Records from 1986 to 2006. Most recent: inspection, 15 November 2006.
Inspection history · 46
15 November 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2821441
11 October 2006
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2798334
6 April 2005
MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2327788
23 March 2005
Hull Examination · Cargo Tank Internal · Internal Structural Exam
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2317551
27 February 2004
COI Inspection · Examination of Repairs
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2013979
5 January 2004
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2031899
23 January 2003
Re-Inspection · Internal Structural Exam · Cargo Tank Internal · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1735148
1 February 2002
COI Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 1483342
21 March 2001
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1382166
21 November 2000
Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1421967
16 February 2000
COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1378942
10 March 1999
Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1467596
1 May 1998
Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 789777
3 April 1998
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1125875
13 March 1998
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1108425
18 February 1998
COI Inspection · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1364572
28 January 1998
Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1394889
26 August 1997
Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1421391
6 January 1997
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1096714
23 September 1996
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1136710
21 June 1996
COI Inspection · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1404180
1 November 1995
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 881163
13 September 1995
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 882064
10 September 1995
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1192687
24 October 1994
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1173624
14 October 1994
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 867558
1 March 1994
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1354591
3 December 1993
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 848000
20 October 1993
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 849831
17 November 1992
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 827106
21 October 1992
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 942467
16 May 1991
Construction Oversight · Deadweight Survey
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 911015
25 March 1991
Re-Inspection · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 902803
30 January 1990
COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 979500
5 September 1989
Deficiency Check · Examination of Repairs
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1044332
28 February 1989
Hull Examination · Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1205788
7 November 1988
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 511161
21 January 1988
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 447358
15 January 1988
COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1326374
23 November 1987
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 497491
19 May 1987
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 456595
17 February 1987
Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1013846
23 January 1987
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 313964
25 November 1986
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 312966
11 March 1986
COI Inspection · Credit Drydock
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1299106
5 February 1986
Examination of Repairs · Damage Survey
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1304881
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 5 April 2005
Resolved
Navigation light shields faded and repainted with matte black.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 April 2005
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 5 April 2005
Resolved
18 valve handles on cargo manifold were unserviceable and to be replaced prior to loading liquid cargo.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 April 2005
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 5 April 2005
Resolved
P/V valves not secured properly and some contained grit inside of them.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 April 2005
Electrical
Issued 27 February 2004
Resolved
Fix inoperative emergency shutdown in way of vessel's starboard midship. Vessel not allowed to conduct liquid cargo transfer until above is corrected. Vessel is in gas free condition. LEGACY COMPONENT DESC: Emergency shutdown IWO midship
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 March 2004
Resolved 5 March 2004
Resolution: Renewed electrical junction, affected wiring and electrical conduit. Teste sat.
Construction/Loadline › Structures
Issued 22 February 2002
Resolved
Effect permanent repairs to the watertight door on the port side of the pump house machinery space. LEGACY COMPONENT DESC: Door
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 March 2002
Resolved 20 March 2002
Resolution: Verified satisfactory repairs to the watertight door.
Pollution Prevention/Response › Response Equipment
Issued 22 February 2002
Resolved
Install discharge removal equipment required by regulation 33 CFR 155.210 onboard the vessel. LEGACY COMPONENT DESC: Sorbents
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 March 2002
Resolved 20 March 2002
Resolution: Verified installation of required discharge removal equipment onboard the barge.
Documentation › Safety/Response Plans/Programs
Issued 1 February 2002
Resolved
Provide and keep onboard the vessel a current and approved vessel response plan. LEGACY COMPONENT DESC: Vessel Response Plan
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 March 2002
Resolved 22 February 2002
Resolution: Vessel operators provided evidence that the vessel did have a currently approved VRP and the plan was provided and stowed onboard the vessel.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 1 February 2002
Resolved
Prior to loading and carrying flammable or combustible liquid cargos, this vessel must prove proper operation of all equipment used in the loading/offloading of liquid cargos, conduct required testing, and provide all required documentation.
