MAURY USCG vessel records
← All vessels

DOLORES CHOUEST

Built
1978
Last inspected
27 January 2025
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 27 January 2025
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8225931
WCP8847
Flag
UNITED STATES
Maury page id
psix-50007

Documentation record

Registered dimensions (L × B × D)228.3 ft × 42.4 ft × 12.2 ft
Registered tonnagegross 294 / net 200
ITC dimensions (L × B × D)210.8 ft × 42.5 ft × 14.0 ft
ITC tonnagegross 1,067 / net 320
BuilderNORTH AMERICAN SHIPBLDG · LAROSE, LA, UNITED STATES · built 1978
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 17 June 2026 · expires 31 July 2027
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1067 - Convention (Subpart B), Gross Ton
294 - Regulatory (Subpart C or D), Gross Ton
320 - Convention (Subpart B), Net Ton
200 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 29 inspections, each with its date, unit and type; 16 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 29

27 January 2025 Drydock Extension · Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8071254
24 July 2024 Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7969741
8 March 2024 Damage Survey · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7876215
12 February 2024 Administrative Inspection · Annual Inspection · Excursion Permit
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7867497
28 November 2023 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7830720
28 November 2022 Examination of Repairs · Internal Structural Exam · COI Inspection · Deficiency Check · Drydock Exam · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7600714
12 August 2022 Excursion Permit
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7531471
7 January 2022 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7378559
14 December 2021 MTSA Verification · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7367283
23 August 2021 Excursion Permit
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7294292
8 March 2021 Excursion Permit
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7151966
11 December 2020 Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7110416
5 October 2020 Construction Oversight · Administrative Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7071741
17 August 2020 Excursion Permit
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7035670
1 June 2020 Excursion Permit
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6966284
28 April 2020 Excursion Permit
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6944854
4 March 2020 Excursion Permit
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6920498
7 January 2020 Deficiency Check · Internal Structural Exam · Examination of Repairs · Administrative Inspection · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6903629
18 December 2019 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6876274
11 December 2019 MTSA Verification · Periodic Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6868995
10 December 2018 Annual Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6592878
15 August 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6512698
4 December 2017 Underwater Inspection in lieu of Drydock
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6317599
9 November 2017 MTSA/ISPS Verification · Examination of Repairs · COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6304120
20 March 2017 MTSA/ISPS Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6108135
11 January 2017 Annual Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6060185
27 June 2016 Damage Survey · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5921897
14 January 2016 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5797666
4 January 2016 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5785892

