← All vessels
LOCKVIEW IV
Passenger (Inspected) · Passenger Ship class · Built 1970s · USCG Great Lakes District (CGD-GL) · Other hulls named LOCKVIEW IV
LOCKVIEW IV is a 1979 passenger vessel (inspected). The Coast Guard has recorded 68 inspections since 1985, most recently in June 2026, along with 104 deficiencies — 1 with no resolution recorded — and 1 operational control.
Records from 1985 to 2026. Most recent: inspection, 29 June 2026.
- Built
- 1979
- Last inspected
- 29 June 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 104 recorded · 1 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
603032
WSX9224
50142
Flag
UNITED STATES
—
Maury page id
psix-50142
Inspections, by type
…with no type recorded5
Years with a record
37 calendar years (1985–2026)
The 68 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)41.7 ft × 13.4 ft × 6.3 ft
Registered tonnagegross 22 / net 18
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJ HUBERT BONNER · WETUMPKA AL, UNITED STATES · built 1979
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portLOCKPORT, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 4 February 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it22 - Regulatory (Subpart C or D), Gross Ton
18 - Regulatory (Subpart C or D), Net Ton
18 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 68
29 June 2026
Deficiency Check · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8421323
13 May 2025
COI Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8129571
17 October 2024
Drydock Exam
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8083755
9 July 2024
Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7955163
28 June 2024
Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7946427
31 May 2024
Drydock Extension
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7924082
8 September 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7791457
12 July 2023
Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7742568
13 February 2023
Damage Survey
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7636117
19 August 2022
Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7537327
10 April 2020
COI Inspection · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6937844
12 November 2019
Examination of Repairs · Administrative Inspection · Plan Review "T" Boat
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6853941
29 April 2019
Administrative Inspection · Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6672709
10 December 2018
Administrative Inspection · Examination of Repairs · Drydock Exam · Plan Review "T" Boat · Internal Structural Exam
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6595316
3 May 2018
Annual Inspection · Deficiency Check · Administrative Inspection · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6404525
28 June 2017
Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6189746
18 April 2016
Annual Inspection · Deficiency Check · Administrative Inspection · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5932551
3 May 2012
Annual Inspection · Deficiency Check · Simplified Stability Test
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4301483
14 December 2011
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4207904
2 March 2009
Drydock Exam
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3426506
25 June 2008
DAPI Audit · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3261358
27 June 2007
DAPI Audit · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2975352
27 June 2006
Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2692423
3 May 2005
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2347985
1 July 2004
Annual Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2107268
5 March 2004
Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2018588
27 June 2003
Annual Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1828094
26 July 2002
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1652457
17 June 2002
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1632091
26 June 2001
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1370296
29 June 2000
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1050419
5 May 2000
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1440322
7 October 1999
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 106364
28 June 1999
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1372671
23 April 1999
Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1404649
11 March 1999
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 810771
17 June 1998
Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 793813
17 June 1998
Drydock Extension · Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1438747
9 June 1997
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 787360
13 May 1997
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1421330
22 July 1996
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1441094
24 June 1996
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1430229
11 July 1995
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1417798
14 July 1994
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1177667
30 June 1994
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1442160
21 March 1994
Examination of Repairs
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1409095
19 July 1993
Deficiency Check · Plan Review "T" Boat
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1422256
14 June 1993
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1356319
6 May 1993
Hull Examination · Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1415783
26 May 1992
Plan Review "T" Boat · Deficiency Check · Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1461474
23 September 1991
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1250466
14 August 1991
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1247375
12 July 1991
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1247008
12 July 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1251978
15 April 1991
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 908752
18 December 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1234791
8 May 1990
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 912291
5 April 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1217159
15 May 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1339866
1 May 1989
Hull Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1034769
5 April 1989
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1202512
20 April 1988
COI Inspection · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 991525
15 May 1987
Hull Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1310457
15 April 1986
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1000897
