Records from 2016 to 2026. Most recent: inspection, 3 January 2026.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 January 2026
Resolved
ALL VESSELS SHALL BE PROVIDED WITH A SATISFACTORY ARRANGEMENT FOR DRAINING ANY WATERTIGHT COMPARTMENT. MIs OBSERVED TWO SOFT PATCHES ON BILGE SUCTION PIPE IN GENERATOR ROOM, BILGE PIPE EXCESSIVE LEAKING IN CENTERLINE OF ENGINE ROOM (GENERATOR ROOM SUCTION LINE), AND BILGE PIPE LEAK AT MANIFOLD (VOID 1 SUCTION LINE). PLEASE AFFIX SATISFACTORY REPAIRS AND DEMONSTRATE SATISFACTORY OPERATIONAL TESTS OF ALL SPACES SERVED BY BILGE SYSTEM. 46 CFR 182.25-1(a) Old T
07JAN2026: WITNESSED REPAIRS AND OPERATION OF BILGE SYSTEM. OBSERVED A PINHOLE LEAK IN GALLEY SPACE BILGE PIPING. REQUIRED 14 DAYS TO MAKE REPAIRS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 January 2026
Resolved 12 January 2026
Resolution: Inspected repair to the satisfaction of attending Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 January 2026
Resolved
JUNCTION BOXES SHALL BE OF WATERTIGHT CONSTRUCTION. MIs OBSERVED 3 JUNCTION BOXES THAT WERE NOT SECURED WITH EXPOSED WIRING IN LAZERETTE AND ENGINE ROOM, AND CCTV WITH EXPOSED WIRING. PLEASE AFFIX SATISFACTORY REPAIRS. 46 CFR 183.10-20(l) Old T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 January 2026
Resolved 7 January 2026
Resolution: Observed satisfactory repairs made to the junction boxes.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 3 January 2026
Resolved
BATTERIES SHALL BE EFFECTIVELY SCREENED BY A CAGE OR SIMILAR STRUCTURE TO MINIMIZE THE DANGER OF ACCIDENTAL SPARK. MIs OBSERVED BATTERY BOX WITH MISSING COVER. PLEASE AFFIX REPAIRS. 46 CFR 183.05-20(a)Old T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 January 2026
Resolved 7 January 2026
Resolution: Observed satisfactory cover for battery box.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 3 January 2026
Resolved
OVERCURRENT PROTECTION SHALL BE PROVIDED FOR EACH CONDUCTOR. MIs OBSERVED BATTERY CHARGER FOR EMERGENCY LIGHTING BATTERIES TO BE PLUGGED INTO AN OUTLET. PLEASE SUBMIT REPAIR PLAN TO ENSURE BATTERY CHARGER IS ON A DEDICATED CIRCUIT WITH SUFFICIENT OVERCURRENT PROTECTION AND PROPERLY SIZED CONDUCTORS.46 CFR 183.10-35(a)Old T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 January 2026
Resolved 7 January 2026
Resolution: Observed battery charger wired satisfactory.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 January 2026
Resolved
AUXILIARY MACHINERY SHALL BE SUITABLE IN TYPE AND DESIGN FOR THE PURPOSE INTENDED. MIs OBSERVED LAUNDRY DRYER VENT EXHAUST HOSE DISCONNECTED WITH HOLES, PRESENTING POSSIBLE FIRE HAZARD. PLEASE MAKE NECESSARY REPAIRS AND IF REMOVING EQUIPMENT, PLEASE DEMONSTRATE IN ACCORDANCE WITH 46 CFR 177. 46 CFR 182.05-1 Old T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 January 2026
Resolved 7 January 2026
Resolution: Reviewed documentation of dryer type is vent less. Vent hose removed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 3 January 2026
Resolved
THE BULKHEAD DECK MUST BE WEATHERTIGHT. MIs OBSERVED FAULTY WEATHERTIGHT DOOR DOG AND DAMAGED DOG JOINT. PLEASE SUBMIT REPAIR PLAN AND AFFIX NECESSARY REPAIRS. 46 CFR 171.122(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 January 2026
Resolved 7 January 2026
Resolution: Observed WTD dog repaired with replaced pin and tested satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 January 2025
Resolved
Internal combustion engine exhausts, boiler and galley uptakes, and similar sources of ignition shall be kept clear of and suitably insulated from any woodwork or other combustible matter. Port engine turbos are not suitably insulated. Re-install insulation around turbos. - 46 CFR 177.10-05(b) - 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 February 2025
Resolution: Attended vessel to verify operation of oil gauges from previous def, witnessed insullation installed around turbos.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 January 2025
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge of Marine Inspection. 1.) Wire run/bundle in the engine room on the port aft bulkhead is not suitably supported. 2.) Port Aft Main Propulsion Engine was found with wires disconnected from engine oil gauge. 3.) Port Engine's found with dead end wires. - 46 CFR 183.01-15(a)
- 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 February 2025
Resolution: replaced wires and repaired system
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 January 2025
Resolved
Gages to indicate engine cooling water discharge temperature and lubricating oil pressure shall be provided for all propulsion engines and located so as to be in view of the operator. Starboard forward/inboard engine oil gauge piping is damaged. - 46 CFR 182.20-5 - 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 February 2025
Resolution: replaced wires and repaired system.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 3 January 2025
Resolved
The public address system must be a fixed installation and be audible during normal operating conditions. Aft second deck loud hailer was found broken. repair/replace. - 46 CFR 184.610(b) - 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 February 2025
Resolution: replaced aft deck loudhailer
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 November 2023
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations.
