Inspection history · 171
1 March 2019
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6635043
28 February 2018
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6363281
12 February 2018
Deficiency Check · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6354050
6 February 2018
Administrative Inspection · Ballast Water Examination · MTSA Verification · COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6336306
4 January 2018
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6335006
23 May 2017
Annual Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6153695
4 May 2017
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6137023
6 January 2017
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6067947
6 January 2017
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6080941
27 April 2016
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 5864521
8 December 2015
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5777365
22 August 2015
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5226968
8 July 2015
Cargo Tank Internal · Internal Structural Exam · MTSA/ISPS Verification · Administrative Inspection · MARPOL Annex I Examination · Examination of Repairs · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5178069
22 June 2015
MARPOL Annex I Examination · Annual Inspection · MARPOL Annex VI Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5157768
30 December 2014
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5045758
5 June 2014
Annual Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4880014
19 November 2013
MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4753157
18 October 2013
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4739045
7 October 2013
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4730720
3 December 2012
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4492993
30 December 2011
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4215960
28 November 2011
MTSA/ISPS Verification · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4196920
27 June 2011
Type not recorded
No type recorded · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 4078247
13 September 2010
COI Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3848710
14 July 2010
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3800207
8 June 2010
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3761797
15 May 2010
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3740201
10 April 2009
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3449990
13 January 2009
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3395405
12 December 2008
Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3378107
4 April 2008
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3177376
28 January 2008
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3136489
14 January 2008
Cargo Tank Internal · Hull Examination · Administrative Inspection · Annual Inspection · MTSA/ISPS Verification · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3131920
9 May 2007
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2926157
5 October 2006
Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2794031
28 August 2006
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2761838
18 January 2006
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 2569550
15 September 2005
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2492271
15 September 2005
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2758624
12 August 2005
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2460314
21 June 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2397920
14 June 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2390217
13 June 2005
Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2389318
14 March 2005
Administrative Inspection
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2309889
15 January 2005
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2274136
11 January 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2272972
18 December 2004
Annual Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2261687
29 November 2004
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2249853
1 September 2004
Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2183546
15 August 2004
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2252747
15 June 2004
MTSA Verification
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2114630
4 June 2004
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2088847
9 December 2003
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1961846
5 November 2003
Cargo Tank Internal · Hull Examination · Internal Structural Exam · Annual Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1942422
31 October 2003
Administrative Inspection · Drydock Extension
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1933106
15 September 2003
Administrative Inspection
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1905477
20 August 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1995358
19 March 2003
Administrative Inspection · Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1746148
22 January 2003
Damage Survey
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1733656
19 November 2002
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1707387
15 October 2002
MARPOL Annex I Examination · Annual Inspection · Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1693474
24 June 2002
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1635802
19 June 2002
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1631568
10 April 2002
Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1603079
10 April 2002
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1648275
9 April 2002
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1603719
7 March 2002
Administrative Inspection
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1492093
25 January 2002
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1484947
17 October 2001
Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1457020
20 February 2001
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1437851
30 January 2001
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1058440
26 October 2000
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 823490
22 September 2000
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1384558
21 February 2000
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 125114
28 October 1999
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1129653
7 October 1999
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1196939
22 August 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 459794
18 December 1998
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 120828
12 November 1998
Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 804517
9 November 1998
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 803657
4 November 1998
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 771158
3 November 1998
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 197654
3 November 1998
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 803601
23 October 1998
COI Inspection · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1464136
16 March 1998
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 164602
7 March 1998
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 180893
1 March 1998
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 42656
19 December 1997
Type not recorded
No type recorded · MSFO Portsmouth · USCG Northeast District (CGD-NE) · Activity 499974
7 October 1997
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1115384
4 June 1997
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 784010
28 April 1997
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 478202
3 April 1997
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 456350
5 February 1997
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1105028
15 January 1997
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 480731
17 December 1996
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 181139
9 December 1996
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 6837
18 October 1996
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1159889
12 September 1996
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 178010
4 July 1996
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 495254
14 April 1996
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 439750
29 December 1995
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 484932
20 October 1995
Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1392319
13 June 1995
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 524313
4 January 1995
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 854797
7 December 1994
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 437314
20 October 1994
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1405613
17 October 1994
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 867686
7 October 1994
Deficiency Check · Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 863065
8 June 1994
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 457890
8 May 1994
Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 513915
2 December 1993
Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 535657
30 October 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 35576
30 October 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 129846
23 October 1993
COI Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1449647
2 September 1993
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1139352
5 April 1993
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 478484
24 January 1993
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 960421
21 January 1993
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 828565
16 January 1993
Examination of Repairs
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 826460
16 November 1992
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 960687
14 October 1992
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1244064
22 September 1992
Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 522294
4 March 1992
Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1008521
3 March 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 504895
26 February 1992
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1134288
22 January 1992
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1142695
6 January 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1261011
5 January 1992
Damage Survey
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1470345
4 January 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 186007
13 December 1991
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1270674
21 October 1991
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 938110
18 October 1991
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1254020
11 October 1991
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 948311
4 September 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 463982
26 July 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1253700
16 July 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 666968
21 June 1991
Examination of Repairs
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1228650
12 June 1991
Permit to Proceed
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1320763
12 April 1991
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1217968
4 April 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1231131
22 March 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 468393
2 November 1990
COI Inspection · Hull Examination · Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1242227
19 August 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 926512
14 July 1990
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 903564
12 July 1990
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 455338
14 June 1990
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 914786
4 February 1990
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 532540
1 November 1989
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 479154
12 June 1989
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1344058
5 May 1989
COI Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1042915
14 January 1989
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 504882
27 July 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 524103
23 May 1988
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1353144
11 March 1988
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1037952
8 March 1988
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1029645
11 February 1988
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 523005
19 August 1987
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 441030
2 April 1987
Hull Examination · Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1330703
28 October 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 485556
26 April 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 448709
11 March 1986
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1307251
29 December 1985
Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 989530
26 December 1985
Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1294931
18 November 1985
Credit Drydock
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1301858
21 October 1985
Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 479567
17 October 1985
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 514734
2 July 1985
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 450530
23 May 1985
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1292068
2 May 1985
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1292054
9 December 1984
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 502710
18 June 1984
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 479170
Deck/Cargo › Cargo Heating › General
Issued 13 February 2018
Resolved
Thermal Fluid Heater tests (periodic) not conducted in presence of marine inspector. Tests must be conducted in the presence of MI prior to operation. Prior to carrying cargos requiring use of thermal fluid heater.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 February 2019
Resolved 5 March 2018
Resolution: Utilized appropriate manufacturers procedures to test TFH.