Action required: 705 - Other - as specified
Due 22 February 2007
Resolved 27 February 2004
Resolution: Witnessed sat operational test of vsl''s cargo pumps and shutdowns, all appeared sat.
Deck/Cargo
Issued 13 March 1998
Resolved
PROVIDE PROPER WELDING PROCEDURES AND QUALIFIED WELDERS WHEN WELDING CARGO PIPING ON THE VESSEL TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 13 March 1998
Resolved 13 March 1998
Deck/Cargo
Issued 23 September 1996
Resolved
PROVIDE COPY OF APPROVED PLAN FOR INSTALLATION OF HOSE HANDLING CRANE, WHENRECEIVED FROM ABS.
Condition: Unknown
Due 23 September 1996
Resolved 23 September 1996
Documentation
Issued 21 June 1996
Resolved
PROVIDE VESSEL RESPONSE PLAN. TO BE SHOWN IN THE ORIGINAL TO THE COGNIZANTMARINE INSPECTOR, BARGE MUST BE MAINTAINED IN GAS-FREE CONDITION, PRIOR TO OPERATION._x001C_ _x001C_
Condition: Unknown
Due 21 June 1996
Resolved 21 June 1996
Documentation
Issued 21 June 1996
Resolved
PROVIDE COFR. TO BE SHOWN IN ORIGINAL TO COGNIZANT MARINE INSPECTOR, BARGEMUST BE MAINTAINED IN GAS-FREE CONDITION, PRIOR TO OPERATION._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 June 1996
Resolved 21 June 1996
Documentation
Issued 21 June 1996
Resolved
PROVIDE SOPEP. TO BE SHOWN IN ORIGINAL TO COGNIZANT MARINE INSPECTOR, BARGE MUST BE MAINTAINED IN GAS-FREE CONDITION, PRIOR TO OPERATION.
Condition: Unknown
Due 21 June 1996
Resolved 21 June 1996
Deck/Cargo
Issued 14 October 1994
Resolved
HYDROSTATICALLY TEST CARGO PIPING AT 1.5 TIMES THE MAWP AT NEXT VESSEL DRYDOCKING/REPAIR PERIOD, BUT NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 14 October 1994
Resolved 14 October 1994
Documentation
Issued 14 October 1994
Resolved
PROVIDE OIL TRANSFER PROCEDURES PER 33 CFR 155.750. NO CARGO TRANSFERS AREAUTHORIZED UNTIL THIS ITEM HAS BEEN COMPLETED.
Condition: Unknown
Due 14 October 1994
Resolved 14 October 1994
Deck/Cargo
Issued 21 October 1992
Resolved
HYDRO CARGO HOSES TO 1.5 MAWP AND LABEL AS OIL SERVICE.
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Deck/Cargo
Issued 21 October 1992
Resolved
REMOVE PORTABLE CRANE FROM VESSEL
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Engineering
Issued 21 October 1992
Resolved
INSTALL PROTECTION ON EACH EXHAUST PIPE ON EACH DIESEL ENGINE IN ENGINE PUMP ROOM
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Deck/Cargo
Issued 21 October 1992
Resolved
CRANE TO HAVE INSTALLATION AND ANNUAL TESTS CONDUCTED BY AUTHORIZED COAST GUARD 3RD PARTY
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Documentation
Issued 21 October 1992
Resolved
PROVIDE AND POST POLLUTION PLACARD
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Documentation
Issued 21 October 1992
Resolved
PROVIDE TRIM AND STABILITY CONDITION MAX=LOAD TABLE NO 3,4,5, AND 6
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Deck/Cargo
Issued 21 October 1992
Resolved
PROVIDE DATA TO SHOW THE HYDRALIC OIL USED IN THE CRANE COMPLIES WITH 46 CFR PART 58.30
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Lifesaving
Issued 21 October 1992
Resolved
PROVIDE SIGNED COAST GUARD ANNUAL SERVICE REPORT FOR LIFERAFT OR REMOVE FROM VESSEL.
