MAURY USCG vessel records Sign in
← All vessels

NEW KINGFISHER

NEW KINGFISHER is a 1979 passenger vessel (inspected). The Coast Guard has recorded 76 inspections since 1985, most recently in November 2025, along with 146 deficiencies and 1 casualty investigation in 2013.

Records from 1985 to 2025. Most recent: inspection, 3 November 2025.

Built
1979
Last inspected
3 November 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WCX2852
Flag
UNITED STATES
367160560
Maury page id
psix-50069

Inspections, by type

…with no type recorded9
Years with a record 35 calendar years (1985–2025)
The 76 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)62.4 ft × 20.0 ft × 7.5 ft
Registered tonnagegross 67 / net 45
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBREAUX'S BAY CRAFT INC · LOREAUVILLE, LA, UNITED STATES · built 1979
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPORT ARANSAS, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 9 January 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it67 - Regulatory (Subpart C or D), Gross Ton
45 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WCX2852MMSI 367160560 · active · compulsorily equipped · granted 13 January 2017, expires 24 February 2027
WDC8276MMSI 367084430 · expired · compulsorily equipped · granted 4 January 2006, cancelled 5 March 2016
WSE8974MMSI not assigned · expired · compulsorily equipped · granted 2 November 1995, cancelled 14 January 2006 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 76

3 November 2025 Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8262574
3 November 2025 Drydock Exam · Internal Structural Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8262599
16 January 2025 Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8064818
8 November 2023 Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7822342
8 November 2023 Internal Structural Exam · Administrative Inspection · COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7822345
20 March 2023 Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7653918
15 December 2022 Deficiency Check · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7609586
18 February 2022 Annual Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7398358
5 January 2022 Drydock Exam · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7376061
9 April 2021 Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7171831
27 April 2020 Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6944570
6 August 2019 Internal Structural Exam · In-Service Inspection · Simplified Stability Test · Administrative Inspection · Drydock Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6775014
14 January 2019 Administrative Inspection · Internal Structural Exam · COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6609962
14 June 2018 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6443598
10 April 2018 Deficiency Check · Hull Examination · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6389160
26 March 2018 Internal Structural Exam · Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6378943
10 April 2017 DAPI Audit · Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6121125
29 July 2016 Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5956927
3 May 2016 Internal Structural Exam · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5864196
11 April 2016 Hull Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5864830
28 October 2014 Examination of Repairs
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5013870
9 May 2012 Annual Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4444414
6 February 2009 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3413555
20 January 2009 COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3389175
2 September 2008 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3315870
30 August 2008 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3315695
8 May 2008 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3202044
28 April 2008 Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3194077
16 April 2008 Hull Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3185431
17 January 2007 COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2850315
14 March 2006 Annual Inspection · Hull Examination · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2598755
5 April 2005 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2327197
7 March 2005 Annual Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2304819
3 September 2004 Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2185752
19 August 2004 Administrative Inspection · Plan Review "T" Boat
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2178445
31 March 2004 Deficiency Check · Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2029555
23 January 2004 Deficiency Check · Annual Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1991271
4 March 2003 Deficiency Check · Annual Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1751115
4 June 2002 Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1626351
9 April 2002 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1602978
4 January 2002 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1475554
14 July 2001 Type not recorded
No type recorded · Station Port Aransas · USCG Heartland District (CGD-H) · Activity 1521945
16 February 2001 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1059383
19 April 2000 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1384413
25 January 2000 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1449414
11 January 2000 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1433581
8 June 1999 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 808393
15 April 1999 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1469261
11 March 1999 Type not recorded
No type recorded · Station Port Aransas · USCG Heartland District (CGD-H) · Activity 1510189
1 March 1999 Type not recorded
No type recorded · Station Port Aransas · USCG Heartland District (CGD-H) · Activity 1510168
19 February 1999 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1129624
19 February 1999 Type not recorded
No type recorded · Station Port Aransas · USCG Heartland District (CGD-H) · Activity 1510155
30 December 1998 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1469884
4 May 1998 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 791279
27 February 1998 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1368620
1 April 1997 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1419745
2 January 1997 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1427297
4 January 1996 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1419547
27 April 1995 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1407464
18 April 1995 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1463888
30 March 1994 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1166047
17 March 1994 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1417622
22 February 1994 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 853733
16 April 1993 Type not recorded
No type recorded · USCG Heartland District (dp) · USCG Heartland District (CGD-H) · Activity 642242
12 February 1993 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 831489
19 January 1993 Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1362687
8 November 1991 COI Inspection · Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1354113
31 October 1990 Hull Examination · Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 928716
11 December 1989 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 920216
7 November 1989 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1232098
21 November 1988 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 893764
8 November 1988 COI Inspection · Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1202940
10 November 1987 Hull Examination · Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1334339
3 November 1986 Hull Examination · Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1320870
8 November 1985 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1294613
20 August 1985 Credit Drydock
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1292468

Deficiency record · 146

09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 10 February 2025 Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. All medication in the first aid kit onboard the vessel were expired. 46CFR184.710
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 February 2025
Resolved 11 February 2025
Resolution: Captain provided photos of the new first aid kit.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 10 February 2025 Resolved
The floating waterlight must be attached around the body of the life float or buoyant apparatus by a 10 mm (3/8 inch) lanyard, resistant to deterioration from ultraviolet light, and at least 5.5 meters (18 feet) in length. The lanyard attaching the waterlights to all five life floats was approximately 6 feet long. 46CFR180.175(f)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 February 2025
Resolved 11 February 2025
Resolution: Captain provided photos of all renewed life float light lines.
