Records from 1999 to 2025. Most recent: inspection, 10 June 2025.
Inspection history · 45
10 June 2025
Internal Structural Exam · Administrative Inspection · COI Inspection · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 8157822
14 February 2024
COI Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7865383
17 May 2023
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 7691662
21 April 2023
Administrative Inspection
Administrative · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7672996
31 January 2022
Examination of Repairs · Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7385926
17 March 2021
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7155177
27 February 2020
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6916913
20 February 2019
COI Inspection · Internal Structural Exam · Drydock Exam · Cargo Tank Internal · Examination of Repairs · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6608118
20 July 2018
Examination of Repairs · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6482043
7 February 2018
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6351847
1 June 2017
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6160021
18 July 2016
Examination of Repairs · Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5937264
18 April 2016
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5859531
17 August 2015
Examination of Repairs · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5214638
20 June 2014
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4910589
2 May 2014
Examination of Repairs · Cargo Tank Internal · COI Inspection · Administrative Inspection · Drydock Exam · MTSA Verification · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4848791
26 August 2013
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4693290
5 July 2012
MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4364952
21 March 2012
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4273280
19 January 2012
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4228050
13 October 2011
Damage Survey
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4167408
11 October 2011
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4166633
28 April 2009
Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3462837
18 September 2008
Internal Structural Exam · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3327250
7 September 2007
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3052046
31 August 2007
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3044181
6 August 2007
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3019767
24 May 2007
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 2940261
11 December 2006
Deficiency Check
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 2838041
3 December 2006
Damage Survey
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 2833087
7 November 2006
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2816342
29 November 2005
MTSA Verification · Periodic Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 2543482
2 December 2004
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2252166
27 March 2004
Type not recorded
No type recorded · Station Dauphin Island · USCG Heartland District (CGD-H) · Activity 2032672
29 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978931
18 September 2003
Examination of Repairs · Internal Structural Exam · COI Inspection
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1907585
21 January 2003
Periodic Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1733148
18 February 2002
Deficiency Check
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1495733
12 February 2002
Periodic Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1486117
12 December 2001
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1606723
7 December 2000
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1433763
10 May 2000
Administrative
Administrative · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1049943
29 March 2000
Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 276379
23 October 1999
Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 497556
8 October 1999
Hull Examination · Initial Certification · Initial Construction-Excluding Oversight
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1463524
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 14 February 2024
Resolved
Each cargo tank of a tank barge must have a high-level indicating device, unless the barge complies with 46 CFR 39.2009(a). 05 meter sticks onboard not installed correctly. Complete installation of the equipment and to the satisfaction of the MI.
46 CFR 2003(b)(1)-(b)(3)
Action required: 10 - Deficiency Rectified
Resolved 14 February 2024
Resolution: Crew completed installation of the meter sticks onboard in the presence of the MI.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 14 February 2024
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter (0.5 inch) diameter and is at least 25.4 millimeters (1 inch) long. It must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern. Extension found on the Portside of the VCS header with no stud on the outboard side.
46CFR39.2001(j)
Action required: 10 - Deficiency Rectified
Resolved 14 February 2024
Resolution: VCS pipeline coupling/extension removed, all sat.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 14 February 2024
Resolved
Cargo pump pressure gage shall be tested at least once a year for accuracy. Provide documentation attesting that the cargo pump pressure gauge has been tested .
46CFR35.35-70(c)
Action required: 10 - Deficiency Rectified
Resolved 14 February 2024
Resolution: Onboard documentation corrected to account for the accuracy of the Pipeline guages, all sat.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 5 July 2012
Resolved
Repair exhaust leak on cargo prime mover prior to discharging cargo.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 July 2012
Resolved 9 July 2012
Resolution: Section replaced.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 5 July 2012
Resolved
Replace gasket on starboard aft hatch cover
Action required: 705 - Other - as specified
Due 19 July 2012
Resolved 9 July 2012
Resolution: Gasket replaced.
Construction/Loadline › Hull › Longitudinal Frame
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the bow void: Gouge & Reweld Ten (10) Fractured Welds; Crop & Renew #1S & # 3S Bulkhead Brackets; Crop & Renew Port Corner Shelf Bracket; Crop & Renew Vertical Flange Plate Insert; Crop & Renew #3P & #4P Floor Bracket; and Crop & Renew 2 ft Section of #2S Vertical Side Chord.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the bow void: Gouge & reweld attachment to starboard #3S side chord from aft bulkhead to side long; and Fit & reweld #1P & #2P vertical side chord to side long.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 18 September 2008
Resolved
Provide written record of the date and result of the most recent test and inspection of the following equipment as required by 33 CFR 155.820: Each transfer system relief valve, each pressure gauge, and each item of remote operating or indicating equipment, such as a remotely operated valve, tank level alarm, or emergency shutdown device.