Construction/Loadline › Markings › Load Line Mark
Issued 6 February 2018
Resolved
Load line markings shall be permanently marked on the sides of the vessel. Vessel's crew painted marked load line black and raised to match ILLC. Class will need to confirm load line and permanently mark to ensure accuracy of marked position.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 February 2018
Resolved 12 February 2018
Resolution: Class attended vessel, verified load line and stamped new markings.
Deck/Cargo › Cargo Heating › General
Issued 6 February 2018
Resolved
Thermal fluid heater tests at COI, F/O pressure switch on the vessels thermal fluid heater failed stopping operational test during COI inspection. Thermal fluid heater is not to be used to heat cargo until full test IAW 61.30-20 is conducted.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 21 February 2018
Resolved 5 March 2018
Resolution: Verified operation of f/o psi switch.
Engineering › Diesel Engine (auxiliary) › Emergency shutdown
Issued 6 February 2018
Resolved
Inoperable remote manual shutdown for #1 cargo pump the remote quick acting manual shutdown shall be installed on the engine to provide quick and effective means of stopping engine. Vessel shall provide effective remote manual shutdown prior to operation of engine.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 6 February 2018
Resolved 6 February 2018
Resolution: Vessels crew removed and re-routed the cable to allow for the smooth shutdown of the engine when pulled.
Engineering › Pressure Vessel › Relief Valve
Issued 6 February 2018
Resolved
Relief valve for aft air receiver inoperable exceeding MAWP. All relief valves shall be set not to exceed the MAWP of the pressure vessel. Vessel shall provide operable relief valve and sat test prior to cargo discharge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2018
Resolved 6 February 2018
Resolution: Safety relief valve on pressure vessel was changed out with a brand new valve set at 125 PSI and tested sat for proper relief at the MAWP.
Deck/Cargo › Cargo Stowage › General
Issued 6 January 2017
Resolved
Damage to aft cargo tank #6P causing oil leak to top of aft void tank top. Complete permanent repairs to the satisfaction of the attending class surveyor.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 January 2017
Resolved 12 January 2017
Resolution: Verified satisfactory repair and air test of holed #6P cargo tank. All sat. ABS attended.
Electrical › Electrical Distribution System (service) › Wiring
Issued 22 June 2015
Resolved
Port side barge overfill alarm connection to facility is contained in a box that is broken and can not be shut. Renew enclosure to the satisfaction of attending CG Marine Inspector prior to cargo ops utilizing portside manifold.
Action required: 705 - Other - as specified
Resolved 8 December 2015
Resolution: Received proper documentation that requirement has been rectified.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 22 June 2015
Resolved
P/V valves are not marked IAW 46CFR162.017-5. Provide documentation for and mark P/V valves to the satisfaction of attending CG Marine Inspector.
Action required: 705 - Other - as specified
Due 22 July 2015
Resolved 8 December 2015
Resolution: Received proper documentation that requirement has been rectified.
Documentation › Logs/Records › Cargo Record Book (NLS)
Issued 5 June 2014
Resolved
Provide Cargo Record Book prior to carrying any cargoes listed on NLS Certificate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2014
Resolution: Cargo Record Book has been purchased and been placed on vessel.
Documentation › Manuals/Policy Documentation › Procedures and Arrangements Manual (NLS)
Issued 5 June 2014
Resolved
Provide P & A Manual prior to carrying any cargoes listed on NLS certificate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 June 2014
Resolution: Company purchased P & A Manual for barge.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 5 June 2014
Resolved
Have navigation light backgounds painted flat black.
Action required: 705 - Other - as specified
Due 5 July 2014
Resolved 6 June 2014
Resolution: Received documentation that lights backings have been corrected.
Construction/Loadline › Structures › Deck Plating
Issued 7 October 2013
Resolved
Vessell must make permanent repairs by cropping and renewing to original the anchor chute and main deck plating where gauging report indicated more than 25% wastage and holes where found to the satisfaction of the attending class surveyor and provide class report to USCG marine inspector.
Action required: 705 - Other - as specified
Due 29 October 2013
Resolved 18 October 2013
Resolution: Vessel completed permanent repairs by inserting anchor chute and main deck plating to the satisfaction of the marine inspector.
Documentation › Certificates/Documents › International Air Pollution Prevention Certificate
Issued 30 November 2011
Resolved
Gather information and make request for International Air Pollution Prevention (IAPP) inspection IAW MARPOL Annex VI.
Action required: 705 - Other - as specified
Due 30 December 2011
Resolved 30 December 2011
Resolution: Received information and application for ABS IAPP survey, cleared deficiency.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 13 September 2010
Resolved
Prove proper operation of the overspeed device, low lube oil alarm, high jacket water temp and reverse power relay on both main service generators.
Due 4 October 2010
Resolved 14 September 2010
Resolution: Witnessed SAT tests of MSG''s.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Governor
Issued 12 December 2008
Resolved
SSDG's unable to be test for overspeed, no available software or laptop onbaord to conduct the test. 835 issued untill test can be rescheduled
Condition: Unknown
Due 9 January 2009
Resolved 17 December 2008
Resolution: Attended vessel at pier 80 Philadelphia PA to observe SAT test of both diesel generators and their safties. Observed both generators over speed trips, low L/O trips, and high water temp trips. Cleared 835
Engineering › Diesel Engine (auxiliary) › Injector (fuel injection)
Issued 12 December 2008
Resolved
#3 cargo pump prime mover fuel oil supply and return hoses cracked and deteriorated. Need to re replaced.
Condition: Unknown
Due 9 January 2009
Resolved 17 December 2008
Resolution: Re-inspected #3 cargo pump prime movers fuel oil hoses, both fuel oil supply and return hoses were replaced. Cleared 835.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 12 December 2008
Resolved
load line marking on port side need to be repainted.
