Records from 1982 to 2025. Most recent: inspection, 21 July 2025.
Inspection history · 90
21 July 2025
Damage Survey · Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8191201
9 July 2025
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8204559
6 June 2025
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8153524
2 January 2025
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8057097
27 December 2024
In-Service Inspection · Administrative Inspection · Internal Structural Exam · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8051310
21 September 2024
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8015999
15 September 2024
Deficiency Check · Administrative Inspection · Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8002867
21 January 2024
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8009373
17 November 2023
Drydock Exam · Deficiency Check · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7825531
31 August 2023
Administrative Inspection · Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7782080
4 October 2022
COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7568220
5 January 2022
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7375854
4 November 2021
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7345354
16 December 2020
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7107946
7 January 2020
Annual Inspection · In-Service Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6884607
17 September 2019
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6814022
13 December 2018
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6591746
28 February 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6363422
12 December 2017
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6323037
13 November 2017
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6306222
28 September 2017
Drydock Exam · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6277335
5 April 2017
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6118591
24 January 2017
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6076403
4 January 2017
Examination of Repairs · Administrative Inspection · Damage Survey · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6059028
7 December 2015
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5769446
22 September 2015
Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5726040
16 May 2012
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4313261
15 February 2012
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4244721
10 January 2012
Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4221325
16 February 2011
Annual Inspection
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 3948189
4 March 2010
Hull Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3696330
10 December 2009
In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3648520
4 February 2009
Deficiency Check · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3401624
8 January 2008
Administrative Inspection · Hull Examination · Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3126982
2 November 2007
Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3091898
2 February 2007
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2867937
16 February 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2586271
17 January 2006
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2570491
4 January 2006
Re-Inspection · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2560247
15 November 2005
Drydock Extension
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2535263
18 February 2005
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2295153
14 May 2004
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2070630
14 January 2004
Internal Structural Exam · Re-Inspection · Examination of Repairs · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1984853
18 November 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1950173
17 November 2003
Administrative Inspection
Administrative · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1949116
3 November 2003
Administrative Inspection
Administrative · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1941391
7 November 2002
COI Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1701729
29 November 2001
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1462285
15 November 1999
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1441581
17 December 1998
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 813256
2 December 1997
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1375193
12 June 1997
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 778145
22 November 1996
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1467945
13 February 1996
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 881883
6 December 1995
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1464616
29 November 1995
Inclining Experiment
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1411194
8 June 1994
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1321623
20 December 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 650086
3 November 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 76087
3 November 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 91657
3 November 1993
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 227844
11 August 1993
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1154574
19 July 1993
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1444741
7 August 1992
Hull Examination · COI Inspection · Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1366743
23 March 1992
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 943549
23 January 1992
Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1262418
22 January 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 80804
16 September 1991
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 940957
20 May 1991
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 917038
5 April 1991
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1232733
31 October 1990
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1244155
9 May 1990
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1237462
15 December 1989
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1219601
15 May 1989
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1034774
9 December 1988
Drydock Extension
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1209981
9 December 1988
Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1349973
27 June 1988
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1208389
11 March 1988
Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 990514
9 July 1987
Hull Examination · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1031631
30 May 1987
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1022183
17 March 1987
Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1323479
6 March 1986
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1296738
7 October 1985
Credit Drydock
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1296541
3 April 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1292012
21 March 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 980617
6 March 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1286959
9 March 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 971333
9 March 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 973196
7 March 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 973749
18 March 1982
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 963808
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 July 2025
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Vessel reported 03 inoperable main engines after striking an unknown object in the ship channel. Repair or replace prior to the carriage of passengers/cargo.
46 CFR 182.100
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 September 2025
Resolution: Vessel is being totaled due to cost of repairs and placed in inactive status.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 6 January 2025
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces: A space with a through-hull fitting below the deepest load waterline, such as a lazarette, A machinery space bilge, bilge well, shaft alley bilge, or other spaces subject to flooding from sea water piping within the space; and A space with a non-watertight closure, such as a space with a non-watertight hatch on the main deck.
Vessel's high level switch raised to a level that allows a significant amount of water to gather in every bilge space without alarm at the operating station. Lower bilge high level switch to the satisfaction of the attending USCG Marine Inspector (MI).
46 CFR 182.530
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2025
Resolved 23 January 2025
Resolution: Vessel lowered bilge high level switch to the satisfaction of the MI.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 January 2025
Resolved
The bilge suctions shall be fitted with suitable strainers having an open area not less than three times the area of the bilge pipe. Vessel does not have any strainers on bilge suction lines. Install strainers to the satisfaction of USCG MI.
46 CFR 182.25-5 (b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2025
Resolved 23 January 2025
Resolution: Vessel installed strainers on all bilge suction piping.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 6 January 2025
Resolved
In addition to meeting § 180.130, each life float and buoyant apparatus must be stowed as required under this section, the float-free link required by § 180.130(a)(1) must be:(1) Certified to meet § 160.073 in subchapter Q of this chapter, or other standard specified by the Commandant; Vessel's float-free link missing identification tag certifying that it meets required standard. Replace float-free link to the satisfaction of the attending USCG MI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2025
Resolved 23 January 2025
Resolution: Vessel installed new float free link.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 6 January 2025
Resolved
Each floating waterlight must be approved in accordance with § 161.010 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.110. Vessel's floating waterlight had only 1 of 3 clips on the top of the light that were operable. Replace floating waterlight to the satisfaction of the attending USCG MI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2025
Resolved 23 January 2025
Resolution: Vessel installed new floating waterlight.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 January 2025
Resolved
The alcohol testing of each individual must be conducted within 2 hours of when the SMI occurred, unless precluded by safety concerns directly related to the incident. Vessel did not have any way to conduct alcohol testing available. Order alcohol testing equipment for the vessel to the satisfaction of the attending MI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2025
Resolved 23 January 2025
Resolution: Vessel received new alcohol testing strips.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 October 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: (a) Provide services necessary for safety under normal and emergency conditions. After completing sea trials and returning to the mooring area, vessel lost power. The vessel was on the #1 generator and then switched to the #2 generator to regain power to necessary services. Identify cause of power failure and repair or replace to the satisfaction of the attending Marine Inspector.
**Vessel is restricted as follows: Prior to carrying Passengers and conducting commercial operations. - 46 CFR 183.200(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 October 2024
Resolution: Vessel replaced fuel filter and refueled.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 September 2024
Resolved
When operating a vessel on a body of water where the discharge of untreated sewage is prohibited by the Environmental Protection Agency under 40 CFR 140.3, the operator must secure each Type III device in a manner which prevents discharge of sewage.
