Records from 2006 to 2022. Most recent: inspection, 29 July 2022.
Documentation record
Registered dimensions (L × B × D)49.0 ft × 16.0 ft × 3.0 ft
Registered tonnagegross 62 / net 62
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSUSQUEHANNA SANTEE BW · WILLOW ST, PA, UNITED STATES · built 1999
Hull materialAluminum
PropulsionGasoline Engine
Hull shapeShip
Hull configurationMonohull
Hailing portHOPKINS, SC
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it62 - Simplified, Gross Ton
62 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 4
29 July 2022
Administrative Inspection
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7519808
25 March 2022
Initial Certification · Administrative Inspection · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7516794
15 November 2016
Annual Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6041510
4 January 2016
Deficiency Check
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6035249
Engineering › Fuel Oil Service System › Vent Pipe
Issued 15 November 2016
Resolved
Fuel tank vent pipe missing flame screen on starboard fuel tank. Fuel tank vent pipe cloggerd flame screen on port fuel tank.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 December 2016
Resolved 15 December 2016
Resolution: flame screens replaced
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 15 November 2016
Resolved
Portable fuel oil tank being utilized for installed portable vessel service generator. Remove from vessel.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 15 November 2016
Resolved 15 November 2016
Resolution: Removed from vessel.
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 15 November 2016
Resolved
Fiberglass resin being stored in passenger compartment in an non-approved space. Remove flammable liquids from vessel.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2016
Resolution: Flammable liquids removed from vessel.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 15 November 2016
Resolved
Grab line on life ring wasted. Replace grab line with new
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2016
Resolved 15 December 2016
Resolution: Relace ring buoy with new
Communications › Radio Communications › VHF Radiotelephone
Issued 15 November 2016
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Due 15 December 2016
Resolved 16 December 2016
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 15 November 2016
Resolved
Gauges to indicate engine revolutions per minute must be provided for all propulsion engines. Port engine tach is INOP. Repair as required.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2016
Resolved 15 December 2016
Resolution: Replaced gage
Engineering › Gasoline Engine (propulsion) › Ignition Wire (4 cycle)
Issued 15 November 2016
Resolved
Installed port engine safety shut down inoperable. Repair as required.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2016
Resolved 15 December 2016
Resolution: Repair safety shutdown and witnessed operational test
Electrical › Electrical Distribution System (service) › Cable
Issued 15 November 2016
Resolved
Insulation on electrical cable leaving service generator wasted. Repair as required.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2016
Resolved 15 December 2016
Resolution: Repaired damaged areas with shrink wrap and electrical tape