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 January 2009
Resolved 4 February 2009
Resolution: Plimsoll mark was painted.
Engineering › Pressure Vessel › Shell Plate
Issued 28 January 2008
Resolved
Hydrostatic testing proved the air receiver located portside aft to have at least one pinhole on its bottom center.
Replace faulty air receiver located on portside aft. Faulty air receiver shall not be operated whatsoever.
Action required: 705 - Other - as specified
Due 15 April 2008
Resolved 4 April 2008
Resolution: Air receiver has been replaced and the pressure relief valve has been tested and meetes the requirements of 46 CFR 54.01.
Engineering › Diesel Engine (auxiliary) › Pump, Positive Displacement
Issued 14 January 2008
Resolved
Renew leaking suction hoses on both hydraulic fluid power systems I.A.W. 46 CFR 56.60-25.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 February 2008
Resolved 15 January 2008
Resolution: OSG maintenance personnel used crimping machine/bands to secure hydraulic hose onto a barbed hose fitting on suction side of pump.
Deck/Cargo › Cargo Heating › General
Issued 14 January 2008
Resolved
Conduct tests of all safeties on vsl's TFH in the presence of the CG Marine Inspector prior to using.
Action required: 705 - Other - as specified
Due 15 February 2008
Resolved 28 January 2008
Resolution: All TFH shutdowns tested satisfactorily in presence of Marine Inspector.
Engineering › Pressure Vessel › Shell Plate
Issued 14 January 2008
Resolved
Conduct gauging on vsl's main air receiver, discovered heavy rust and scaling on the entire bottom half of the air receiver. If PV is within allowable wastage limits conduct a hydrostatic test prior to placing back in service. I.A.W.46 CFR 54.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 February 2008
Resolved 28 January 2008
Resolution: Gauging & hydrostatic testing conducted. Air receiver failed hydro. New deficiency issued for replacement of receiver.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 14 January 2008
Resolved
Properly clean blockage and debris from both main cargo header pressure/vacuum valves prior to conducting cargo operations.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 February 2008
Resolved 18 January 2008
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 14 January 2008
Resolved
Repair No.2 Cargo Pump Engine Tachometer not showing engine speed.
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 February 2008
Resolved 18 January 2008
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 14 January 2008
Resolved
Replace missing vapor cap from Class 1 Div 1 lighting wiring in the No.2 cargo pump engine room prior to conducting cargo operations.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 February 2008
Resolved 15 January 2008
Engineering › Diesel Engine (auxiliary) › Block
Issued 14 January 2008
Resolved
Properly repair cracked gauge housing on vsl's stbd hydraulic fluid power system engine.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 February 2008
Resolved 18 January 2008
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 14 January 2008
Resolved
Properly repair leaking main cargo suction valves, discovered to be leaking by or leaking at the gland; Prior to cargo operations.
1.Valve 18 valve block leak. 2. Valve 20 block leak. 3. Valve no.2 port and stbd high suction leaking by. 4. Valve 3 port and stbd high suction leaking by. 5. Valves no. 4 port and stbd high suction leaking by.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 January 2008
Deck/Cargo › Cargo Heating › General
Issued 5 October 2006
Resolved
Prove proper operation of Thermal Fluid Heater and all safety shutdowns and alarms prior to operating.
Action required: 705 - Other - as specified
Resolved 15 December 2006
Resolution: Completed tests, sat.
Electrical › Electric Generation Source (service) › Panelboard
Issued 5 October 2006
Resolved
Prove proper operation of #1 Generator and demonstrate all required safety shutdowns and alarms prior to operating.
Action required: 705 - Other - as specified
Resolved 24 January 2007
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 5 October 2006
Resolved
Provide adequate discharge containment under single port side manifold prior to use.
Action required: 705 - Other - as specified
Resolved 18 January 2007
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 5 October 2006
Resolved
Service #4 dry chem extinguisher, lost pressure.
Action required: 705 - Other - as specified
Due 5 October 2006
Resolved 5 October 2006
Resolution: Replaced in kind with additional extinguisher on board.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Flame Screens
Issued 5 October 2006
Resolved
Provide proper flame screens for ullage #3s and #1p.
Action required: 705 - Other - as specified
Resolved 5 October 2006
Engineering › Compressed Air System (start air) › Valve
Issued 5 October 2006
Resolved
Prove proper operation of relief valve for air start receiver (set @ 125 psi).
Action required: 705 - Other - as specified
Resolved 15 December 2006
Engineering › Compressed Air System (start air) › Compressor
Issued 5 October 2006
Resolved
Prove proper operation of #1 air compressor for air start system prior to operating.
Action required: 705 - Other - as specified
Resolved 18 January 2007
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 5 October 2006
Resolved
Replace or repair 40' section of 12" on deck cargo piping due to wastage. Secure #4 transfer pump and all valves required to isolate section of piping. Complete hydrostatic testing prior to placing new piping in service. (new section on order).
Action required: 705 - Other - as specified
Resolved 18 January 2007
Resolution: New piping installed, received copy of hydro tests. all sat.
Electrical › Electric Generation Source (service) › Switch
Issued 15 September 2005
Resolved
#2 Generator failed to take the load of the thermal fluid heater. Main breaker would immediately trip.
Action required: 705 - Other - as specified
Due 12 October 2005
Resolved 12 October 2005
Resolution: Breaker adjustments improperly set on #2 Gen, corrected as per manufacturers manual. Load and shutdown tests conducted, cleared discreapancy.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 15 September 2005
Resolved
Prove proper operation of #1 cargo pump prime mover, failed to secure during emergency shutdown tests.
Action required: 705 - Other - as specified
Due 30 September 2005
Resolved 16 September 2005
Resolution: Bad seal on blower/air dampner caused by warped shutdown flap. Service tech replaced defective parts. CG inspector witnessed shutdown tests.
Fire Fighting › Semiportable Chemical-Foam Fire Extinguishers › Securing Means
Issued 15 September 2005
Resolved
Permanently secure Type V fire extinguisher located forward of the thermal fluid heater house.
