Records from 2010 to 2025. Most recent: inspection, 18 June 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 21
18 June 2025
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8158766
9 May 2025
Cargo Tank Internal · Internal Structural Exam · Drydock Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8121396
3 June 2024
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7926162
11 July 2023
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7739976
8 June 2023
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7709736
25 April 2023
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7714352
7 March 2023
Drydock Exam · Deficiency Check · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7647201
20 September 2022
Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7563483
20 September 2022
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7564122
22 February 2022
Annual Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7392515
7 June 2021
Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7219156
1 March 2021
Administrative Inspection · Drydock Extension · COI Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7148057
25 February 2020
Deficiency Check · Examination of Repairs · DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6915055
10 October 2019
In-Service Inspection · Administrative Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6832321
21 February 2019
Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6629468
14 November 2018
DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6580268
15 June 2018
Examination of Repairs
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6445100
21 November 2017
COI Inspection · DAPI Audit
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6310715
16 November 2016
Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6048226
13 February 2016
Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5801322
5 January 2016
DAPI Audit · Annual Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 5792670
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 June 2025
Resolved
All vessels shall be provided with bilge pumps in accordance with Table 182-10(a). The two required fixed power pumps shall be self priming and shall each be driven by different sources of power. Vessel was unable to provide evidence of a working bilge pump. Vessel's fire pump was unable to obtain suction when using the fire pump as a bilge pump.
46 CFR 182.25-10(a)
OLD - T
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 June 2025
Resolution: Witnessed in person the proper operation of bilge system.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 3 June 2024
Resolved
The Bridge-to-Bridge Act and the regulations of this part apply to the following vessel in the navigable waters of the United States: (a) Every power-driven vessel of 20 meters or over in length while navigating. Vessel did not have a Bridge-to-Bridge Certificate on board. Technician will be coming next week to inspection radio installation, once complete supply proof of inspection and certificate.
47 CFR 80.1001
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2024
Resolved 11 June 2024
Resolution: Provided tech report, Bridge-to-Bridge certificate, and photo of GPS coordinates in VHF with MMSI, and MMSI number in AIS.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 3 June 2024
Resolved
The lights prescribed in these Rules (Subpart C) shall have an intensity as specified in Annex 1 to these Rules (33 CFR part 84), so as to be visible at the following minimum ranges. Vessel stern light and lower red light for the "restricted in their ability to maneuver" were not operable. Have technician correct issue and provide report and proof of correction.
33 CFR 83.22
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2024
Resolved 10 June 2024
Resolution: Provided photo evidence of lights operable and video of light panel with no alarms and test of alarms, sat.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 3 June 2024
Resolved
Exhaust piping shall be properly supported by non-combustible hangers or blocks. Port main exhaust had a broken hanger in the over head. Re-weld and provide photo evidence of correction.
46 CFR 182.20-15 (old T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 5 June 2024
Resolution: Provided photo evidence of weld completed for exhaust hanger. sat.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 3 June 2024
Resolved
Each hydraulic release used in the installation of any liferaft, inflatable liferaft, lifefloat, or bouyant apparatus must meet Subpart 160.062 of this chapter. Inflatable liferaft painter was not connected to the weak-link. Corrected on the spot by crew.
46 CFR 180.20 (e)
Action required: 10 - Deficiency Rectified
Resolved 4 June 2024
Resolution: Corrected on the spot by crew.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 11 July 2023
Resolved
Adequate emergency lighting automatically actuated upon failure of the main lighting system shall be fitted along the line of escape in vessels having lounge areas below the main deck as per subpart 177.30-7 of
this subchapter. MI observed no emergency lighting in crew accommodation.
46 CFR 184.30-5
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 July 2023
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 July 2023
Resolved
In no case shall the clearance between the bottom of the hand portable fire extinguisher and the floor be less than 4in. MI noted that the pilot house fire extinguisher was mounted with the base in contact with the deck plate underneath it.
46 CFR 175.600(k)(1)
NFPA10-6.1.3.8.3
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2023
Resolved 18 July 2023
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 July 2023
Resolved
Equipment and material that is required by this subchapter to be approved or of an approved type, must have been manufactured and approved in accordance with the design and testing requirements in subchapter Q (Equipment, Construction, and Materials: Specifications and Approval) of this chapter or as otherwise specified by the Commandant. MI observed incorrect bracket installed for pilot house fire extinguisher.
46 CFR 175.800(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2023
Resolved 18 July 2023
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 July 2023
Resolved
Each portable fire extinguisher on a vessel must be of an approved type. The minimum number of portable fire
extinguishers required on a vessel must be acceptable to the cognizant Officer in Charge, Marine Inspection, but must not be fewer than the minimum number required by Table 181.500(b) and other provisions of this section. The galley does not have 40-B:C PFE and a 40-B:C is needed in the vicinity of the machinery space exit.
