Records from 1984 to 1995. Most recent: inspection, 20 October 1995.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 48
20 October 1995
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 384179
30 June 1993
Certificate of Compliance
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1354389
6 November 1992
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 166931
11 February 1991
Administrative
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1216337
14 October 1989
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 485078
6 July 1989
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1036493
9 June 1989
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 892591
3 April 1989
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 449503
12 March 1989
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 896594
17 February 1989
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 508013
17 February 1989
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1041083
11 February 1989
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1035766
31 December 1988
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1347879
30 July 1988
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 515457
7 June 1988
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 888119
19 May 1988
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1195149
17 May 1988
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1352228
21 April 1988
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1341435
14 April 1988
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1206082
22 February 1988
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1024274
28 January 1988
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 320985
23 January 1988
Examination of Repairs · Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1023830
11 December 1987
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 448170
5 October 1987
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1016275
12 May 1987
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1024377
7 April 1987
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1329601
3 March 1987
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1013948
12 February 1987
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1320784
5 February 1987
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 458810
30 January 1987
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1015139
28 July 1986
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 460526
23 May 1986
Credit Drydock · Damage Survey · Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1294701
1 May 1986
Permit to Proceed · Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1308976
27 February 1986
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1303681
19 February 1986
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 994526
10 January 1986
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 535180
2 December 1985
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 995206
3 November 1985
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 991099
4 September 1985
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 452130
2 August 1985
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 527640
25 July 1985
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 991186
28 April 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 301807
28 April 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1288983
1 March 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1290276
28 February 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 519530
20 February 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 977075
19 September 1984
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 512634
30 May 1984
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 471918
Navigation
Issued 20 October 1995
Resolved
TARGET RADAR (NOT ARPA) WAS BEING REPAIRED.
Condition: Unknown
Due 29 November 1995
Resolved 29 January 2002
Deck/Cargo
Issued 20 October 1995
Resolved
TEMPERATURE SENSING SYSTEM FOR THE CARGO PUMP BEARINGS WAS NOT WORKING FOR ANY CARGO PUMP.
Condition: Unknown
Due 20 November 1995
Resolved 29 January 2002
Lifesaving
Issued 9 June 1989
Resolved
RENEW IN ITS ENTIRETY, AND AS ORIGINAL, THE STBD LIFEBOAT ENGINE BOX. CONSTRUCTION SHALL BE IN KIND, INCLUDING ACCESS PLATES AND GALVANIZED OR CORROSION RESISTANT MATERIAL.
Condition: Unknown
Due 9 June 1989
Resolved 9 June 1989
Construction/Loadline
Issued 12 March 1989
Resolved
EFFECT TEMPORARY REPAIR TO #2 BALLAST SUCTION LINE IN WAY OF PIPE SECTION LOCATED BETWEEN SEA SUCTION AND BLOCK VALVES IN CARGO PUMP ROOM.
Condition: Unknown
Due 12 March 1989
Resolved 12 March 1989
Engineering
Issued 11 February 1989
Resolved
REPLACE THE SECTION OF NO. ONE MAIN CIRCULATING PUMP DISCHARGE PIPING IN WAY OF EXISTING EPOXY REPAIR.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Construction/Loadline
Issued 11 February 1989
Resolved
FOR SHIPS PAINT LOCKER, COMPLETE THE FOLLOWING: (1) REPAIR EXHAUST VENT PIPING ON PORT SIDE OF COMPARTMENT; (2) LABEL CO2-ACTUATED SWITCHES FOR FANS; (3) INSTALL DOOR SO THAT IT SWINGS OUT OF THE PAINT LOCKER & ENSURE THAT THE KICK-OUT IS PROPERLY INSTALLED.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Fire Fighting
Issued 11 February 1989
Resolved
REPAIR/REPLACE FOAM MAIN EXPANSION JOINT IN WAY OF FOAM MONITOR #1.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Fire Fighting
Issued 11 February 1989
Resolved
PERMANENTLY REPAIR DRESSER COUPLING ON #2 CARGO LINE, IN WAY OF MONITOR #3.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Fire Fighting
Issued 11 February 1989
Resolved
REPAIR FIREMAIN ISOLATION VALVES FORE AND AFT OF MONITOR #1 (WASTED BOLTS).