14 March 1986
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1301629
24 April 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 984554
23 April 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 980439
2 April 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1290335
Deficiency record · 104
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 29 June 2026
No resolution recorded
Port engine room hatch cover was found deteriorated. Vessel owner/operator shall repair or replace cover to ensure structural and watertight integrity.Temporary repair had been approved for remainder of season. Complete permanent repair to hatch cover prior to 2027 operating season
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 17 October 2024
Resolved
Delamination of the fiberglass was found in the vessel's engine room. Vessel owner has a plan to repair and replace that section of fiberglass near the shaft seal.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 28 June 2024
Resolved
Engine room forward bulkhead was found with unsealed penetration. Make permanent repair to bulkhead
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 June 2024
Resolved
Low voltage wiring for interior LED lighting was loose or improperly secured. Make repares or remove bare wiring and loose lighting.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 28 June 2024
Resolved
Water pump for freshwater system was leaking into space. Secure or repair leaking fitting at water pump.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 September 2023
Resolved
Previous deficiency to replace hose was correcte and output of hose was increased, still not sufficient. Replace fire pump to ensure sufficient hose pressure and discharge.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 12 July 2023
Resolved
Fire pump output was insufficient with the current configuaration of collapsible hose. Replace pump and hose to increase output of installed firepump.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 August 2022
Resolved
VESSEL IS REQUIRED TO HAVE 50 ADULT LIFE JACKETS ON BOARD. ONLY 48 WERE AVAILABLE. PROVIDE 2 ADDITIONAL ADULT LIFEJACKETS. CORRECTED ON THE SPOT
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 August 2022
Resolved
STARBOARD NAVIGATION LIGHT WAS INOPERABLE. REPAIR/REPLACE STARBOARD NAVIGATION LIGHT PRIOR TO DURING NIGHT TIME HOURS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 19 August 2022
Resolved
REPAIR STARBOARD RPM GUAGE
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 19 August 2022
Resolved
PROVIDE ASPIRIN FOR FIRST AID KIT.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 19 August 2022
Resolved
SUBMIT REPAIR PROPOSAL FOR CRACK IN FIBERGLASS CENTERLINE BILGE ABOVE KEEL IN ENGINE SPACE.
Deficiency was updated to reflect submission of repair proposal to complete repairs at 2022 winter lay up.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 July 2019
Resolved
During a steering test, a rotted brace that the steering
ram mounts to was discovered. When the vessel is turned
hard port or starboard a hard flex in the board is
evident. Provide a plan for a temporary repair until
permanent repairs can be affected during off season
drydock.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 11 July 2019
Resolved
Vessel is required to conduct drills on board and log
monthly. The operator failed to provide records.
Conduct drills and provide a record to marine inspector.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 10 December 2018
Resolved
During the 2018 dry-dock/internal structural exam, a
metal plate was found on the hull port side/aft in way
of the keel. When removed, an improperly repaired
through hull was discovered. There was 2 inch (approx)
whole penetrating the hull utilizing a wood plug in the
repair. In the work list issued on December 18, 2018, a
repair plan was required before making a permanent
proper repair. Your company made the repair without
first submitting a repair plan for our review. The resin
used in the repair was polyester and the original
construction resin is unknown, which would require the
use of epoxy due to potential secondary bonding issues.
Either provide documentation attesting to original resin
used in construction or make repair to the area using
appropriate materials. If you decide to make a new
repair, you are required to provide a detailed plan to
this office prior to repair. This deficiency needs to be
cleared prior to carrying passengers.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 25 June 2018
Resolved
Vessel did not have valid Certificate of Documentation on-board.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 25 June 2018
Resolved
First-aid kit must have all of the items listed in 46CFR 160.041-4(b) *Found multiple expired items.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 June 2018
Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. Found multiple holes in bulkheads below deck.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 June 2018
Resolved
Wires in engine space must be securely fastened and in such a matter to prevent damage.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 June 2018
Resolved
Vessel's name must be marked on lifebuoy
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 28 June 2017
Resolved
Mark ring buoy as required within the provided cite.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 28 June 2017
Resolved
Destroy 2 life jackets found in unserviceable condition, replace with approved properly marked jackets.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 28 June 2016
Resolved
To the satisfaction of the attending Marine Inspector, Prove proper operation of stern light. Vessel limited to day time and fair weather operations only.
Engineering › Fuel Oil Service System › Pump
Issued 28 June 2016
Resolved
To the satisfaction of the attending Marine Inspector, tighten starboard engine low pressure fuel oil pump inlet connection.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 28 June 2016
Resolved
To the satisfaction of the attending Marine Inspector, Lubricate emergency fuel stop cables.
Operations/Management › Drills/Instruction › Not Conducted
Issued 3 May 2012
Resolved
Perform underway drills in presence of Marine Inspector.
Fire Fighting › Fixed High-Expansion Foam Fire Extinguishing System › Operation Controls
Issued 3 May 2012
Resolved
Prove servicing of Fireboy.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 3 May 2012
Resolved
Complete DAPI Audit.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 3 May 2012
Resolved
Provide crew licenses.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 3 May 2012
Resolved
Prove operation of two portable lights.