05 - Radio Communications › N/A - No Subsystem › MF Radio installation
Issued 10 April 2023 Resolved
Radio transmitting and recieving installations are required on certain vessels carrying passengers. Per 47 CFR 80.1091(a)(1): ships subject to this section must be provided with: and MF installation capable of transmitting and receiving for distress and safety purposes. Vessel's MF/HF single sideband radio is incapable of receiving. Rectify to the satisfaction of the attending marine ispector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 April 2023
Resolved 14 April 2023
Resolution: MF/HF radio operational test was satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 19 December 2022 Resolved
Fire Detection: An interconnected detection and alarm system must (4) Alarm on low power. Newly installed fire/smoke detection system doesn't have the required low power alarm installed. Parts are currently on order. Install and test to the satisfaction of the attending MI. 46 CFR 181.450 (a)(4)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 December 2022
Resolution: Low voltage alarm installed to meet loss/low power alarm requirements.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 February 2022 Resolved
All cable and wire must be installed with metal supports spaced nor more than 24 inches apart and in such a manner as to avoid chaffing and other damage. Wiring runs throughout fuel tank space are currently hung by zip ties. Hang wires to the satisfation of the USCG Marine Inspector. 46 CFR 183.340(b)(4)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 March 2022
Resolved 7 March 2022
Resolution: Vessel submitted pictures of corrected wire installation.
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 18 February 2022 Resolved
All fuel tanks must be electrically banded to a common ground. Diesel tank vent did not have continuous bonding. Add common ground bonding to the satisfaction of the USCG Marine Inspector. Vessel added required bonding during inspection. 46 CFR 182.440 (b)(4)
Action required: 10 - Deficiency Rectified
Due 1 March 2022
Resolved 1 March 2022
Resolution: Vessel corrected deficiency during exam.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 April 2021 Resolved
All vessels shall be provided with bilge pumps in accordance with Table 182.25-10(a). Impeller on bilge pump exploded. 46 CFR 182-25-10(a)
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Witnessed Testing of bilge system and suction from all compartments; All Sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 April 2021 Resolved
Shutoff valves, installed so as to close against the fuel flow, shall be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank shall be operable from outside the tank compartment, preferably from an accessible position on the weather deck. 46 CFR 182.20-40(b)(3)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Reach rod secured to fuel shutoff valve and operational; All Sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 12 April 2021 Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Prior To Movement, Replace STBD side head window. 46 CFR 176.830(a)
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Window has been installed and is weathertight; All Sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 April 2021 Resolved
The individual bilge suction lines shall be led to a central control point or manifold. Each line shall be provided with a stop valve at the control point or manifold and in addition shall be provided with a check valve at some accessible point in the bilge line. A stop-check valve located at the control point or manifold will meet the requirements for both. 46 CFR 182.25010(c)
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Reach rod secured to bilge suction valve behind collision bulkhead and is operational; All Sat.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 12 April 2021 Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces. 46 CFR 182.530(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Witnessed test of engine room high water visual and audible alarms; All Sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 12 April 2021 Resolved
Penetrations and openings in watertight bulkheads in a vessel less than a 100 gross tons. (a) Penetrations and openings in watertight bulkheads must (1) Be kept as high and as far inboard as practicable; and (2) have a means to make them watertight. 46 CFR 171.114(a)(1)(2)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2021
Resolution: Penetrations have been secured and are watertight; All Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 12 April 2021 Resolved
Stowage of life floats and buoyant apparatus. (b) The float-free link required by § 180.130(a)(1) must be: (1) Certified to meet § 160.073 in sub chapter Q of this chapter, or other standard specified by the Commandant; (2) Of proper strength for the size of the life float or buoyant apparatus as indicated on its identification tag. 46 CFR 180.137(b)(1)(2)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 April 2021
Resolution: New weak links with legible tags have been installed on all (05) life floats, 4x12 person and 1x6 person; All Sat.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 12 April 2021 Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. Periodic servicing of hydrostatic release units. (b) Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. Vessel restricted from operating beyond 3NM from the coastline. 46 CFR 185.740(b)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 April 2021
Resolution: A valid HRU has been installed on the EPIRB; All Sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 27 April 2020 Resolved
A vessel must comply with the applicable requirements for any radio and Electronic Position Indicating Radiobeacon (EPIRB) installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Vessels Radio safety Certificate was found expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2020
Resolved 15 May 2020
Resolution: FCC Inspector issue new certificate to vessel.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 2 April 2018 Resolved
FWD void space dewatering pump pipe check valve installed upside down.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 April 2018
Resolved 2 April 2018
Resolution: Removed and reinstalled check valve properly to allow suction of water from void space.
