MAURY USCG vessel records Sign in
← All vessels

TEAL

TEAL is a 1979 passenger vessel (inspected). The Coast Guard has recorded 70 inspections since 1985, most recently in June 2026, along with 171 deficiencies and 1 casualty investigation in 2025.

Records from 1985 to 2026. Most recent: inspection, 11 June 2026.

Built
1979
Last inspected
11 June 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDL7048
Flag
UNITED STATES
368156630
Maury page id
psix-50346

Inspections, by type

…with no type recorded4
Years with a record 37 calendar years (1985–2026)
The 70 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)60.5 ft × 21.1 ft × 5.8 ft
Registered tonnagegross 48 / net 32
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPARKER MARINE ENTERPRISE · HARKERS ISLAND, NC, UNITED STATES · built 1979
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portITHACA, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 16 March 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it48 - Regulatory (Subpart C or D), Gross Ton
32 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDL7048MMSI 368156630 · active · compulsorily equipped · granted 31 July 2020, expires 31 July 2030
WDH9643MMSI 367670140 · expired · voluntarily equipped · granted 2 May 2015, cancelled 7 June 2025
WDD2073MMSI 367110540 · expired · compulsorily equipped · granted 29 April 2006, cancelled 2 July 2016 · licensed under a name not among this hull’s recorded names (not shown)
WOEJMMSI 366854440 · expired · compulsorily equipped · granted 28 May 2002, cancelled 28 July 2012 · licensed under a name not among this hull’s recorded names (not shown)
WRA9865MMSI not assigned · expired · compulsorily equipped · granted 16 January 1997, cancelled 10 June 2007 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 70

11 June 2026 Vessel Attendance · Examination of Repairs
Physical examination · Marine Safety Unit Thousand Islands · USCG Great Lakes District (CGD-GL) · Activity 8413030
21 August 2025 Type not recorded
No type recorded · Marine Safety Unit Thousand Islands · USCG Great Lakes District (CGD-GL) · Activity 8234464
4 June 2025 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Thousand Islands · USCG Great Lakes District (CGD-GL) · Activity 8153139
5 November 2024 Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Thousand Islands · USCG Great Lakes District (CGD-GL) · Activity 8029951
20 May 2024 Annual Inspection
Physical examination · Marine Safety Unit Thousand Islands · USCG Great Lakes District (CGD-GL) · Activity 7913326
22 July 2023 Damage Survey
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7901551
2 November 2022 Internal Structural Exam · COI Inspection · Hull Examination
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7589109
20 June 2022 Administrative Inspection · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7483191
25 March 2022 Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7418531
20 May 2021 DAPI Audit · Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7201580
23 July 2020 DAPI Audit · Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7014132
19 June 2019 Deficiency Check · DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6704960
7 November 2017 Drydock Exam · COI Inspection · Examination of Repairs · Internal Structural Exam · Administrative Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6302173
15 May 2017 Annual Inspection · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6160101
8 March 2016 Administrative Inspection · Deficiency Check · Internal Structural Exam · Annual Inspection · Hull Examination · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5829621
8 August 2014 Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4951780
16 May 2014 Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4865392
22 December 2011 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4212539
2 December 2009 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3643411
27 June 2008 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3327336
13 May 2008 Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3205253
20 April 2007 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2911463
24 April 2006 Administrative Inspection · Annual Inspection · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2632388
10 August 2005 Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 2458003
18 April 2005 Hull Examination · Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2336945
6 April 2005 COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2323517
13 April 2004 Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2049502
12 March 2004 Annual Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2022260
2 September 2003 Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1894230
23 July 2003 Annual Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1855797
25 March 2003 Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1763899
21 March 2003 Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1763761
21 August 2002 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1664272
9 July 2002 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1643644
2 April 2002 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1600360
18 April 2001 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1061718
1 March 2001 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1389315
15 March 2000 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1417038
10 March 2000 Deficiency Check · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1467201
12 April 1999 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1397155
23 February 1998 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1434675
9 January 1998 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1424511
6 August 1997 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 126285
24 February 1997 COI Inspection · Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1422800
13 March 1996 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1437056
7 December 1995 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1357415
10 April 1995 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 867591
13 March 1995 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1417741
14 March 1994 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 869798
1 March 1994 COI Inspection · Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1366990
17 December 1993 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1423848
15 March 1993 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1142947
19 May 1992 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1266566
3 April 1992 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 943975
14 May 1991 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 922615
23 April 1991 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1234213
18 April 1991 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 922929
14 June 1990 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 917309
23 March 1990 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1237304
22 March 1990 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1237983
24 April 1989 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1034430
17 March 1989 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 896595
14 July 1988 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1340963
24 March 1988 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1301903
15 June 1987 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1009010
8 May 1987 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1020549
24 April 1986 Credit Drydock
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1000872
11 April 1986 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 999021
23 September 1985 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1293496
25 March 1985 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 980603

Deficiency record · 171

02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 11 June 2026 Resolved
The third strake board above the bilge knuckle on the port side has rotten from the the stern to approximately 12 feet forward from stern. Replace in kind
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 July 2026
Resolved 30 June 2026
Resolution: Repair complete
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 11 June 2026 Resolved
Starboard side where transom and side shell come together is rotten and separating. Repair/replace in kind
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 July 2026
Resolved 30 June 2026
Resolution: Repair Complete
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 11 June 2026 Resolved
REPAIRS OR ALTERATIONS TO THE HULL, MACHINERY, OR EQUIPMENT AFFECTING THE SAFETY OF THE VESSEL MUST NOT BE MADE WITHOUT THE APPROVAL OF THE COGNIZANT [name withheld] IN AN EMERGENCY. THE VESSEL WAS FOUND TO HAVE DETERIORATED AND ROTTED WOOD IN THE STARBOARD AFT QUARTER AND PORT AFT QUARTER. ADDITIONALLY, DUE TO THE VESSEL REMAINING IN DRYDOCK FOR AN EXTENDED PERIOD, THE HULL PLANKING HAS DRIED AND SEPARATED AT VARIOUS LOCATIONS ON THE UNDERBODY. A REPAIR PROPOSAL WAS NOT SENT TO USCG BEFORE REPAIRS WERE COMMENCED, AND USCG WAS NOT KEPT INFORMED THROUGHOUT THE PROCESS TO ALLOW FOR INSPECTION OF AREAS THAT WOULD LATER BE HIDDEN FROM VIEW. THESE DEFICIENCIES MUST BE REPAIRED BEFORE THE VESSEL IS RETURNED TO SERVICE. A DETAILED REPAIR PLAN SHALL BE SUBMITTED TO THE COGNIZANT OCMI FOR REVIEW AND APPROVAL PRIOR TO COMMENCING ANY REPAIRS. THE REPAIR PROPOSAL SHOULD INCLUDE THE SCOPE OF WORK, REPAIR METHODS, MATERIALS TO BE USED, AND ANY PROCEDURES NECESSARY TO RESTORE THE VESSEL TO AN ACCEPTABLE CONDITION. UPON [name withheld], REPAIRS MAY COMMENCE. UPON COMPLETION OF ALL APPROVED REPAIRS, THE WORK SHALL BE MADE AVAILABLE FOR EXAMINATION BY A U.S. COAST GUARD MARINE INSPECTOR PRIOR TO THE VESSEL BEING REFLOATED.