Communications › Public Address System › Announcing Station
Issued 3 May 2012
Resolved
Prove operation of PA system.
Engineering › Diesel Engine (propulsion-direct drive) › Emergency shutdown
Issued 3 May 2012
Resolved
Properly terminate dead wire on Stbd engine Fireboy shutdown solenoid.
Fire Fighting › Structural - B Class Divisions › Machinery Spaces
Issued 3 May 2012
Resolved
Seal 4 holes in aft blkhd Port side engnine compartment.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 3 May 2012
Resolved
Replace expired first aid kit items - Ammonia, Iodine, Aspirin.
Operations/Management › Vessel Safety Management › Master's Responsiblity/Authority
Issued 3 May 2012
Resolved
Vessel limited to maximum passenger count 48 persons plus 2 crew with 848 lbs installed ballast IAW SST conducted 03MAY12.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 25 June 2008
Resolved
Replace 3 adult life jackets do to unserviceable condition.
Electrical › Electrical Distribution System (service) › Wiring
Issued 27 June 2007
Resolved
Pipe holding wire bundle within # 2 compartment requires support brackets. Provide an arrangement that meets the requirements of 46 CFR 183.340 (B) 4.
Fire Fighting › Portable CO2 Fire Extinguisher › Number
Issued 27 June 2007
Resolved
Portable fire extinguisher posted outside engine room must be a B-II. Provide an arrangement that meets the requirements of 46 CFR 181.500 (a) See Table
Engineering › Bilge Water Management System › Valve
Issued 27 June 2007
Resolved
Install positive shut off vales in each bilge discharge line at hull penetration. Provide an arrangement that meets the requirements of 46 CFR182.520 (e) 7
Fire Fighting › Structural Fire Protection - General › Hull Construction
Issued 27 June 2007
Resolved
Seal engine room bulkheads fore and aft to contain CO2 discharge. Provide an arrangement that meets the requirements of 46 CFR 176.802 (2)
Engineering › Steering Gear System › Rudder
Issued 27 June 2007
Resolved
Rudder packing leaking monitor and repair as appropriate. Must be completed prior to 2008 operation season.
Provide an arrangement that meets the requirements of 46 CFR 176.840
Engineering › Reduction Gearing/Clutches › Casing
Issued 27 June 2007
Resolved
Port transmission leaking fluid, monitor and repair as appropriate. Must be completed prior to 2008 operation season.
Provide an arrangement that meets the requirements of 46 CFR 176.840
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 27 June 2007
Resolved
Portable bilge pump discharge hose not of sufficient length to discharge overboard. Provide an arrangement that meets the requirements of 46 CFR 182.520 (B).
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 27 June 2007
Resolved
Improper operation of fixed fire fighting discharge indicating light and audible alarm at control panel.
Provide an arrangement that meets the requirements of 46 CFR 46 CFR 181.420 (4) (B) 1 and 2
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 27 June 2007
Resolved
Provide complete up-to-date first aid kit. Provide an arrangement that meets the requirements of 46 CFR 184.710 and 160.041
Construction/Loadline › Penetrations › Pipe Flange
Issued 27 June 2007
Resolved
Cap hull penetration in port side engine room. Provide an arrangement that meets the requirements of 46 CFR 176.802 (2)
Lifesaving › Lifejacket/PFD (Type I)
Issued 27 June 2003
Resolved
Condemned seven closed cell foam PFDs due to exterior shell cracking/splitting. Replace on the spot.
Lifesaving › Lifejacket/PFD (Type I)
Issued 17 June 2002
Resolved
Provide retro-reflective tape on 3 Child and 5 Adult PFD's. LEGACY COMPONENT DESC: Retroreflective Material
Fire Fighting › Fixed Gas Fire Extinguishing System
Issued 17 June 2002
Resolved
Seal up holes (4) in the aft engine room bulkhead to ensure proper operation of fixed gas fire extinguishing system for the engine room.
Fire Fighting › Fixed Gas Fire Extinguishing System
Issued 17 June 2002
Resolved
Provide means to secure supply and exhaust ventilation cowls and ducts (4) for the engine room.
Lifesaving
Issued 26 June 2001
Resolved
Conduct drills with [name withheld].
Construction/Loadline
Issued 26 June 2001
Resolved
Install proper caps on foam filled thru-hulled fittings on starboard side.
Fire Fighting
Issued 26 June 2001
Resolved
Install bar fire extinhuisher in a bracket.