During operation the vessels port outboard shaft broke inside the shaft tube. Repair shaft to the satisfaction of a Coast Guard Marine inspector. 46 CFR 182.200
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 December 2023
Resolution: MI's attended vessel to inspect. Vessel has replaced shaft, coupling and shaft seal. Deficecny has been resolved.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 4 October 2023
Resolved
At each inspection for certification the firefighting pump shall be tested and the fire hose shall be subjected to the available fire pump pressure.
Vessels fire pump was leaking water through seal.
46 CFR 176.25-25(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Vessel installed replacement fire pump. Vessel performed operational test with marine inspectors onboard. Deficiency has been resolved.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 October 2023
Resolved
Each nameplate for a circuit breaker must show the electrical load served and the setting of the circuit breaker.
All breaker panels had missing nameplates and energized spare breakers.
46 CFR 111.30-15(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Missing nameplates have been replaced.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 4 October 2023
Resolved
Provision shall be made by means of plugs, covers, etc to prevent the admission of air into the space protected.
Vent closures for engine room had damaged gaskets.
46 CFR 181.20-35
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Vessel repaired gasket material on identifed closures.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 October 2023
Resolved
Internal combustion engines shall be kept clear of and suitably insulated from any wood work or other combustible matter.
Portions of missing exhaust lagging on main engines and generator.
46 CFR 177.10-5(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Vessel replaced missing exhuast lagging on engines.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 October 2023
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection.
Lighting fixture above the inboard starboard main engine is being held by zip ties.
46 CFR 183.01-15
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Light fixture above inboard starboard engine has been properly mountes.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 October 2023
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection.
Exposed junction boxes on overhead at both port and starboard side of rudder space.
46 CFR 183.01-15
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Exposed junction boxes in rudder space have been corrected.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 October 2023
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection.
Electrical receptacle to battery charger is not permanently secured in generator room.
46 CFR 183.01-15
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Battery charger in generator room has been permanently secured.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 October 2023
Resolved
When operating a vessel on a body of water where the discharge of treated or untreated sewage is prohibited by the Environmental Protection Agency under 40 CFR 140.3 or 140.4, the operator must secure each Type I or Type II device in a manner which prevents discharge of treated or untreated sewage.
Sewage overboard discharge valve was corroded and needs replacement.
33 CFR 159.7(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Sewage overboard discharge valve has been replaced.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 October 2023
Resolved
Conductors in power and lighting circuits must be No. 14 American Wire Gauge (AWG) or larger.
Wire size for deck lighting and aft ramp controller was incorrect.
46 CFR 183.340(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Wire for deck lighting and ramp controller has been replaced with correct gauge.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 October 2023
Resolved
Wire joints and splices shall be mechanically secure and made in junction boxes.
Sewage pump power cable is exposed, needs to be terminated or permanently installed.
46 CFR 183.05-50(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Sewage pump power cable has been properly routed through motor junction box.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 4 October 2023
Resolved
Adequate emergency lighting automatically actuated upon failure of the main lighting system shall be
fitted along the line of escape.
Battle lantern in generator room did not energize manually and automatically during simulated power failure.
46 CFR 184.300-5(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Battle lantern in generator room has been repaired. Vessel performed test of identified battle lantern during check.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 October 2023
Resolved
Except as otherwise provided in this section, machinery
and fuel tank spaces shall be separated from
accommodation spaces by which watertight and/or vapor
tight bulkheads.