Action required: 705 - Other - as specified
Due 30 September 2005
Resolved 16 September 2005
Resolution: Tank secured with mounting brackets.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 15 September 2005
Resolved
Replace extinguished light bulbs on overfill/high level alarm panel.
Action required: 705 - Other - as specified
Due 30 September 2005
Resolved 16 September 2005
Resolution: Bulbs replaced, conducted lamp test.
Deck/Cargo › Cargo Heating › General
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center (MSC) for review and approval all required drawings, plans, and calculations demonstrating compliance with 46 CFR Part 52 for the newly installed thermal fluid heater. All review comments from the MSC approval letter shall be resolved prior to placing the thermal fluid heater in service as required by 46 CFR 31.10-25.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 22 August 2005
Resolution: Received approval letter from MSC dtd 27 July 05, Ser# C1-0505293, Project File Number P011257, and MSC ltr dtd 16 Aug 05, Ser# E1-0505299, approving or marked "examined" all required drawings, plans, and calculations for the new Thermal Fluid Heater.
Construction/Loadline › Structures › Rake
Issued 13 June 2005
Resolved
Crop and renew deteriorated non-tight bulkhead and associated structural support members located just below the entrance ladder to the aft port rake. All repairs shall be completed to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 11 August 2005
Resolution: Reference ABS survey report # M606049 conducted 17 Jun 05. Permanent repairs were made, corroded area cropped and renewed. Examined and determined satisfactory.
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center (MSC) for review and approval an elementary one-line wiring diagram of the new power system, supported, by cable lists, panelboards summaries, and other information as noted in 46 CFR 110.25-1 and resolve all plan review comments prior to placing system in service.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 22 August 2005
Resolution: Received MSC approval letter, dtd 02 Aug 05, Ser#E2-0505328,Project File Number P011257.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center for review and approval, the necessary drawings, plans, and calculations demonstrating compliance with 46 CFR 58.50 for the modified of the existing 16,000 gallon independent fuel oil tank as required by 46 CFR 31.10-25. All review comments shall be resolved prior to placing tank in service.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 1 September 2005
Resolution: Received MSC approval letter, dtd 16 Aug 05, Ser# E1-0505299, Project File Number P011257, Encl 4.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 13 June 2005
Resolved
Conduct hydrostatic test of modified independent fuel oil tank in the presence of the attending marine inspector. The tank must withstand a pressure of 5 pounds per square inch or 1.5 times the maximum head to which it may be subjected in service, whichever is greater in accordance with 46 CFR 58.50-10(c) prior to placing fuel oil tank in service.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 11 August 2005
Resolution: Reference ABS Survey Report #M606049 and Atlantic Marine Inc. test form dtd 08Jun05. Tests completed to the satisfaction of class.
Deck/Cargo › Cargo Heating › General
Issued 13 June 2005
Resolved
Conduct hydrostatic test of newly installed thermal fluid heater at 1.5 times the maximum allowable working pressure in the presence of the attending marine inspector as required by 46 CFR 61.30-10 prior to placing thermal fluid heater in service.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 11 August 2005
Resolution: Ref: ABS Miscellaneous Survey Report, CH605062, dtd 28Apr05. ABS witnessed the hydrostatic test of Liquid Phase Heater #23282, at 340psi (MAWP @225psi). The coiled steel tubing were also tested as per report CH474625.
Construction/Loadline › Structures › Superstructure
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center (MSC) for review and approval all required drawings, plans, and calculations demonstrating compliance with 46 CFR Part 32.60 for the newly constructed deckhouse as required by 46 CFR 31.10-25. All review comments from the MSC approval letter shall be resolved prior to placing the deckhouse in service as required by 46 CFR 31.10-25.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 11 August 2005
Resolution: Reference ABS letter dtd 04Aug05 and MSC letter dtd 27Jul05 (Ser#C1-0505293). All four plans for the TFH machinery house (Arrangement, Structure, Walkway, Doublers) were marked "Approved" by MSC.
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center (MSC) for review and approval all required drawings, plans, and calculations demonstrating compliance with 46 CFR Part 34 for the newly installed fire extinguishing system in the thermal fluid heater deckhouse as per 46 CFR 31.10-25. All review comments shall be resolved prior to placing the thermal fluid heater in service.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 24 August 2005
Resolution: No fixed system aboard the barge and not required as per 46 CFR part 34. Vessel has 2 BII fire extinguishers located inside the Thermal Fluid Heater deck house and a semi-portable 50 lbs dry chemical extinguisher outside the space .
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center (MSC) for review and approval all required drawings, plans, and calculations demonstrating compliance with 46 CFR Part 34 for the newly installed fire detection system in the thermal fluid heater deckhouse as per 46 CFR 31.10-25. All review comments shall be resolved prior to placing the thermal fluid heater in service.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 24 August 2005
Resolution: No fire detection system aboard the barge and not required as per 46 CFR part 34.
Deck/Cargo › Cargo Heating › General
Issued 13 June 2005
Resolved
Conduct operational test of thermal fluid heater relief valve in the presence of the attending marine inspector to determine that the safety devices are functioning properly and are in satisfactory condition as required by 46 CFR 61.30-20. This shall item shall be completed prior to placing the thermal fluid heater in service.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 8 August 2005
Resolution: Sector Delaware Bay marine inspector witnessed the testing of 3 relief valves. Two valves (#K02, #F04) 1 1/2", 125 psi, opened at 128 psi and 125 psi respectively and seated properly. Third relief valve, 1 1/4", 15psi (expansion tank) relieved at 15psi
Documentation › Certificates/Documents › Stability Letter
Issued 13 June 2005
Resolved
Provide revised and updated stability letter reflecting adjusted lightship valves due to the additional weight added to the vessel during recent modifications.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 11 August 2005
Resolution: Reviewed new ABS Stability ltr dtd 24Jun05 (copy placed in file). Conducted measurement of new load line and compared to new document confirming placement. Revised loading manual placed onboard.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 13 June 2005
Resolved
Provide full term International Load Line Certificate prior to departure from the Port of Philadelphia, PA. Short term International Load Line certifcate was issued to vessel on 6/17/05 for a one trip voyage in ballast condition from Mobile, AL to Philadelphia, PA pending final stability review.