Fire Fighting › Fire Hoses › Connections
Issued 2 April 2018 Resolved
Fire hose nozzle connection fitting was non-metallic construction. Required to be of brass, copper, or equivalent metal.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 April 2018
Resolved 2 April 2018
Resolution: Vessel representative removed and repalced fire hose fitting with brass material.
Communications › Radio Communications › VHF Radiotelephone
Issued 2 April 2018 Resolved
VHF/MF radio not inspected on Communications Act Safety Radiotelephony Certificate. Vessel required to have VHF/MF radio certified. Vessel restricted to not more than 20nm from shore.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 April 2018
Resolved 15 June 2018
Resolution: Vessel fixed HF radio and recieved a new radiotelephoney Safety Certificate
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 11 April 2017 Resolved
Repair exhaust leak on PORT engine exhaust piping. Temporary repair has been completed until new material is ordered to effect premanent repairs. Prior to commencing any hot work, clean area of any oil residue.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 19 April 2017
Resolved 20 April 2017
Resolution: Replacement of Port exhaust piping completed; test satisfactory.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 10 April 2017 Resolved
Prior to vessel movement & carrying passengers repair exhaust leaks on PORT & STBD engines exhaust piping. Prior to commencing any hot work clean area of any oil residue.
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 April 2017
Resolved 11 April 2017
Resolution: STBD exhaust repaired & tested satisfactory; Temporary repair on PORT exhaust - NEW 835 to follow.
Electrical › Electric Generation Source (service) › Generator
Issued 10 April 2017 Resolved
Oil on vessel's prime mover for generator determine cause and repair.
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 April 2017
Resolved 11 April 2017
Resolution: Third party technician inspected generator and determined oil was from a loose oil filter.
Engineering › Diesel Engine (propulsion-electric) › Governor
Issued 8 February 2017 Resolved
Main Propulsion machinery installed must be suitable for the operation that it is intended and must be maintained in such a manner to protect against failure. Port main engine throttle cable to governor is held down by plastic tie because original brackets cable sleeve is separated at end of cable.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 February 2017
Resolved 9 February 2017
Resolution: Deficiency cleared to the satisfaction of the attending marine inspector.
Construction/Loadline › Hull › Hull Plating
Issued 11 April 2016 Resolved
All zincs are less than 50% remaining. Replace all zincs.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: All zincs were replaced.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 11 April 2016 Resolved
Stbd shaft cutlass bearing worn beyond limits. Replace stbd shaft cutlass bearing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Stbd shaft cutlass bearing replaced.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 11 April 2016 Resolved
Stbd prop key cracked. Replace stbd prop key.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: stbd prop key replaced with new.
Engineering › Bilge Water Management System › Piping
Issued 11 April 2016 Resolved
Spool pieces on port and stbd side engine room wasted thru. Repair/replace 2 spool pieces.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Both spool pieces were replaced with new.
Construction/Loadline › Hull › Weld
Issued 11 April 2016 Resolved
Gouge/weld marked welds on 3 frames on port side aft engine room and marked welds on 3 frames on stbd side aft engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Stitch welding gouged and renewed at marked locations in engine room.
Construction/Loadline › Hull › Weld
Issued 11 April 2016 Resolved
Apply 4 missing stitch welds in #2 forward space.
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Proper stitch welds applied to missing places in #2 space forward.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 11 April 2016 Resolved
Unauthorized clad welding on bottom both sides of integral fuel tanks. Remove clad welding, and properly repair bottom sides of fuel tank.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Proper repairs made to both bottom sides of integral fuel tank. Hydrostatic test of tank performed satisfactory.
Construction/Loadline › Hull › Weld
Issued 11 April 2016 Resolved
Gouge/Weld 3 broken stitch welds in #2 space forward.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: 3 cracked welds in #2 space forward repaired.
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 9 May 2012 Resolved
Replace retroreflective tape on 10 lifejackets.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 9 May 2012
Resolution: Tape was replaced as indicated
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 9 May 2012 Resolved
Replace 05 lifejackets.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 9 May 2012
Resolution: Replaced 05 lifejackets as required and properly labeled.
Lifesaving › Lifefloat › Lifeline
Issued 9 May 2012 Resolved
Provide new line for starboard/aft lifefloat meeting 46 CFR 180.175(e)(3)(ii)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 9 May 2012
Resolution: Line was replaced and inspected as required.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 9 May 2012 Resolved
Provide FCC Safety Certificate as required 47 CFR 80.401
Action required: 705 - Other - as specified
Resolved 9 May 2012
Resolution: Certificate was found and provided for inspection.