46 CFR 181.500(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2023
Resolved 18 July 2023
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 11 July 2023
Resolved
Each vessel must have the following: (1) Marine charts of the area to be transited, published by the National Ocean Service, U.S. Army Corps of Engineers, or a river authority that— (ii) Are currently corrected. The marine charts onboard are not up to date.
33 CFR 164.33 (a)(1)
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 July 2023
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 11 July 2023
Resolved
Except as otherwise provided in this section, rails or equivalent protection shall be installed near the periphery of all weather decks accessible to passengers and crews. MI noted missing chain courses on both port and starboard sides of the upper deck.
46 CFR 177.35-1(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2023
Resolved 18 July 2023
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 11 July 2023
Resolved
Vessels operated solely within 20 nautical miles of land must be equipped with a VHF-DSC radiotelephone installation meeting the requirements of § 80.1101(c)(2), except that a VHF radiotelephone installation without DSC capability is permitted until one year after the Coast Guard notifies the Commission that shore-based sea area A1 (see GMDSS Areas and Search and Rescue Areas. Navigation Center (uscg.gov)) coverage is established (see Rescue 21 Distress System Coverage | Navigation Center (uscg.gov)). Vessels in this category must not operate more than 20 nautical miles from land. Sea Area 1 was established on 20JAN2015, and the vessel's GPS is not on the emergency power circuit which causes the VHF's Digital Selective Calling (DSC) capability to be disabled when the vessel experiences a loss of power.
47 CFR 80.905(a)(1)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2023
Resolved 18 July 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 11 July 2023
Resolved
Life preservers shall be distributed through the upper part of the vessel in protected places convenient to the persons on board. MI noted life jackets stored in non-easily accessible location.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2023
Resolved 18 July 2023
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 20 September 2022
Resolved
A vessel must be provided with a main steering gear that is capable of moving the rudder from 35° on one side to 30° on the other side in not more than 28 seconds. Rudder stuck to port preventing vessel maneuverability. Repair to the satisfaction of attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 September 2022
Resolved 3 October 2022
Resolution: Vessel has replaced solenoid in autopilot. Vessel was tested u/w with SAT results.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Ship's occupational safety and health policies and programmes
Issued 1 March 2021
Resolved
DAPI information not O/B.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2021
Resolved 3 March 2021
Resolution: Documentation provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 March 2021
Resolved
Bilge piping not labled.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2021
Resolved 3 March 2021
Resolution: Piping labled.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 1 March 2021
Resolved
Could not operate fire pump due to lack of ballast.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2021
Resolved 3 March 2021
Resolution: Witnessed fire pump operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 March 2021
Resolved
Batteries had wing nuts securing the terminals.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2021
Resolved 3 March 2021
Resolution: Wing nuts removed with appropriate hardware
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 February 2020
Resolved
Port side engine remote shutdown on bridge not operational. Repair and test to satisfaction of local inspector.
46 CFR 182.20
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 March 2020
Resolved 31 March 2020
Resolution: Remote shutdown tested satisfactorily.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 February 2020
Resolved
Drills were not conducted as vessel was unable to get underway. Drills to be conducted upon return from drydock to satisfaction of local inspector
46 CFR 185.520
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 March 2020
Resolved 20 May 2020
Resolution: Drills conducted satisfactorily
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 10 October 2019
Resolved
Berthing light for 02 racks in 4-man crew cabin need covers installed. 46 CFR 177.800
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 November 2019
Resolved 8 November 2019
Resolution: Berthing lights had covers installed. All was satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 October 2019
Resolved
Remove caps on both main engines and replace with approved means. 46 CFRR 183.10-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 November 2019
Resolved 8 November 2019
Resolution: Approved means were installed. All was satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 October 2019
Resolved
Cable entering bottom of engine room panel on port bulkhead needs to be repaired. 46 CFR 183.10-30
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 November 2019
Resolved 8 November 2019
Resolution: Repair was completed. All was satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 October 2019
Resolved
Junction box over work table in forward engine compartment needs to be repaired and secured. 46 CFR 183.10-30
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 November 2019
Resolved 8 November 2019
Resolution: Junction box was replaced with new and secured to bulkhead. All was satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 October 2019
Resolved
Life buoy on main deck plug missing needs to be replaced. 46 CFR 180.70
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 November 2019
Resolved 25 February 2020
Resolution: Life buoy was replaced.