Action required: 60 - Rectify deficiencies prior to movement
Due 15 July 2026
Resolved 30 June 2026
Resolution: Repair complete
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 June 2025 Resolved
(a) Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Port and Starboard MDE are leaking oil. Port is more excessive than starboard. MDE's need to be serviced and reduce the amount of oil leaking.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 2 July 2025
Resolution: Received attestation from vessel rep of repair to engines via email. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 June 2025 Resolved
(a) All vessels except non-self-propelled vessels shall be provided with suitable steering apparatus. Mounting bolts for rudder steering assembly on rudder posts in lazarette has sheered a bolt and remaining bolts (7) and nuts are extremely corroded. Replaced all bolts and nuts in kind.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 2 July 2025
Resolution: Received photographs of new bolts installed on rudder posts. All sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 June 2025 Resolved
Flexible hose designed for use with hose clamps may be installed with two clamps, at both ends of the hose. Exhaust hose in lazarette on port side aft as it leads overboard is deteriorated and needs replaced in kind. Both port and Starboard are missing a second hose clamp on flexible exhaust hose as it leads overboard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 31 July 2025
Resolution: New hose installed. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 4 June 2025 Resolved
(c) At least one ring life buoy must be fitted with a lifeline. If more than one ring life buoy is carried, at least one must not have a lifeline attached. Both ring life buoys have a life line attached. One life line needs to be removed from the ring buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 2 July 2025
Resolution: Lifeline has a corrosion resistant clip to capable of being removed. All sat
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 4 June 2025 Resolved
(b) At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, clog bilge pumping systems, or block emergency escapes. Oil soaked absorbents under both MDEs in bilge need to be removed. If absorbents become soaked in oil frequently, ensure they are replaced as needed to prevent fires.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 31 July 2025
Resolution: Bilges cleaned. All sat
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 4 June 2025 Resolved
(d) Connections must be made to battery terminals with permanent type connectors. Spring clips or other temporary type clamps are prohibited. A loose terminal for the battery was found in the overhead above port MDE batteries. Tighten connection.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 2 July 2025
Resolution: Received attestation from vessel rep terminals are tightened. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 4 June 2025 Resolved
(a) At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Deck light on port side midship, has a broken globe. Replace globe in kind.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 2 July 2025
Resolution: New globe installed. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 May 2024 Resolved
Deadend wires in the #2 compartment.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2024
Resolved 12 June 2024
Resolution: Vessel rep sent email to attest to correction. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 May 2024 Resolved
Stbd main engine alternator had a build up of oil and dirt.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2024
Resolved 12 June 2024
Resolution: Replaced in kind. All sat
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 May 2021 Resolved
Starboard side frames 1-3 and the attached 5 wood planks in lazarette are wasted and require repair.
Action required: 60 - Rectify deficiencies prior to movement
Due 25 May 2021
Resolved 27 May 2021
Resolution: MI recieved objective evidence of satisfactory repair
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 May 2021 Resolved
The #6 bottom frame, on top of the keelson, is wasted
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2021
Resolved 23 June 2021
Resolution: MI approved/recieved objective evidence of repair.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 May 2021 Resolved
Port stanchion in lazarette that supports the main deck, top of stanchion is wasted and requires repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2021
Resolved 23 June 2021
Resolution: MI approved/recieved objective evidence of repair.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 20 May 2021 Resolved
Notify local OCMI once vessel is hauled out of water for winter lay-up, for MI to evaluate conditions of repairs
Action required: 705 - Other - as specified
Due 30 April 2022
Resolved 20 June 2022
Resolution: Inspected Structural member replacement while in operation. No Discrepancies found.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 August 2020 Resolved
Contact Sector Buffalo MI upon haul out to arrange inspection of areas identified weeping. Provide written plan to address areas.
Action required: 705 - Other - as specified
Due 30 April 2021
Resolved 24 May 2021
Resolution: areas inspected by available MI
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 August 2020 Resolved
Replace raw water pump and prove proper operation of port mde.
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 August 2020
Resolved 17 August 2020
Resolution: Received email from master and crew showing replacement with statement attesting to sat operation.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 July 2020 Resolved
Monitor weeping members and keel bolt with permanent repairs to be completed prior to the 2021 operating season.