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Lifesaving
Issued 11 February 1989
Resolved
MAKE ENGINE COMPARTMENT ON STBD LIFEBOAT WATERTIGHT.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Electrical
Issued 11 February 1989
Resolved
PROVE THE PROPER OPERATION OF REVERSE POWER RELAY FOR NO. ONE S/S STEAM TURBINE GENERATOR.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Engineering
Issued 11 February 1989
Resolved
INSTALL ESCAPE PIPING TO THE FOLLOWING SAFETY RELIEF VALVES IAW 46CFR56.50-25(C): HOT WATER SYS RELIEF VALVE,250 PSI SYS RELIEF VALVE,DC HEATER INLET PIPE RELIEF VALVE,DC HEATER RELIEF VALVE,150 PSI STATION RELIEF VALVE (2EA)5 PSI STATION RELIEF VALVE. (ALL STEAM SAFETY RELIEF VALVES)
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Engineering
Issued 11 February 1989
Resolved
INSTALL MISSING LIFTING DEVICES FOR THE FOLLOWING STEAM SAFETY RELIEF VALVEIAW 46CFR54.15-10(C): DC HEATER SAFETY RELIEF VALVE,DC HEATER INLET PIPE SAFETY RELIEF VALVE,150 PSI STATION OVER THE SEMI-PORTABLE CO2 SYSTEM.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Electrical
Issued 11 February 1989
Resolved
CORRECT THE FOLLOWING DISCREPANCIES TO BATTERY INSTALLATIONS IN THE E-GEN RM: (1)PROVIDE A SUITABLE COVER FOR BOTH E-GEN STARTING BATTERY AND EMERG. BATTERIES. (2)LINE THE EMERG. BATTERY BOX W/ A NON-CORROSIVE LINER. (3) BLOCK FROM MOVEMENT, E-GENERATOR STARTING BATTERIES.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Engineering
Issued 11 February 1989
Resolved
PROVE THE PROPER OPERATION OF THE SUPERHEATER AND DRUM PILOT SAFETY VALVES,BY READJUSTING THE SET PRESSURES SUCH THAT THE DRUM PILOT HAS THE LOWEST SETTING AND THE SUPERHEATER IS SET LESS THAN OR EQUAL TO 1050 PSI FOR THE STBD BOILER.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Deck/Cargo
Issued 11 February 1989
Resolved
PERMANENTLY REPAIR ALL CARGO LINES IN CARGO PUMP ROOM THAT ARE TEMPORARILY REPAIRED WITH DOUBLERS.
Condition: Unknown
Due 31 January 1991
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Construction/Loadline
Issued 11 February 1989
Resolved
PERMANENTLY REPAIR BROKEN WELDS IN LOWER HORIZONTAL STIFFENERS IN CARGO PUMP ROOM, CENTERLINE, LOWER LEVEL, ON ENGINE ROOM BULKHEAD.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Deck/Cargo
Issued 11 February 1989
Resolved
REPAIR/REPLACE CARGO STRIPPER VALVE ON EDUCTOR LINE, STARBOARD SIDE, CARGO PUMP ROOM.
Condition: Unknown
Due 31 January 1991
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Electrical
Issued 11 February 1989
Resolved
REPAIR LIGHT BETWEEN #2 AND #3 CARGO PUMPS IN PUMP ROOM.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Electrical
Issued 11 February 1989
Resolved
PROPERLY SUPPORT ELECTRICAL WIRING WITH METAL SUPPORTS IN PUMP ROOM, JUST ABOVE CARGO PUMPS.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Engineering
Issued 11 February 1989
Resolved
PERMANENTLY REPAIR PORT, FORWARD, BUNKER MANIFOLD DRAIN LINE.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Deck/Cargo
Issued 11 February 1989
Resolved
PERMANENTLY REPAIR 4 CENTER TANK ULLAGE.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Deck/Cargo
Issued 11 February 1989
Resolved
REPAIR/REPLACE PIPE HANGERS ON IGS LINES.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Electrical
Issued 11 February 1989
Resolved
REPAIR CABLE TRAY COVER, FORWARD, STARBOARD.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Construction/Loadline
Issued 11 February 1989
Resolved
PERMANENTLY REPAIR FRACTURE IN AFT BULKHEAD OF CARGO TANK 5 CENTER THAT BORDERS ON CARGO PUMP ROOM.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Deck/Cargo
Issued 11 February 1989
Resolved
PERMANENTLY REPAIR TOP OF DECK WATER SEAL, IN WAY OF EXISTING TEMPORARY REPAIRS.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Deck/Cargo
Issued 11 February 1989
Resolved
PERMANENTLY REPAIR ALL SOFT PATCHES IN IGS LINES.