Navigation › Piloting/Steering › Marine Charts
Issued 9 May 2012 Resolved
Provide corrected charts (updated) 46 CFR 184.420
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 9 May 2012
Resolution: New charts were provided at time of inspection.
Fire Fighting › Fire Hoses › Condition
Issued 9 May 2012 Resolved
Replace 01 (50 ft) length of Firehose.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 9 May 2012
Resolution: New hose was provided.
Documentation › Logs/Records › Logbook (official)
Issued 20 January 2009 Resolved
Maintain proper log entries for training and emergency drills.
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 February 2009
Resolved 6 February 2009
Resolution: Logs started.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 January 2009 Resolved
Insulate and re-attach wires for hydraulic pump mounted on forward end of port main engine.
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 February 2009
Resolved 6 February 2009
Resolution: Wires are attached and insulated.
Lifesaving › Lifefloat › Markings
Issued 20 January 2009 Resolved
Repair or replace 12 person life float. Total persons on board limited to 39.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 February 2009
Resolved 6 February 2009
Resolution: 12-person life float has been repaired.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 20 January 2009 Resolved
Replace 4 adult PFDs, total passenger count reduced to 47.
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 February 2009
Resolved 6 February 2009
Resolution: Four adult PFD''s have been added.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 20 January 2009 Resolved
Install proper flame screen (30X30 mesh) on all fuel compartment vents.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 19 February 2009
Resolved 6 February 2009
Resolution: Flame screens have been replaced.
Stability › Weathertight Integrity › General
Issued 20 January 2009 Resolved
Ensure both doors leading to the passenger cabin are weather tight.
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 February 2009
Resolved 6 February 2009
Resolution: Both doors leading to the passenger cabin are weather tight.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 20 January 2009 Resolved
Post current Certificate of Documentation.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 20 January 2009
Resolution: Current COD was posted.
Lifesaving › Buoyant Apparatus › Marking
Issued 20 January 2009 Resolved
Mark hydrostatic release date for EPIRB.
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 January 2009
Resolved 20 January 2009
Resolution: Hydrostatic release date marked on EPIRB.
Lifesaving › Hand Flares › Not on Board
Issued 20 January 2009 Resolved
6 additional red hand flares are required.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 20 January 2009
Resolution: 6 additional red hand flares provided.
Lifesaving › Lifebuoys › Immediately Available
Issued 20 January 2009 Resolved
Remove zip ties securing the the ring bouy float lights.
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 January 2009
Resolved 20 January 2009
Resolution: Zip ties removed
Electrical › Lighting (service) › Switch
Issued 20 January 2009 Resolved
Remove out of service light switch hanging from engine room overhead.
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 January 2009
Resolved 20 January 2009
Resolution: Light switch removed.
Lifesaving › Lifefloat › Serviceable
Issued 28 April 2008 Resolved
Owner/operator must replace (2) lifefloats. Vessel is not to carry more than 30 passengers until damage floats are replaced.
Action required: 705 - Other - as specified
Resolved 8 May 2008
Resolution: Replaced with (2) new lifeboats.
Lifesaving › Buoyant Apparatus › Serviceable
Issued 28 April 2008 Resolved
Replace damaged life ring.
Due 30 April 2008
Resolved 30 April 2008
Resolution: Replaced damaged life ring with new life ring (on the spot correction).
Electrical › Electric Supply System (service) › Cable
Issued 17 January 2007 Resolved
ENGINE ROOM - Re-attach wire run into fixed clamping arrangement IAW Sub Chapter J
Action required: 705 - Other - as specified
Due 17 March 2007
Resolved 14 March 2007
Electrical › Electric Supply System (service) › Cable
Issued 17 January 2007 Resolved
TANK COMPARTMENT - Re-attach wire run into fixed clamping arrangement IAW Sub Chapter J
Action required: 705 - Other - as specified
Due 17 March 2007
Resolved 14 March 2007
Electrical › Electric Supply System (service) › Cable
Issued 17 January 2007 Resolved
ENGINE ROOM - Remove dead end wires from engine room.
Action required: 705 - Other - as specified
Due 17 March 2007
Resolved 14 March 2007
Communications › Audible Communications › Horn/Whistle
Issued 17 January 2007 Resolved
Repair ships horn
Action required: 705 - Other - as specified
Due 17 March 2007
Resolved 14 March 2007
Construction/Loadline › Hull › Bottom Plating
Issued 17 January 2007 Resolved
Crop & Re-new Aluminum corrosion in rudder room on starboard side at next haul out in March.
Action required: 705 - Other - as specified
Due 17 March 2007
Resolved 14 March 2007
Engineering › Bilge Water Management System › Valve
Issued 17 January 2007 Resolved
Repair Valve handle for collision bulkhead shutoff and re-attach reach rod.
