Records from 2001 to 2026. Most recent: inspection, 16 May 2026.
Inspection history · 36
16 May 2026
Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8374103
28 October 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8259852
19 August 2025
COI Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8202856
19 November 2024
Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8036934
20 May 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7923382
4 April 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7889915
28 February 2024
Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7871291
24 January 2024
In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7854157
18 October 2023
Examination of Repairs · Drydock Exam · Internal Structural Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7811357
20 April 2023
In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7672546
24 February 2023
In-Service Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7642756
4 October 2022
Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7570859
26 July 2022
In-Service Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7518541
10 March 2022
Liferaft Servicing
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7417762
24 February 2022
Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7401688
2 February 2022
In-Service Inspection · Administrative Inspection · Load Line/Change of Employment
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7389970
28 October 2021
Annual Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7341420
5 August 2021
Administrative Inspection · Internal Structural Exam · Drydock Extension
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7278405
3 August 2021
In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7276435
28 July 2021
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7271165
26 March 2021
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7238527
12 November 2020
COI Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7083119
15 October 2020
Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7078044
17 June 2020
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7055649
9 December 2019
Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6870460
22 October 2019
Administrative Inspection · Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6839459
8 October 2019
In-Service Inspection · Administrative Inspection · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6831505
18 January 2019
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6612325
25 September 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6547946
17 September 2018
Drydock Exam · Examination of Repairs · Annual Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6542760
15 June 2018
Drydock Extension · Internal Structural Exam · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6445206
1 June 2018
Administrative Inspection · Drydock Extension
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6433862
4 December 2017
Annual Inspection · Administrative Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6317936
1 August 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6227525
20 September 2016
Administrative Inspection · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6005105
15 April 2016
Administrative Inspection · Internal Structural Exam · Damage Survey · Examination of Repairs · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5853158
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 May 2026
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel reported loss of jet control on STBD inboard jet drive.
46 CFR 119.200(a)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2026
Resolved 18 May 2026
Resolution: Maintenance crew identified broken hydraulic line and replaced in kind. Op test was satisfactory to the MI.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 August 2025
Resolved
An internal structural examination conducted in compliance with § 115.600 of this part may be conducted while the vessel is afloat or out of the water and consists of a complete examination of the vessel's main strength members, including the major internal framing. MI discovered two cracked welds. One in the port forward void and another one in the stbd ballast void space, at centerline, at the base of the ladder. To be repaired at next drydock.
46 CFR 115.610 (b)
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 16 March 2026
Resolution: Vessel completed satisfactory repairs
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 19 August 2025
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, flooding, heavy weather, or man overboard conditions. Sticker instructions for IBA is worn. Needs to be replaced with a new emergency instructions.
46 CFR 122. 510 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 September 2025
Resolution: Operator sent in photos of new instructions posted.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 19 November 2024
Resolved
Suitable means... must be provided in an accessible location outside the space served by the ventilation duct for shutting off the passage of air. MI observed ventilation closure for starboard jet room vent missing securing device. 46 CFR 116.610(d)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 December 2024
Resolved 27 November 2024
Resolution: Operator provided objective evidence of correction.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 19 November 2024
Resolved