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 14 November 2018
Resolved
Vessel missing list of employees enrolled in drug consotium. Place list of enrolled employees on vessel with DAPI documentation. 46 CFR 16.230(d)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2018
Resolved 14 November 2018
Resolution: Vessel representative printed out list of enrolled employees and placed in DAPI documentation binder.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 November 2018
Resolved
Fire pump does not have gage. Install gage at fire pump outlet. 46 CFR 181.10-1(c)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 December 2018
Resolved 6 December 2018
Resolution: Inspected gauge installation at fire pump outlet. Witnessed operational test of fire pump to ensure gauge operation and correct pump pressure. Gauge read 78psi. Test was satisfactory.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 14 November 2018
Resolved
Vessel's magnetic compass does not have deviation table. Obtain appropriate deviation table for compass. 46 CFR 184.402 705- To be completed at drydock.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 25 February 2020
Resolution: Vessel provided deviation table for magnetic compass
Fire Fighting › Fire Pumps › Arrangement
Issued 22 November 2017
Resolved
During fire drill the fire pump failed to start. Cause as stated by vessel Master related to the breaker.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 December 2017
Resolution: Master demonstrated properly operating ballast and fire pump with adequatepressure being displayed at hose nozzle and on guage near pump. Cause of pump failure to start was attributed to a seized impellor within the pump housing. Impellor freed.
Construction/Loadline › Structures › Door
Issued 21 November 2017
Resolved
Watertight door leading from aft deck to galley found with bottom right dog (looking aft) no longer providing any watertight seal.
Condition: Improper/Lack of Maintenance
Due 22 December 2017
Resolved 1 December 2017
Resolution: Operator replaced watertight dog in-kind and operationally demonstrated propely aligned WTD. Attending USCG Inspector visually verified proper sealing surfaces.
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 21 November 2017
Resolved
Four (4) chemlights fround either missing or expired.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 February 2020
Resolution: Lifejackets have new lights attached.
Documentation › Logs/Records › Drug Test Records
Issued 21 November 2017
Resolved
Records of enrollment in a drug testing consortium and random drug test results for crewmembers not available for examination.
Due 22 November 2017
Resolved 22 November 2017
Resolution: Marine employer provided records of NRC enrollment in a drug testing consortium and random drug test results for crewmembers present at day of exam.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 21 November 2017
Resolved
VRP available for review on-board was valid through June 23, 2014.
Condition: Invalid
Due 22 December 2017
Resolved 22 November 2017
Resolution: NRC Operations Manger provided documentation of a valid VRP.
Documentation › Certificates/Documents › Stability Letter
Issued 21 November 2017
Resolved
Stability letter not available for examination.
Due 22 December 2017
Resolved 1 December 2017
Resolution: Exisiting ABS Correspondence dated 04JAN2000 indicates no stability letter issued IAW 46CFR170.120. Verified required statement as per letter is clearly visible on current Loadline Certificate issued 13MAR2014
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 21 November 2017
Resolved
Vessel did not make pressure vessels available for internal examination and testing.
Action required: 705 - Other - as specified
Due 29 November 2017
Resolved 1 December 2017
Resolution: Examined internal condition of pressure vessel with nothing exceptional noted. Mechanically verified operation of relief valve & compressor settings. Relief valve let go at 180psi - SAT Updated COI dates
Electrical › Electric Supply System (service) › Cable
Issued 16 November 2016
Resolved
Remove dead end wire on bridge aft stbd corner
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 December 2016
Resolved 12 December 2016
Resolution: Dead end wires were removed.
Communications › Public Address System › Loudspeaker
Issued 16 November 2016
Resolved
Install Public Address speaker in lower accomodation space
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 December 2016
Resolved 12 December 2016
Resolution: Installed and proved proper operation of public address speaker in lower accomodation space.
Navigation › Piloting/Steering › Magnetic Compass
Issued 5 January 2016
Resolved
Provide light for magnetic compass.
Action required: 705 - Other - as specified
Due 5 February 2016
Resolved 5 January 2016
Resolution: Light found to be working.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 5 January 2016
Resolved
Provide CG approved first aid kit.
Action required: 705 - Other - as specified
Due 5 February 2016
Resolved 14 January 2016
Resolution: First Aid kit provided.
Communications › Radio Communications › EPIRB
Issued 5 January 2016
Resolved
Provide non-expired EPIRB battery.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 February 2016
Resolved 14 January 2016
Resolution: New EPIRB provided.
Communications › Alarms/Indicators › Bilge Alarm
Issued 5 January 2016
Resolved
Make bilge visual alarm function properly. Light constantly on.
Action required: 705 - Other - as specified
Due 5 February 2016
Resolved 5 January 2016
Resolution: Visual alarm functions as intended.