Documentation record
Tonnage as PSIX records it571 - Convention (Subpart B), Gross Ton
233 - Regulatory (Subpart C or D), Gross Ton
171 - Convention (Subpart B), Net Ton
158 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
The full record for this vessel
Behind this panel: 4 inspections, each with its date, unit and type; 7 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 4
17 April 2018
In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6393468
6 September 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6261263
13 December 2016
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6057137
16 February 2016
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5816107
Electrical › Electrical Distribution System (service) › Switch
Issued 16 February 2016
Resolved
Repair switchboard interlock to not allow more than one (1) power source at a time.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 16 February 2016
Resolved 23 February 2016
Resolution: Switchboard has newly cut interlock bar to prevent closing to more than one source (Gen #1, Gen #2, OR Shore power) at a time.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 16 February 2016
Resolved
Install gasket and bolts on MSD.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2016
Resolved 23 February 2016
Resolution: Complete, cover gasket and bolted in place.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 16 February 2016
Resolved
Repair STBD main engine exhaust lagging.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2016
Resolved 23 February 2016
Resolution: Lagging has been replaced.
Electrical › Lighting (service) › Lighting Fixture
Issued 16 February 2016
Resolved
Install proper cages for light fixtures in engine room.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 February 2016
Resolved 23 February 2016
Resolution: Lighting wire cage fixtures replaced.
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 16 February 2016
Resolved
Make rescue platform proper length.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 16 February 2016
Resolved 23 February 2016
Resolution: Rescue platform was placed over bitt, which fixed the length problem and allows better access for rescue personnel (stbd bit has bulwark gate/cut out that can lift out adjacent to bitt and personnel don't have to climb over bulwark rail.
Operations/Management › Port and Waterways Safety › Violation of Safety Zone Regulations
Issued 16 February 2016
Resolved
Provide appropriate monthly checklists for vessels in laid up status.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 16 February 2016
Resolved 23 February 2016
Resolution: Vsl representative present basic check list, cleared and Marine Inspector recommend vsl rep consider company fleeting requirements, contact CID for possible further options (cold stack) meeting.
Lifesaving › Lifebuoys › Serviceable
Issued 16 February 2016
Resolved
Ring bouy plug worn and waterlogged.
Action required: 705 - Other - as specified
Due 23 February 2016
Resolved 16 February 2016
Resolution: Replaced during inspection.