A hatch exposed to the weather must be watertight, except that the following hatches may be weathertight: A hatch on a watertight trunk that extends at least 305 millimeters (12 inches) above the weather deck. Weathertight hatch for starboard aft engine room access leaking. 46 CFR 116.1160(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 December 2024
Resolved 27 November 2024
Resolution: Operator provided objective evidence of correction.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 November 2024
Resolved
Be installed with metal supports spaced not more than 610 millimeters (24 inches) apart...The use of plastic tie wraps must be limited to bundling or retention of multiple cable installations, and not used as a means of support; MI observed electrical cabling in overhead between engines in starboard side supported only by zip ties. 46 CFR 120.340(b)(4)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 December 2024
Resolved 27 November 2024
Resolution: Operator provided objective evidence of correction.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 28 February 2024
Resolved
Each survival craft must be stowed so that when the vessel sinks the survival craft floats free and, if inflatable, inflates automatically. All five of vessels liferaft have improperly routed inflation lines. Vessel to properly route inflation lines to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 February 2024
Resolution: Vesssel properly routed inflation lines.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 28 February 2024
Resolved
An inspection for renewal of a Certificate of Inspection is conducted to determine if the vessel is in satisfactory condition, fit for the service intended, and complies with all applicable regulations. It normally includes inspection and testing of the structure, machinery, equipment. The owner or operator must conduct all tests as required by the OCMI, and make the vessel available for all specific inspections and drills. Vessel did not complete drills and the underway portion of annual exam. The vessel must conduct a satisfactory man overboard drill, fire drill, and have their machinery, equipment, and structure inspected and tested underway.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 March 2024
Resolution: Completed full underway portion of exam.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 October 2022
Resolved
At each initial and subsequent inspection for certification, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment, including the following: Inspection and testing of fire confining appliances (such as fire screen doors and fire dampers). During last annual fire equipment servicing, shutdowns were not completed. Have serviced and shutdowns completed prior to carriage of passengers.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 October 2022
Resolution: GFS conducted satifactory servicing.
07 - Fire Safety › N/A - No Subsystem › Emergency Escape Breathing Device and disposition
Issued 4 October 2022
Resolved
A fire control plan (FCP) must be posted on the vessel in a location that is accessible and visible to all passengers. The plan must show escape routes, areas of refuge, embarkation stations, the location of fire protection/emergency equipment, compartment titles and hazard classification of accommodation and service spaces, and structural fire protection boundaries. Vessel has a Fire Control Plan that is not approved by [name withheld], this FCP is missing structural fire protection boundaries and has symbols for manual fire dampers that do not match installed automatic dampers.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 November 2022
Resolved 24 February 2023
Resolution: Verified updated FCP.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 October 2022
Resolved
Cylinders continuously in service without discharging shall be permitted to be retained in service for a maximum of 12 years from the date of the last hydrostatic test. All cylinders are to be hydrostatically tested prior to 30NOV2022.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 November 2022
Resolved 3 March 2023
Resolution: Bottles replaced.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 2 February 2022
Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Port #3 void: aft side of frame 22 has holed weld approximately 5' up from keel; several pits along the centerline near aft bilge pick up need to be gauged for remaining hull thickness and repaired to the satisfaction of attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 March 2022
Resolved 2 June 2022
Resolution: Concerned areas were cladded adn or cropped and renewed by MGS.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 2 December 2021
Resolved
Each light fixture globe lens must have a guard or be made of high strength material. Port and Stbd engine room - cracked light cover.
46 CFR 120.410
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2021
Resolved 30 December 2021
Resolution: Operator sent photo of new light cover.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 December 2021
Resolved
Each vessel must be equipped with at least two operable portable battery lights one of these lights at the access to the propulsion machinery space. Portable light charger incorrecly connect to power source.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2021
Resolved 9 December 2021
Resolution: Portable light charger correctly installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 December 2021
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of electrical equipment and systems, including the following: the inspection of all cable as far as practicable without undue disturbance of the cable or electrical apparatus. Starboard genset cable armor sheared.