Action required: 705 - Other - as specified
Due 30 April 2021
Resolved 24 May 2021
Resolution: inspected by available MI
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 19 June 2019 Resolved
Provide suitable metal marine type strainer meeting the requirements of the engine manufacture. Fuel strainer must meet the requirements of provided cite.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 July 2019
Resolved 25 June 2019
Resolution: Received notification from poc requirement corrected.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 June 2019 Resolved
Void #1; de-water and maintain dry and ventilated. Prior to commercial operations in 2020 replace keel bolt within area grinding and glassing old bolt below surface. CG Marine Inspector to be notified when work is completed to allow out of water inspection.
Action required: 705 - Other - as specified
Due 1 May 2020
Resolved 24 May 2021
Resolution: inspected by available MI
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 19 June 2019 Resolved
Provide copy of annual fire extinguishing and alarm system attesting to the satisfactory operational testing of system. Requirement to be corrected within 7 days. Requirement will be a NO SAIL requirement if not corrected by requirement date.
Action required: 705 - Other - as specified
Due 26 June 2019
Resolved 25 June 2019
Resolution: Received notification from poc requirement corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 19 June 2019 Resolved
Prove proper operations of engine cooling ball valves. Found handles either difficult to operate or unable to operate with interference of structural members.
Action required: 10 - Deficiency Rectified
Due 19 June 2019
Resolved 19 June 2019
Resolution: Handle modified with all valves cyceled prior to MI's departure.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 June 2019 Resolved
Void #2: De-water bilge and maintain dry. Space to be inspected during follow up visit within 14 days.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 July 2019
Resolved 25 June 2019
Resolution: Received notification from poc requirement corrected.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 May 2018 Resolved
Continue repairs to void #2 weeping seam ivo stbd chine between knees 3 & 4, PT 7 & 8. Lazarette PT aft transverse deck frame & PT aft knee weeping.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2018
Resolved 14 May 2018
Resolution: Leaks w/in void #2 sealed with sat results - monitor. Leaks in laz sealed with deck frame repair sat, pt knee reduced to a slow weep. Monitor / MI to check in 1 wk.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 May 2018 Resolved
Make repairs to pilot house personnel hazards. Pilothouse removed to transit through canal, mating surface provides hazard - complete reattachment.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 May 2018
Resolved 14 May 2018
Resolution: Witnessed sat repairs eliminating personnel hazards.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 May 2018 Resolved
Mark quantity of adult life jackets stowed in forward space. Mark all life jackets with vsl name.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2018
Resolved 14 May 2018
Resolution: Stowage location provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 May 2018 Resolved
Remove dead ended wires ivo pilot house.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2018
Resolved 14 May 2018
Resolution: Several old, unused wires removed.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 8 May 2018 Resolved
Provide covers for shafts - protection from rotating machinery.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2018
Resolved 4 June 2018
Resolution: Metal mesh covers provided.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 May 2018 Resolved
Complete electrical bonding wires throughout vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 May 2018
Resolved 4 June 2018
Resolution: Bonding system repairs completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 May 2018 Resolved
De-water all voids, clean all voids of debris ensuring lumber holes are open/provided to allow drainage to installed bilge pumps.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2018
Resolved 14 May 2018
Resolution: Spaces cleaned and dewatered.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 May 2018 Resolved
Provide electrical junction boxes for main deck overhead wires. (String lights installations)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 14 May 2018
Resolution: Appropriate outlets, wiring and supports provided.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 8 May 2018 Resolved
Provide servicing report for fire fighting equipment and ensure appropriate mounts are provided.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2018
Resolved 14 May 2018
Resolution: Servicing certificate provided for fixed fire suppression system and portable extinguishers.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 May 2018 Resolved
Rig ring buoy with light/line.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2018
Resolved 14 May 2018
Resolution: Lifebuoy arrangement provide as required.
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 8 May 2018 Resolved
Rig appropriate life line for upper deck w/sign crew only. Same sign/chain for main deck forward.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2018
Resolved 14 May 2018
Resolution: Cable with appropriate signage provided.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 8 May 2018 Resolved
Prove proper ops of water pump for sanitary use.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2018
Resolved 14 May 2018
Resolution: New valve installed ops sat.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 8 May 2018 Resolved
Provide appropriate logs.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2018
Resolved 14 May 2018
Resolution: Log book provided with appropriate entries made.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 8 May 2018 Resolved
Make changes to emergency procedures to reflect actual method of mob recovery.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2018
Resolved 14 May 2018
Resolution: Completed underway drills witnessing MOB recovery as provided within posted procedures.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 8 May 2018 Resolved
Provide on board required first-aid kit.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2018
Resolved 14 May 2018
Resolution: Updated kit provided.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 8 May 2018 Resolved
Provide required navigation lights.
Action required: 17 - Rectify deficiencies prior to departure
Due 8 May 2018
Resolved 14 May 2018
Resolution: Stern light ops sat.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 8 May 2018 Resolved
Secure Lazarette bilge pump hose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 14 May 2018
Resolution: Hose secured as required.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 November 2017 Resolved
Post EAP hotline phone number.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2018
Resolved 14 May 2018
Resolution: Hotline number posted and provided within company policy signed by each crewmember.
Operations/Management › Vessel Activity › Construction/Repair
Issued 3 May 2016 Resolved
Complete worklist issued 14 Apr 2016 (except items 5, 6, 7, 10, which are deferred to 01 Oct 2016).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 15 May 2017
Resolution: Vessel completed worklist
Documentation › Markings/Placards › Lifejacket Placard
Issued 3 May 2016 Resolved
Lifejacket placard required for jacket style lifejackets.
Action required: 705 - Other - as specified
Due 17 May 2016
Resolved 25 May 2016
Resolution: Verified proper placard is posted.
Fire Fighting › Fire Main › Material
Issued 3 May 2016 Resolved
Replace bilge/fire main flexible hose in engine room (stbd side) with acceptable material.