Penetration's passing through port side E/R & port side
rudder space are not vapor/watertight.
46 CFR 182.35-1(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2023
Resolution: Penetrations through identified bulkheads have been repaired.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 9 January 2023
Resolved
Hydrostatic release unit on within the EPRIB casing was expired and requires renewal. Prior to operations beyond 3 NM from shore
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 January 2023
Resolved 4 April 2023
Resolution: Condition satisfactorily corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 9 January 2023
Resolved
Air Reciever safety valves require replacement on both port and starboard air recievers. Ensure safety valves lift within 10% above or below the marked setting on the valve. (desired 150 psi)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 February 2023
Resolved 4 April 2023
Resolution: Condition satisfactorily corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 December 2022
Resolved
Lubricating oil line servicing the tubo charger on the port side generator prime mover leaking. Drain line also leaking lubricating oil. Jacket water cooling line leaking during inspection.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 January 2023
Resolved 4 April 2023
Resolution: Condition satisfactorily corrected.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 January 2022
Resolved
Portable fire extinguishers located in engine room and interior passenger space on main deck were stowed directly on the floor.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 January 2022
Resolution: Operator emailed photographs of mounted fire extinguishers.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 13 January 2022
Resolved
Bolt penetrations above steering gear room were left open after equipment was removed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2022
Resolved 13 January 2022
Resolution: Operator emailed photographs of bolts replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 January 2022
Resolved
Excessive oil, soot, and debris located under ME.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2022
Resolved 13 January 2022
Resolution: Operator emailed photographs of clean bilge in engine room.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 16 December 2021
Resolved
Provide repair plan for wastage on port tiller head.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2021
Resolved 23 December 2021
Resolution: Operator provided sat UT shots and repair plan.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 22 January 2020
Resolved
Fix the oil leak coming from the front of the starboard generator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 February 2020
Resolved 24 January 2020
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 8 January 2020
Resolved
Determine location of exhaust leak on port generator and repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2020
Resolved 22 January 2020
Resolution: Sec NY verified that the exhaust leak on the Port Generator was rectified.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 23 December 2019
Resolved
Weld the gouge from grinder cut off wheel on vertical frame, stbd side, just inside the potable water tank void watertight hatch.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 January 2020
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 23 December 2019
Resolved
Place cap on end of centerline lower integral fuel tank drain valve.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 January 2020
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 13 December 2019
Resolved
Provide repair proposal for the identified two longitudinal beams in lazarette port side that have serious corrosion and pitting.
Action required: 705 - Other - as specified
Resolved 3 January 2020
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 13 December 2019
Resolved
Provide repair proposal for the small corrosion pin hole
midship, port side, 2" above chine.
Action required: 705 - Other - as specified
Resolved 3 January 2020
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 13 December 2019
Resolved
Grind and re-weld the cracked weld in lazarette, upper aft port side corner.
Action required: 705 - Other - as specified
Resolved 3 January 2020
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 December 2019
Resolved
Pump out and clean the void spaces beneath and around the integral fuel tank and potable water tank for inspection.
Action required: 705 - Other - as specified
Resolved 23 December 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 December 2019
Resolved
Clean section of bilge inboard of port sea suction behind port main engine for inspection. Section touching bulkhead
Action required: 705 - Other - as specified
Resolved 23 December 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 9 October 2018
Resolved
Wiring/cabling must be run as high as practicable above the bilges. Outboard starboard engine cables are laying in the e/r bilge. 46 CFR 183.10-20(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 October 2018
Resolved 24 October 2018
Resolution: Cables lifted out of bilge and clamped as high as possible.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 9 October 2018
Resolved
Electric cable for installation in damp or wet areas must be impervious sheathed. Wiring on the outboard side of the port outboard engine was fraying, dead-ended, and was losing the insulation layer. 46 CFR 183.10.-20(b)(1)(i)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 October 2018
Resolved 24 October 2018
Resolution: Dead-end cables removed and cables resheathed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 9 October 2018
Resolved
Cables entering boxes or fittings shall be protected from abrasion and cables shall be secured to the box or the fitting. Cables leading to the phase charger located in the generator space are frayed and open. 46 CFR 183.10-20(f)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 October 2018
Resolved 24 October 2018
Resolution: Cables resheathed, no exposed wires remain.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 9 October 2018
