURES FOR FUEL AND CARGO SYSTEMS. THE PLANS ARE TO BE IN ACCORDANCE WITH 33 CFR PART 155.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Navigation
Issued 4 June 1996 Resolved
DEGAUSS VESSEL AND PROVIDE NEW DEVIATION CARD FOR MAGNETIC COMPASS.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Accommodation/Occupational Safety
Issued 4 June 1996 Resolved
REPAIR AND PROVE PROPER OPERATION OF TYPE II MARINE SANITATION DEVICE.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Lifesaving
Issued 4 June 1996 Resolved
REPLACE WEAKLINK ON PORT LIFERAFT OR PROVIDE DOCUMENTATION ON RATED BREAKING STRENGTH OF WEAKLINK PROVIDED BY SERVICING COMPANY.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Fire Fighting
Issued 4 June 1996 Resolved
REPLACE 3 FIRE HOSES WITH ALUMINUM FITTINGS WITH U.L. LABS OR NFPA APPROVEDHOSES.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Lifesaving
Issued 4 June 1996 Resolved
PROVIDE AND APPLY RETRO REFLECTIVE TAPE ON TWO EXPOSURE SUITS. THE RETRO REFLECTIVE TAPE IS TO BE INSTALLED IN ACCORDANCE WITH NVIC 1-87.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Lifesaving
Issued 4 June 1996 Resolved
REPLACE RING BUOYS ON PORT AND STARBOARD BRIDGE WINGS. RING BUOYS SHALL BEPROPERLY MARKED AND OUTFITTED WITH RETRO REFLECTIVE TAPE IN ACCORDANCE WITHNVIC 1-87.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Lifesaving
Issued 4 June 1996 Resolved
RELOCATE FORWARD PORT AND STARBOARD RING BUOYS SO THEY ARE ACCESSABLE IN THE EVENT OF AN EMERGENCY.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Engineering
Issued 4 June 1996 Resolved
PROVE PROPER OPERATION OF OVERSPEED TRIPS ON MAIN DIESEL ENGINES USED FOR PROPULSION.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Engineering
Issued 4 June 1996 Resolved
PROVE PROPER OPERATION OF LOW LUBE OIL TRIPS FOR PROPULSION MAIN DIESEL ENGINES._x001C_
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Electrical
Issued 4 June 1996 Resolved
PROVE PROPER OPERATION OF OVERSPEED TRIPS ON BOTH SHIP SERVICE GENERATORS.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Engineering
Issued 7 July 1995 Resolved
PROVE PROPER OPERATION OF THE OVERSPEED SHUTDOWNS FOR NO. 2 MDE, NO. 1 & 2 S/S GEN'S.
Condition: Unknown
Due 2 August 1995
Resolved 23 August 1995
Lifesaving
Issued 7 July 1995 Resolved
REPLACE OUTDATED RED PARACHUTE FLARES.
Condition: Unknown
Due 2 August 1995
Resolved 23 August 1995
Fire Fighting
Issued 6 June 1995 Resolved
REPAIR FIRE MAIN AND CONDUCT SAT HYDRO TEST IN PRESENCE OF MARINE INSPECTOR.
Condition: Unknown
Due 7 June 1995
Resolved 16 June 1995
Deck/Cargo
Issued 2 February 1995 Resolved
Repair Leaks in hydralic piping connections in the #1 Starboard Void
Condition: Unknown
Due 2 February 1995
Resolved 2 February 1995
Deck/Cargo
Issued 6 June 1994 Resolved
CONDUCT HYDROSTATIC TEST OF FLEXIBLE OIL TRANSFER HOSE TO 1 1/2 MAWP OR 225PSI, WHICH EVER IS GREATER.
Condition: Unknown
Due 6 June 1994
Resolved 6 June 1994
Electrical
Issued 6 June 1994 Resolved
REMOVE ELECTRIC HEATING COILS FOR P & S MSD PIPING FOR CONEX ACCOMMADATION SPACES.
Condition: Unknown
Due 6 June 1994
Resolved 6 June 1994
Electrical
Issued 6 June 1994 Resolved
REPAIR AND PROVE PROPER OPERATION OF STBD SHIP SERVICE GENERATOR OVERSPEED TRIP.
Condition: Unknown
Due 6 June 1994
Resolved 6 June 1994
Deck/Cargo
Issued 23 July 1993 Resolved
PROVIDE PROOF OF CG APPROVAL FOR TWO MPT'S ON MAIN DECK. VESSEL IS PROHIBITED FROM CARRYING BULK LIQUID FLAMMABLE OR COMBUSTIBLE CARGOES IN MPT'S UNTIL ITEM IS CLEARED.
Condition: Unknown
Due 23 July 1993
Resolved 23 July 1993
Engineering
Issued 23 July 1993 Resolved
REPAIR AND PROVE PROPER OPERATION OF OVERSPEED TRIP FOR PORT M.D.E.
Condition: Unknown
Due 23 July 1993
Resolved 23 July 1993
Accommodation/Occupational Safety
Issued 1 March 1993 Resolved
PROVIDE A PROPER HOLDING TANK OR AN APPROVED MARINE SANITATION DEVICE UNIT FOR THE SEWAGE AND GRAY WATER ON TEMPORARY BERTHING AREA ON THE MAIN DECK.VESSEL MAY NOT CARRY LIQUID CARGO UNTIL STABILITY GUIDANCE AND ADMEASUREMENT CERTIFICATE ADDRESS CARRIAGE OF SEWAGE IN INTEGRAL TANKS.
Condition: Unknown
Due 1 March 1993
Resolved 1 March 1993
Documentation
Issued 26 May 1992 Resolved
PROVIDE SAFETY RADIOTELEPHONE CERTIFICATE.
Condition: Unknown
Due 26 May 1992
Resolved 26 May 1992
Electrical
Issued 26 May 1992 Resolved
PROVE AUTOMATIC OPERATION OF THE EMERGENCY LIGHTING SYSTEM.
Condition: Unknown
Due 26 May 1992
Resolved 26 May 1992
Accommodation/Occupational Safety
Issued 16 July 1991 Resolved
MAKE MSD OPERATIONAL - DO NOT USE WITHIN 3 MILES OF LAND PRIOR TO REPAIR.
Condition: Unknown
Due 16 July 1991
Resolved 16 July 1991
Deck/Cargo
Issued 16 July 1991 Resolved
MAKE REPAIRS TO ANCHOR SYSTEM TO MAKE MORE FUNCTIONAL AND PREVENT ANCHOR JAMMING.
Condition: Unknown
Due 16 July 1991
Resolved 16 July 1991
Lifesaving
Issued 16 July 1991 Resolved
MAKE AN AREA IN THE PORT RAIL TO FACILITATE THE LAUNCHING OF THE PORT LIFERAFT.
Condition: Unknown
Due 16 July 1991
Resolved 16 July 1991
Construction/Loadline
Issued 16 July 1991 Resolved
MARK CORRECT HOMEPORT ON STERN.
Condition: Unknown
Due 16 July 1991
Resolved 16 July 1991
Lifesaving
Issued 7 May 1990 Resolved
INSTALL RESCUE BOAT AND DEMONSTRATE PROPER OPERATION OF BOAT LOWERING EQUIPMENT AND BOAT TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 7 May 1990
Resolved 7 May 1990
Lifesaving
Issued 7 May 1990 Resolved
INSTALL EMBARKATION AID IN ACCORDANCE WITH 46CFR94.50-7
Condition: Unknown
Due 7 May 1990
Resolved 7 May 1990

Casualty record · 1

13 June 2012Routine · role: Acknowledged Pollution Source · activity 4343211
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.