Action required: 705 - Other - as specified
Due 15 November 2016
Resolved 15 May 2017
Resolution: vessel installed galvanized piping
Engineering › Sea-water System (primary cooling) › Piping
Issued 3 May 2016 Resolved
Replace port engine raw water cooling line.
Action required: 705 - Other - as specified
Due 17 May 2016
Resolved 25 May 2016
Resolution: Flex hose replaced with new run.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 3 May 2016 Resolved
Install breakglass cover over fixed firefighting system activation point.
Action required: 705 - Other - as specified
Due 17 May 2016
Resolved 25 May 2016
Resolution: Owner asked for reconsideration for this deficiency. After taking another look, the wood frame around the pull activation meets the intent of the reg, not allowing an accidental discharge.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 3 May 2016 Resolved
Remove hydraulic flexible hose penetrations of watertight bulkhead and install bulkhead fittings or change to metallic piping.
Action required: 705 - Other - as specified
Due 3 May 2016
Resolved 31 August 2016
Resolution: The OCMI has ruled that if it is an existing installation, the flex hose penetrations will be allowed until the replacement is required, and the vessel must mee the regulation.
Engineering › Bilge Water Management System › Valve
Issued 3 May 2016 Resolved
Install check valves in bilge lines connected to manifold.
Action required: 705 - Other - as specified
Due 3 May 2016
Resolved 25 May 2016
Resolution: The owner pointed out that the end of the bilge piping in each space have the strainer/check valve combo fitting.
Construction/Loadline › Hull › Bottom Plating
Issued 3 May 2016 Resolved
Remove plastic cap on transducer through-hull fitting and replace with metallic cap
Action required: 705 - Other - as specified
Due 17 May 2016
Resolved 25 May 2016
Resolution: Metallic cap installed
Lifesaving › Lifefloat › Retroreflective Material
Issued 3 May 2016 Resolved
Repair lifefloat in accordance with manufacturer's instructions.
Action required: 705 - Other - as specified
Due 17 May 2016
Resolved 31 August 2016
Resolution: O/O removed lifefloats from vessel. Reduced route to warm water only.
Operations/Management › Vessel Activity › Other
Issued 3 May 2016 Resolved
Vessel is restricted to a Lakes, Bays, and Sounds route.
Action required: 705 - Other - as specified
Resolved 25 May 2016
Resolution: Issued amended COI with LBS route.
Operations/Management › Vessel Activity › Construction/Repair
Issued 22 April 2016 Resolved
Submit written repair proposal for all outstanding work list items for review and approval by CGMI.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 April 2016
Resolved 15 May 2017
Resolution: Vessel cleared outstanding worklist with Sector Del Bay
Stability › Watertight Integrity › General
Issued 19 April 2016 Resolved
Repair leaking three-inch pipe thru-hull fitting in second void space.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 April 2016
Resolved 19 April 2016
Resolution: Vessel was able to tighten cap to stop leakage.
Operations/Management › Vessel Activity › Underway
Issued 14 April 2016 Resolved
Conduct satisfactory underway check ride prior to carrying passengers for completion of credit dry dock.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2016
Resolved 19 April 2016
Resolution: Conducted satisfactory underway check ride.
Electrical › Lighting (service) › Lighting Fixture
Issued 8 August 2014 Resolved
Remove exposed wires located in lighting fixture in Engine room or Install lighting fixture/cap lighting outlet
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Electrical › Electric Supply System (service) › Cable
Issued 8 August 2014 Resolved
Remove dead end wiring located in the entrance to engineroom and in the lazerette.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 8 August 2014 Resolved
Vessel has UNSAT first aid kit onboard. Vsl is required to maintain First Aid Kit per 46CFR184.710.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Communications › Radio Communications › EPIRB
Issued 8 August 2014 Resolved
Vessels EPIRB battery expired 10/2013. Vessel is restricted to L/B/S route vice L/B/S plus LC until proof of sat EPIRP Battery installation is verified by OCMI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Communications › Radio Communications › EPIRB
Issued 8 August 2014 Resolved
Vessel is required to maintain monthly EPIRB inspection /testing log per 46CFR180.64
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 8 August 2014 Resolved
Vsl Master/Supervisor is required to obtain drug awareness/dapi training per 46CFR16.401
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 8 August 2014 Resolved
Vessel required to maintain lifesaving inspection log. Vessel had 02 Lifefloats on board with 02 water lights that he is currently not inspecting.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 8 August 2014 Resolved
Provide proof of 2013 MIS report/submission.
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 8 August 2014 Resolved
Per 46CFR16.401 vessel is required to post companys DAPI Policy statement.
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Electrical › Electrical Distribution System (service) › Wiring
Issued 8 August 2014 Resolved
Observed extention cord andset of allgator clips being used on portside battery bank. Informed vessel rep that both alligator clips and extention cords are not allowed onboard vessel.
Condition: Invalid
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 8 August 2014 Resolved
Vessel was missing the following NavPUBS: NAVRULE, Coast Pilots and updated nautical charts.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Engineering › Sea-water System (primary cooling) › Piping
Issued 8 August 2014 Resolved
Starbord side exhaust (Pedro connection) piping missing double clamp.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Navigation › Collision/Grounding Avoidance › Radar
Issued 8 August 2014 Resolved
Vessel rep was unable to operate RADAR. Vsl rep stated that the RADAR was new and he was not sure how to operate it and that there was not a handbook/operator manual onboard. Vessel is restricted to L/B/S route vice L/B/S plus LC until proof of sat operation of RADAR is verified by OCMI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 12 August 2014
Resolution: Radar was operational.
Fire Fighting › Remote Fuel Shutoff › General
Issued 8 August 2014 Resolved
Vsl must label emergency fuel shut offs (Port/Starboard) and label direction of open/closure at reachrod opening.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 8 August 2014 Resolved
Secure wire run opening located portside on bulkhead located in engineroom adjacent to fuel compartment.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 8 September 2014
Resolution: Items Cleared by CIV [name withheld]. All Sat
Construction/Loadline › Structures › Superstructure
Issued 13 May 2008 Resolved
Properly repair portside bottom/side frames beginning at the transom (Frames 1 through 9).