Engineering
Issued 26 June 2001
Resolved
Label emergency fuel shut offs and fixed fire extinguiser system so as not to be confused.
Engineering
Issued 5 May 2000
Resolved
reduce lenght of flexible fuel lines to less than 30 inches
Lifesaving
Issued 5 May 2000
Resolved
provide proper retroreflective tape on all lefe preservers and ring bouy
Fire Fighting
Issued 11 March 1999
Resolved
VESSEL CAN NOT OPERATE WITH PASSENGERS UNTIL IT IS IN COMPLIANCE WITH THE NEW FIXED FIRE FIGHTING SYSTEM REQUIREMENTS.
Documentation
Issued 17 June 1998
Resolved
Provide drug testing records for Coast Guard Audit.
Unknown
Issued 13 May 1997
Resolved
PROVIDE APPROVED FIRST AID KIT.
Fire Fighting
Issued 13 May 1997
Resolved
START MAINTENANCE LOG FOR FIRE EXTINGUISHERS AND FAX COPY OF EXTINGUISHER WEIGHTS TO OFFICE WHEN COMPLETE.
Unknown
Issued 24 June 1996
Resolved
Reinstall 15 lb anchor and line which was previously onboard vessel and subsequently removed to the satisfaction of the attending USCG marine inspector.
Unknown
Issued 24 June 1996
Resolved
Place onboard Garbage Placard to the satisfaction of the attending USCG marine inspector.
Electrical
Issued 24 June 1996
Resolved
Reinstall missing 12 volt battery cell cap to the satisfaction of the attending USCG marine inspector.
Lifesaving
Issued 24 June 1996
Resolved
Place onboard two additional approved type 1 PFDs onboard to the satisfaction of the attending USCG marine inspector.
Navigation
Issued 24 June 1996
Resolved
Place onboard current Inland Navigation Rules to the satisfaction of the attending USCG marine inspector.
Construction/Loadline
Issued 24 June 1996
Resolved
Demonstrate satisfactory operation of forepeak bilge pump to the satisfaction of the attending USCG marine inspector.
Construction/Loadline
Issued 11 July 1995
Resolved
Two overboard through hull fittings were missing the discharge hoses to them.
Lifesaving
Issued 11 July 1995
Resolved
Provide one additional adult PFD.
Fire Fighting
Issued 30 June 1994
Resolved
Replace 7lb (B-I) dry chemical fire extinguisher with a 10lb (B-II) dry chemical fire extinguisher.
Lifesaving
Issued 14 June 1993
Resolved
PROVIDE THREE ADDITIONAL APPROVED DAY DISTRESS SIGNALS.
Construction/Loadline
Issued 14 June 1993
Resolved
INSTALL INTERMEDIATE SIDE FRAMES IN LOCATIONS WHERE EXISTING FIBERGLAS ENCAPSULATED FRAMES ARE CRACKED OR DETERIORATED. REPLACEMENT FRAMES SHALL BE RENEWED TO ORIGINAL SCANTLINGS AND REPAIRS COMPLETED IAW NVIC 8-87. THIS REQUIREMENT DUE PRIOR TO CARRYING PASSENGERS IN 1994.
Electrical
Issued 14 June 1993
Resolved
PROVIDE AN ACID RESISTANT LINING (FIBERGLAS OR LEAD) FOR THE BATTERY BOX.
Electrical
Issued 14 June 1993
Resolved
INSTALL OVERCURENT PROTECTION FOR THE BILGE PUMP WIRING.
Lifesaving
Issued 14 June 1993
Resolved
PROVIDE TWO ADULT AND ONE CHILD-SIZE TYPE I PFD. VESSEL RESTRICTED TO 60 TOTAL PERSONS UNTIL COMPLETE.
Electrical
Issued 14 June 1993
Resolved
PROVIDE AS BUILT DRAWING OF REWIRED 12V DISTRIBUTION SYSTEM, INCLUDING THE BATTERY CHARGER CIRCUIT AND OVERCURRENT PROTECTION REQUIRED BY ITEM 3 (ER BILGE PUMPS).
Engineering
Issued 14 June 1993
Resolved
PROPERLY FIT THE GROUND WIRE FOR THE FUEL FILL, SO THAT THE WIRE IS NOT TUCKED UNDER THE HOSE.
Construction/Loadline
Issued 26 May 1992
Resolved
Provide documentation of changes to water and sewage tankage.
Navigation
Issued 26 May 1992
Resolved
Ensure navigation lights are proper IAW Nav. Rules.