Action required: 705 - Other - as specified
Due 17 March 2007
Resolved 14 March 2007
Fire Fighting › Remote Fuel Shutoff › General
Issued 14 March 2006 Resolved
Repair broken fuel shutoff on the port side
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 30 March 2006
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 14 March 2006 Resolved
Gouge and re-weld cracks in anchor bracket
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 30 March 2006
Construction/Loadline › Structures › Superstructure
Issued 14 March 2006 Resolved
Replace cracked bridge window port side
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 10 April 2006
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 14 March 2006 Resolved
Replace forward ring life buoy line with dark color line
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 30 March 2006
Lifesaving › Lifefloat › Markings
Issued 14 March 2006 Resolved
Remark all life floats with vessel name "NEW KINGFISHER" including marking attached oars
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 30 March 2006
Personnel › Training › First Aid/CPR
Issued 7 March 2005 Resolved
Provide CPR training for 50% of the crew.
Due 7 April 2005
Resolved 5 April 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 March 2005 Resolved
Remove all dead end wires from under console. Permanently mount all wiring/cables in void compartment and e/r.
Due 7 April 2005
Resolved 5 April 2005
Fire Fighting › Means of Escape › Escape Route Signs
Issued 7 March 2005 Resolved
Mark all emergency exits "Emergency Exit - Keep Clear".
Due 7 April 2005
Resolved 5 April 2005
Construction/Loadline › Hull
Issued 31 March 2004 Resolved
Clean bilge in way of keel in MSD space for further inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 April 2004
Electrical › Electrical Distribution System (service) › Wiring
Issued 31 March 2004 Resolved
Rewire bilge alarms in MSD space and collision bulkhead space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 April 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 31 March 2004 Resolved
Repack bulkhead penetrations between MSD space and engine room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 April 2004
Construction/Loadline › Hull
Issued 31 March 2004 Resolved
Remove anchor line and plywood deck in forward peak for further inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 April 2004
Construction/Loadline › Hull
Issued 31 March 2004 Resolved
Proceed with bottom plate renewal on starboard side as proposed by shipyard/owner.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 April 2004
Engineering › Shafting/Propeller Arrangements
Issued 31 March 2004 Resolved
Renew clamps and nonmetallic piping in shaft logs at penetrations through engine room aft bulkhead.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 April 2004
Construction/Loadline › Hull
Issued 31 March 2004 Resolved
Clean the following areas for further inspection; bottom plate areas beneath exhaust risers, beneath port forward battery box, port side penetrations in way of openings.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 April 2004
Construction/Loadline › Penetrations
Issued 31 March 2004 Resolved
Remove sea valve bonnet for bilge R/W, fire pump sea suction for further inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 April 2004
Engineering › Steering Gear System › Rudder Bearing
Issued 31 March 2004 Resolved
Renew bearing for port rudder post as proposed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 April 2004
Communications › Internal Communications System
Issued 23 January 2004 Resolved
Repair public address system and prove proper operation.
Action required: 705 - Other - as specified
Due 23 February 2004
Resolved 11 February 2004
Communications › Radio Communications
Issued 23 January 2004 Resolved
Prove satisfactory EPIRB Battery by renewing battery date. LEGACY COMPONENT DESC: EPIRB
Action required: 705 - Other - as specified
Due 4 April 2004
Resolved 14 May 2004
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 23 January 2004 Resolved
Provide updated Certificate of Documentation.
Action required: 705 - Other - as specified
Due 23 February 2004
Resolved 23 January 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 23 January 2004 Resolved
Repack stuffing tube on port side engine room bulkhead.
Action required: 705 - Other - as specified
Due 23 February 2004
Resolved 11 February 2004
Lifesaving › Rigid Liferafts › Markings
Issued 23 January 2004 Resolved
Stencil oars on all life floats.
Action required: 705 - Other - as specified
Due 23 February 2004
Resolved 11 February 2004
Electrical › Lighting (service)
Issued 23 January 2004 Resolved
Remount/ repair or remove lighting fixture in aft compartment.
Action required: 705 - Other - as specified
Due 23 February 2004
Resolved 11 February 2004
Electrical › Lighting (service)
Issued 23 January 2004 Resolved
Repair or remove lighting fixture in MSD space.
Action required: 705 - Other - as specified
Due 23 February 2004
Resolved 11 February 2004
Deck/Cargo › Mooring/Anchoring
Issued 23 January 2004 Resolved
Repair/replace hydraulic line to anchor windlass in MSD space.
Action required: 705 - Other - as specified
Due 23 February 2004
Resolved 11 February 2004
Accommodation/Occupational Safety › Washroom/Toilet
Issued 23 January 2004 Resolved
Replace PVC pipe from sea chest in MSD space with galvanized pipe or attach reach rod to sea chest valve.
Action required: 705 - Other - as specified
Due 23 February 2004
Resolved 11 February 2004
Construction/Loadline › Hull
Issued 23 January 2004 Resolved
Clean all bilges especially in way of keel for futher inspection.