Action required: 17 - Rectify deficiencies prior to departure
Due 18 August 2005
Resolved 11 August 2005
Resolution: Reviewed new loadline certificate. Conducted measurements between the deck line and load lines to confirm placement of new load line, all sat.
Engineering › Pressure Vessel › Marking and Stamping
Issued 13 June 2005
Resolved
Provide a copy of the registered professional engineers certified pressure vessel plans attesting that the newly installed pressure vessel meets the design requirements of section VIII, division 1, of the ASME code as modified by 46 CFR 54.01-5. Once verified, the pressure vessel shall be stamped by a marine inspector as required by 46 CFR 54.10-3.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 24 August 2005
Resolution: Ref Drawing #306472 for Horizontal Air Receiver, Quincy 113266U-200, with Profession Engineer [name withheld] stamp (#106953), dtd 17 Aug 05. Completed.
Engineering › Pressure Vessel › Relief Valve
Issued 13 June 2005
Resolved
Prove operation of relief valve to newly installed Manchester pressure vessel, serial number 479623, as required by 46 CFR 54.15-10 in the presence of the attending marine inspector prior to placing pressure vessel in service.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 11 August 2005
Resolution: Ref: ABS Report #M606049, relief valve tested to the satisfaction of class on 17Jun05.
Engineering › Pressure Vessel › Marking and Stamping
Issued 13 June 2005
Resolved
Provide manufacturers' data report form (U1A) for the thermal expansion tank for review as required by 46 CFR 54.10-25 prior to placing thermal fluid heater in service.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 11 August 2005
Resolution: Reviewed U-1A Manufacturer''s Data Report (tank ser# 479623). Copy placed in file.
Engineering › Compressed Air System (control) › Piping
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center for review and approval, the necessary drawings, plans, and calculations demonstrating compliance with 46 CFR Subchapter F for the newly installed compressed air system as required by 46 CFR 31.10-25. All review comments shall be resolved prior to placing system in service.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 24 August 2005
Resolution: Ref MSC approval ltr, dtd 16 Aug 05, Ser# E1-505299, Encl 7, Pfitzco Dwg # 1609-09-1, rev 3., Compressed Air System approved.
Electrical › Electric Generation Source (service) › Power Requirement
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center for review and approval, an electrical plant load analysis indicating connected loads and computed operating loads for each condition of operation as required by 46 CFR 110.25-1. All review comments shall be resolved prior to placing generators in service.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 15 September 2005
Resolution: Received MSC approval dated Aug 2, 2005 during COI inspection.
Electrical › Electric Generation Source (service) › Generator
Issued 13 June 2005
Resolved
Provide documentation and prove to the satisfaction of the attending marine inspector that the newly installed 99 kW generators comply with the temperature ratings required by 46 CFR 111.01-15 prior to placing the generators in service.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 11 August 2005
Resolution: Reviewed manufacturer''s data plates confirming Ambient temp rating of 50 deg C. for two new 99 KW gen sets (Marathon Electric, Magnaplus Generator, mod#363PSL1607). Confirmed data plate via phone con with manufacturer and printed website info.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Location
Issued 13 June 2005
Resolved
Provided additional B-II portable fire extinguishers for the newly constructed thermal fluid heater deckhouse in accordance with 46 CFR 34.50-10 prior to placing thermal fluid heater or generators in service.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 11 August 2005
Resolution: Confirmed two additional B-II extinguishers placed in side the new TFH house. Instructed barge personnel to install new brackets to secure extinquishers.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center (MSC) for review and approval an electrical switchboard drawing demonstrating compliance with applicable prescriptive requirements listed in 46 CFR 111.30 and resolve any plan review comments prior to placing system in service.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 24 August 2005
Resolution: Ref MSC Approval ltr, dtd 2 Aug 05, Ser#E2-0505328, Encl 3 and 5. Approved.
Engineering › Fuel Oil Service System › Piping
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center for review and approval, the necessary drawings, plans, and calculations demonstrating compliance with 46 CFR Subchapter F for the newly installed fuel oil & cargo heating oil system as required by 46 CFR 31.10-25. All review comments shall be resolved prior to placing the systems in service.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 15 September 2005
Resolution: Received approved plans dated Aug 16, 2005 with MSC approval letter.
Engineering › Lubricating Oil Service System › Piping
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center for review and approval, the necessary drawings, plans, and calculations demonstrating compliance with 46 CFR Subchapter F for the newly installed hydraulic fluid power & control system as required by 46 CFR 31.10-25. All review comments shall be resolved prior to placing the system in service.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 24 August 2005
Resolution: Ref MSC approval stamp, dtd 29 Jun 05, on Hydraulic piping arrangement, drawing # 1624-01-2, rev 1. Approved.
Electrical › Electrical Distribution System (service) › Shore Connection Box
Issued 13 June 2005
Resolved
Prove proper operation of electrical interlock device between shore power connection to new main switchboard, where generators cannot be started when vessel to connected to shore power.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 15 September 2005
Resolution: Checked interlock device.
Engineering › Pressure Vessel › Relief Valve
Issued 13 June 2005
Resolved
Provide documentation that the two thermal fluid heater safety valves and the thermal fluid heater expansion tank safety valve meets the prescriptive design and marking requirements listed in 46 CFR Subpart 54.15 prior to placing the system in service.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 11 August 2005
Resolution: Reviewed plans and physical system. Determined relief valves set well below MAWP (225) and test pressure. Normal operating pressure of 80 psi safely below relief valve settings of 125psi. 15 psi adequate for expansion tank under minimal static head.
Accommodation/Occupational Safety › Ventilation › General
Issued 13 June 2005
Resolved
Submit to the U.S. Coast Guard Marine Safety Center for review and approval, the necessary drawings, plans, and calculations demonstrating compliance with the applicable sections 46 CFR Subchapter F , Subchapter D and Subchapter J for the newly installed ventilation system as required by 46 CFR 31.10-25. All review comments shall be resolved prior to placing the systems in service.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 15 September 2005
Resolution: Received approved plans for ventilation dated Aug 16, 2005, from MSC.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 13 June 2005
Resolved
Conduct noise level survey for newly constructed machinery space that houses both generators and thermal fluid heater and prove to the attending marine inspector that the requirements of 46 CFR 58.01-50 have been complied with.