46 CFR 115.806 (a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 December 2021
Resolution: Operator sent picture of new cable armor installed on gen set.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 November 2020
Resolved
ELECTRICAL EQUIPMENT MUST BE INSTALLED TO PROTECT PASSENGERS, CREW, AND OTHER PERSONS, AND VESSEL FROM ELECTRICAL HAZARDS INCLUDING FIRE THOSE CAUSED BY OR ORIGINATING IN ELECTRICAL EQUIPMENT. MI OBSERVED FAULTY GROUND DETTECTION ON 24V BRIDGE PANEL.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 November 2020
Resolved 19 November 2020
Resolution: The 24VDC ground fault was isolated to a battery charging unit. Maintenance Mechanics located the ground on 11/17/2020 and replaced the charger on 11/19/2020. Ground fault indicator no longer indicates a fault on the system.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 12 November 2020
Resolved
HATCH EXPOSED TO THE WEATHER MUST BE WATERTIGHT. MI OBSERVED PORT AND STARBOARD WATERTIGHT DOORS DID NOT MAKE PROPPER SEALS IN SPACE SEPERATING AUXILLARY AND ENGINE ROOM.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 November 2020
Resolved 12 November 2020
Resolution: Port and STBD water tight doors between the auxiliary machine room and the engine room were adjusted to achieve a proper seal. Mechanics verified seal by applying chalk to the door and verifying a continuous line was transferred to the sealing gasket
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 November 2020
Resolved
EACH RING LIFE BUOY MUST BE APPROVED IN ACCORDANCE WITH 160.50 IN SUBCHAPTER Q. ALL EXPOSED MATERIALS MUST BE RESISTANT TO OIL OR OIL PRODUCTS, SALT WATER AND ANTICIPATED WEATHER CONDITIONS. MI OBSERVED PLUG ON BACK OF RING WAS CRACKED.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 November 2020
Resolved 12 November 2020
Resolution: Replaced life ring buoy with same type
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 December 2019
Resolved
Ring life buoys shall be of first class workmanship and free from any defects affecting their appearance or serviceability. 3 ring life buoys had deteriorating lines around the body of the buoy, replace wasted line.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 December 2019
Resolved 10 December 2019
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 9 December 2019
Resolved
A-Class decks must be composed of steel or equivalent material, and must be so insulated w/ approved structural insulations. Structural insulation missing from PT engine room in the overhead, aft inboard area of space; install missing insulation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 December 2019
Resolved 18 December 2019
Resolution: Received picture from vessel rep for repair on overhead.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 October 2019
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its COI. Starboard outboard stern tube had a small fracture over a previous repair that was located approximately 3” behind the flange face of the outboard side. Conduct temporary repairs to the satisfaction of OCMI with permanent repairs to be completed in 2021 drydock.
46 CFR 116.100(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 November 2019
Resolved 17 October 2019
Resolution: Area ground out and expoxy placed over fracture.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 8 October 2019
Resolved
Penetrations in A-Class fire control boundaries for electrical cables must be construced to prevent the passage of flame and smoke for one hour. Multi cable transits (MCT) in port steering void and at the top of the ladder at port side engine room egress were not properly sealed. Install proper fire protection in both MCT locations.
46 CFR 116.415(a)(2)(ii)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 November 2019
Resolved 15 October 2019
Resolution: Verified MCT's properly resealed.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 28 January 2019
Resolved
Piping used in a vital system as defined in 46 CFR 119.710 (a) must meet 46 CFR 56.60. Port and Starboard fire pump suction non-metallic hoses are not installed with IAW 46 CFR 56.60. Non metallic hoses are installed with hose clamps rather than end fittings that comply with SAE J1475. 46 CFR 119.710 (c)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 March 2019
Resolution: Port and Starboard Fire Pumps installed with hose that meets SAE J1942 standard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 January 2019
Resolved
Piping used in a vital system as defined in 46 CFR 119.710 (a) must meet 46 CFR 56.60. Port and Starboard bilge pump suction and discharge non-metallic hoses are not installed with IAW 46 CFR 56.60. Non metallic hoses are installed with hose clamps rather than end fittings that comply with SAE J1475. 46 CFR 119.710 (c)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 March 2019
Resolution: Bilge Pump non-metallic hose installed meets SAE J-1942 standard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 January 2019
Resolved
Piping used in a vital system as defined in 46 CFR 119.710 (a) must meet 46 CFR 56.60. Port and Starboard reduction gear cooler inlet and discharge salt water non-metallic hoses on all 4 Propulsion Engine Reduction Gears are not installed with IAW 46 CFR 56.60. Non metallic hoses are installed with hose clamps rather than end fittings that comply with SAE J1475.46 CFR 119.710 (c)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 November 2019
Resolved 12 November 2020
Resolution: Completed to meet the standards for installation of non metallic hoses end fittings.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 25 September 2018
Resolved
IMO: Vsl is broadcasting no IMO #
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 15 October 2020
Resolution: Verified AIS error was corrected through NAVCEN's website.