Vessel's overboard sewage discharge valve is not fully secured nor fully closed. Sewage was slowly discharging on the side shell/skin of the vessel. The means of securing the valve is via flexible wire which still allowed the valve handle to turn. Repair or replace to the satisfaction of the attending USCG Marine Inspector
33 CFR 159.7(c)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 4 October 2024
Resolution: Vessel repaied valve and locked to prevent unintentional discharge.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 15 September 2024
Resolved
No major repairs or altercations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge and approval of the Officer in Charge, Marine Inspection. Vessel was repairing the motor on the main diesel engine without making any notifications to the Coast Guard on the repair. Vessel will also need to conduct a sea trial. Repair to the satisfaction of the attending Coast Guard Marine Inspector. 46 CFR 176.20-1
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 7 October 2024
Resolution: Repairs were satisfactory completed.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 15 September 2024
Resolved
At each initial and subsequent inspection for certification, the marine inspector shall view the vessel afloat and shall conduct the following test and inspections of the hull structure and its appurtenances: Examine all accessible parts of the exterior and interior of the hull. Vessel had multiple cracked welds on both the port and starboard railings around the parameter of the vessel and was missing railing on port and starboard stairs. Repair to the satisfaction of the attending Coast Guard Marine Inspector. 46 CFR 176.25-5(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 7 October 2024
Resolution: Sections of damaged or missing railing have been repaired and/or replaced.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 21 September 2023
Resolved
At each initial and subsequent inspection for certification, reinspection and at every other vessel inspection the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. Port and Starboard Engine room ventilation covers do not properly seal when installed. Correct ventilation covers to fit snugly and properly seal engine room to the satisfaction of the attending Marine Inspector. 46 CFR 176.25-50(a)Repair at Drydock
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 November 2023
Resolved 18 January 2024
Resolution: Corrected vetilation dampers notched out bolt holes and installed wingnuts to hold shut.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 21 September 2023
Resolved
At each inspection for certification and reinspection the marine inspector shall examine the bilges and other spaces to see that there is no accumulation of oil or other matter which might create a fire hazard. #4 MDE has accumulation of fuel oil in the flame impingement bowl. Remove fuel oil and repair leak causing fuel oil to accumulate to the satisfaction of the attending Marine Inspector. 46 CFR 176.25-50(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 October 2023
Resolved 10 October 2023
Resolution: Oil cleaned
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 5 September 2023
Resolved
A vessel on an oceans route must carry six hand red flare distress signals and six hand orange smoke distress signals. Substitutions are allowed per 46 CFR 180.68(c). The 12 combination flares carried on board were 5 months expired. Replace to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 5 September 2023
Resolution: Vessel POC provided photographs of newly purchased flares.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 5 September 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. Vessel’s First Aid kit was incomplete and contained expired products. Replace to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 5 September 2023
Resolution: Vessel POC provided photographs of newly purchased first aid kits.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 5 September 2023
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 September 2023
Resolved 18 January 2024
Resolution: Recieved new charts
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 5 September 2023
Resolved
Abandon ship and man overboard drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. The drill entry shall include the following information: Date of the drill and training; and General description of the drill scenario and training topics. Vessel did not have a record of Abandon Ship and man overboard drills and training in any vessel log.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 6 November 2023
Resolution: Witnessed satisfactory Man Overboard and Fire Drills. All Drills Logged in Logbook.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 5 September 2023
Resolved
Firefighting drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. The drill entry shall include the following information: Date of the drill and training; and General description of the drill scenario and training topics. Vessel did not have record of Firefighting drills and training in any vessel log.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 6 November 2023
Resolution: Witnessed satisfactory Man Overboard and Fire Drills. All Drills Logged in Logbook.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 5 September 2023
Resolved
The master of the vessel shall ensure that: The EPIRB required by 180.40-1 of this subchapter is tested monthly. The vessel has no recent records of EPIRB testing.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 10 October 2023
Resolution: Verified logs
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 5 September 2023
Resolved
At each inspection for certification and reinspection the marine inspector shall examine the bilges and other spaces to see that there is no accumulation of oil or other matter which might create a fire hazard. Excessive oil in engine room, multiple leaks from main engines and standing oil in bilges. Clean oil from bilges and machinery and repair leaks to the satisfaction of the attending Marine Inspector. 46 CFR 176.25-50(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 10 October 2023
Resolution: Bilges were cleaned and leaks rectified.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 5 September 2023
Resolved
At each initial and subsequent inspection for certification, the marine inspector shall view the vessel afloat and shall conduct the following test and inspections of the hull structure and its appurtenances: Examine all accessible parts of the exterior and interior of the hull. Starboard midship railing has a cracked weld on the top and a broken weld on the course. Repair to the satisfaction of the attending Marine Inspector. 46 CFR 176.25-5(a)(1) Repair at drydock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 November 2023
Resolved 18 December 2023
Resolution: All Rails have been welded and are structurally sound.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 5 September 2023
Resolved
The hailing port of the vessel must be marked on some clearly visible exterior part of the stern of the vessel. Vessels hailing port on the stern board does not match the hailing port listed on the Certificate of Documentation. Correct the hailing port to read “Corpus Christi, TX” to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 21 September 2023
Resolution: Repainted stern board to read correctly.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 5 September 2023
Resolved
The marine employer must have a sufficient number of alcohol testing devices readily accessible on board the vessel to determine the presence of alcohol in the system of each individual who was directly involved in the SMI. Alcohol testing strips were expired, replace to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 10 October 2023
Resolution: verified test strips
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 5 September 2023
Resolved
At each initial and subsequent inspection for certification, reinspection and at every other vessel inspection the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. Both watertight doors leading into the engine room have compromised seals. Replace seals to the satisfaction of the attending Marine Inspector. 46 CFR 176.25-50(a) Repair at Drydock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2023
Resolved 18 January 2024
Resolution: seals replaced
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 5 September 2023
Resolved
Each life jacket, immersion suit, and ring life buoy must be marked in clearly legible block capital letters with the vessel's name. Vessel had 12 life jackets that were not marked with the vessels name. Correct to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 10 October 2023
Resolution: Jackets Marked
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 September 2023
Resolved
Electrical enclosures shall be constructed so uninsulated parts cannot be inadvertently touched. The electrical panel mounted on the Starboard side forward bulkhead of the engine room was open and did not have the front panel attached. The electrical panel in the passenger accommodation space was missing blank fillers that would allow accidental contact to live electrical circuits. Replace the front panel and fill in the blank spaces of the electrical enclosures to the satisfaction of the attending Marine Inspector. 46 CFR 183.10-10(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 10 October 2023
Resolution: Blank filled
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 September 2023
Resolved
All wiring and cables shall be suitable for marine service and for the particular installation used. The main cable coming out of the port side generator has compromised armor and possibly compromised sheathing from rubbing on the generator mount due to insufficient mounting and lack of chaffing gear. Repair or replace cable and mount properly as to not cause future failure due to chaffing on frame to the satisfaction of the attending Marine Inspector. 46 CFR 183.10-20(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 10 October 2023
Resolution: repaired, chaffing gear installed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 September 2023
Resolved
All wiring and cables shall be suitable for marine service and for the particular installation used. Wiring inside the electrical enclosure mounted on the Starboard side forward bulkhead of the engine room has compromised insulation that could cause an electrical arc between wires. Repair to the satisfaction of the attending Marine Inspector. 46 CFR 183.10-20(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 10 October 2023
Resolution: panel repaired
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 September 2023
Resolved
Electrical installations on vessels shall be such that services essential for safety will be maintained under various emergency conditions and the safety of passengers, crew and vessel from electrical hazards will be assured. Vessel’s electrical system has many loose and or exposed wires in the engine room, air conditioning space and in the crew’s mess that could cause electrocution or arcing of wires. Crew’s mess also contains a live light fixture with no bulbs or cover. Repair or replace wiring to the satisfaction of the attending Marine Inspector. 46 CFR 111.05-15(a)Repair at Drydock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2023