Resolved
When Class 1 watertight doors are installed below deck, an indicator light that the door is open must be present on the bridge. The galley watertight door was registering as closed when it was open. 46 CFR 170.255(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 October 2018
Resolved 24 October 2018
Resolution: Indicator repaired, door registers properly.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 9 October 2018
Resolved
When Class 1 watertight doors are installed below deck, an indicator light that the door is open must be present on the bridge. The actuator on the generator space door must be repaired. 46 CFR 170.255(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 October 2018
Resolved 24 October 2018
Resolution: Actuator replaced, door registers properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 9 October 2018
Resolved
A gauge to indicate lubricating oil pressure shall be provided for at propulsion engines. The lube oil gauge on the outboard port engine was not functioning during engine operation. 46 CFR 182.20-5(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 October 2018
Resolved 24 October 2018
Resolution: Gauge operates properly, checked during engine operation.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 9 October 2018
Resolved
Inspections shall be in accordance with standards acceptable to the Officer in Charge, Marine Inspections as good marine practice. The starboard generator has a small oil leak that is being blown across the deck by the engine fan, creating a slipping hazard. 46 CFR 176.25-1(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 October 2018
Resolved 24 October 2018
Resolution: Oil leak rectified, checked during engine operation.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 October 2018
Resolved
All portable fire extinguishers installed on vessels shall be of an approved type. The extinguisher in the starboard bunk room is not mounted in the proper bracket, nullifying the extinguisher approval. 46 CFR 181.30-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 October 2018
Resolved 24 October 2018
Resolution: Proper bracket and extinguisher mounted to bulkhead.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 October 2018
Resolved
All vessels shall be provided with a hand operated portable fire pump having a capacity of at least five gallons per minute. The vessel has no hand fire pump. 46 CFR 181.10-5(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 October 2018
Resolved 24 October 2018
Resolution: Hand operated pump placed onboard vessel.
Engineering › Bilge Water Management System › Piping
Issued 28 December 2017
Resolved
Repair corroded bilge suction line prior to departing drydock.
Action required: 705 - Other - as specified
Resolved 29 December 2017
Resolution: Verified bilge suction line was repiared.
Construction/Loadline › Hull › Side Shell
Issued 28 December 2017
Resolved
Make and maintain temporary repair to hole in port sideshell as discussed. Permanent repair required.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 16 January 2018
Resolution: Satisfactory insert made on the side shell and NDT tested with no deficiencies.
Construction/Loadline › Hull › Weld
Issued 28 December 2017
Resolved
Make permanent repairs to cracked welds in forepeak as follows: #2 port frame IWO deck long, lower portion of frame #3 port and stbd as marked, lower portion of frame #4 port and stbd as marked. Existing welds must be ground down, structure refitted, and rewelded as original.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 16 January 2018
Resolution: All welds repaired to the satisfaction of the attending marine inspector.
Construction/Loadline › Hull › Stiffener
Issued 28 December 2017
Resolved
Crop and renew port side 1st long from deck between frame #3 & #4.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 16 January 2018
Resolution: Repaired to the satisfaction of the attending marine inspector.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 28 December 2017
Resolved
In compartment #2, replace 4" horizontal sewage lines.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 16 January 2018
Resolution: Sewage lines replaced to the satisfaction of the attending marine inspector
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 28 December 2017
Resolved
Make sewage overboard available for inspection.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 16 January 2018
Resolution: Sewage valve was inspected during deficiency check, all sat.
Construction/Loadline › Hull › Bottom Plating
Issued 28 December 2017
Resolved
Crop and renew pitting in bottom shell under lube oil tank in engine room.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 16 January 2018
Resolution: Crop and renew was not required, based on the 1/2 inch thickness of the hull.
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 December 2017
Resolved
Remove dead end wire in engine room, aft stbd corner.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 16 January 2018
Resolution: Dead end wire was removed.
Construction/Loadline › Structures › Deck Plating
Issued 28 December 2017
Resolved
Plug electrical deck penetrations in lazarette.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 16 January 2018
Resolution: Electrical deck penetrations were capped with metal caps.
Construction/Loadline › Structures › Trunk
Issued 28 December 2017
Resolved
Clear insulation and storage for inspection in compartment #2 & #3.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 16 January 2018
Resolution: Insulation was cleared from compartments and the hull was inspected internally with no deficiencies.
Engineering › Pressure Vessel › Relief Valve
Issued 13 December 2017
Resolved
missing a relief valve on the hydropneumatic tank
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 December 2017
Resolved 27 December 2017
Resolution: Received picture showing newly installed relief valve on hydro-pnuematic tank.
Electrical › Electric Supply System (service) › Battery Installation Ventilation
Issued 13 December 2017
Resolved
Small battery installed in a cabinet with no ventilation.