Engineering › Bilge Water Management System › Piping
Issued 4 December 2017
Resolved
Vital System Piping has repairs utilizing unauthorized couplings. Couplings are located in Port and Starboard Engineroom on forward bilge suction line. Port side Ballast void #1 bilge suction piping, and port side firepump discharge piping. 46 CFR 119.710, 46 CFR 56.60, 46 CFR 56.30-35, 46 CFR 56.30-40
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 May 2018
Resolved 8 November 2018
Resolution: Coupling removed, welded in-king piping, hydro-tested to 25 p.s.i.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 4 December 2017
Resolved
Port and Starboard Engine Room trunks and hatch are not A-0. The stainless steel hatch and coamings are less than 3mm thick and are not insulated. 46 CFR 116.415(a), NVIV 09-97
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 8 January 2018
Resolved 15 January 2019
Resolution: Both port/stbe engine room trunks replaced with A-0 material.
Engineering › Bilge Water Management System › Strainer
Issued 4 December 2017
Resolved
Bilge Strainers are Plastic and are not an acceptable material for use in a vital system. 46 CFR 119.710, 46 CFR 56.60, 46 CFR 56.50 (g).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 January 2018
Resolved 10 December 2018
Resolution: Metallic strainers were installed.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 4 December 2017
Resolved
Port and Starboard Ballast Bilge #1 has excessive amounts of mud and debris that could possibly clog the bilge piping system. 46 CFR 115.830
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 January 2018
Resolved 17 April 2018
Resolution: Mud was cleaned out of the voids.
Engineering › Bilge Water Management System › Piping
Issued 4 December 2017
Resolved
Bilge Pipe on discharge side of stbd bilge pump contains a leak. Suction Bilge pipe on Starboard bilge on starboard bilge pump contains a soft patch. 46 CFR 119.510.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 January 2018
Resolved 10 December 2018
Resolution: Bilge piping from sea chest to fwd AMR replaced with copper/nickel piping and hydro-tested to 25 p.s.i.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 1 August 2017
Resolved
COMPLETE REPAIRS ON REPORTED PORT ENGINE COOLANT LEAK OCCURING ON 7/31/17. 46 CFR 119.200
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 August 2017
Resolved 23 August 2017
Resolution: Engine tech replaced cylinder head. Pressure tested; all sat. Completed sea trials; all sat.
Construction/Loadline › Structures › Machinery Space Opening
Issued 15 April 2016
Resolved
Starboard side outer jet intake is exhibited accelerated corrosion in a in a 1-3 inch circumference approximately 4 tenths inch deep at the intersection of the inlet seal adapter and inlet nozzle sealing surface, area just forward of jet impeller, required to submit gauging report to verify amount of good material remaining
Action required: 705 - Other - as specified
Due 31 May 2016
Resolved 1 November 2016
Construction/Loadline › Structures › Machinery Space Opening
Issued 15 April 2016
Resolved
Starboard side outer jet intake is exhibited accelerated corrosion in a in a 1-3 inch circumference approximately 4 tenths inch deep at the intersection of the inlet seal adapter and inlet nozzle sealing surface, area just forward of jet impeller, required to submit repair proposal and repair wasted area
Action required: 705 - Other - as specified
Due 31 May 2016
Resolved 1 November 2016