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2008
Resolved 1 July 2008
Resolution: Area properly repaired.
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 13 May 2008 Resolved
Replace both port and stbd shaft cutlass bearings.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 July 2008
Resolved 1 July 2008
Resolution: New port and stbd cutlass bearings placed on shafts.
Construction/Loadline › Hull › Stiffener
Issued 13 May 2008 Resolved
Properly repair 2 engine room portside frame heads.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 July 2008
Resolved 1 July 2008
Resolution: Area properly repaired.
Construction/Loadline › Hull › Transverse Frame
Issued 13 May 2008 Resolved
Properly repair engine room second deck support beams, repair area where support beams intersect main deck.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 July 2008
Resolved 1 July 2008
Resolution: Area properly repaired.
Construction/Loadline › Hull › Transverse Frame
Issued 13 May 2008 Resolved
Properly repair forepeak stbd deck beam heads.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 July 2008
Resolved 1 July 2008
Resolution: Area properly repaired.
Documentation › Manuals/Policy Documentation › Company Action Plan (SIP)
Issued 13 May 2008 Resolved
Submit repair proposal prior to commence work on repairs.
Condition: Unknown
Action required: 705 - Other - as specified
Due 16 May 2008
Resolved 21 May 2008
Resolution: Rcvd repair proposal.
Fire Fighting › Fixed Fire Detection System › Power Supply
Issued 20 April 2007 Resolved
Vessel required to install CG approved equipment for the fire detection system and provide a supervised control circuit.
Action required: 705 - Other - as specified
Due 31 March 2008
Resolved 3 December 2009
Resolution: Fire detection system verified to be in compliance with requirement for a supervised circuit.
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 18 April 2005 Resolved
Renew corroded shaft packing gland (STBD) at the next drydocking.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 March 2006
Resolved 25 April 2006
Resolution: Verified new packing gland in vessel.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 6 April 2005 Resolved
All pages of posted COI not visible.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 10 May 2005
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 6 April 2005 Resolved
Portable dry chem fire extinguishers service expired
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 6 April 2005 Resolved
Fixed CO2 fire extinguisher service expired
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2005
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 6 April 2005 Resolved
Lifefloat floating electric water light inop
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2005
Lifesaving › Hand Flares › Not on Board
Issued 6 April 2005 Resolved
Vessel only had 2 of the required 6 red hand flares
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2005
Communications › Radio Communications › EPIRB
Issued 6 April 2005 Resolved
EPIRB NOAA registration expired.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2005
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 6 April 2005 Resolved
Repair fuel oil leaks on both the port and starboard fuel storage tanks. Leak are at fittings coming out of side of tanks . 2 spots at each tank.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2005
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 6 April 2005 Resolved
Replace both post a starboard fuel oil storage tank's rubber hose between the tank and the connection to the deck fitting. Hose are weeping small amounts of fuel oil
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2005
Engineering › Fuel Oil Service System › Filter
Issued 6 April 2005 Resolved
Repair fuel oil leaks at both port and starboard engine fuel oil strainers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2005
Engineering › Fuel Oil Service System › Valve
Issued 6 April 2005 Resolved
Mark both port and starboard emergency fuel tank shut offs with direction required to close valves
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2005
Engineering › Bilge Water Management System › Pump
Issued 6 April 2005 Resolved
Install 2 hose clamps on the bilge pump intake hose where it connects at the shut off valve and the piping.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 10 May 2005
Electrical › Electrical Distribution System (service) › Cable
Issued 6 April 2005 Resolved
Over the starboard engine, electrical wiring is secured to the overhead with plastic wire ties. Metal type required.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 10 May 2005
Construction/Loadline › Structures › Superstructure
Issued 6 April 2005 Resolved
Pilot house wooden sheeting has several area of heavy decay in both the forward and overhead sections. Sheeting needs renewing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2006
Resolution: New plywood in areas identified.
Construction/Loadline › Structures › Deck Plating
Issued 6 April 2005 Resolved
Inside compartment #4 (Lazertte) Replace/renew or repair using standard marine practices heavily decayed structure members: Port side, 3 deck beams and 3 frames and deck sheeting over same (marked for identification #1, 2,3). Starboard side, 6 deck beam and 6 frames and deck sheeting over same (marked for identification #9-14). Starboard side stern corner frame and deck sheeting (marked 4)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 May 2005
Construction/Loadline › Structures › Transverse Bulkhead
Issued 6 April 2005 Resolved
Replace/renew or repair using standard marine practices the following fractured structure member. · Starboard side stern corner frame. (marked for identification #4)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 10 May 2005
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2005 Resolved
Replace/renew or repair using standard marine practices the decayed planks: Port side, between the forth and fifth frames back from the forward bulkhead 2 spots of decay and one spot between the sixth and seventh frames
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 May 2005
Engineering › Bilge Water Management System › Not Installed
Issued 6 April 2005 Resolved
Vessel only has bilge high level visual indicator in one ( engine room) of the 4 compartments required
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 10 May 2005
Accommodation/Occupational Safety › Occupational Safety
Issued 12 March 2004 Resolved
Repair deck rails on Starboard Aft and Starboard Forward. LEGACY COMPONENT DESC: Deck Rail
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 April 2004
Resolved 13 April 2004
Lifesaving › Lifejacket/PFD (Type IV)
Issued 12 March 2004 Resolved
Provide 3 additional adult sized PFD's for a total of 112. **Vessel resticted to carrying 109 persons until requirement is met.** LEGACY COMPONENT DESC: Quantity
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 April 2004
Resolved 13 April 2004
Electrical › Lighting (service)
Issued 12 March 2004 Resolved
Provide marine type light fixture at engine room entry and storage locker. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 13 April 2004
Resolved 13 April 2004
Engineering › Fuel Oil Storage/Transfer System
Issued 12 March 2004 Resolved
Install F/O vent screens. LEGACY COMPONENT DESC: Ventilation
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 April 2004
Resolved 13 April 2004
Fire Fighting › Ventilation Systems
Issued 12 March 2004 Resolved
Provide vent closures for engine room ventilation.
