Records from 2013 to 2025. Most recent: inspection, 3 November 2025.
Inspection history · 20
3 November 2025
Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8262574
3 November 2025
Drydock Exam · Internal Structural Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8262599
16 January 2025
Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8064818
8 November 2023
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7822342
8 November 2023
Internal Structural Exam · Administrative Inspection · COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7822345
20 March 2023
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7653918
15 December 2022
Deficiency Check · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7609586
18 February 2022
Annual Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7398358
5 January 2022
Drydock Exam · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7376061
9 April 2021
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7171831
27 April 2020
Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6944570
6 August 2019
Internal Structural Exam · In-Service Inspection · Simplified Stability Test · Administrative Inspection · Drydock Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6775014
14 January 2019
Administrative Inspection · Internal Structural Exam · COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6609962
14 June 2018
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6443598
10 April 2018
Deficiency Check · Hull Examination · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6389160
26 March 2018
Internal Structural Exam · Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6378943
10 April 2017
DAPI Audit · Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6121125
29 July 2016
Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5956927
3 May 2016
Internal Structural Exam · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5864196
11 April 2016
Hull Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5864830
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 10 February 2025
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. All medication in the first aid kit onboard the vessel were expired.
46CFR184.710
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 February 2025
Resolved 11 February 2025
Resolution: Captain provided photos of the new first aid kit.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 10 February 2025
Resolved
The floating waterlight must be attached around the body of the life float or buoyant apparatus by a 10 mm (3/8 inch) lanyard, resistant to deterioration from ultraviolet light, and at least 5.5 meters (18 feet) in length. The lanyard attaching the waterlights to all five life floats was approximately 6 feet long.
46CFR180.175(f)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 February 2025
Resolved 11 February 2025
Resolution: Captain provided photos of all renewed life float light lines.
05 - Radio Communications › N/A - No Subsystem › MF Radio installation
Issued 10 April 2023
Resolved
Radio transmitting and recieving installations are required on certain vessels carrying passengers. Per 47 CFR 80.1091(a)(1): ships subject to this section must be provided with: and MF installation capable of transmitting and receiving for distress and safety purposes. Vessel's MF/HF single sideband radio is incapable of receiving. Rectify to the satisfaction of the attending marine ispector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 April 2023
Resolved 14 April 2023
Resolution: MF/HF radio operational test was satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 19 December 2022
Resolved
Fire Detection: An interconnected detection and alarm system must (4) Alarm on low power. Newly installed fire/smoke detection system doesn't have the required low power alarm installed. Parts are currently on order. Install and test to the satisfaction of the attending MI.
46 CFR 181.450 (a)(4)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 December 2022
Resolution: Low voltage alarm installed to meet loss/low power alarm requirements.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 February 2022
Resolved
All cable and wire must be installed with metal supports spaced nor more than 24 inches apart and in such a manner as to avoid chaffing and other damage. Wiring runs throughout fuel tank space are currently hung by zip ties. Hang wires to the satisfation of the USCG Marine Inspector.
46 CFR 183.340(b)(4)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 March 2022
Resolved 7 March 2022
Resolution: Vessel submitted pictures of corrected wire installation.
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 18 February 2022
Resolved
All fuel tanks must be electrically banded to a common ground. Diesel tank vent did not have continuous bonding. Add common ground bonding to the satisfaction of the USCG Marine Inspector. Vessel added required bonding during inspection.
46 CFR 182.440 (b)(4)
Action required: 10 - Deficiency Rectified
Due 1 March 2022
Resolved 1 March 2022
Resolution: Vessel corrected deficiency during exam.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 April 2021
Resolved
All vessels shall be provided with bilge pumps in accordance with Table 182.25-10(a).
Impeller on bilge pump exploded.
46 CFR 182-25-10(a)
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Witnessed Testing of bilge system and suction from all compartments; All Sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 April 2021
Resolved
Shutoff valves, installed so as to close against the fuel flow, shall be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank shall be operable from outside the tank compartment, preferably from an accessible position on the weather deck. 46 CFR 182.20-40(b)(3)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Reach rod secured to fuel shutoff valve and operational; All Sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 12 April 2021
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition.
Prior To Movement, Replace STBD side head window.
46 CFR 176.830(a)
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Window has been installed and is weathertight; All Sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 April 2021
Resolved
The individual bilge suction lines shall be led to a central control point or manifold. Each line shall be provided with a stop valve at the control
point or manifold and in addition shall be provided with a check valve at some accessible point in the bilge line. A stop-check valve located at the control
point or manifold will meet the requirements for both.
46 CFR 182.25010(c)
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Reach rod secured to bilge suction valve behind collision bulkhead and is operational; All Sat.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 12 April 2021
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces.
46 CFR 182.530(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Witnessed test of engine room high water visual and audible alarms; All Sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 12 April 2021
Resolved
Penetrations and openings in watertight bulkheads in a vessel less than a 100 gross tons. (a) Penetrations and openings in watertight bulkheads must (1) Be kept as high and as far inboard as practicable; and (2) have a means to make them watertight.