Action required: 705 - Other - as specified
Due 23 February 2004
Resolved 11 February 2004
Lifesaving › Lifejacket/PFD (Type I)
Issued 23 January 2004 Resolved
Replace retro tape to 15 life jackets and 6 clips to life jackets as indicated. LEGACY COMPONENT DESC: Condition
Action required: 705 - Other - as specified
Due 23 February 2004
Resolved 23 February 2004
Resolution: Replaced 6 lifejackets that had corroded clips.
Documentation › Certificates/Documents
Issued 4 March 2003 Resolved
Post COI and Stability Letter iaw 46 CFR 176.302/306.
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Documentation › Certificates/Documents
Issued 4 March 2003 Resolved
Provide updated FCC Safety Certificate.
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Documentation › Certificates/Documents
Issued 4 March 2003 Resolved
Provide updated CPR certification for 50% of crew.
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Engineering › Bilge Water Management System
Issued 4 March 2003 Resolved
Repair visual alarm for void bilge alarm.
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Accommodation/Occupational Safety › Medical/First Aid
Issued 4 March 2003 Resolved
Provide Coast Guard approved first aid kit. LEGACY COMPONENT DESC: Medicine Chest
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Navigation › Piloting/Steering
Issued 4 March 2003 Resolved
Update nautical publications iaw 46 CFR 184.420.
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 14 May 2004
Communications › Radio Communications
Issued 4 March 2003 Resolved
Prove proper operation of SSB radio.
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Communications › Internal Communications System
Issued 4 March 2003 Resolved
Prove proper operation of public address system.
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Construction/Loadline › Structures
Issued 4 March 2003 Resolved
Repair/replace cracked window on starboard bridge window.
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 14 May 2004
Construction/Loadline › Structures
Issued 4 March 2003 Resolved
Replace safety lanyards for lazarette and tank void hatch covers. LEGACY COMPONENT DESC: Scuttle
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Construction/Loadline › Structures
Issued 4 March 2003 Resolved
Replace gaskets for lazarette and engine room hatch cover. LEGACY COMPONENT DESC: Scuttle
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Construction/Loadline › Structures
Issued 4 March 2003 Resolved
Repair closure (hinge) on engine room hatch as original. LEGACY COMPONENT DESC: Machinery Space Opening
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Construction/Loadline › Hull
Issued 4 March 2003 Resolved
Gouge and reweld fracture on forward edge port strut. LEGACY COMPONENT DESC: Strut/Cross Tie
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Engineering › Bilge Water Management System
Issued 4 March 2003 Resolved
Replace PVC piping with approved metallic material. LEGACY COMPONENT DESC: Piping
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Pollution Prevention/Response › Prevention Equipment
Issued 4 March 2003 Resolved
Install Marine Sanitation Device as per 33 CFR 159.7 LEGACY COMPONENT DESC: Marine Sanitation Device, Type III
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Lifesaving › Rigid Liferafts
Issued 4 March 2003 Resolved
Provide Coast Guard approved weak link for life floats. LEGACY COMPONENT DESC: Weak Link
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Lifesaving › Rigid Liferafts
Issued 4 March 2003 Resolved
Repair holes in 6 man life float, replace retro tape, and make float free.
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Lifesaving › Rigid Liferafts
Issued 4 March 2003 Resolved
Replace life float painter with UV resistant poly line.
Action required: 705 - Other - as specified
Due 4 April 2003
Resolved 4 September 2003
Construction/Loadline › Hull
Issued 19 December 2001 Resolved
ARREST INTERIOR CORROSION IN VICINITY OF #3 COMPARTMENT PORT SIDE KEEL COOLER, E/R STARBOARD SIDE AFT OF ENGINE VICINITY OF CHINE. LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Due 19 January 2002
Resolved 25 January 2002
Pollution Prevention/Response › Prevention Equipment
Issued 19 December 2001 Resolved
RENEW 2 FAULTY OVERBOARD SEWAGE VALVES AND PROVIDE MEANS TO LOCK VALVES WITHIN 3 NM OF SHORE. LEGACY COMPONENT DESC: Sewage System Valve
Condition: Unknown
Due 19 January 2002
Resolved 25 January 2002