Action required: 705 - Other - as specified
Due 19 January 2018
Resolved 29 January 2018
Resolution: Vessel installed a vent to the space containing the battery to provide natural ventiliation.
Electrical › Electric Generation Source (service) › Ground Detection
Issued 13 December 2017
Resolved
vessel does not have ground detection
Action required: 705 - Other - as specified
Due 19 January 2018
Resolved 29 January 2018
Resolution: Vessel installed ground detection to the satisfaction of the attending MI.
Operations/Management › Drills/Instruction › Fire
Issued 13 December 2017
Resolved
crew unfamiliar with fire drill instructions.
Action required: 705 - Other - as specified
Due 27 December 2017
Resolved 27 December 2017
Resolution: Received picture of log entry of firefighting familiarization training.
Documentation › Markings/Placards › Warning Signs
Issued 13 December 2017
Resolved
vessel is missing signage for watertight doors
Action required: 705 - Other - as specified
Due 19 January 2018
Resolved 29 January 2018
Resolution: vessel provided signage to the satisfaction of the attending MI.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 2 November 2016
Resolved
Label fwd E/R breaker panel. All breakers not labeled.
Due 30 November 2016
Resolved 1 December 2016
Resolution: Breakers in fwd e/r breaker panel labeled correctly.
Stability › Watertight Integrity › General
Issued 2 November 2016
Resolved
Properly seal all bulkhead fittings for both fwd & aft E/R.
Due 30 November 2016
Resolved 1 December 2016
Resolution: Fwd and aft bulkhead fittings properly sealed in E/R.
Fire Fighting › Combustible Materials › Insulation
Issued 2 November 2016
Resolved
Provide lagging for both generator exhaust elbows.
Due 30 November 2016
Resolved 1 December 2016
Resolution: Atttested to proper installation of lagging around generator exhaust elbows.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 November 2016
Resolved
Properly wire stairway closet electrical. Remove extension cord, light fixture, and make connections in junction box.
Due 30 November 2016
Resolved 1 December 2016
Resolution: Stairway closet electrical equipment properly configured.
Electrical › Electrical Distribution System (service) › Cable
Issued 2 November 2016
Resolved
Provide wire hangers every 24" for electrical cables below deck in fwd lower saloon.
Due 30 November 2016
Resolved 1 December 2016
Resolution: Wire hangers properly installed below deck in fwd lower saloon.
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Relief
Issued 2 November 2016
Resolved
Relief valve for boiler did not function properly. Provide new ASME approved relief valve.
Due 4 January 2017
Resolved 7 July 2017
Resolution: Boiler tagged out indefinitely; deficiency no longer applies.
Engineering › Steam Boiler (auxiliary/waste heat) › Fuel Oil Burner
Issued 2 November 2016
Resolved
Flame & ignition failure safety on boiler did not function properly. Repair to the satisfaction of attending MI.
Due 4 January 2017
Resolved 7 July 2017
Resolution: Boiler tagged out indefinitely; deficiency no longer applies.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 8 January 2016
Resolved
Smoke detector in port berth inop. Install smoke detector & prove proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 January 2016
Resolved 22 January 2016
Resolution: Conducted operational test of smoke detector.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 8 January 2016
Resolved
Exposed wiring, junction boxes for A/C, STBD side e/r missing covers. Install proper covers.
Action required: 705 - Other - as specified
Due 22 January 2016
Resolved 22 January 2016
Resolution: Install covers. Observed proper covers for junction boxes installed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 8 January 2016
Resolved
Generator room wiring exposed, wiring in junction boxes near boiler missing covers.
Action required: 705 - Other - as specified
Due 22 January 2016
Resolved 22 January 2016
Resolution: Vessel is installing new boiler parts, to be reviewed following refurb of boiler. wiring no longer exposed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 8 January 2016
Resolved
2 Junction boxes in Steering room missing covers.
Action required: 705 - Other - as specified
Due 22 January 2016
Resolved 8 January 2016
Resolution: Junction box covers installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 8 January 2016
Resolved
Exposed wiring in pilot house, for the port forward window heater.
Action required: 705 - Other - as specified
Due 22 January 2016
Resolved 22 January 2016
Resolution: Operator removed wiring for heater
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 8 January 2016
Resolved
Found liferafts HRU installed incorrectly, painter not attached to weak link. Corrected on the spot.
Action required: 705 - Other - as specified
Due 8 January 2016
Resolved 8 January 2016
Resolution: Gave training on proper installation procedures and witnessed HRU and liferaft installed properly.