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 April 2004
Resolved 13 April 2004
Pollution Prevention/Response › Prevention Equipment
Issued 12 March 2004 Resolved
Sand sewage holding tank for inspection. LEGACY COMPONENT DESC: Marine Sanitation Device, Type III
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 April 2004
Resolved 13 April 2004
Lifesaving › Buoyant Apparatus
Issued 23 July 2003 Resolved
Renew 12 person capacity lifefloat.
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 August 2003
Resolved 26 August 2003
Resolution: Owner has removed deteriorated 12-person lifefloat and the COI has been updated.
Lifesaving › Lifejacket/PFD (Type IV)
Issued 23 July 2003 Resolved
Provide 9 adult size, type IV lifejackets/PFD's for a total of 112. VESSEL IS RESTRICTED TO CARRYING 103 PASSENGERS UNTIL REQUIREMENT IS MET. LEGACY COMPONENT DESC: Quantity
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 July 2003
Resolved 26 August 2003
Lifesaving › Lifejacket/PFD (Type IV)
Issued 23 July 2003 Resolved
Renew retro reflective tape on 24 adult size, type IV lifejacket/PFD's. VESSEL IS RESTRICTED TO CARRYING 79 PASSENGERS UNTIL REQUIREMENT IS MET. LEGACY COMPONENT DESC: Retroreflective Material
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 August 2003
Resolved 26 August 2003
Lifesaving › Buoyant Apparatus
Issued 23 July 2003 Resolved
Renew waterlight for 12 person capacity buoyancy apparatus (lifefloat). LEGACY COMPONENT DESC: Waterlight
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 August 2003
Resolved 26 August 2003
Resolution: Owner will not replace until later. COI updated indicating the removal of this 12-person lifefloat.
Fire Fighting › Fire Pumps
Issued 23 July 2003 Resolved
Provide operable fire pump. LEGACY COMPONENT DESC: Pressure
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 August 2003
Resolved 26 August 2003
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 23 July 2003 Resolved
Re locate one (1) PORTABLE type BII, CO2 fire extinguisher from the Engine Room to the Deck Space. LEGACY COMPONENT DESC: Location
Action required: 705 - Other - as specified
Due 23 August 2003
Resolved 26 August 2003
Pollution Prevention/Response › Prevention Equipment
Issued 23 July 2003 Resolved
Provide 3/4 full indicator for MSD. LEGACY COMPONENT DESC: Marine Sanitation Device, Type 1
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 November 2003
Resolved 13 April 2004
Engineering › Bilge Water Management System
Issued 23 July 2003 Resolved
Provide properly operating bilge pump in compartment #1. LEGACY COMPONENT DESC: Pump
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 August 2003
Resolved 26 August 2003
Communications › Alarms/Indicators
Issued 23 July 2003 Resolved
Provide bilge pump visual indicator at the operating station for compartment #1. LEGACY COMPONENT DESC: Bilge Alarm
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 August 2003
Resolved 26 August 2003
Electrical › Lighting (service)
Issued 23 July 2003 Resolved
Provide 2 portable lights. (flashlights or equivalent) LEGACY COMPONENT DESC: Portable
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 August 2003
Resolved 26 August 2003
Engineering › Bilge Water Management System
Issued 23 July 2003 Resolved
Provide 5 gallon per minute portable hand bilge pump. LEGACY COMPONENT DESC: Pump
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 August 2003
Resolved 26 August 2003
Engineering › Electric Propulsion System
Issued 23 July 2003 Resolved
Empty water from enginr room battery storage boxes. LEGACY COMPONENT DESC: Battery
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 August 2003
Resolved 26 August 2003
Construction/Loadline › Hull
Issued 21 March 2003 Resolved
Sister frame number 15, port side from forward bulkhead in engine room. LEGACY COMPONENT DESC: Transverse Frame
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 April 2003
Resolved 28 March 2003
Construction/Loadline › Hull
Issued 21 March 2003 Resolved
Re-new plank between frame 3 and 5 from forward bulkhead, starboard side, steering gear room. LEGACY COMPONENT DESC: Stringer
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 April 2003
Resolved 28 March 2003
Construction/Loadline › Hull
Issued 21 March 2003 Resolved
Re-new plank, stern, starboard quarter. LEGACY COMPONENT DESC: Stringer
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 April 2003
Resolved 28 March 2003
Lifesaving › Buoyant Apparatus
Issued 9 July 2002 Resolved
Secure paddles to each of (3) lifefloats.
Condition: Improper/Lack of Maintenance
Due 5 August 2002
Resolved 31 July 2002
Lifesaving › Buoyant Apparatus
Issued 9 July 2002 Resolved
Label both 22-person lifefloats with capacity and vessel name with 2 inch letters.
Condition: Improper/Lack of Maintenance
Due 5 August 2002
Resolved 31 July 2002
Lifesaving › Buoyant Apparatus
Issued 9 July 2002 Resolved
Properly attach sea painter to lifefloats.
Condition: Improper Installation
Due 5 August 2002
Resolved 31 July 2002
Lifesaving › Lifebuoys
Issued 9 July 2002 Resolved
Attach waterlight to ring buoy with 3-foot lanyard and corrosion-resistant clip.