Communications › Alarms/Indicators
Issued 19 December 2001 Resolved
PERMANENTLY INSTALL BILGE ALARM WIRING IN E/R. LEGACY COMPONENT DESC: Bilge Alarm
Condition: Improper Installation
Due 19 December 2001
Resolved 19 December 2001
Communications › Alarms/Indicators
Issued 19 December 2001 Resolved
REINSTALL STBD JACKET WATER SENSOR ALARM AND DEMONSTATE PROPER FUNCTION OF ALARM CIRCUIT. LEGACY COMPONENT DESC: High Water Alarm
Condition: Unknown
Due 19 January 2002
Resolved 25 January 2002
Electrical › Electrical Distribution System (service)
Issued 19 December 2001 Resolved
MOUNT ALTERNATOR SWITCH IN WATER TIGHT BOX LEGACY COMPONENT DESC: Switch
Condition: Improper Installation
Due 19 January 2002
Resolved 25 January 2002
Engineering › Steering Gear System
Issued 19 December 2001 Resolved
REPAIR OIL LEAK ON STEERING SYSTEM IN STEERING ROOM. LEGACY COMPONENT DESC: Hydraulic Hose
Condition: Unknown
Due 19 January 2002
Resolved 25 January 2002
Lifesaving › Launching Appliances
Issued 19 December 2001 Resolved
PROVIDE WEAK LINK FOR 6 MAN LIFE FLOAT AND PROPERLY STOW ALL OTHER LIFE FLOATS. LEGACY COMPONENT DESC: Release Mechanism
Condition: Unknown
Due 19 December 2001
Resolved 19 December 2001
Engineering › Steering Gear System
Issued 19 December 2001 Resolved
SECURE STERRING LINKAGE IAW 46CFR182.610 LEGACY COMPONENT DESC: Linkage
Condition: Unknown
Due 19 January 2002
Resolved 25 January 2002
Stability › Incline Test
Issued 19 December 2001 Resolved
POST STABILITY LETTER
Condition: Unknown
Due 19 January 2002
Resolved 25 January 2002
Engineering › Fuel Oil Service System
Issued 19 December 2001 Resolved
RE-ATTACH REMOTE FUEL CUT OFF REACH RODS ARE ATTACHED TO VALVE HANDLES. LEGACY COMPONENT DESC: Valve
Condition: Unknown
Due 19 December 2001
Resolved 19 December 2001
Construction/Loadline
Issued 25 January 2000 Resolved
Stencil forward collision bulkhead reach rod.
Condition: Unknown
Due 25 January 2000
Resolved 25 January 2000
Navigation
Issued 25 January 2000 Resolved
Repair/Renew hydraulic hose fittings located in forward peak. (hoses are for anchor winch)
Condition: Unknown
Due 25 January 2000
Resolved 25 January 2000
Navigation
Issued 25 January 2000 Resolved
Provide Current copies of tide tables and coastal pilot publicatios I.A.W. 46 CFR 184.420
Condition: Unknown
Due 25 January 2000
Resolved 25 January 2000
Engineering
Issued 25 January 2000 Resolved
Provide machinery guards for exposed belts located on front of both main engines.
Condition: Unknown
Due 25 January 2000
Resolved 25 January 2000
Accommodation/Occupational Safety
Issued 25 January 2000 Resolved
Renew rubber hose on sink drain overboard piping located in Port center compartment. (Port side shell overboard line)
Condition: Unknown
Due 25 January 2000
Resolved 25 January 2000
Electrical
Issued 25 January 2000 Resolved
Secure overhead wiring through out vessel every 24" with metal clamps.
Condition: Unknown
Due 25 January 2000
Resolved 25 January 2000
Navigation
Issued 25 January 2000 Resolved
Repair leaky seal on steering ram located in lazarette.
Condition: Unknown
Due 25 January 2000
Resolved 25 January 2000
Lifesaving
Issued 25 January 2000 Resolved
Restencil life floats and ring buoy with vessel's name. I.A.W. 46 CFR 185.604 (a) (e) & 180.604 (b) (i).
Condition: Unknown
Due 25 January 2000
Resolved 25 January 2000
Engineering
Issued 25 January 2000 Resolved
Provide exhaust blankets for both main diesel engine exhasut systems.
Condition: Unknown
Due 25 January 2000
Resolved 25 January 2000
Lifesaving
Issued 8 June 1999 Resolved
PROVIDE ON BOARD A MEANS FOR SAFELY SECURING THE RESCUER DURING THE MAN OVERBOARD ATTEMPT FROM THE RESCUE PLATFORM (SAFETY HARNESS).
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Lifesaving
Issued 8 June 1999 Resolved
PROVIDE A MEANS FOR TRANSFERRING A PERSON WITH A BACK, NECK OR ANY INJURY FROM WATER/PLATFORM KEEPING TO A MINIMUM AGGREVATION OF THE INJURY.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Lifesaving
Issued 19 February 1999 Resolved
PROVE THAT VESSEL IS SUFFICIENTLY MANEUVERABLE, ARRANGED AND EQUIPPED TO ALLOW THE CREW TO RECOVER A HELPLESS PERSON FROM THE WATER.
Condition: Unknown
Due 19 February 1999
Resolved 19 February 1999
Lifesaving
Issued 30 December 1998 Resolved
REPLACE WATERLIGHT LINE ON FLOATS AS NEEDED.
Condition: Unknown
Due 31 December 1998
Resolved 4 January 1999
Navigation
Issued 30 December 1998 Resolved
TIGHTEN PORT STEERING/RUDDER PACKING GLAND.
