Records from 2016 to 2026. Most recent: inspection, 25 February 2026.
Inspection history · 11
25 February 2026
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8314233
16 January 2025
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8064461
22 February 2024
COI Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7857106
8 March 2023
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7637930
22 February 2022
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7391838
12 February 2021
Annual Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7140002
23 January 2020
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6894759
26 February 2019
Drydock Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6630272
20 February 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6337179
21 February 2017
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6087703
23 February 2016
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5817329
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 February 2022
Resolved
This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems, steering apparatus, and associated safety systems. Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personal injury.
Transom has cracks above waterline.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 March 2022
Resolved 14 March 2022
Resolution: Repairs were made to the satisfaction of the marine inspector.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 22 February 2022
Resolved
46 CFR 182.520 (f) A flexible tube or hose may be used instead of fixed pipe for the discharge line of a submersible electric bilge pump provided the hose or tube does not penetrate any required watertight bulkheads and is: (1) Of good quality and of substantial construction, suitable for the intended use.
flexible bilge hose has dry rot.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 March 2022
Resolved 14 March 2022
Resolution: Bilge hose was renewed.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 5 March 2021
Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew.
Contents of first aid kit were expired.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 March 2021
Resolved 5 March 2021
Resolution: Expired contents were replaced on the spot
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 March 2021
Resolved
child life jackets equal to 10% of the number of persons permitted on board must be provided as necessary. 46CFR180.71(b)
vessel did not have enough suitable child life jackets on board
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 March 2021
Resolved 5 March 2021
Resolution: vessel replaced worn child life jackets on the spot
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 21 February 2017
Resolved
Cracked weld found at the dbase of the stbd fwd most stanchion of the deck rail.
Action required: 705 - Other - as specified
Due 28 February 2017
Resolved 28 February 2017
Resolution: Repaired to the satisfaction of the lead marine inspector.
Documentation › Markings/Placards › Lifejacket Placard
Issued 21 February 2017
Resolved
Life jacket donning instructions were faded and unreadable.
Action required: 705 - Other - as specified
Due 28 February 2017
Resolved 28 February 2017
Resolution: Life jacket donning placard was replaced with a new one.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 21 February 2017
Resolved
Nav lights were inoperable.
Action required: 705 - Other - as specified
Due 21 March 2017
Resolved 28 February 2017
Resolution: Nav lights were repaired to the satisfaction of the lead marine inspector.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 21 February 2017
Resolved
Anchor was missing.
Action required: 705 - Other - as specified
Due 28 February 2017
Resolved 28 February 2017
Resolution: Anchor was installed onboard the vessel.
Construction/Loadline › Hull › Weld
Issued 23 February 2016
Resolved
Cracked weld in stbd bow handrail. Corrected on the spot.
Action required: 705 - Other - as specified
Due 26 February 2016
Resolved 24 February 2016
Resolution: Repairs made to stisfaction of attending Marine Inspector.