Fire Fighting
Issued 26 May 1992
Resolved
Prove proper operation of power fire pump.
Engineering
Issued 26 May 1992
Resolved
Ensure proper ground for flexible hose at fuel fill.
Construction/Loadline
Issued 26 May 1992
Resolved
Prove proper operation of electric bilge pump under hatch no. three.
Fire Fighting
Issued 26 May 1992
Resolved
Install metallic piping for fire main system.
Engineering
Issued 26 May 1992
Resolved
Secure fuel lines to prevent vibration on both main engine fuel supply lines.
Engineering
Issued 26 May 1992
Resolved
Provide proper fuel lines and fittings to engine supply lines.
Lifesaving
Issued 26 May 1992
Resolved
Provide 1 Adult and 1 child PFD.
Electrical
Issued 26 May 1992
Resolved
Provide plans for approval to properly rewire vessel IAW subchapter T.
Construction/Loadline
Issued 12 July 1991
Resolved
MAKE FORWARD BULKHEAD OF AFT BILGE COMPARTMENT WATERTIGHT PRIOR TO NEXT DRYDOCK.
Electrical
Issued 12 July 1991
Resolved
REMOVE EXTRA WIRING FROM PORT MDE STARTING BATTERY TO A SEPERATE BUSS/FUSE BLOCK FOR EACH CIRCUIT LEG. PROVIDE PROPERLY SIZED OVERCURRENT PROTECTION_x001C_FOR EACH CIRCUIT.
Navigation
Issued 12 July 1991
Resolved
REPAIR RUDDER BUSHING FOUNDATION/CARRIER FOR STARBOARD RUDDER, (SLIGHT WEEPING IS PRESENT AT SKIN,) PRIOR TO NEXT DRYDOCK.
Fire Fighting
Issued 12 July 1991
Resolved
REPAIR OR RENEW BUILT IN FIRE PUMP. UNTIL PUMP IS OPERATIONAL, VESSEL IS RESTRICTED TO 49 PASSENGERS.
Engineering
Issued 12 July 1991
Resolved
TIGHTEN ENGINE MOUNT TO ENGINE BED BOLTS.
Lifesaving
Issued 12 July 1991
Resolved
CONDUCT SATISFACTORY FIRE AND MAN OVERBOARD DRILLS.
Navigation
Issued 12 July 1991
Resolved
INSTALL SNUG FITTING PINS OR BOLTS AT BOTH ENDS OF TILLER TIE ROD, UTILIZING DOUBLE NUTS OR COTTER PINS, AND INSTALL WITH HEAD IN UP POSITION.
Construction/Loadline
Issued 12 July 1991
Resolved
REPAIR DECK AND DECK BEAMSWHERE ROTTED.
Engineering
Issued 12 July 1991
Resolved
EXTEND EMERGENCY FUEL OIL SHUT OFF VALVE HANDLES TO INSIDE EDGE OF HATCH, (MUST PRESENTLY REACH INSIDE UNDER DECK TO CLOSE VALVES,) PRIOR TO NEXT DRYDOCK.
Accommodation/Occupational Safety
Issued 12 July 1991
Resolved
REPAIR OR RENEW POTABLE WATER PUMP.
Electrical
Issued 12 July 1991
Resolved
REMOVE UNDERSIZED WIRING THROUGHOUT VESSEL, AND RENEW WITH APPROVED, PROPERLY SIZED WIRING, AND CLEAN UP WIRING INSTALLATION PRIOR TO NEXT DRYDOCK.
Lifesaving
Issued 8 May 1990
Resolved
PROVIDE THREE USCG-APPROVED HANDHELD SMOKE DISTRESS SIGNALS
Lifesaving
Issued 8 May 1990
Resolved
REPAIR OR REPLACE USCG-APPROVED WATERLIGHT ON RING BUOY
Lifesaving
Issued 8 May 1990
Resolved
PROVIDE ONE USCG-APPROVED ADULT LIFE PRESERVER
Construction/Loadline
Issued 8 May 1990
Resolved
EXTEND ENGINEROOM EXHAUST VENTILATION DUCT INTO LOWER BILGE AREA
Fire Fighting
Issued 8 May 1990
Resolved
MOUNT FIRE PUMP SECURELY IN LOWER COMPARTMENT
Electrical
Issued 8 May 1990
Resolved
SECURE BATTERY BOX IN ENGINE ROOM
Lifesaving
Issued 23 April 1985
Resolved
PROVIDE SIX ORANGE AND SIX RED DISTRESS FLARES.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.