Condition: Unknown
Due 30 December 1998
Resolved 30 December 1998
Unknown
Issued 30 December 1998 Resolved
PLACE ON BOARD 46 CFR 166-199 AT LEAST 1998 EDITION.
Condition: Unknown
Due 30 December 1998
Resolved 30 December 1998
Lifesaving
Issued 30 December 1998 Resolved
LABEL ALL FLOATS, AND FLOAT LIGHTS, WITH VESSELS NAME AND HOLDING CAPACITY.
Condition: Unknown
Due 31 December 1998
Resolved 4 January 1999
Lifesaving
Issued 30 December 1998 Resolved
PROVE PROPER OPERATION OF EPIRB.
Condition: Unknown
Due 31 December 1998
Resolved 4 January 1999
Navigation
Issued 30 December 1998 Resolved
PROVE PROPER OPERATION OF SINGLE SIDE BAND RADIO.
Condition: Unknown
Due 31 December 1998
Resolved 4 January 1999
Navigation
Issued 27 February 1998 Resolved
Install light on compass as per 46 CFR 184.402.
Condition: Unknown
Due 27 February 1998
Resolved 4 March 1998
Engineering
Issued 27 February 1998 Resolved
Install hand operated shutoff valves in the fuel system located in the vicinity of each engine to operate as fuel shut off valves as per 46 CFR 182.455.
Condition: Unknown
Due 27 February 1998
Resolved 4 March 1998
Engineering
Issued 27 February 1998 Resolved
Repair port main engine shutdown device so it operates from the bridge as per 46 CFR 176.804.
Condition: Unknown
Due 27 February 1998
Resolved 4 March 1998
Construction/Loadline
Issued 27 February 1998 Resolved
Repair forepeak bilge suction valve so the remote operation functions properly as per 46 CFR 182.510.r
Condition: Unknown
Due 27 February 1998
Resolved 4 March 1998
Fire Fighting
Issued 27 February 1998 Resolved
Inspect all portable fire extinguishers before vessel sails with passengersas per 46 CFR 176.810.
Condition: Unknown
Due 27 February 1998
Resolved 4 March 1998
Documentation
Issued 27 February 1998 Resolved
Apply for and provide proof of FCC Radio Operators Permit as per 47 CFR 81.55._x001C_ _x001C_ x
Condition: Unknown
Due 27 February 1998
Resolved 4 March 1998
Documentation
Issued 27 February 1998 Resolved
Begin and maintain ships log to include monthly training of crew members infire, man overboard and abandon ship, include number of passengers on each voyage and time departed/time returned from port. inslude EPIRB test log_x001C_ as per 46 CFR 185.420 & 185.728.
Condition: Unknown
Due 27 February 1998
Resolved 4 March 1998
Lifesaving
Issued 27 February 1998 Resolved
Replace vessels lifering and outfit as per 46 CFR 180.70.
Condition: Unknown
Due 27 February 1998
Resolved 4 March 1998
Fire Fighting
Issued 27 February 1998 Resolved
Install smoke detectors in passenger spaces as per 46 CFR 181.400.
Condition: Unknown
Due 27 February 1998
Resolved 4 March 1998
Construction/Loadline
Issued 27 February 1998 Resolved
Install lanyards on all flush deck hatches as per 46 CFRb179.360.
Condition: Unknown
Due 27 February 1998
Resolved 4 March 1998
Lifesaving
Issued 18 April 1995 Resolved
INSTALL APPROVED FLOAT FREE LINK ON VESSEL'S LIFE FLOATS.
Condition: Unknown
Due 9 May 1995
Resolved 9 May 1995
Lifesaving
Issued 18 April 1995 Resolved
INSTALL LIGHT ON PFD WITH MISSING LIGHT.
Condition: Unknown
Due 9 May 1995
Resolved 9 May 1995
Lifesaving
Issued 18 April 1995 Resolved
RENEW OUTDATED HAND FLARE.
Condition: Unknown
Due 9 May 1995
Resolved 9 May 1995
Accommodation/Occupational Safety
Issued 17 March 1994 Resolved
Replace cracked glass in starboard window on bridge
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Navigation
Issued 17 March 1994 Resolved
Repiar and prove proper operation of vessel radar.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Lifesaving
Issued 17 March 1994 Resolved
Reduce number of passengers to 38 until 11 aproved PFD's are added to vessel to replace PFD's removed from service
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Lifesaving
Issued 8 November 1988 Resolved
PROPERLY ATTACH THE FOUR WEAK-LINKS TO VESSEL AND LIFEFLOATS. PROVIDE EVIDENCE THAT WEAK-LINKS ARE OF PROPER BREAKING STRENGTH.
Condition: Unknown
Due 8 November 1988
Resolved 8 November 1988

Casualty record · 1

6 July 2013Routine · role: Involved in a Marine Casualty · 1 injured · activity 4646964
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.