Resolved 18 December 2023
Resolution: Above corrected, junction boxes have been installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 5 September 2023
Resolved
At each initial and subsequent inspection for certification, the marine inspector shall examine and test items to the extent necessary to determine that they are in proper operating condition and fit for the service in which they are intended. The oil pressure gauges on both generators are illegible and the oil pressure gauge above the starboard generator is leaking oil onto the generator. Repair to the satisfaction of the attending Marine Inspector. 46 CFR 176.25-10(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 10 October 2023
Resolution: replaced
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 5 September 2023
Resolved
At all inspections special attention shall be paid to insure that no fire hazards exist and that guards or protective devices are provided in all hazardous places. Lagging on all four main engines as well as the generators is severely degraded, missing or separated. Repair or replace to the satisfaction of the attending Marine Inspector. 46 CFR 176.25-10(b)Repair at Drydock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2023
Resolved 18 December 2023
Resolution: degraded lagging has been replaced, vessel is planning on an re-power next year and will replace all lagging during that time.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 5 September 2023
Resolved
A cooking appliance must be installed to prevent movement in heavy seas. Sea rails, with suitable barriers to prevent accidental movement of cooking pots, must be installed on a cooking range. Sea rails on stove were partially installed and microwave was not secure as to prevent movement in heavy seas. Install sea rails on stove and secure microwave to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 21 September 2023
Resolution: Sea rails installed and microwave secured.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 5 September 2023
Resolved
Each hatch exposed to the weather must be watertight, except that the following hatches may be weathertight: Each hatch on a watertight trunk that extends at least 12” above the weather deck. Weathertight hatch on stern of accommodation has degraded seals and has a notch cut into the bottom knife edge to allow an extension cord to transit rendering the hatch non-weathertight. Repair to the satisfaction of the attending Marine Inspector.Repair at Drydock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2023
Resolved 18 December 2023
Resolution: Door knife edge has been repaired.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 5 September 2023
Resolved
At each initial and subsequent inspection for certification, the marine inspector shall examine and test items to the extent necessary to determine that they are in proper operating condition and fit for the service in which they are intended. Water heater tank reservoir bracket has cracked / broken weld. Repair to the satisfaction of the attending Marine Inspector. 46 CFR 176.25-10(a)Repair at Drydock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2023
Resolved 18 December 2023
Resolution: Bracket weld repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 September 2023
Resolved
Electrical installations on vessels shall be such that services essential for safety will be maintained under various emergency conditions and the safety of passengers, crew and vessel from electrical hazards will be assured. Outlet in lower deck head and two outlets in engine room had missing / loose covers and loose electrical boxes. Repair to the satisfaction of the attending Marine Inspector. 46 CFR 111.05-15(a)Repair at Drydock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2023
Resolved 18 December 2023
Resolution: Outlets were secured.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 September 2023
Resolved
Switchboards shall be fitted with driphoods and non-conducting handrails. Vessels main distribution panel switchboard is missing the non-conducting handrail. Replace to the satisfaction of the attending Marine Inspector. 46 CFR 183.10-15(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2023
Resolved 10 October 2023
Resolution: Handrail replaced
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 5 September 2023
Resolved
An interconnected detection and alarm system must:(1)Consist of multiple-station smoke detectors listed by an NRTL, or independent laboratory accepted by the Commandant according to 46 CFR subpart 159.010, as meeting UL 217; (2) Be installed such that the actuation of alarm in one area results in both audible and visual alarms in all areas required by 46 CFR 181.405(c) or 118.400(d) to be protected by the interconnected detection and alarm system; (3) Contain an independent power source; and (4) Alarm on low power. (b) A fire detection and alarm system of an approved type installed in accordance with 46 CFR part 76 would satisfy the requirements of this section. Vessel does not have an interconnected detection and alarm system. Provide plans for approval for the proposed system prior to installation. Installation must be verified onboard the vessel by the attending Marine Inspector.Repair at Drydock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2023
Resolved 18 January 2024
Resolution: Installed interconnected system, tested system, functioned correctly.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 5 September 2023
Resolved
A vessel must comply with the applicable requirements for any radio and Electronic Position Indicating Radiobeacon (EPIRB) installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Vessel currently has a <200nm route and does not have the proper installation of radios for the route. Vessel is missing a MF-DSC or SSB-DSC radio or approved Ship Earth Station (SES) with reserve source of power for 3 hours, and NAVTEX. Install required radio equipment and have station re-certified by FCC inspector to the satisfaction of the attending Marine Inspector. Vessel is restricted to <100nm route until installation is complete.Repair at Drydock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2023
Resolved 18 January 2024
Resolution: Reduced COI to less than 100nm.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 5 September 2023
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 October 2023
Resolved 10 October 2023
Resolution: Captain recieved med card
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 5 September 2023
Resolved
At each initial and subsequent inspection for certification, reinspection and at every other vessel inspection the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. The step on the inside of the weathertight door leading into the accommodation space is broken and has a temporary wooden board installed. Repair or replace to the satisfaction of the attending Marine Inspector. 46 CFR 176.25-50(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 October 2023
Resolved 21 September 2023
Resolution: New step installed.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 5 September 2023
Resolved
At each initial and subsequent inspection for certification, reinspection and at every other vessel inspection the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. Alarm panel in operating station does not have labels indicating which alarms are going off. Label panel to indicate which alarms are which to the satisfaction of the attending Marine Inspector. 46 CFR 176.25-50(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 October 2023
Resolved 10 October 2023
Resolution: Alarms labled
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 4 October 2022
Resolved
Each EPIRB must be tested monthly to determine that it is operative and shall be logged or otherwise documented, as applicable. Vessel had no record of EPIRB testing logged.
46 CFR 185.728(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 October 2022
Resolution: Vessel created new EPIRB monthly log sheet and started to log EPIRB testing.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 4 October 2022
Resolved
A vessel must carry one floating waterlight, unless it is limited to daytime operation. Vessel had inoperable waterlight.
46 CFR 180.70(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 October 2022
Resolution: Vessel purchased new waterlight battery.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 4 October 2022
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible. Vessel did not have up-to-date charts nor means of correcting charts.
46 CFR 184.420(a)(1)
Action required: 10 - Deficiency Rectified
Resolved 10 October 2022
Resolution: Vessel purchased new up-to-date chart and chart correction kit.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 5 January 2022
Resolved
As appropriate for the intended voyage, all vessels must carry adequate and up-to-date charts. The vessels charts were printed in 2019 and did not contain any chart corrections. Vessel shall ensure charts are kept corrected/reviewed for corrections upon LNM release, for intended area(s) of operation within 14 days.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 January 2022
Resolved 18 January 2022
Resolution: Received satisfactory objective evidence of new charts on board vessel. All sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 5 January 2022
Resolved
The bridge-to-bridge radiotelephone station will be inspected on vessels subject to regular inspections pursuant to the requirements of parts II & III of Title III of the Communications Act… Each vessel must carry a certificate with a valid endorsement while subject to the Bridge-to-Bridge Act. The vessels FCC Safety Radio certificate expired in 2021. Vessel shall renew their FCC Safety Radio certificate within 14 days. 47 CFR 80.1005
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 January 2022
Resolved 5 January 2022
Resolution: Received satisfactory objective evidence of valid FCC Safety Radio certificate on board vessel. All sat.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 16 December 2020
Resolved
Except as otherwise provided in this section, all vessels shall be provided with not less than two avenues of escape from all general areas. The second means of escape in the passenger seating area has seized dogs and was unable to be opened by the crew for at least 8 minutes. Lubricate and/or repair to the satisfaction of the attending CG Marine Inspector.
46 CFR 177.15-1(a)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 December 2020
Resolution: Vessel crew was able to conduct maintenance on the hatch.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 December 2020
Resolved
Cables entering boxes or fittings shall conform with the following requirements: openings through which conductors enter shall be adequately closed. The outlet box for the clothes dryer located next to the exhaust has an opening in the side and is covered in lint dust creating a hazardous fire condition. Close and/or repair to the satisfaction of the attending CG Marine Inspector.