46 CFR 171.114(a)(1)(2)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Penetrations have been secured and are watertight; All Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 12 April 2021
Resolved
Stowage of life floats and buoyant apparatus. (b) The float-free link required by § 180.130(a)(1) must be:
(1) Certified to meet § 160.073 in sub chapter Q of this chapter, or other standard specified by the Commandant;
(2) Of proper strength for the size of the life float or buoyant apparatus as indicated on its identification tag.
46 CFR 180.137(b)(1)(2)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 April 2021
Resolution: New weak links with legible tags have been installed on all (05) life floats, 4x12 person and 1x6 person; All Sat.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 12 April 2021
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate.
Periodic servicing of hydrostatic release units.
(b) Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. Vessel restricted from operating beyond 3NM from the coastline.
46 CFR 185.740(b)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 April 2021
Resolution: A valid HRU has been installed on the EPIRB; All Sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 27 April 2020
Resolved
A vessel must comply with the applicable requirements for any radio and Electronic Position Indicating Radiobeacon (EPIRB) installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Vessels Radio safety Certificate was found expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2020
Resolved 15 May 2020
Resolution: FCC Inspector issue new certificate to vessel.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 2 April 2018
Resolved
FWD void space dewatering pump pipe check valve installed upside down.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 April 2018
Resolved 2 April 2018
Resolution: Removed and reinstalled check valve properly to allow suction of water from void space.
Fire Fighting › Fire Hoses › Connections
Issued 2 April 2018
Resolved
Fire hose nozzle connection fitting was non-metallic construction. Required to be of brass, copper, or equivalent metal.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 April 2018
Resolved 2 April 2018
Resolution: Vessel representative removed and repalced fire hose fitting with brass material.
Communications › Radio Communications › VHF Radiotelephone
Issued 2 April 2018
Resolved
VHF/MF radio not inspected on Communications Act Safety Radiotelephony Certificate. Vessel required to have VHF/MF radio certified. Vessel restricted to not more than 20nm from shore.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 April 2018
Resolved 15 June 2018
Resolution: Vessel fixed HF radio and recieved a new radiotelephoney Safety Certificate
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 11 April 2017
Resolved
Repair exhaust leak on PORT engine exhaust piping. Temporary repair has been completed until new material is ordered to effect premanent repairs. Prior to commencing any hot work, clean area of any oil residue.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 19 April 2017
Resolved 20 April 2017
Resolution: Replacement of Port exhaust piping completed; test satisfactory.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 10 April 2017
Resolved
Prior to vessel movement & carrying passengers repair exhaust leaks on PORT & STBD engines exhaust piping. Prior to commencing any hot work clean area of any oil residue.
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 April 2017
Resolved 11 April 2017
Resolution: STBD exhaust repaired & tested satisfactory; Temporary repair on PORT exhaust - NEW 835 to follow.
Electrical › Electric Generation Source (service) › Generator
Issued 10 April 2017
Resolved
Oil on vessel's prime mover for generator determine cause and repair.
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 April 2017
Resolved 11 April 2017
Resolution: Third party technician inspected generator and determined oil was from a loose oil filter.
Engineering › Diesel Engine (propulsion-electric) › Governor
Issued 8 February 2017
Resolved
Main Propulsion machinery installed must be suitable for the operation that it is intended and must be maintained in such a manner to protect against failure. Port main engine throttle cable to governor is held down by plastic tie because original brackets cable sleeve is separated at end of cable.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 February 2017
Resolved 9 February 2017
Resolution: Deficiency cleared to the satisfaction of the attending marine inspector.
Construction/Loadline › Hull › Hull Plating
Issued 11 April 2016
Resolved
All zincs are less than 50% remaining. Replace all zincs.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: All zincs were replaced.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 11 April 2016
Resolved
Stbd shaft cutlass bearing worn beyond limits. Replace stbd shaft cutlass bearing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Stbd shaft cutlass bearing replaced.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 11 April 2016
Resolved
Stbd prop key cracked. Replace stbd prop key.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: stbd prop key replaced with new.
Engineering › Bilge Water Management System › Piping
Issued 11 April 2016
Resolved
Spool pieces on port and stbd side engine room wasted thru. Repair/replace 2 spool pieces.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Both spool pieces were replaced with new.
Construction/Loadline › Hull › Weld
Issued 11 April 2016
Resolved
Gouge/weld marked welds on 3 frames on port side aft engine room and marked welds on 3 frames on stbd side aft engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Stitch welding gouged and renewed at marked locations in engine room.
Construction/Loadline › Hull › Weld
Issued 11 April 2016
Resolved
Apply 4 missing stitch welds in #2 forward space.
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Proper stitch welds applied to missing places in #2 space forward.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 11 April 2016
Resolved
Unauthorized clad welding on bottom both sides of integral fuel tanks. Remove clad welding, and properly repair bottom sides of fuel tank.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Proper repairs made to both bottom sides of integral fuel tank. Hydrostatic test of tank performed satisfactory.
Construction/Loadline › Hull › Weld
Issued 11 April 2016
Resolved
Gouge/Weld 3 broken stitch welds in #2 space forward.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: 3 cracked welds in #2 space forward repaired.