Condition: Improper/Lack of Maintenance
Due 5 August 2002
Resolved 31 July 2002
Navigation › Piloting/Steering
Issued 9 July 2002 Resolved
Provide current Coast Guard Light List. LEGACY COMPONENT DESC: Coast Guard Light List
Condition: Unknown
Due 5 August 2002
Resolved 31 July 2002
Documentation › Certificates/Documents
Issued 9 July 2002 Resolved
Provide FCC Safety Certificate. LEGACY COMPONENT DESC: Cargo Ship Safety Radio Certificate
Condition: Improper/Lack of Maintenance
Due 5 August 2002
Resolved 11 July 2002
Accommodation/Occupational Safety › Medical/First Aid
Issued 9 July 2002 Resolved
Provide eye wash for first aid kit. LEGACY COMPONENT DESC: Medicine Chest
Condition: Improper/Lack of Maintenance
Due 5 August 2002
Resolved 31 July 2002
Communications › Radio Communications
Issued 9 July 2002 Resolved
Provide hydrostatic release for EPIRB. LEGACY COMPONENT DESC: EPIRB
Condition: Improper/Lack of Maintenance
Due 5 August 2002
Resolved 31 July 2002
Engineering › Fuel Oil Service System
Issued 9 July 2002 Resolved
Double clamp fuel hose in comp # 2. LEGACY COMPONENT DESC: Hose
Condition: Improper/Lack of Maintenance
Due 5 August 2002
Resolved 31 July 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 9 July 2002 Resolved
Mark/label steps to upper deck "Crew Only" LEGACY COMPONENT DESC: Deck Rail
Condition: Improper/Lack of Maintenance
Due 5 August 2002
Resolved 31 July 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 9 July 2002 Resolved
Install restricted device on steps to upper deck. LEGACY COMPONENT DESC: Hand Grab
Condition: Unknown
Due 5 August 2002
Resolved 31 July 2002
Construction/Loadline › Hull
Issued 2 April 2002 Resolved
Renew planking on port side in way of rub rail in the engine room as needed to remove rot.
Due 2 May 2002
Resolved 17 April 2002
Construction/Loadline › Hull
Issued 2 April 2002 Resolved
Renew planking to remove rot in way of rub rail on port and starboard side in lazerette.
Due 2 May 2002
Resolved 17 April 2002
Construction/Loadline › Penetrations
Issued 2 April 2002 Resolved
Replace bilge pump hose in Cargo Hold #2 and dissassemble thru hull fittings for inpsection.
Due 2 May 2002
Resolved 17 April 2002
Construction/Loadline › Structures
Issued 2 April 2002 Resolved
Replace/Reinstall new keel bolts in #2 cargo hold.
Due 2 May 2002
Resolved 17 April 2002
Construction/Loadline › Hull
Issued 2 April 2002 Resolved
Replace rotted bulwark, portside, 10 feet forward of transom.
Due 2 May 2002
Resolved 17 April 2002
Construction/Loadline › Structures
Issued 2 April 2002 Resolved
Secure port and starboard railing.
Due 2 May 2002
Resolved 17 April 2002
Construction/Loadline › Structures
Issued 2 April 2002 Resolved
Replace/reinstall new keel bolts between frames #8 and #9 and between frames #11 and #12 in engine room.
Due 2 May 2002
Resolved 17 April 2002
Construction/Loadline › Hull
Issued 2 April 2002 Resolved
Replace rotted section of #1 and #4 side frames in lazerette on port side.
Due 2 May 2002
Resolved 17 April 2002
Construction/Loadline › Hull
Issued 2 April 2002 Resolved
Replace rotted (inboard) butt block port side between frames #2 and #3 in lazerette
Due 2 May 2002
Resolved 17 April 2002
Construction/Loadline › Structures
Issued 2 April 2002 Resolved
Make forward bulkhead water tight, between bulkhead stiffeners #6 and #7 (from port side inboard).
Due 2 May 2002
Resolved 17 April 2002
Construction/Loadline › Hull
Issued 2 April 2002 Resolved
Replace rotted strip planking section in #2 Cargo hold on starboard side aft (midway between shear and chine).
Due 2 May 2002
Resolved 17 April 2002
Engineering › Fuel Oil Storage/Transfer System
Issued 2 April 2002 Resolved
Repair starboard fuel tank leak, and prove integrity of both tanks.
Due 2 May 2002
Resolved 17 April 2002
Lifesaving
Issued 1 March 2001 Resolved
14 ADULT LIFE VEST CONTAINED STRAPS THAT WERE UNSERVICABLE. / REPLACE OR REPAIR STRAPS OR LIFE VEST.
Condition: Unknown
Due 1 March 2001
Resolved 1 March 2001
Lifesaving
Issued 1 March 2001 Resolved
TWO CHILD SIZE LIFE VEST CONTAINED INOPERABLE FASTENERS ON STRAPS. / REPLACE OR REPAIR FASTENERS OR LIFE VEST.
Condition: Unknown
Due 1 March 2001
Resolved 1 March 2001
Lifesaving
Issued 10 March 2000 Resolved
CLEAN AND RESTENCIL 25 MAN LIFEFLOAT. 46 CFR 185.604
Condition: Unknown
Due 10 April 2000
Resolved 10 April 2000
Lifesaving
Issued 10 March 2000 Resolved
PROVIDE ONE CHILD SIZE LIFE PRESERVER. MUST HAVE A TOTAL OF TWELVE (12) AS PER COI. 46 CFR 180.71 (b)._x001C_ VESSEL RESTRICTED TO CARRYING NO MORE THAN ELEVEN (11) CHILDREN.