46 CFR 183.10-20(f)(1)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 December 2020
Resolution: The electrical outlet was relocated to a safer location and the area cleaned of debris (lint)
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 December 2020
Resolved
At least one ring life buoy must be fitted with a lifeline. Each lifeline on a ring life buoy must: be of a dark color if synthetic, or of a type certified to be resistant to deterioration from ultraviolet light. The starboard side bridge wing ring life buoy has deteriotating line. The line must be replaced with a suitable lifeline to the satisfaction of the attending CG Marine Inspector.
46 CFR 180.70(c)(6)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 28 December 2020
Resolution: Line was replaced.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 December 2020
Resolved
The discharge ends of the diesel fuel tank vent pipes shall be fitted with removable flame screens. The port side diesel fuel tank vent flame screen is severely wasted around the edges where flammable vapors can pass around the remaining flame screen. Repair to the satisfaction of the attending CG Marine Inspector.
46 CFR 182.20-35(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 28 December 2020
Resolution: Flame screen is in place.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 December 2020
Resolved
Fire hose if 1.5 inches in diameter is used after Janauary 1, 1980 each length of hose must be lined commercial fire hose that conforms to UL Stnadard 19 or Federal Spectification ZZ-H-451E. The port side aft fire hose is worn through the top and secondary layers of the hose. Replace the hose to the satisfaction of the attending CG Marine Inspector.
46 CFR 181.15-10(d)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 28 December 2020
Resolution: New fire hose is in place and tested.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 16 December 2020
Resolved
All supply ducts for ventilation purposes shall be provided with cowls or scoops. The crew could not unsecure the scoop from the bulkhead for 10 minutes in order to demonstrate closure of the portside ventilation duct of the engine room. Modify the storage location of the ventilation scoop to the satisfaciton of the attending CG Marine Inspector.
46 CFR 182.20-45(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 28 December 2020
Resolution: Scoop was made readily available
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 16 December 2020
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules, except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that meet UL 1104, “Standards for Marine Navigation Lights,” or other standard specified by the Commandant. The stern light has a blown bulb and did not work. The crew replaced the bulb and the light tested satisfactorily to the attending CG Marine Inspector.
46 CFR 183.420
Action required: 10 - Deficiency Rectified
Resolved 16 December 2020
Resolution: rectified on the spot
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 December 2020
Resolved
An adult life jacket must be provided for each person carried on board a vessel. One of the lifejackets had a hole in it exposing the inside buoyant material. The crew destroyed the damaged lifejacket and replaced it with an extra one they had one hand to the satisfaction of the attending CG Marine Inspector.
46 CFR 180.71(a)
Action required: 10 - Deficiency Rectified
Resolved 16 December 2020
Resolution: Rectified on the spot.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 16 December 2020
Resolved
An exposed hazard, such as gears or rotating machinery must be properly protected by a cover, guard or rail. The two inboard main engine shafts were not suitably protected or covered. Provide appropriate protection from this rotating machinery.
46 CFR 177.960
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 December 2020
Resolution: Vessel crew was able to obtain and secure proper protective covers over both shafts.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 16 December 2020
Resolved
An exposed hazard, such as gears or rotating machinery must be properly protected by a cover, guard or rail. The starboard ship service generator windings cover was partially open. Provide adequate cover to protect the crew from this hazard.
46 CFR 177.960
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 28 December 2020
Resolution: Appropriate cover was in place and secured.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 December 2020
Resolved
Electrical equipment on a vessel must be installed and maintained to: (b) protect passenger, crew other persons and the vessel from electrical hazards including fire caused by or originating in electrical equipment and electrical shock. A fixed overhead light in the engine room was spliced into an extension cord which was plugged into an outlet. The overhead light shall be properly hard wired into the vessels existing lighting system.
46 CFR 183.200
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 28 December 2020
Resolution: Light was properly tied into existing electrical system.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 December 2020
Resolved
Openings through which conductors enter shall be adequately closed. Two conductors entering a junction box located forward of the starboard inboard main engine were not suitably closed. Properly close the two entry points with the existing plugs.
46 CFR 183.10-20(f)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 28 December 2020
Resolution: Box was appropriately plugged.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 16 December 2020
Resolved
Each generator shall be protected with an overcurrent device set at a value not exceeding 15 percent above the full load rating. The starboard ship service generator overcurrent protection could not be suitably tested. Prover proper operation of the the overcurrent protection.
46 CFR 183.10-35(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 28 December 2020
Resolution: Crew demonstrated proper overspeed trip.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 16 December 2020
Resolved
Auxiliary machinery of the internal combustion type shall comply with the provision of this part. 46 CFR 182.20-5(b) requires gauges to indicate water cooling discharge temperature shall be provided. The port generator jacket water temperature gauge was unreadable due to moisture behind the glass. Gauge must be replaced.
46 CFR 182.10-5(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 28 December 2020
Resolution: New gauge was installed.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 16 December 2020
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. An overhead light protective cover located in a crew accommodation was severely shattered leaving sharp edges and exposed bulbs creating an unsafe condition for those berthing in the space. Provide adequate protection for the light fixture that does not create an unsafe condition.
46 CFR 176.830(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 28 December 2020
Resolution: New light cover was in place.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 16 December 2020
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Marine inspector found in a crew bunk room that two surge protectors were "daisy chained" creating an unsafe condition. Ensure electrical cords and surge protectors are properly used.
46 CFR 176.830(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 16 December 2020
Resolution: Additional surge protectors were disconnected from each other and the crew was educated on the hazards associated with daisy chaining electrical cords.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 December 2020
Resolved
All wiring and cable shall be suitable for marine service and for the particular installation used. An electrical through hole penetration on the starboard side bridge is open and not closed for a weathertight condition. Repair to the satisfaction of the attending CG Marine Inspector.
46 CFR 183.10.20(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 28 December 2020
Resolution: Penetration properly sealed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 December 2020
Resolved
Wiring joints and splices shall be mechanically secured and made in junction boxes. Electrical wires were not properly spliced and terminated in the AC Compartment. Repair to the satisfaction of the attending CG Marine Inspector.
46 CFR 183.05-50(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2020
Resolved 29 December 2020
Resolution: Wires were ended in a junction box.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 January 2020
Resolved
Each life jacket carried on a vessel on oceans and coastwise must have a Coast Guard approved life jacket light. 17 of the 60 required life jacket lights are not working or working intermittently. Attach Coast Guard approved lights to the life jackets to the satisfaction of the attending Coast Guard Marine Inspector. Vessel is limited to 43 total persons on board until deficiency is cleared by attending Coast Guard Marine Inspector. 46CFR180.75(a) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: Vessel provided new lights.
