This record may be incomplete: the most recent inspection recorded for this vessel was 33 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
162 - Regulatory (Subpart C or D), Gross Ton
162 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-49753
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
PROVIDE PROPER WARNING SIGNS IN ACCORDANCE WITH 46CFR 35.30-1.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Electrical
Issued 16 October 1990Resolved
PROPERLY WIRE AND FASTEN THE ELECTRICAL LEAD FOR THE FIRE/BILGE PUMP. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Construction/Loadline
Issued 16 October 1990Resolved
TEST BOOMS & CRANES AND PROVIDE CAPACITY TABLES & ANGLE INDICATORS. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE EQUIPMENT AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Electrical
Issued 16 October 1990Resolved
REMOVE NON APPROVED WIRING ON BOARD THE VESSEL AND REPLACE WITH APPROVED MARINE TYPE WIRING. THIS ITEM IS TO BE COMPLETED PRIOR TO ENERGIZING THE CIRCUITS AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Electrical
Issued 16 October 1990Resolved
PROVIDE METAL WIRE TIES TO REPLACE PLASTIC TIES SUPPORTING ELECTRICAL WIRING. THIS ITEM IS TO BE COMPLETED PIOR TO OPERATING THE VESSEL.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Accommodation/Occupational Safety
Issued 16 October 1990Resolved
RE-ROUTE THE FUEL LINE FOR THE STOVE TO WHERE IT IS NOT ADJACENT TO THE EXHAUST FOR THE MAIN GENERATOR. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE MAIN GENERATOR AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Electrical
Issued 16 October 1990Resolved
REMOVE ALLIGATOR CLIPS FROM BATTERY INSTALLATIONS IN THE ENGINE ROOM. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Electrical
Issued 16 October 1990Resolved
DESIGN AND INSTALL GENERAL ALARM SYSTEM. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL. DRAWINGS ARE TO BE SUBMITTED TO THIS OFFICEFOR APPROVAL PRIOR TO INSTALLING THE SYSTEM.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Lifesaving
Issued 16 October 1990Resolved
PLACE RESCUE BOAT ON BOARD THE VESSEL. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Construction/Loadline
Issued 16 October 1990Resolved
PROVIDE PROPER VENTS FOR ALL VOID SPACES. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Documentation
Issued 16 October 1990Resolved
PROVIDE ORIGINAL OF CERTIFICATE OF INSPECTION ON BOARD THE VESSEL.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Construction/Loadline
Issued 16 October 1990Resolved
DESIGN AND INSTALL BILGE SYSTEM IN ACCORDANCE WITH APPLICIABLE REGULATIONS.DRAWINGS ARE TO BE SUBMITTED TO THIS OFFICE FOR APPROVAL PRIOR TO INSTALL- ING THE SYSTEM.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Accommodation/Occupational Safety
Issued 16 October 1990Resolved
REMOVE THE NON-APPROVED FUEL HOSE THAT HAS BEEN INSTALLED ON THE STOVE FUELSUPPLY. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE STOVE AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Deck/Cargo
Issued 16 October 1990Resolved
PROVIDE, PROVE AND PROPERLY MARK THE REMOTE SHUTDOWN FOR THE CARGO PUMPS. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL/PRIOR TO OPER- ATION OF THE CARGO PUMPS BUT NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Construction/Loadline
Issued 16 October 1990Resolved
PERMANENTLY MARK THE VESSEL'S NAME, DRAFT MARKS AND OFFICIAL NUMBER ON THE VESSEL.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Construction/Loadline
Issued 5 October 1989Resolved
PLACE ON BOARD AND PROVE THE PROPER OPERATION OF THE PORTABLE BILGE PUMP. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 5 October 1989
Resolved 5 October 1989
Deck/Cargo
Issued 5 October 1989Resolved
MOUNT WARNING SIGNS. TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 5 October 1989
Resolved 5 October 1989
Documentation
Issued 5 October 1989Resolved
PROVIDE CURRENT FCC LICENSE FOR VESSEL. THIS ITEM IS TO BE COMPLETED PRIORTO OPERATING THE VESSEL AND NOT LATER THAN DATE OF COMPLIANCE.
Condition: Unknown
Due 5 October 1989
Resolved 5 October 1989
Electrical
Issued 5 October 1989Resolved
REPLACE AND PROPERLY SUPPORT ELECTRICAL CABLES AT THE FUEL TANKS USING APPROVED WIRING. FOLLOWING INSTALLATION PROVE PROPER OPERATION OF THE FUEL PUMPS AND SHUTDOWNS. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 5 October 1989
Resolved 5 October 1989
Accommodation/Occupational Safety
Issued 5 October 1989Resolved
PLACE ON BOARD THE VESSEL A COAST GUARD APPROVED MARINE SANITATION DEVICE. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 5 October 1989
Resolved 5 October 1989
Deck/Cargo
Issued 23 June 1987Resolved
PRIOR TO 07 JULY 87 PROVIDE HYDROSTATIC TEST OF ALL CARGO FUEL HOSES AND RECORDS OF SAME.
Condition: Unknown
Due 23 June 1987
Resolved 23 June 1987