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Engineering
Issued 21 October 1992
Resolved
PROVIDE SPARK ARRESTER FOR DECK WINCH ENGINE
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Deck/Cargo
Issued 21 October 1992
Resolved
REMOVE PORTABLE POWER PACKS FROM VESSEL, EXCEPT BOOM DEPLOYMENT PACK. SUBMIT PLANS FOR APPROVAL OF INSTALLATION.
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Deck/Cargo
Issued 21 October 1992
Resolved
THE TWO 10,000 GALLON SEPERATOR TANK SHALL NOT BE USED UNTIL COAST GUARD PLAN REVIEW IS COMPLETED AND BEEN APPROVED.
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Deck/Cargo
Issued 21 October 1992
Resolved
RESUBMIT PLANS TO SHOW THE ACTUAL INSTALLATION OF THE DECK WINCH AND ITS SUPPORTING STRUCTURE FOR COAST GUARD APPROVAL
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Deck/Cargo
Issued 21 October 1992
Resolved
REMOVE DIESEL FUEL FROM 3500 GALLON SKID TANK, SUBMIT PLANS FOR APPROVAL ASINDEPENDANT TANK. TANK NOT TO BE USED UNTIL COAST GUARD APPROVED.
Condition: Unknown
Due 21 October 1992
Resolved 21 October 1992
Deck/Cargo
Issued 16 May 1991
Resolved
MAINTAIN ALL CARGO TANKS/VOIDS IN GAS FREE CONDITION UNTIL DECK WINCH,_x001C_ DECK CRANE, AND AC GENERATOR SET ARE INSPECTED TO ENSURE INTSTALLATION IS IN ACCORDANCE WITH APPROVED PLANS.
Condition: Unknown
Due 16 May 1991
Resolved 16 May 1991
Deck/Cargo
Issued 25 March 1991
Resolved
MAKE PROPER REPAIRS TO #10 BOTTOM LONG WHERE IT ATTACHES TO FWD. BHD. AFT TO APPROX. 3' AND #1 BOTTOM TRANSVERSE WHERE IT ATTACHES TO SIDE SHELL INWARD TO APPROX 3' IN STBD. CARGO TANK. REPAIRS TO BE MADE PRIOR TO THE CARRAGE OF CARGO._x001C_
Condition: Unknown
Due 25 March 1991
Resolved 25 March 1991
Deck/Cargo
Issued 28 February 1989
Resolved
TEST EMERGENCY SHUT DOWNS PRIOR TO NEXT CARGO OPS BUT NLT 7APR89
Condition: Unknown
Due 28 February 1989
Resolved 28 February 1989
Deck/Cargo
Issued 28 February 1989
Resolved
COMPLETE HYDRO OF ALL DECK CARGO PIPING AT NEXT CARGO OPS, BUT NLT 7 APR 1989
Condition: Unknown
Due 28 February 1989
Resolved 28 February 1989
Deck/Cargo
Issued 15 January 1988
Resolved
PRIOR TO NEXT CARGO TRANSFER OPERATION THE PUMP RELIEF VALVE AND CARGO PIPING SHALL BE TESTED TO 225 PSI, AND NOTIFY THIS OFFICE OF RESULTS BY LETTER.
Condition: Unknown
Due 15 January 1988
Resolved 15 January 1988
Deck/Cargo
Issued 17 February 1987
Resolved
PRIOR TO NEXT CARGO TRANSFER OPERATION, THE PUMP RELIEF VALVE, PRESSURE GUAGE, AND CARGO PIPING SHALL BE TESTED TO 225 PSI AS REQUIRED BY 46 CFR 35,35-70 AND NOTIFY THIS OFFICE OF RESULTS BY LETTER.
Condition: Unknown
Due 17 February 1987
Resolved 17 February 1987