14 - Pollution Prevention › 145 - MARPOL Annex V › Placards
Issued 13 January 2020
Resolved
At a minimum, each garbage placard must notify the reader of the operating requirements contained in 33 CFR 151.67 through 151.73 as they apply to the ship. The garbage placards on board the vessel are not-up-to-date to the current regulations. Post current garbage placards in prominent locations and in sufficient number to the satisfaction of the attending Coast Guard Marine Inspector. 33CFR151.59(c) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: New garbage placard.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 13 January 2020
Resolved
The items contained in first-aid kit shall be as listed in Table 160.041-4(b). Vessels first aid kit was not complete several items were expired. Ensure all the items required by the table are onboard and current. 46CFR160.041-4(b) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: New meds onboard.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 13 January 2020
Resolved
Instructions for the use of the contents of the first-aid kit shall be printed in legible type on a durable surface and shall be securely attached to the inside of the cover. Ensure the instructions are installed. 46CFR160.041-4(c) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: First aid book in cabinet
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 13 January 2020
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. Vessel hydrostatic release was not marked with the expiration date. Install new hydrostatic release marked with expiration date and proof of purchase. 46CFR180.64 - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: New hydrostatic release installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 January 2020
Resolved
Portable fire extinguishers shall be installed and located to the satisfaction of the OCMI. Vessel has 2 portable fire extinguishers that were not installed in brackets, outside the engine room and next to washer and dryers. Mount brackets and install fire extinguishers. 46CFR181.30-10(b) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: Fire extinguishers are hard mounted.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 13 January 2020
Resolved
At each re-inspection and at every other inspection the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. Vessels washer, dryer, and stove not securely mounted. Mount appliances securely to deck or bulkhead to prevent shifting during list and heel. 46CFR176.25-50(a) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: Appliances are mounted to prevent shifting.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 January 2020
Resolved
At each initial and subsequent inspection for certification, re-inspection and at every other inspection the marine inspector shall examine the bilges and other spaces to see that there is no accumulation of oil or other matter which might create a fire hazard. The lubricating oil from the pneumatic control is being sprayed onto the electrical wires and connections inside the operating station. Reposition the air vent so the oil mist does not cause a fire hazard. 46CFR176.25-50(b) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: Cleaned up oil. Remove inline oiler from air controls
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 January 2020
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspections. The following unsatisfactory high voltage electrical hazards were observed: lower passenger compartment stbd side 110v outlet box unsecured, crew quarters passageway 110v outlet box cracked, main vessel entrance outside 110v outlet box broken with silicone holding wires, emergency fuel pump shut off switch box broken with exposed wires, galley port breaker box missing mounting hardware and unsecured. Repair electrical components to the satisfaction of Marine Inspector. - 46CFR183.01-15(a) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: All electrical issues rectified.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 January 2020
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Found the following low voltage electrical hazards: wiring under the pilothouse console has wire nuts, uninsulated connections, bare wires, oil covered wires, connections should be made on terminal strips, dead-end and unused connections. Remove all unused wires, clean off all oil, make all electrical connections on terminal strips, remove all wire nuts to the satisfaction of Marine Inspector. - 46CFR183.01-15(a) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: All electrical issues rectified.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 January 2020
Resolved
Acid batteries shall be located in a tray of lead or other suitable material resistant to deteriorating action by electrolyte. Battery under pilot house console is in metal tray with no insulating material between battery and metal. Battery has corroded connections. Insulate battery tray. Make connections on terminal strip. 46CFR183.05-20(d) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: All electrical issues rectified.
05 - Radio Communications › N/A - No Subsystem › Main installation
Issued 13 January 2020
Resolved
Every vessel subject to Part III of Title III of the Communications Act must have a detailed inspection of the radio installation by an FCC-licensed technician in accordance with § 80.59 once every five years. Vessel Captain could not provide evidence of an inspection of the radiotelephone installation within the last five years. Provide evidence of a valid radiotelephone installation inspection to the satisfaction of the attending Coast Guard Marine Inspector. 47CFR80.903 - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: Bridge to Bridge telephony cert issued by FCC
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 13 January 2020
Resolved
Vessels operating beyond 100NM from shore must be equipped with a single sideband radiotelephone meeting the requirements of 47 CFR 80.1101(c)(4). Vessels SSB radio could not be proven operational. Prove proper operation of vessels SSB radio prior to transiting beyond 100 NM from shore. 47CFR80.905(a)(3) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: SSB radio replaced with new
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 January 2020
Resolved
The bilge pipe may be fitted with a screw-down valve without a reach rod on the aft side of the collision bulkhead if it is readily accessible under service conditions. The reach rod for the screw-down valve is not connected, preventing it from being opened or closed. The valve is also not accessible during service conditions. Prove proper operation of the forepeak reach rod valve connection to the satisfaction of the attending Coast Guard Marine Inspector. 46CFR182.25-5(d) - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 28 January 2020
Resolution: Reach rod re-attached and operable.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 January 2020
Resolved
To maintain a valid COI, you must complete your annual inspection within the period specified in 176.500(b)(1) and your COI must be endorsed. The vessel's annual inspection is past due and the vessel is not ready for CG inspection. Contact cognizant OCMI to schedule inspection when ready.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 January 2020
Resolved 22 January 2020
Resolution: CONDUCTED ANNUAL INSPECTION
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 13 December 2018
Resolved
No life saving maintenance record or logs could be provided. Establish method for documenting life saving equipment maintenance and have available to CG marine inspector upon request. 46 CFR 185.702
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2019
Resolved 8 January 2019
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 13 December 2018
Resolved
Provide appropriate weak links for lifefloats. Currently 2 floats have the wrong size link and the third has not tag to identify it’s size. The 6 person float also needs to be attached to a week link. 46 CFR 180.137(b)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 December 2018
Resolved 8 January 2019
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 13 December 2018
Resolved
Provide and prove proper operation of a public address system that is useable from the operating station. Vessel currently has an inoperable PA system that only works at the external aft facing operating station. 46 CFR 184.610(b) & (c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 December 2018
Resolved 8 January 2019
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 13 December 2018
Resolved
Provide appropriate first aid kit. First aid kit currently on board does not contain required contents. 46 CFR 184.710
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 December 2018
Resolved 8 January 2019
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 13 December 2018
Resolved
Stow distress signals in an appropriate waterproof container and mark distress signals. Current container is a plastic nonsealing container. 46 CFR 180.68(e) & 185.614
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 December 2018
Resolved 8 January 2019
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 13 December 2018
Resolved
Prove proper operation of ship board fixed fire pump pressure to 60 psi. Currently the fire pump only reaches 50 psi. 46 CFR 181.10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2019
Resolved 8 January 2019
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 13 December 2018
Resolved
Provide light guards over lights in overhead of engine room. 46 CFR 183.10-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2019
Resolved 8 January 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 13 December 2018
Resolved
Prove proper installation of starboard main engine oil pressure gauge. Current installation has it hanging on wires. 46 CFR 54.15.5(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2019
Resolved 8 January 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 13 December 2018
Resolved
Prove proper operation of watertight door indicators located on the bridge. Current indicators are not visible. 46 CFR 185
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2019
Resolved 8 January 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 13 December 2018
Resolved
Engine room watertight door closing mechanism shall be put back to original equipment. Currently one dog is held with a handmade clip. 46 CFR 185
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2019
Resolved 8 January 2019
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 13 December 2018
Resolved
Prove air receivers relief valve are of appropriate set point and replace broken gauge on port air receiver. Relief valve set points are not visible and the gauge is broken. 46 CFR 54.15-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2019
Resolved 8 January 2019
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 13 December 2018
Resolved
Repair or replace emergency light in engine room. Light facing escape ladder is not operating. 46 CFR 184.30-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2019
Resolved 8 January 2019
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 13 December 2018
Resolved
Ensure all empty breaker spaces in panels located in engine room are properly blanked. There are currently open breaker spaces exposing people to live electrical equipment when panel door is open. 46 CFR 183.10-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2019
Resolved 8 January 2019
Engineering › Compressed Air System (start air) › Valve
Issued 6 October 2017
Resolved
Cross connect valve between port and starboard air compressors siezed and unable to close
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 December 2017
Resolved 12 December 2017
Resolution: Cross connect valve was replaced.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 6 October 2017
Resolved
Both the interior and exterior of the starboard air receiver wascorroded to the point that inspector was unable to visually verify the integrity of the pressure vessel, required hydrostatic testing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 December 2017
Resolved 12 December 2017
Resolution: Air reciever was replaced with new.