Action required: 705 - Other - as specified
Due 19 February 2009
Resolved 19 May 2009
Resolution: All applicable systems were tested satisfactorily.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 18 September 2008
Resolved
Provide Tank Vessel Response Plan for review by the attending marine inspector as per 33 CFR 155.1040.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 19 May 2009
Resolution: VRP was approved.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 18 September 2008
Resolved
Update contents of transfer procedures to include a listing of each product transferred to or from the vessel including generic or chemical name & cargo information as described in 33 CFR 154.310(a)(5)(ii). Once transfer procedures are update, submit a copy to Sector Mobile Inspection Division for review as per 33 CFR 155.760.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 19 May 2009
Resolution: Transfer procedures were updated and on board.
Construction/Loadline › Hull › Longitudinal Frame
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #1P Wing Tank: Gouge & reweld six fractured welds, Crop & renew #2 transverse deep frame from centerline outboard, crop & renew #5 vertical outboard chord, crop & renew #5 deep frame tip, and crop & renew 2 ft upper section of #2 vertical outboard side chord & attach to side long.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #2P wing void: Gouge & reweld ten fractured welds, crop & renew #1 outboard shelf bracket on fwd bulkhead, crop & renew #1, #2, #3 & #5 vertical side chords, crop & renew #2, #3, #4 transverse deep frames approximately 3 ft to side chord attachment, repair or renew #1 side long in way of #3 through #5 side chord.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Bracket
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #2P wing void: Crop & renew #1 & #6 shelf brackets on aft bulkhead.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #3P wing void: Gouge & reweld eight fractured welds, Crop & renew #2,#4,#5 transverse deep frame tips approx. 30" x 5/16" x 27", Crop & renew damaged sections of #4,#5,#7,#8 vertical side chord, Crop & renew #5 forward bracket on swash bulkhead, Crop & renew transverse #7 deep frame tip approx. 30" x 5/16" x 27".
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #3P wing void: Crop & renew damaged sections of #1,#3, #4 side longs, Crop & renew #1 & #5 aft bulkhead brackets, and Crop & renew #8 lower diagonal angle approx. 3" x 3" x 5/16" x 39" .
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Bracket
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #4P wing void: Gouge & reweld six fractured welds, Crop & renew #6 fwd bulkhead corner bracket, Crop & renew #1 & #2 transverse deep frame tip approx. 30" x 5/16" x 27", Crop & renew #1 side long in way of #2 & #3 vertical side chord, and, Crop & renew #1 & #5 aft bulkhead corner brackets.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #5P wing void: Gouge & reweld ten fractured welds, Crop & renew #1,#2,#3,#4 transverse deep frame tips approx. 30" x 5/16" x 27", and, Fit & reweld or flat clip #1 through #5 vertical side chords to #1 side long.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Stool
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #6P wing void: Gouge & reweld six fractured welds, Crop & renew #3, #4, #5 vertical side chords, Crop & renew transverse #5 deep frame tip approx. 30" x 5/16" x 27", Crop & renew #5 upper diagonal between vertical side & cargo tank chords, and, Crop & renew #1 & #2 aft bulkhead corner brackets.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #6P wing void: Fit & reweld or flat clip upper #1 side long to #1 through #5 vertical side chords, and, Crop & renew damaged sections of #1 side long at aft bulkhead in way of vertical side chord attachment throughout compartment.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Bracket
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the stern wing void: Crop & renew #4,#5,#6 port corner brackets, Crop & renew #2,#4,#5,#6 starboard corner brackets, Crop & renew starboard gunwale bracket, Crop & renew #1,#2,#3 port corner brackets, Crop & renew #1,#5,#6 starboard bulkhead brackets, and, Crop & renew 5 ft section of #1 starboard side long.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Transverse Frame
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #6S wing void: Gouge & reweld eight fractured welds, Crop & renew 3ft top section of #2 & #4 vertical side chord, Crop & renew #1,#2,#6 transverse deep frame tip approx. 30" x 5/16" x 27", Crop & renew #1 side long in way #4 vertical side chord, and, Crop & renew #4 fwd bulkhead outboard corner bracket.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #6S wing void: Crop & renew #1 aft bulkhead corner bracket, and Refit & weld #1 side long to #2 & #3 vertical outboard side chords.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #5S wing void: Gouge & reweld ten fractured welds, Refit & weld #1 side long attachment to #1 through #5 vertical outboard side chord, and Crop & renew #5 fwd bulkhead corner bracket.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Transverse Frame