Condition: Unknown
Due 21 March 2000
Resolved 21 March 2000
Lifesaving
Issued 10 March 2000 Resolved
REPLACE LIGHT CONNECTING WATERLIGHT TO LIFEFLOAT. REPLACE TETHER CONNECTING LIFEFLOATS TOGETHER. 46 CFR 180.175 (d), (f)(4)_x001C_ MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 10 April 2000
Resolved 10 April 2000
Lifesaving
Issued 10 March 2000 Resolved
REPLACE FLOAT FREE LINK ON LIFEFLOAT. 46 CFR 180.137
Condition: Unknown
Due 10 April 2000
Resolved 10 April 2000
Engineering
Issued 10 March 2000 Resolved
REPLACE WASTED CLAMPS ON PORT/STBD STERN TUBE. 46 CFR 176.800 (a)._x001C_
Condition: Unknown
Due 10 April 2000
Resolved 10 April 2000
Construction/Loadline
Issued 10 March 2000 Resolved
PROVIDE FLOAT SWITCH FOR HIGH WATER BILGE ALARM IN FORWARD MOST COMPARTMENT. 46 CFR 176.804 (h)(i) AND 46 CFR 182.530.
Condition: Unknown
Due 10 April 2000
Resolved 10 April 2000
Construction/Loadline
Issued 9 January 1998 Resolved
PRIOR TO CARRYING PASSENGERS, EXIBIT RENEWAL OF #6 FRAME FROM AFT, PORT SIDE, AND SUBSEQUENT DECK BEAM AND SHELF. TO BE COMPLETED NLT 7 FEB 1998 TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 9 January 1998
Resolved 13 January 1998
Lifesaving
Issued 24 February 1997 Resolved
STENCIL TOTAL CAPACITY AND NAME OF VESSEL IWO ALL LIFE FLOATS.
Condition: Unknown
Due 28 February 1997
Resolved 28 February 1997
Lifesaving
Issued 24 February 1997 Resolved
PROVIDE A PROPERLY MARKED WATERTIGHT CONTAINER, OF A BRIGHT COLOR, FOR STORAGE OF DISTRESS SIGNALS
Condition: Unknown
Due 28 February 1997
Resolved 28 February 1997
Lifesaving
Issued 24 February 1997 Resolved
REPLACE FADING RETROREFLECTIVE MATERIAL ON PFD'S.
Condition: Unknown
Due 28 February 1997
Resolved 28 February 1997
Electrical
Issued 24 February 1997 Resolved
REMOVE WIRE NUT CONNECTIONS IWO NAVIGATION CONSOLE AND REPLACE WITH COMPRESSION TYPE FITTINGS.
Condition: Unknown
Due 28 February 1997
Resolved 28 February 1997
Electrical
Issued 24 February 1997 Resolved
REMOVE WIRE NUT CONNECTIONS IN ENGINE COMPARTMENT IWO ENGINE BLOCK HEATER TIMER AND REPLACE WITH COMPRESSION TYPE FITTINGS.
Condition: Unknown
Due 28 February 1997
Resolved 28 February 1997
Lifesaving
Issued 13 March 1995 Resolved
Replace twenty-four (24) destroyed lifejackets. Total number of persons will be limited to eighty-eight (88), provided the lifefloat is repaired. If the lifefloat is not repaired, sixty-two (62) will be the limitation. Tobe corrected to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 12 April 1995
Resolved 12 April 1995
Navigation
Issued 13 March 1995 Resolved
Provide updated navigation publications no later than 13APR95 to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 13 March 1995
Resolved 13 March 1995
Lifesaving
Issued 13 March 1995 Resolved
Make proper repairs to 25-man lifefloat. Total number of passengers and crew will be limited to sixty-two (62) until repairs are made.
Condition: Unknown
Due 12 April 1995
Resolved 12 April 1995
Lifesaving
Issued 1 March 1994 Resolved
REPLACE 13 ADULT AND 2 CHILD PFDs
Condition: Unknown
Due 1 March 1994
Resolved 1 March 1994
Engineering
Issued 17 December 1993 Resolved
Remove non-metalic flex hose from both main diesel engine's exhaust system and raw water cooling system and align with metalic pipe or SAE J-1942_x001C_ hose.
Condition: Unknown
Due 17 December 1993
Resolved 17 December 1993
Lifesaving
Issued 15 March 1993 Resolved
REPAIR/REPLACE RETROREFLECTIVE MATERIAL ON 21 ADULT AND 05 CHILD LIFE PRESERVERS.
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Lifesaving
Issued 22 March 1990 Resolved
MARK VESSEL'S NAME ON EPIRB.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Navigation
Issued 22 March 1990 Resolved
REPAIR SINGLE SIDE BAND RADIO SO THAT TRANSMITS PROPERTY.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Lifesaving
Issued 22 March 1990 Resolved
PROVIDE RETRO TAPE FOR ALL LIFEFLOATS.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Lifesaving
Issued 22 March 1990 Resolved
REPLACE BATTERIES IN RING BUOY AND LIFEFLOAT.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Lifesaving
Issued 22 March 1990 Resolved
REPLACE WHEEL FOR BILGE SHUT OFF VALVE PEAK TANK.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Accommodation/Occupational Safety
Issued 22 March 1990 Resolved
PROVIDE LOCKING MECHANISM FOR MSD OVERBOARD DISCHARGE.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Construction/Loadline
Issued 22 March 1990 Resolved
SECURE INNER RING OF AFT HATCH COVER.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Engineering
Issued 22 March 1990 Resolved
MARK PORT SIDE EMERGENCY FUEL SHUTDOWN.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Fire Fighting
Issued 22 March 1990 Resolved
PROVIDE METAL NOZZLE FOR FIRE HOSE.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Lifesaving
Issued 22 March 1990 Resolved
ATTACH EACH SET OF LIFEFLOAT PADDLES TO ITS REPECTIVE LIFEFLOAT.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Lifesaving
Issued 22 March 1990 Resolved
MAKE LIFEFLOATS FLOAT FREE.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Navigation
Issued 24 March 1988 Resolved
PROVIDE THREE BLACK BALL DAY SHAPES.
Condition: Unknown
Due 24 March 1988
Resolved 24 March 1988

Casualty record · 1

21 August 2025Routine · role: Involved in a Marine Casualty · activity 8234464
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.