Communications › Radio Communications › VHF Radiotelephone
Issued 6 October 2017
Resolved
GPS not hooked up to VHF radio rendering DSC inoperable.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 December 2017
Resolved 12 December 2017
Resolution: GPS and radio connected
Engineering › Bilge Water Management System › Piping
Issued 6 October 2017
Resolved
Installed bilge manifold valves not clearly marked and no line diagram or instructions for operation posted at the manifold.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 December 2017
Resolved 12 December 2017
Resolution: Manifold marked and diagram created
Construction/Loadline › Hull › Weld
Issued 28 September 2017
Resolved
Engine bed mount on #3 MDE weld cracked.
Condition: Damaged By Earlier Event
Due 1 December 2017
Resolved 12 December 2017
Resolution: engine mount rewelded
Construction/Loadline › Structures › Deck Plating
Issued 24 January 2017
Resolved
Vsl cargo deck was holed. Make permanent repairs to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 9 February 2017
Resolution: MI witnessed satisfactory inserts to the damaged cargo deck. See narrative for details.
Construction/Loadline › Hull › Girder
Issued 23 January 2017
Resolved
Significant crack to fore/aft girder used to mount the port main diesel engine exhaust. Permanent repair to be made.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 February 2017
Resolved 9 February 2017
Resolution: final repairs completed
Construction/Loadline › Hull › Hull Plating
Issued 19 January 2017
Resolved
Multiple soft spots in deck plating observed with a complete penetration on the starboard side amidships. Port aft soft patch for engine replacement/repair has cracked weld on the entire aft side. Port forward soft patch (bolted) leaks water through the hatch, which is rotting bolts keeping the hatch down. Permanent repairs to be made to ensure the watertight integrity of the vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 February 2017
Resolved 9 February 2017
Resolution: Final repairs completed. See narrative for details.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 5 January 2017
Resolved
Guards for inboard shafts missing.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 January 2017
Resolved 5 January 2017
Resolution: Vessel crew constructed and welded guards to prevent personnel from being exposed to spinning shafts.
Engineering › Sea-water System (primary cooling) › Piping
Issued 5 January 2017
Resolved
multiple flexible hose sections of wet exhaust piping not double clamped.
Action required: 705 - Other - as specified
Due 5 January 2017
Resolved 5 January 2017
Resolution: All sections double clamped.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 4 January 2017
Resolved
Captain stated that crewmembers onboard were new and were not able to perform a man overboard drill.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 January 2017
Resolved 5 January 2017
Resolution: Vessel conducted successful man overboard drill.
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 4 January 2017
Resolved
Nearly all lights attached to lifejackets flicker and turn off upon movement.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 January 2017
Resolved 5 January 2017
Resolution: Vessel provided new lights for inoperable ones.
Lifesaving › Rocket Parachute Flares › General
Issued 4 January 2017
Resolved
Vessel only had 8 of the required 12 flares.
Action required: 705 - Other - as specified
Due 4 February 2017
Resolved 5 January 2017
Resolution: Vessel purchased remaining 4 flares
Communications › Audible Communications › Horn/Whistle
Issued 4 January 2017
Resolved
Air line for the vessel's horn had parted making the horn inoperable.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 January 2017
Resolved 5 January 2017
Resolution: Vessel replaced air line and horn.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 4 January 2017
Resolved
Stern lighting fixture loose and causing the light to be intermittent. Vessel restricted to daytime operations.
Action required: 705 - Other - as specified
Due 4 February 2017
Resolved 5 January 2017
Resolution: Vessel repaired fixture and replaced bulb.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 4 January 2017
Resolved
Vessel failed to post EAP hotline throughout vessel.
Action required: 705 - Other - as specified
Due 4 February 2017
Resolved 5 January 2017
Resolution: Vessel posted hotline in multiple locations.
Engineering › Compressed Air System (start air) › Valve
Issued 4 January 2017
Resolved
Pressure relief valve markings were indecipherable.
Action required: 705 - Other - as specified
Due 4 February 2017
Resolved 19 January 2017
Resolution: Valves replaced.
Electrical › Electric Supply System (service) › Battery Charger
Issued 4 January 2017
Resolved
Battery Charger in engineroom was not mounted securely to the vessel and the charger was not of the approved variety.
Action required: 705 - Other - as specified
Due 5 May 2017
Resolved 6 April 2017
Resolution: Verified proper installation of marine battery charger.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 4 January 2017
Resolved
Sewage piping at the connection to the holding tank was leaking.
Action required: 705 - Other - as specified
Due 20 February 2017
Resolved 19 January 2017
Resolution: Piping leading to sewage tank permanently repaired.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 4 January 2017
Resolved
Fuel vent on the port side was missing a flame screen.
Action required: 705 - Other - as specified
Due 20 February 2017
Resolved 19 January 2017
Resolution: Fuel vent screen replaced.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 4 January 2017
Resolved
Port aft main deck rail bracken broken.
Action required: 705 - Other - as specified
Due 20 February 2017
Resolved 19 January 2017
Resolution: Deck rail repaired.
Construction/Loadline › Hull › Strut/Cross Tie
Issued 4 January 2017
Resolved
03 cracked welds on the cross tie for the ribs in the forepeak.
Action required: 705 - Other - as specified
Due 20 February 2017
Resolved 19 January 2017
Resolution: Welds repaired.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 7 December 2015
Resolved
MDE 1, 2, 3 had exposed moving parts that were deemed unsafe.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2016
Resolved 8 December 2015
Resolution: Guards installed over exposed moving parts on MDEs 1, 2, 3
Engineering › Shafting/Propeller Arrangements › Coupling Bolt
Issued 7 December 2015
Resolved
Double nut all shaft packing bolts
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 January 2016
Resolved 8 December 2015
Resolution: All shaft packing bolts double nutted
Accommodation/Occupational Safety › Refrigeration (air conditioning) › General
Issued 7 December 2015
Resolved
repair raw water leak on A/C system
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 January 2016
Resolved 8 December 2015
Resolution: raw water leak on A/C system repaired
Construction/Loadline › Structures › Machinery Space Opening
Issued 7 December 2015
Resolved
Seal 2 holes on engine room forward watertight bulkhead
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 January 2016
Resolved 8 December 2015
Resolution: 2 holes on engine room forward watertight bulkhead sealed.
Engineering › Fuel Oil Service System › Filter
Issued 10 January 2012
Resolved
Install flame protection on fuel filter for stbd generator
Due 11 February 2012
Resolved 15 February 2012
Resolution: Installed flame shield on fuel filter for the stbd generator.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 10 January 2012
Resolved
Acquire tide tables and tidal current tables
Due 11 February 2012
Resolved 15 February 2012
Resolution: Provided tide tables and tidal current tables.
Stability › Watertight Integrity › General
Issued 10 January 2012
Resolved
Install watertight bulkhead penetrations in fwd steering gear room.
Due 11 February 2012
Resolved 15 February 2012
Resolution: Chalking was applied around penetration.
Construction/Loadline › Structures › Door
Issued 16 February 2011
Resolved
Arrest and repair cracked welds on port and stbd pilothouse door frames.