Action required: 705 - Other - as specified
Due 18 August 2005
Resolved 11 August 2005
Resolution: Noise level determined to be above 85 decibels, signs posted requiring hearing protection.
Construction/Loadline › Hull › Bracket
Issued 19 December 2004
Resolved
TIGHTEN ALL LIFELINES ON MAIN DECK AND CARGO DECK - REPLACE LINE AT PORT LADDER AREA.
Condition: Improper/Lack of Maintenance
Due 19 January 2005
Resolved 15 January 2005
Engineering › Diesel Engine (auxiliary) › Blower, Centrifugal
Issued 19 December 2004
Resolved
REPAIR #1 CARGO PUMP SHUTDOWN.
Condition: Improper/Lack of Maintenance
Due 19 January 2005
Resolved 15 January 2005
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 18 December 2004
Resolved
INSTALL APPROPRIATE EXHAUST LAGGING ON CARGO PUMPS 1, 2, AND 3.
Condition: Improper/Lack of Maintenance
Due 19 January 2005
Resolved 15 January 2005
Construction/Loadline › Hull › Bracket
Issued 5 November 2003
Resolved
Properly secure all lifelines throughout barge.
Condition: Unknown
Due 4 January 2004
Resolved 19 December 2004
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 5 November 2003
Resolved
Install lagging on all elbows on all cargo pump engines.
Condition: Improper Installation
Due 4 January 2004
Resolved 19 December 2004
Engineering › Diesel Engine (auxiliary)
Issued 5 November 2003
Resolved
Prove proper operation of #1 cargo pump shut-down.
Condition: Improper/Lack of Maintenance
Due 4 January 2004
Resolved 20 December 2003
Engineering › Diesel Engine (auxiliary) › Governor
Issued 5 November 2003
Resolved
Install outboard air compressor and test.
Condition: Improper Installation
Due 4 January 2004
Resolved 19 December 2004
Deck/Cargo
Issued 5 November 2003
Resolved
Stencil SWL on both crane booms.
Condition: Improper/Lack of Maintenance
Due 4 January 2004
Resolved 20 December 2003
Engineering › Compressed Air System (control) › Valve
Issued 5 November 2003
Resolved
Prove proper operation of air receiver relief valve.
Due 4 January 2004
Resolved 19 December 2004
Electrical › Electric Supply System (service)
Issued 5 November 2003
Resolved
Secure wiring on forward outside of generator house. LEGACY COMPONENT DESC: Cable
Condition: Improper/Lack of Maintenance
Due 4 January 2004
Resolved 20 December 2003
Deck/Cargo
Issued 5 November 2003
Resolved
Replace port light outboard of hydraulic pump room.
Condition: Improper/Lack of Maintenance
Due 4 January 2004
Resolved 20 December 2003
Engineering › Compressed Air System (control)
Issued 5 November 2003
Resolved
Repair fan guard for inboard air compressor. LEGACY COMPONENT DESC: Compressor
Due 4 January 2004
Resolved 20 December 2003
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 5 November 2003
Resolved
Repair lights for 6p overfill/high level stack. LEGACY COMPONENT DESC: Lighting
Condition: Unknown
Due 4 January 2004
Resolved 20 December 2003
Pollution Prevention/Response
Issued 5 November 2003
Resolved
Replace caps throughout fuel fill/discharge equipment.
Condition: Improper/Lack of Maintenance
Due 4 January 2004
Resolved 20 December 2003
Documentation › Logs/Records
Issued 5 November 2003
Resolved
Provide documentation for testing 2 vapor vent valves. LEGACY COMPONENT DESC: Transfer Equipment Test/Inspection Records
Condition: Unknown
Due 4 January 2004
Resolved 20 December 2003
Pollution Prevention/Response
Issued 5 November 2003
Resolved
Plug containment for forward starboard vapor line.
Condition: Unknown
Due 4 January 2004
Resolved 20 December 2003
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 5 November 2003
Resolved
Cut walkway to allow proper operation of 3p cargo high level/overfill indicator.
Due 4 January 2004
Resolved 20 December 2003
Navigation
Issued 5 November 2003
Resolved
Repair inoperative port navigation light.
Due 4 January 2004
Resolved 20 December 2003
Construction/Loadline › Structures
Issued 19 March 2003
Resolved
Provide copy of evaluation and written recommendation from ABS technical for repairs to structural failure iwo sloped sheet of #6 cargo tank. LEGACY COMPONENT DESC: Trunk
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 April 2003
Resolved 4 December 2003
Construction/Loadline › Structures
Issued 19 March 2003
Resolved
Provide written proposal to cognizant OCMI, for when and how to permanently repair the reoccuring fractures on the slope sheet iwo #6 cargo tank. LEGACY COMPONENT DESC: Trunk
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 April 2003
Resolved 4 December 2003
Operations/Management › Vessel Safety Management
Issued 15 October 2002
Resolved
Provide proof of benzene periodic exposure monitoring iaw 46 CFR 197.540. LEGACY COMPONENT DESC: Safety/Environmental Protection Policy
Condition: Unknown
Due 15 November 2002
Resolved 19 November 2002
Resolution: Received copy of benzene monitoring report on the following class of vessel: Group I - Black Oil; Group II - Clean Oil.
Documentation › Manuals/Policy Documentation
Issued 15 October 2002
Resolved
Provide copy of Loading Manual Dwg. No. 125-D7, Alt 2, dated 23FEB1999 on board the vessel as per Stability Letter issued by American Bureau of Shipping dtd 18MAR1999. LEGACY COMPONENT DESC: Cargo/Ballast System Instruction Manual
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 October 2002
Construction/Loadline › Structures › Trunk
Issued 15 October 2002
Resolved
Provide copy of class report on temp repairs to forepeak and starboard aft rake access hatch coaming.
Due 15 October 2002
Resolved 18 October 2002
Resolution: Received copy of class report w/ outstanding recommendations to make permanent repairs at next scheduled drydocking 23OCT2003.
