Records from 1982 to 2007. Most recent: inspection, 7 November 2007.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 20
7 November 2007
Ballast Water Examination · PII Safety Exam · MARPOL Annex V Examination · ISPS I Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 3094758
14 January 2001
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 285893
14 January 2001
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1060735
11 April 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1230923
18 July 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1199897
23 June 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 914382
19 June 1989
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1198733
19 December 1988
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1342463
7 July 1988
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1034689
3 May 1988
Hull Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 890501
29 March 1988
Permit to Proceed
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1195803
28 May 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1334728
30 January 1987
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1310299
4 March 1986
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 998059
24 April 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1288979
5 March 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 979887
25 January 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1289409
8 February 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 977233
4 November 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 965051
29 September 1982
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 970085
Engineering › Lubricating Oil Storage/Transfer System › Vent Pipe
Issued 14 January 2001
Resolved
Starboard aft lube oil vent discharge containment not adequate to contain burp or overflow. Vessel not permitted to take on lube oil to tank or conduct tank to tank transfer in U.S. waters until either vent pipe or containment is modified. 33 CFR 155.320
Condition: Unknown
Due 14 January 2005
Resolved 7 November 2007
Construction/Loadline › Structures › Door
Issued 14 January 2001
Resolved
Repair forward most water tight door portside. Noted local control to not be operational. SOLAS 60 II-1/ILLC 66.
Condition: Unknown
Due 1 February 2001
Resolved 7 November 2007
Fire Fighting › Means of Escape › Doorways
Issued 14 January 2001
Resolved
Noted fire doors, port and starboard of engine control room to not close properly. Doors noted to be battered, rattled apart and in need of repair. SOLAS 60 II-2
Condition: Unknown
Due 1 February 2001
Resolved 7 November 2007
Navigation
Issued 19 June 1989
Resolved
EFFECT PERMANENT REPAIRS TO OR REPLACE THE FATHOMETER TRANSDUCER AND PROVE THE PROPER OPERATION OF FATHOMETER.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Fire Fighting
Issued 19 June 1989
Resolved
PROVIDE SERVICING REPORT FOR FIXED CO2, PORTABLE EXTINGUISHERS AND SELF CONTAINED BREATHING APPARATUS.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Navigation
Issued 19 June 1989
Resolved
PROVE THE PROPER OPERATION OF THE FOLLOWING: OILY WATER SEPERATOR, FIRE PUMPS, BILGE PUMPS, STEERING SYSTEM AND VENTILATION SHUTDOWNS.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Electrical
Issued 19 June 1989
Resolved
REPAIR OR REPLACE THE STARTING COIL ON THE EMERGENCY GENERATOR.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Lifesaving
Issued 19 June 1989
Resolved
MAKE PERMANENT REPAIRS TO THE HINGES ON THE MAGAZINE LOCATED ON THE FLYING BRIDGE.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Electrical
Issued 19 June 1989
Resolved
MAKE PERMANENT REPAIRS TO THE CABLE RUN SUPPORTS UNDER BRIDGE AND PORT BRIDGE WING.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Fire Fighting
Issued 19 June 1989
Resolved
UPON RE-CREWING THE VESSEL, CONDUCT FIRE AND BOAT DRILL AND DOCUMENT THE SAME.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Engineering
Issued 19 June 1989
Resolved
PROVE THE PROPER OPERATION OF ALL ALARMS AND TRIPS FOR BOTH MAIN ENGINES.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Lifesaving
Issued 19 June 1989
Resolved
DEMONSTRATE EASE OF OPERATION OF DAVITS FOR LAUNCHING LIFERAFTS AND RELOCATE RAFTS TO IMMEDIATE VICINITY OF DAVITS.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Construction/Loadline
Issued 19 June 1989
Resolved
REPAIR OR REPLACE ALL BROKEN/BENT DOGS ON WEATHERDECK VENT OPENINGS.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Lifesaving
Issued 19 June 1989
Resolved
END FOR END LIFEBOAT FALLS (PORT AND STARBOARD) AND CONDUCT PROPER WEIGHT TEST OF EACH LIFEBOAT UPON COMPLETION.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Lifesaving
Issued 19 June 1989
Resolved
REPLACE HAND HELD FLARES ON FLYING BRIDGE WITH USCG APPROVED FLARES.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Construction/Loadline
Issued 19 June 1989
Resolved
REMOVE LUMBER FROM ATHWARTSHIPS WEATHERDECK PASSAGE FROM PORT TO STARBOARD EMBARKATION DECK.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Accommodation/Occupational Safety
Issued 19 June 1989
Resolved
EFFECT REPAIRS TO AND MAKE TIGHT THE VESSELS MARINE SANITATION DEVICE.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Electrical
Issued 19 June 1989
Resolved
PROVIDE AUDIBLE AND VISUAL ALARMS FOR HIGH JACKET WATER TEMPERATURE AND LOWLUBRICATING OIL PRESSURE FOR THE EMERGENCY GENERATOR.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Electrical
Issued 19 June 1989
Resolved
PROVE THE PROPER OPERATION OF ALL ALARMS AND TRIPS FOR ALL SIX AUXILIARY GENERATORS.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Accommodation/Occupational Safety
Issued 7 July 1988
Resolved
PRIOR TO CONDUCTING DIVE OPERATIONS, THE DIVING EQUIPMENT PRESSURE VESSELS AND COMPRESSORS MUST BE TESTED TO THE SATIFACTION OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 7 July 1988
Resolved 7 July 1988
Lifesaving
Issued 3 May 1988
Resolved
CONDUCT FIRE AND BOAT DRILLS WITHIN 24 HOURS OF DEPARTING PORT AS REQUIRED BY 46 CFR 94.15.35. TELEX MIONY UPON COMPLETION OF DRILLS.