Due 19 March 2011
Resolved 25 March 2011
Resolution: Verified repairs have been made
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 16 February 2011
Resolved
Arrest and repair cracked weld on portside ladder attached to pilothouse.
Due 19 March 2011
Resolved 25 March 2011
Resolution: Verified repairs have been made
Construction/Loadline › Hull › Transverse Frame
Issued 16 February 2011
Resolved
Arrest and repair cracked welds/fractures on first transverse frames port and starboard of the keel in the rudder room.
Due 19 March 2011
Resolved 25 March 2011
Resolution: Verified repairs have been made
Construction/Loadline › Hull › Longitudinal Frame
Issued 16 February 2011
Resolved
Crop and renew cracked #2 longitudinal frame stbd of keel in rudder room.
Due 30 April 2011
Resolved 26 April 2011
Resolution: Verified section of frame has been cropped and renewed.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 16 February 2011
Resolved
Arrest and repair cracks on port and stbd crew house aft, where blower housing connects to deckhouse.
Due 19 March 2011
Resolved 25 March 2011
Resolution: Verified repairs have been made
Communications › Radio Communications › VHF Radiotelephone
Issued 16 February 2011
Resolved
Current master obtain FCC operators permit.
Due 2 March 2011
Resolved 25 March 2011
Resolution: Master now has FCC permit
Stability › Weathertight Integrity › General
Issued 16 February 2011
Resolved
Renew broken windows in pilothouse.
Due 19 March 2011
Resolved 25 March 2011
Resolution: Verified repairs have been made
Documentation › Certificates/Documents › Certificate of Inspection
Issued 4 March 2010
Resolved
Vessel to complete annual exam and drydock inspection prior to carrying passengers for hire.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 June 2010
Resolution: Annual Completed.
Engineering › Bilge Water Management System › Piping
Issued 4 March 2010
Resolved
Replace wasted bilge piping in compartment aft of rudder room with schedule 80 piping.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 June 2010
Resolution: Replaced wasted bilge piping.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 March 2010
Resolved
Repair all fractures as marked in rudder room aft compartment, approximately 15.
Action required: 705 - Other - as specified
Resolved 24 June 2010
Resolution: Repaired fractures.
Construction/Loadline › Structures › Cofferdam
Issued 4 March 2010
Resolved
Repair all fractures as marked in starboard side potable water tank in the steering gear room.
Action required: 705 - Other - as specified
Resolved 24 June 2010
Resolution: Repaired fractures.
Construction/Loadline › Structures › Deck Plating
Issued 4 March 2010
Resolved
Repair all fractures in engine room hatch at deck level.
Action required: 705 - Other - as specified
Resolved 24 June 2010
Resolution: Repaired fractures.
Construction/Loadline › Hull › Longitudinal Frame
Issued 4 March 2010
Resolved
Repair all fractured and broken engine mounts on all four propulsion engines.
Action required: 705 - Other - as specified
Resolved 24 June 2010
Resolution: Repaired fractures.
Construction/Loadline › Hull › Longitudinal Frame
Issued 4 March 2010
Resolved
Repair all fractures as marked in crew compartment
Action required: 705 - Other - as specified
Resolved 24 June 2010
Resolution: Repaired fractures.
Construction/Loadline › Hull › Weld
Issued 4 March 2010
Resolved
Repair punctures in port bow in way of deck level tire slings
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 24 June 2010
Resolution: Repaired puncture.
Construction/Loadline › Hull › Longitudinal Frame
Issued 4 March 2010
Resolved
Repair all broken longitudinal and fractures in forward potable water tank
Action required: 705 - Other - as specified
Resolved 24 June 2010
Resolution: Repaired fractures.
Construction/Loadline › Structures › Deck Plating
Issued 4 March 2010
Resolved
Repair all fractured and broken stanchion supports to the bulwark on deck level.
Action required: 705 - Other - as specified
Resolved 24 June 2010
Resolution: Repaired fractures.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 10 December 2009
Resolved
Replace line between 02 auto-actuating water lights and life floats.
Action required: 705 - Other - as specified
Due 14 December 2009
Resolved 11 December 2009
Resolution: Lines have been replaced.
Pollution Prevention/Response › Prevention Equipment › Drains/Scuppers (means of closure)
Issued 4 February 2009
Resolved
Provide pipe cap for lube oil tank on forward engine room bulkhead as per 46 CFR 176.800
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 4 February 2009
Resolution: Installed pipe cap
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 4 February 2009
Resolved
Repair exhaust leaks in exhaust piping in the engine room as per 46 CFR 176.800
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Exhaust leaks repaired.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 4 February 2009
Resolved
Properly secure exhaust piping to over head on starboard side of engine room as per 46 CFR 182.430
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Exhaust piping on stbd side of engine room is secured.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 February 2009
Resolved
Remove dead end wire from outboard starboard engine as per 46 CFR 176.800
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Dead end wire in outboard stbd engine was repaired.
Construction/Loadline › Hull › Sheerstrake
Issued 4 February 2009
Resolved
Properly weld round bar at the sheer joint in engine room, steering room, and aft lazarette as per 46 CFR 176.800
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: All damaged welds in the engine room, steering room, and aft lazarette were renewed.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 4 February 2009
Resolved
Make repairs to all internal combustion engine lube oil leaks in engine room as per 46 CFR 176.800
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Lube oil leaks on engines have been repaired.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 February 2009
Resolved
Properly support wiring and copper tubing in engine room as per 46 CFR 183.340
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Wiring and copper tubing properly secured.
Accommodation/Occupational Safety › Refrigeration (air conditioning) › General
Issued 4 February 2009
Resolved
Properly mount air dryer on port side forward engine room as per 46 CFR 176.800.
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Air dryer was properly mounted.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 4 February 2009
Resolved
Properly secure switchboard door on main switchboard as per 46 CFR 183.330
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Top bracket was added to door to properly secure door.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 4 February 2009
Resolved
PROVIDE FIRE SERVICING CERTIFICATE AS PER 46 CFR 176.18
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Fire servicing certificates were provided.
Engineering › Steering Gear System › Piping
Issued 4 February 2009
Resolved
Properly support hydraulic steering piping in steering room as per 46 CFR 187.720
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Steering piping properly secured.
Lifesaving › Lifefloat › Paddle
Issued 4 February 2009
Resolved
Properly lash paddles to lifefloat as per 46 CFR 180.175(f)(2)
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Lifefloat paddles are lashed properly.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 4 February 2009
Resolved
Provide a lifesaving equipment maintainence logbook and prove testing of EPIRB as per 46 CFR 185.702(d)
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Lifesaving equipment maintenance and EPIRB tests are being logged in the Master''s log.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 4 February 2009
Resolved
Update hailing port on stern and remove or update hailing port on lifesaving equipment as per 46 CFR 67.123
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Hailing port on stern and on lifesaving equipment was changed to show "South Padre Island, TX."
Lifesaving › Lifefloat › Float-free Link
Issued 4 February 2009
Resolved
Provide proper weak link for 12 and 6-man lifefloats as per 46 CFR 180.175(f)
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 March 2009
Resolved 5 February 2009
Resolution: New weak link was installed with proper capacity.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 4 February 2009
Resolved
Provide means of operational shutdown for main engines at the pilot house as per 46 CFR 184.620(b)
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Vessel demonstrated means to shut down main engines at the pilot house.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 4 February 2009
Resolved
Properly secure lagging on exhaust piping as per 46 CFR 176.800
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Lagging on exhaust piping is secured.