Construction/Loadline › Structures
Issued 15 October 2002
Resolved
Make permanent repairs to forepeak and stbd aft rake access hatch coaming at next scheduled drydock as per class report ABS T290790. LEGACY COMPONENT DESC: Access Hatch Coaming
Due 23 October 2003
Resolved 4 December 2003
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 15 October 2002
Resolved
Prove proper operation of vsl's high level and overfill alarm prior to next loading to the satisfaction of cognizant OCMI.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 October 2002
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 15 October 2002
Resolved
Prove proper operation of air receiver relief valve in the presence of CG Marine Inspector.
Due 30 October 2002
Resolved 18 October 2002
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 15 October 2002
Resolved
Fixed broken level gauge on 2,410-gal sludge vacuum tank.
Condition: Damaged By Earlier Event
Due 30 October 2002
Resolved 18 October 2002
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 15 October 2002
Resolved
Install pin on vapor recovery port and stbd forward manifold.
Condition: Improper Installation
Due 30 October 2002
Resolved 18 October 2002
Engineering › Compressed Air System (start air)
Issued 15 October 2002
Resolved
Submit repair proposal and make repairs/replace start air receiver for cargo pump engines prior to use. LEGACY COMPONENT DESC: Receiver/Bottle
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2002
Resolved 12 February 2003
Resolution: Visualy inspected a brand new air receiver and tested relief valve. Relief valve open at 120 psi. Test sat.
Deck/Cargo › Holds/Tanks
Issued 10 April 2002
Resolved
Make permanent repairs in way of #6 stbd cargo tank aft, at the forward area of the notch. 2 cracks at seams. Vessel is not allowed to take on cargo until repairs are made to the satisfaction of attending marine inspector. LEGACY COMPONENT DESC: Bulkhead
Condition: Unknown
Action required: 705 - Other - as specified
Due 17 April 2002
Resolved 24 June 2002
Resolution: Received ABS report attesting to the proper repair of #6 cargo tank.
Deck/Cargo
Issued 30 January 2001
Resolved
PRIOR TO ANY CARGO OPERATIONS, VESSEL SHALL PROCEED TO A REPAIR FACILITY INTAMPA, FL TO CONDUCT PERMANENT REPAIRS TO EXISTING 3" FRACTURE IN WAY THE #6 STBD AFT PORTION OF THE RAISED TRUNK.
Condition: Unknown
Due 30 January 2001
Resolved 30 January 2001
Deck/Cargo
Issued 22 September 2000
Resolved
MAKE PERMANENT REPAIR TO #6 STBD HI-LEVEL ALARM EXPLOSION PROOF ASSEMBLY BOX.
Condition: Unknown
Due 22 September 2000
Resolved 22 September 2000
Deck/Cargo
Issued 22 September 2000
Resolved
REPLACE MISSING TIE DOWNS FOR CARGO PUMP FUEL LINE.
Condition: Unknown
Due 22 September 2000
Resolved 22 September 2000
Deck/Cargo
Issued 22 September 2000
Resolved
REPAIR LEAKS IN TANK TOP CARGO PUMP FUEL LINES.
Condition: Unknown
Due 22 September 2000
Resolved 22 September 2000
Electrical
Issued 22 September 2000
Resolved
PROVIDE LABELS FOR EMERGENCY CUT-OFFS TO GENERATORS.
Condition: Unknown
Due 22 September 2000
Resolved 22 September 2000
Lifesaving
Issued 22 September 2000
Resolved
PROVIDE A FIXED CO2 FIREFIGHTING SYSTEM AND FLAME SCREEN VENTILATION FOR CARGO SAMPLE STORAGE LOCKER ON DECK ADJACENT TO BARGE OFFICE SPACE.
Condition: Unknown
Due 22 September 2000
Resolved 22 September 2000
Accommodation/Occupational Safety
Issued 22 September 2000
Resolved
REPAIR TWISTED LIFELINE STANCHON MIDSHIPS, PORT SIDE.
Condition: Unknown
Due 22 September 2000
Resolved 22 September 2000
Deck/Cargo
Issued 22 September 2000
Resolved
REPAIR ALL CARGO HANDLING VALVE POSITION INDICATORS OR REPLACE VALVE WITH RISING STEM TYPE. INC: ALL CARGO MANIFOLD, DROPS, DISCHARGE AND CROSS OUTS
Condition: Unknown
Due 22 September 2000
Resolved 22 September 2000
Deck/Cargo
Issued 22 September 2000
Resolved
REPLACE FLAME SCREENS ON FLAME SCREEN ASSEMBLY DRAIN PLUGS._x001C_ TANKS: 1 P/S; 2 P; 3 P/S.
Condition: Unknown
Due 22 September 2000
Resolved 22 September 2000
Documentation
Issued 22 September 2000
Resolved
PROVIDE CG WITH COPY OF MSC LETTER SERIAL # M-10665 DATED 22SEP91.
Condition: Unknown
Due 27 September 2000
Resolved 27 September 2000
Deck/Cargo
Issued 7 October 1999
Resolved
REPLACE RELIEF VALVE ON DECK COMPRESSED AIR RECEIVER.
Condition: Unknown
Due 7 October 1999
Resolved 7 October 1999
Engineering
Issued 7 October 1999
Resolved
PROPERLY MARK TWO INCH FUEL HOSES WITH TEST DATE AND SERVICE.
Condition: Unknown
Due 7 October 1999
Resolved 7 October 1999
Deck/Cargo
Issued 3 November 1998
Resolved
PRIOR TO LOADING PRODUCT TO #3 STBD CARGO TANK, MAKE PERMANENT REPAIRS TO PINHOLE LEAK LOCATED FOUR FEET ABOVE MAIN DECK STBD SIDE FORWARD, FRAME 28.
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Documentation
Issued 23 October 1998
Resolved
Provide proof that new tonnages have been sent to Vessel Documentation and obtain an updated copy of certificate._x001C_ Existing certificate does no reflect new tonnage measurements after Double Hull Modification.
Condition: Unknown
Due 30 October 1998
Resolved 2 November 1998
Documentation
Issued 23 October 1998
Resolved
Fax copies of class certificates including loadline, Hull, Cert of Class toMSO Tampa @ 228-2399 upon receipt of certificates and prior to departure from shipyard.