Condition: Unknown
Due 3 May 1988
Resolved 3 May 1988
Accommodation/Occupational Safety
Issued 3 May 1988
Resolved
CONDUCT THE INSPECTIONS AND TESTS REQUIRED BY 46 CFR 61.10-5 ON THE THIRTY (30) HE/HEO2 PRESSURE VESSELS AND THE THREE (03) HIGH PRESSURE AIR RECEIVERS IN THE PRESSENCE OF A COAST GUARD INSPECTOR
Condition: Unknown
Due 3 May 1988
Resolved 3 May 1988
Accommodation/Occupational Safety
Issued 3 May 1988
Resolved
PRIOR TO CONDUCTING DIVE OPERATIONS, THE DIVING EQUIPMENT PRESSURE VESSELS AND COMPRESSORS MUST BE TESTED TO THE SATISFACTION OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 3 May 1988
Resolved 3 May 1988
Accommodation/Occupational Safety
Issued 3 May 1988
Resolved
PRIOR TO CONDUCTING DIVE OPERATIONS AND NOT LATER THAN 1 NOVEMBER 1988 PROVE OPERATION AND SAFETY TRIPS OF THE DIVE OPERATION GENERATOR TO THE SATISFACTION OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 3 May 1988
Resolved 3 May 1988
Unknown
Issued 5 March 1985
Resolved
MAKE AVAILABLE FOR INTERNAL EXAMINATION THIRTY-THREE (33) HIGH PRESSURE HELIUM/AIR RECIEVERS. DEMONSTRATE SATISFACTORY OPERATION OF AIR RELIEF VALVES. THIS SYSTEM SHALL NOT BE USED UNTIL THIS INSPECTION HAS BEEN COMPLETED TO THE SATISFACTION OF THE ATTENDING COAST GUARD INSPECTOR.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Unknown
Issued 5 March 1985
Resolved
REPLACE RELIEF VALVE ON 200 PSI BREATHING AIR RECEIVER IN DIVING EQUIPMENT SPACE PRIOR TO USING, BUT IN NO CASE LATER THAN 25APR85. RELIEF VALVE TO BE TESTED IN THE PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Unknown
Issued 5 March 1985
Resolved
MAKE PERMANANT REPAIRS TO THE LOW LUBE OIL PRESSURE ALARM ON THE STARBOARD MAIN DIESEL ENGINE. OPERATIONAL TEST TO BE CONDUCTED TO THE SATISFACTION OF THE ATTENDING COAST GUARD INSPECTOR.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Unknown
Issued 5 March 1985
Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO THE VESSEL APACHE DN603819
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Unknown
Issued 5 March 1985
Resolved
REPLACE SOLAS APPROVED SMOKE FLARE ON RING BUOY ON STBD BRIDGE WING WITH COAST GUARD APPROVED SMOKE FLARE PRIOR TO 25APR85.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Unknown
Issued 5 March 1985
Resolved
WITHIN TWO WEEKS AFTER ARRIVAL IN THE UNITED KINGDOM BUT NOT LATER THAN 25APR85 CONDUCT ANNUAL SERVICING OF NINE (9) LIFERAFTS TO THE SATISFACTION OF THE ATTENDING COAST GUARD INSPECTOR. ONLY REQUIRED CREW TO BE CARRIED ON TRANSIT FROM BRAZIL TO UNITED KINGDOM.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Unknown
Issued 5 March 1985
Resolved
CONDUCT TO THE SATISFACTION OF THE ATTENDING COAST GUARD INSPECTOR A GAS TEST OF THE DIVING HABITAT AND A HYDRO TEST OF THE DIVING BELL. TESTS TO BE CONDUCTED PRIOR TO USING EITHER PRESSURE VESSEL BUT NOT LATER THAN 25APR85.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Unknown
Issued 8 February 1984
Resolved
MANEUVERABILITY LIGHTS IMPROPERLY LOCATED VERTICALLY BETWEEN REQ. FWD AND AFT MASTHEAD LTS.
Condition: Unknown
Due 8 February 1984
Resolved 8 February 1984
Navigation
Issued 8 February 1984
Resolved
ARRANGE MASTHEAD LIGHTS AND RESTRICTED MANEUVERABILITY LIGHTS TO COMPLY WITH INTERNATIONAL RULES OF THE ROAD ANNEX I, PARA 2(F) RESTRICTED
Condition: Unknown
Due 8 February 1984
Resolved 8 February 1984