Condition: Unknown
Due 31 January 1991
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Accommodation/Occupational Safety
Issued 11 February 1989
Resolved
REPAIR FRACTURES IN ACCOMMODATION LADDER COFFINS, PORT AND STARBOARD SIDES.
Condition: Unknown
Due 11 February 1989
Resolved 11 February 1989
Deck/Cargo
Issued 22 February 1988
Resolved
EFFECT REPAIRS TO ANGLE BRACKETS IN STARBOARD SLOP TANKS.
Condition: Unknown
Due 22 February 1988
Resolved 22 February 1988
Construction/Loadline
Issued 22 February 1988
Resolved
REPLACE WASTED GRATING ON PORT CATWALKS TO CARGO LOADING STATION. REPAIR HAND RAIL AT SAME LOCATION.
Condition: Unknown
Due 22 February 1988
Resolved 22 February 1988
Construction/Loadline
Issued 22 February 1988
Resolved
REPLACE CROSSOVER BRIDGE AT STARBOARD SIDE OF DECKHOUSE.
Condition: Unknown
Due 22 February 1988
Resolved 22 February 1988
Construction/Loadline
Issued 23 January 1988
Resolved
OPEN, CLEAN, GAS FREE AND HAVE INSPECTED THE STARBOARD SLOP TANK TO INCLUDECLEANING BOTTOM LONG TAPERED ENDS FOR VISUAL AND U.T. INSPECTION TO CHECK FOR HULL FRACTURES IN THESE AREAS.
Condition: Unknown
Due 23 January 1988
Resolved 23 January 1988
Engineering
Issued 3 March 1987
Resolved
REPLACE #2 MAIN CIRC PUMP'S DISCHARGE SIDE EXPANSION JOINT TO MAIN CONDENSER.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Engineering
Issued 3 March 1987
Resolved
REPLACE PORT BOILER'S FOUR (4) BURNER VENTURI ASSEMBLIES.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Accommodation/Occupational Safety
Issued 3 March 1987
Resolved
REPLACE/REPAIR WASTED DECK HOUSE DOORS.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Deck/Cargo
Issued 3 March 1987
Resolved
REPLACE WASTED CARGO PIPING.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Engineering
Issued 3 March 1987
Resolved
OPEN BOTH BOILER MOUNTS FOR COAST GUARD INSPECTION.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Construction/Loadline
Issued 3 March 1987
Resolved
COMPLETE WORKLIST LETTERED A-G
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Lifesaving
Issued 3 March 1987
Resolved
REPLACE BEARINGS IN BOAT DAVIT WINCH.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Navigation
Issued 3 March 1987
Resolved
REPLACE RUBBER MATTING WITH NON SKID.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Lifesaving
Issued 30 January 1987
Resolved
HAVE #1 LIFEBOAT REMOVED FOR REPAIRS.
Condition: Unknown
Due 30 January 1987
Resolved 30 January 1987
Accommodation/Occupational Safety
Issued 30 January 1987
Resolved
REPLACE WASTED WEATHERTIGHT DOOR TO HOUSE OR HAVE EXTERIOR REPAIRED.
Condition: Unknown
Due 30 January 1987
Resolved 30 January 1987
Deck/Cargo
Issued 30 January 1987
Resolved
HAVE #4 CARGO PUMP DISCHARGE LINE IN WAY OF DOUBLER GAUGED FOR REPAIRS.
Condition: Unknown
Due 30 January 1987
Resolved 30 January 1987
Deck/Cargo
Issued 30 January 1987
Resolved
HAVE IGS PIPING GAUGED FOR REPAIRS.
Condition: Unknown
Due 30 January 1987
Resolved 30 January 1987
Lifesaving
Issued 1 May 1986
Resolved
REPAIR TRICING PENDANT FOR AFTER DAVIT STARBOARD BOAT
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Deck/Cargo
Issued 1 May 1986
Resolved
MAKE GRATINGS AND LADDERS SOUND IN ALL CARGO BALLAST AND SLOP TANKS
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Engineering
Issued 1 May 1986
Resolved
FREE UP ON BOTH BOILERS SAFETY VALVES RELEASING GEAR LINKAGE.
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Engineering
Issued 1 May 1986
Resolved
TEST LOW LUBE OIL TRIP & OVERSPEED TRIP ON H.P & L.P. TURBINS U/W & FWD LOG ENTRY TO [name withheld]/LB.