Engineering › Generator (propulsion/auxiliary-electric) › Winding
Issued 4 February 2009
Resolved
Clean generator windings on port and starboard generators as per 46 CFR 176.800
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Vessel representative agreed to have both generators removed and the windings cleaned at the next drydock, due January 2010.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 4 February 2009
Resolved
Remove all oil, filters, and rags from bilge as per 46 CFR 176.800
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Bilges were clean, showed no excessive oil or debris.
Engineering › Diesel Engine (propulsion-reduction gear) › Crosshead Assembly
Issued 4 February 2009
Resolved
Properly mount all murphy switches on main engines as per 46 CFR 176.800
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Brackets for mounting the murphy switches are properly bolted.
Operations/Management › Drills/Instruction › Fire
Issued 4 February 2009
Resolved
Properly conduct fire and man overboard drills as per 46 CFR 176.500
Action required: 705 - Other - as specified
Due 4 March 2009
Resolved 5 March 2009
Resolution: Fire, abandon ship, and man overboard drills conducted with crew.
Engineering › Diesel Engine (propulsion-reduction gear) › Nozzle, Injection (fuel injection)
Issued 4 February 2009
Resolved
Make repairs to port engine fuel leak on fuel sensor as per 46 CFR 176.800
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 March 2009
Resolved 5 February 2009
Resolution: Entire fuel sensor on port engine was replaced; no leaks observed.
Communications › Alarms/Indicators › Bilge Alarm
Issued 2 February 2007
Resolved
Prove proper operation of of vsl's audible and visual alarms to the satisfaction of attending marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 February 2007
Navigation › Piloting/Steering › US Coast Pilot
Issued 2 February 2007
Resolved
Provide current copies of US Coast Pilot and CG Light List prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 February 2007
Electrical › Lighting (service) › Lighting Fixture
Issued 2 February 2007
Resolved
Replace two missing light fixture safety covers in engine room.
Due 2 March 2007
Resolved 2 November 2007
Fire Fighting › Means of Escape › Escape Route Signs
Issued 2 February 2007
Resolved
Properly mark escape hatch on deck with 'Emergency Exit, Keep Clear'.
Due 2 March 2007
Resolved 2 November 2007
Electrical › Lighting (emergency) › Lighting Fixture
Issued 18 February 2005
Resolved
Install an emergency lighting fisture of some sort in the passageway between the engine room and the crew accomodation space.
Action required: 705 - Other - as specified
Resolved 7 March 2005
Resolution: Emergency light installed.
Construction/Loadline › Structures › Door
Issued 18 February 2005
Resolved
Adjust dogs on the watertight door.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 February 2005
Resolution: Dogs and door adjusted to seal properly.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 7 November 2002
Resolved
Provide vessel with strip chart 11347.
Due 7 December 2002
Resolved 7 November 2002
Resolution: Owner''s rep purchased chart locally.
Operations/Management › Passenger Operations › Safety Orientation
Issued 7 November 2002
Resolved
Repair or replace passenger orientation tape player.
Due 7 December 2002
Resolved 7 November 2002
Resolution: Electrician was onboard during inspection and replaced amplifier for tape deck.
Engineering › Steering Gear System › Piping
Issued 7 November 2002
Resolved
Properly support hydraulic piping in steering room.
Due 7 December 2002
Resolved 7 November 2002
Resolution: Boat engineer installed metal clips to support piping.
Documentation
Issued 6 December 1995
Resolved
PROVIDE ON BOARD A NEW PERMANENT STABILITY LETTER.
Condition: Unknown
Due 6 December 1995
Resolved 6 December 1995
Fire Fighting
Issued 19 July 1993
Resolved
PROVE PROPER OPERATION OF INSTALLED FIRE MONITOR.
Condition: Unknown
Due 19 July 1993
Resolved 19 July 1993
Navigation
Issued 19 July 1993
Resolved
ADJUST WEAR PLATE PORT RUDDER STOCK TO SATISFACTION OF ATTENDING USCG INSPECTOR.
Condition: Unknown
Due 19 July 1993
Resolved 19 July 1993
Engineering
Issued 23 January 1992
Resolved
MAKE PERMANENT REPAIRS AND PROVE PROPER OPERATION OF STBD OUTBOARD ENGINE.
Condition: Unknown
Due 23 January 1992
Resolved 23 January 1992
Construction/Loadline
Issued 23 January 1992
Resolved
MAKE PERMANENT REPAIRS TO BUCKLED DECK IN WAY OF STBD OUTBOARD ENGINE.
Condition: Unknown
Due 23 January 1992
Resolved 23 January 1992
Electrical
Issued 23 January 1992
Resolved
MAKE PERMANENT REPAIRS TO ALL ELECTRICAL WIRING AND LIGHTING DAMAGED FROM FIRE IN WAY OF STBD OUTBOARD ENGINE AND PROVE PROPER OPERATION.
Condition: Unknown
Due 23 January 1992
Resolved 23 January 1992
Navigation
Issued 9 May 1990
Resolved
OBTAIN CURRENT EDITIONS OF US COAST PILOT AND USCG LIGHT LIST
Condition: Unknown
Due 9 May 1990
Resolved 9 May 1990
Fire Fighting
Issued 9 May 1990
Resolved
OBTAIN A COAST GUARD APPROVED HAND OPERATED PORTABLE FIRE PUMP
Condition: Unknown
Due 9 May 1990
Resolved 9 May 1990
Construction/Loadline
Issued 15 December 1989
Resolved
PERMANENTLY MARK DRAFT MARKS IN ALL REQUIRED LOCATIONS.
Condition: Unknown
Due 15 December 1989
Resolved 15 December 1989
Unknown
Issued 6 March 1985
Resolved
FLAME SCREENS IN PORT AND STARBOARD FUEL OIL VENTS TORN.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985
Electrical
Issued 6 March 1985
Resolved
OVERSPEED TRIPS ON PORT AND STARBOARD GENERATOR'S INOPERATIVE.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985
Engineering
Issued 6 March 1985
Resolved
SAFETY RELIEF VALVE ON STARBOARD AIR RECEIVER WOULD NOT LIFT AT 190PSI, SUPPOSE TO REIEVE AT 165. VALVE HAS BEEN PAINTED OVER, BUT COULD BE LIFTED BY HAND. TO BE REPAIRED OR REPLACED.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985
Lifesaving
Issued 6 March 1985
Resolved
FLOAT LIGHT ON LIFERING ON PORT BRIDGE WING INOPERATIVE.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985
Fire Fighting
Issued 6 March 1985
Resolved
HANDLE ON VALVE FOR PORT FIRE STATION BROKEN OFF. CAN BE OPERATED WITH VISE GRIPS.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985
Fire Fighting
Issued 6 March 1985
Resolved
ONE FIFTY FOOT LENGTH OF 1 1/2 FIRE HOSE LEAKS IN MIDDLE WHEN UNDER PRESSURE.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985
Construction/Loadline
Issued 6 March 1985
Resolved
GASKETS IN WATERTIGHT DOORS IN ENGINEROOM HAVE 1 TO 2 INCH GAPS IN GASKET MATERIAL.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985
Construction/Loadline
Issued 6 March 1985
Resolved
EMERGENCY ESCAPE HATCH FOUND TO BE BROKEN BY DECK LOAD FALLING ON IT, A TEMPORARY WOODED FLUSH HATCH HAS BEEN INSTALLED.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985
Lifesaving
Issued 6 March 1985
Resolved
ALL PFD LIGHTS HAVE EXPIRED DATES. (SALT WATER ACTIVATED LIGHTS). HAVE BEENREORDERD.
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985