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #4S wing void: Gouge & reweld eight fractured welds, Crop & renew #2,#3,#4,#5 transverse deep frame tips, Refit & weld #1 side long attachment to #2 through #5 vertical outboard side chord, and, Crop & renew #5 vertical outboard side chord.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Transverse Frame
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #3S wing void: Gouge & reweld five fractured welds, Crop & renew #4,#5, #8 transverse deep frame tip, and, Refit & weld #1 side long attachment to #2 through #5 vertical outboard side chord.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Transverse Frame
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #2S wing void: Gouge & reweld eight fractured welds, Crop & renew #1 through #5 transverse deep frames approx 3ft long each, Crop & renew 4ft section of #1,#3,#4 vertical outboard side chords, and, Crop & renew 4ft section of lower portion of #1 diagonal angle,.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #2S wing void: Refit/Renew & weld #1 side long attachment to #1 through #5 vertical outboard side chord, and, Crop & renew upper section of #5 diagonal angle.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Transverse Frame
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #1S wing void: Gouge & reweld six fractured welds, Crop & renew #1,#3,#4 aft bulkhead corner brackets, Crop & renew #2,#3,#4 transverse deep frame under cargo tank approx. 10 ft long, and Crop & renew #1 transverse deep web frame approx. 8ft long.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Hull Plating
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #1S wing void: Crop & renew upper 3ft section of #1,#2,#4,#5 vertical outboard side chord, Crop & renew damaged section of bottom shell plating approx 10ft x 35ft along with associated bottom plate angle stiffeners in bay #3, Crop & renew #1Fwd bulkhead floor bracket, Crop & renew #5 fwd bulkhead corner bracket.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Construction/Loadline › Hull › Stiffener
Issued 18 September 2008
Resolved
Make the following repairs and/or renewals to the following structural members in the #1S wing void: Crop & renew #5 bottom long located in bay #5, Crop & renew #4 & #5 bottom long in bay #4, and, Refit/Renew & reweld #1 upper side long attachment to outboard vertical side chord.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 18 September 2008
Resolved
Repair or renew damaged tank top port and starboard ladders to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 19 May 2009
Resolution: Ladders repaired.
Engineering › Fuel Oil Service System › Piping
Issued 18 September 2008
Resolved
Repair or renew loose/leaking pump engine diesel fuel return piping on main deck.
Action required: 705 - Other - as specified
Due 25 September 2008
Resolved 25 September 2008
Resolution: New fitting was installed and found satisfactory
Documentation › Markings/Placards › Warning Signs
Issued 18 September 2008
Resolved
Mark all cargo hatches with "Danger-Keep Out" as required by 46 CFR 35.05-15 to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 19 May 2009
Resolution: All hatches were marked "Danger Keep Out."
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 18 September 2008
Resolved
Mark vessel's name and hailing port on some clearly visible exterior part of the vessel as required by 46 CFR 67.123 to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 19 May 2009
Resolution: Proper markings were painted on bow and stern.
Construction/Loadline › Structures › Deck Plating
Issued 18 September 2008
Resolved
Cap weld deteriorated weld seam located at deck knuckle between #4S & #5S wing tank hatches to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 18 February 2009
Resolved 28 April 2009
Resolution: All reccomendations were followed.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 31 August 2007
Resolved
Broken dog on forward most hatch of the #1 port cargo tank
Action required: 703 - Prior to bunkering operations
Due 31 August 2007
Resolved 7 September 2007
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Gaskets
Issued 31 August 2007
Resolved
Packing of the reach rod on the #3 port cargo tank is not vapor tight
Action required: 703 - Prior to bunkering operations
Due 30 September 2007
Resolved 7 September 2007
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 31 August 2007
Resolved
Sight glass on the #1 port ullage leaking vapors
Action required: 703 - Prior to bunkering operations
Due 30 September 2007
Resolved 6 September 2007
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 31 August 2007
Resolved
Nav light boxes had faded matte black inner coating. Instructed to rectify prior to twilight/after dark operations
Due 30 September 2007
Resolved 7 September 2007
Construction/Loadline › Hull › Bottom Plating
Issued 3 December 2006
Resolved
Barge noted in this activity has a 3/4" wide by 10" long fracture located on portside of bow rake appx. 6' inboard, 18" forward of the collision bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 December 2006
Resolution: Permanet repair to bow rake complete. Leak check satisfactory.
Documentation › Markings/Placards
Issued 12 February 2002
Resolved
Provide and post an Oil Discharge Placard in accordance with Title 33 Code of Federal Regulations Part 155.450. LEGACY COMPONENT DESC: Oil Discharge Placard
Condition: Unknown
Due 12 March 2002
Resolved 18 February 2002
Resolution: Placard provided.