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Unknown
Issued 1 May 1986
Resolved
TEST IGS & OWS AFTER PROPER REPAIRS HAVE BEEN MADE.
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Documentation
Issued 1 May 1986
Resolved
COMPLETE MID-PERIOD INSPECTION
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Deck/Cargo
Issued 1 May 1986
Resolved
MAKE PERMANENT REPAIRS TO IGS FROM DECK WATER SEAL TO ALL CARGO TANKS
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Deck/Cargo
Issued 1 May 1986
Resolved
MAKE ALL CARGO TANKS AND INTERNALS READY FOR INT. EXAM AND MAKE REPAIRS AS NECESSARY
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Lifesaving
Issued 1 May 1986
Resolved
REPAIR THE ELECTRIC WINCH AND DEMONSTRATE PROPER OPERATION OF THE PART LIFEBOAT LIMIT SWITCHES.
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Construction/Loadline
Issued 1 May 1986
Resolved
REPAIR/REPLACE AFT DRAFT INDICATOR SEA VALVE LOCATED PORT SIDE AFT OF WATER TIGHT DOR #1 IN SHAFT ALLEY.
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Deck/Cargo
Issued 1 May 1986
Resolved
REPAIR/REPLACE AS NEEDED PIPING ON IGS FROM BOILER UP TAKES TO MAIN DECK SEAL TANK. ALSO REPAIR/REPLACE ISOLATION VALVES, AND OTHER COMPONENTS AS NEEDED TO RESTORE SYSTEM TO AS ORIGINAL CONDITION.
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Electrical
Issued 1 May 1986
Resolved
REPAIR/REPLACE AS NEEDED COMPONENTS TO BRING OILY WATER SEPERATOR INTO FULLOPERATION UPON REPAIRS COMPLETED IOPP CERT. TO BE ENDORSED BY COAST GUARD INSPECTOR AFTER SATISFACTORY TEST.
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Construction/Loadline
Issued 1 May 1986
Resolved
ON ENGINE ROOM BLOWERS FIRE DDAMPERS (A) REPAIR HANDLE AND PROVE OPERATION OF AFT PORT SUPPLY & CENTER STBD EXCHANGE. (B) FREE UP AFT STBD SUPPLY AND FWD STBD SUPPLY.
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Lifesaving
Issued 1 May 1986
Resolved
PROVIDE TWO(2) ADDITIONAL EXPOSURE SUITS
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Deck/Cargo
Issued 1 May 1986
Resolved
MAKE PERMANENT REPAIRS TO THE STRIPPING LINES IN CARGO TANK (4) CENTER
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Electrical
Issued 1 May 1986
Resolved
REPAIR THE BOW LOOKOUT SOUND POWERED PHONE
Condition: Unknown
Due 1 May 1986
Resolved 1 May 1986
Navigation
Issued 3 November 1985
Resolved
MAKE PERMANENT REPAIRS TO THE PORT RADAR & ARPA INDICATOR. UPON COMPLETION OF REPAIRS INFORM THIS OFFICE BY TELEX THAT REPAIRS WERE MADE & POSITION OFSHIP WHEN REPAIRS WERE MADE.
Condition: Unknown
Due 3 November 1985
Resolved 3 November 1985
Lifesaving
Issued 1 March 1985
Resolved
OVERHAUL PORT LIFEBOAT WINCH CONTROLLER BOX TO MAKE IT WATERTIGHT.
Condition: Unknown
Due 1 March 1985
Resolved 1 March 1985
Electrical
Issued 1 March 1985
Resolved
INSTALL PERMANTLY FIXED CABLE TO FLOOD LIGHTS ON BRIDGE AND AFTER DECK EXCEPT FOR SHORT LENGTHS OF PORTABLE CABLE AT EACH LIGHT.
Condition: Unknown
Due 1 March 1985
Resolved 1 March 1985
Deck/Cargo
Issued 1 March 1985
Resolved
INSTALL PERMANENT METALLIC PIPING FROM THE IGS SYSTEM DECK SEAL OVERFLOW AND DRAIN CONNECTIONS.
Condition: Unknown
Due 1 March 1985
Resolved 1 March 1985
Engineering
Issued 1 March 1985
Resolved
CONDUCT INTERNAL EXAM OF DC HEATER.
Condition: Unknown
Due 1 March 1985
Resolved 1 March 1985