Deficiency record · 16

02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 8 March 2024 Resolved
A survey shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made and that the material and the workmanship of such repairs or renewals are in all respects effectively made; vessel was involved in an allision with a Navy RHIB vessel while docked at NAS Pensacola pier sustaining a 1.5 inch deep over 1 ft span deformation above the waterline on the stern side shell in way of the stbd #08 ballast tank. No other damage was reported. Vessel is to undergo ABS survey and damage assessment and provide report to Sector Mobile prior to vessel movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 March 2024
Resolution: Damage survey conducted. No immediate repairs required.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 8 March 2024 Resolved
A survey shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made and that the material and the workmanship of such repairs or renewals are in all respects effectively made; vessel was involved in an allision with a Navy RHIB vessel while docked at NAS Pensacola pier sustaining a 1.5 inch deep over 1 ft span deformation above the waterline on the stern side shell in way of the stbd #08 ballast tank. Vessel underwent ABS survey and damage assessment and provided report to Sector Mobile. Vessel permitted to make permanent repairs no later than the next drydocking survey. Notify CG inspection office as CG inspector will need to oversee repairs.
Action required: 705 - Other - as specified
Due 1 October 2024
Resolved 24 July 2024
Resolution: Repair completed and visually inspected by [name withheld] witnessed by ABS per 398.1
08 - Alarms › N/A - No Subsystem › General alarm
Issued 13 February 2023 Resolved
The system must be arranged and installed that the presence of a fire may be reported from any of the protected spaces and be automatically registered visibly and audibly in the pilothouse or fire control station. There must also be an audible alarm in the engine room. The Engine Room did not have an audible alarm for the fire detection system. 46 CFR 95.05-1 (a) 46 CFR 76.35.15 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2023
Resolved 14 February 2023
Resolution: Vessel added General Alarm speaker in the engine room.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 13 February 2023 Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work. Fire control: general arrangement plans showing for each deck the control stations, the various fire sections enclosed by the fire resisting bulkheads, the arrangement of the alarm and extinguishing systems, ventilation systems, details of the alarm system, and details of the extinguishing system. The approved General Arrangement Plan dated 26MAY2015 only shows a stove top. It does not reflect the Deep Fat Fryer which is on-board. A new ventilation hood was install which services the stove and the Deep Fat Fryer. Submit plan reviews to MSC for approval to address the new equipment on-board, electrical installation, and any needed fire fighting equipment. Provide an updated approved Fire Safety Plan to the CG which addresses the alternation of the galley equipment. 46 CFR 91.55.10(a)
Action required: 705 - Other - as specified
Due 12 April 2023
Resolved 20 March 2023
Resolution: Received complete work order that the Deep Fat Fryer has been locked-out.
10 - Safety of Navigation › N/A - No Subsystem › Signalling lamp
Issued 11 December 2019 Resolved
Signaling unit shall be energized from a self contained storage battery. Vessel's day light signal lamp battery is inoperable. 46 CFR 111.75-15(h).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 January 2020
Resolved 18 December 2019
Resolution: Vessel obtained new battery for day light signal lamp and proved proper operation.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 11 December 2019 Resolved
Each cargo vessel must carry an immersion suit approved under 160.171 of an appropriate size. Master's jumbo sized was not Coast Guard approved. 46 CFR 199.273.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 January 2020
Resolved 18 December 2019
Resolution: Vessel obtained 02 jumbo immersion suits that are approved under 46 CFR 160.171
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 11 December 2019 Resolved
Each liferaft must be arranged for float free launching. Vessel's weak link on the stbd side #3 liferaft was broken. 46 CFR 199.130(c)(7).
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 January 2020
Resolved 18 December 2019
Resolution: Vessel obtained new wire type weak link for their liferaft. Vessel showed inspectors satisfactory evidence through emails from Vane Brothers that the weak link has a breaking strength of 500lbs. Same breaking strength of the weak link that was replaced.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 11 December 2019 Resolved
Each class 1 door on a vessel in ocean service must be designed to withstand a head of water. The starboard aft engineroom watertight door is not watertight along bottom. Repair or replace to the satisfaction of attending marine inspector. 46CRFR170.270(b)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 January 2020
Resolved 21 January 2020
Resolution: Watertight door sill replaced during drydock and MI witnessed satisfactory chalk test.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 11 December 2019 Resolved
Bilge and ballast piping must be so arranged as to prevent oil or water from the sea or ballast system from passing into machinery spaces. Ballast pipe in port side Z drive alley has a temporary patch. Repair to the satisfaction of attending Marine Inspector. 46CFR56.50-50(h)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 January 2020
Resolved 21 January 2020
Resolution: Pipe was replaced and tested to the satisfaction of attending marine inspector.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 11 December 2019 Resolved
Means shall be provided for closing all ventilators. The port forward engine room vent closure was not operable. Repair to the satisfaction of attending Marine Inspector. 46CFR92.15-10
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 December 2019
Resolution: Crew found that the reset cable had jumped a sheave and prevented the release cable from operating. Corrected on the spot.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 15 August 2018 Resolved
Vsl is broadcasting: Greater/smaller than expected vessel length.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 September 2018
Resolved 21 January 2020
Resolution: Verified vessel is now transmitting proper length.
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 28 November 2017 Resolved
Gangway Load Test post visual inspection, found multiple cracks in the structural welds. Repair or replace Gangway and conduct a load test to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2017
Resolution: Satisfactory weld repairs and weight test.
Construction/Loadline › Hull › Side Shell
Issued 29 June 2016 Resolved
Port chain locker was found to have several clad weld repairs and severe pitting throughout an insert on the side shell. The insert is approximately 5' x 12' spanning from aft of frame 2 to aft of frame 6. Crop and renew this insert to also include severe pitting found just aft of the existing weld seam on this insert, during the next scheduled dry dock availability to the satisfaction of the CGMI
Action required: 705 - Other - as specified
Due 31 December 2017
Resolved 29 November 2017
Resolution: Port and stbd chain locker pitted and wasted steel replaced SAT.
Construction/Loadline › Hull › Bottom Plating
Issued 27 June 2016 Resolved
Vessel has reported a hole in the anchor chain locker, accompanied by seawater ingress. Contact CG MI to inspect damage extent. Submit a repair proposal for approval & completion to the satisfaction of the attending CG MI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 June 2016
Resolved 29 June 2016
Resolution: Repair proposal was reviewed by attending [name withheld] to be cropped and renewed were marked and ABS concurs.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 4 January 2016 Resolved
The air stop solenoid on the #1 SSDG does not actuate when overspeed condition sensed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 January 2016
Resolved 15 January 2016
Engineering › Generator (propulsion/auxiliary-electric) › Circuit Breaker (overload/over current protection)
Issued 4 January 2016 Resolved
The number 1 ssdg circuit breaker does not open when the "open breaker" switch pushbutton on the swbd is pressed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 January 2016
Resolved 14 January 2016

Ownership record