Condition: Unknown
Due 28 October 1998
Resolved 28 October 1998
Engineering
Issued 7 October 1994
Resolved
PROVIDE DOCUMENTATION OF HYDROSTATIC TEST FOR FUEL HOSE.
Condition: Unknown
Due 11 October 1994
Resolved 11 October 1994
Deck/Cargo
Issued 7 October 1994
Resolved
ADJUST EMERGENCY TRIP ON # 3 CARGO PUMP PRIME MOVER.
Condition: Unknown
Due 11 October 1994
Resolved 11 October 1994
Documentation
Issued 7 October 1994
Resolved
PROVIDE DOCUMENTATION OF LAST BENZENE MONITOR, PRIOR TO OPS WITH CARGOES CONTAINING 5% BENZENE BY VOLUME.
Condition: Unknown
Due 14 October 1994
Resolved 12 October 1994
Electrical
Issued 7 October 1994
Resolved
REPAIR/RENEW ACKNOWLEDGE RECEPTICAL LOCATED ON FORWARD BULKHEAD OF #2 CARGOPUMP HOUSE FOR VAPOR RECOVERY SYSTEM.
Condition: Unknown
Due 14 October 1994
Resolved 12 October 1994
Electrical
Issued 7 October 1994
Resolved
RENEW GUARD ON EXPLOSIVE PROOF LIGHT IN #1 AND # 2 CARGO PUMP PRIME MOVER HOUSES.
Condition: Unknown
Due 11 October 1994
Resolved 11 October 1994
Deck/Cargo
Issued 7 October 1994
Resolved
MODIFY THE OIL TRANSFER PROCEDURES AND VAPOR COLLECTION SYSTEM OPERATING GUIDANCE TO ENSURE PUMP PACKING GLAND WELL DRAIN VALVES ARE CLOSED, UNLESS A TANKERMAN IS SUPERVISING THEIR CONDITION (PROVIDE AN EQUIVALENT LEVEL OF SAFETY REQUIRED OF OTHER TANK OPENINGS BY 46 CFR 35.30-10).
Condition: Unknown
Due 7 October 1994
Resolved 7 October 1994
Deck/Cargo
Issued 7 October 1994
Resolved
RENEW EMERGENCY PULL CABLE FOR # 4 CARGO PUMP PRIME MOVER.
Condition: Unknown
Due 11 October 1994
Resolved 11 October 1994
Construction/Loadline
Issued 16 January 1993
Resolved
Make temporary repairs to the crack in #1 PORT CARGO TANK prior to departing the port of PHILADELPHIA. Cargo is not to be loaded in #1 CT. Upon discharge of cargo in BOSTON, no cargo may be loaded again until permanent repairs are made to the satisfaction of the cognizant OCMI.
Condition: Unknown
Due 16 January 1993
Resolved 16 January 1993
Construction/Loadline
Issued 14 October 1992
Resolved
REPAINT HULL MARKINGS - VESSEL'S NAME, PORT & STARBOARD.
Condition: Unknown
Due 30 November 1992
Resolved 16 November 1992
Engineering
Issued 13 December 1991
Resolved
DEMONSTRATE SATISFACTORY OPERATION OF PRESSURE RELIEF VALVES LOCATED IN WAYOF BOTH AIR RECEIVERS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 January 1992
Resolved 8 January 1992
Deck/Cargo
Issued 13 December 1991
Resolved
PROVIDE PROOF OF PROPER TESTING OF FIXED CARGO PIPING SYSTEM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 28 January 1992
Resolved 28 January 1992
Deck/Cargo
Issued 13 December 1991
Resolved
PRIOR TO CARRYING CARGOES REQUIRING VAPOR RECOVERY SYSTEM MAKE PERMANENT REPAIRS TO HIGH LEVEL VISUAL ALARM FOR THE NUMBER THREE (3) PORT CARGO TANK.
Condition: Unknown
Due 8 January 1992
Resolved 8 January 1992
Deck/Cargo
Issued 26 July 1991
Resolved
D1-BARGE OCEAN 192, TO OFF LOAD CARGO PRIOR TO DEPARTING THE PORT OF _x001C_ PHILADELPHIA. NO CARGO OPS. THE BARGE IS ALLOWED TO PROCEED TO CITY DOCK,_x001C_ PHILADELPHIA FOR CLEANING AND GAS FREEING TO MAKE READY NO.6 PORT AND STBD_x001C_TANKS FOR INTERNAL EXAMINATION.
Condition: Unknown
Due 26 July 1991
Resolved 26 July 1991
Deck/Cargo
Issued 4 April 1991
Resolved
GAS FREE AND MAKE AVAILABLE FOR INSPECTION # 6 PORT AND ADJACENT CARGO TANKS AND VOIDS AS NECESSARY. TO BE COMPLETED PRIOR TO THE LOADING OF ANY CARGO AND NO LATER THAN 12 APRIL 91.
Condition: Unknown
Due 4 April 1991
Resolved 4 April 1991
Engineering
Issued 14 June 1990
Resolved
REMOVE PERTCOCKS FROM THE RAYCO DIESEL OIL FUEL FILTERS SERVING THE DIESEL AIR COMPRESSORS.
Condition: Unknown
Due 14 June 1990
Resolved 14 June 1990
Accommodation/Occupational Safety
Issued 14 June 1990
Resolved
PROVIDE PRESSURE VESSEL DATA PLATES WITH MANUFACTURED INFO, MAWP, AND USCG NUMBERS. DATA PLATES TO BE FASTENDED TO BOTH PRESSURE VESSELS.
Condition: Unknown
Due 14 June 1990
Resolved 14 June 1990
Accommodation/Occupational Safety
Issued 14 June 1990
Resolved
REPAIR OR RENEW THE INBOARD DIESEL AIR COMPRESSOR, DISCHARGE GAUGE AND DIESEL TACHOMETER.
Condition: Unknown
Due 14 June 1990
Resolved 14 June 1990
Deck/Cargo
Issued 14 June 1990
Resolved
REPLACE THE NO SMOKING/NO OPEN LIGHT/WARNING SIGN ON THE PORT SIDE OF NUMBER 3 PUMP HOUSE.
Condition: Unknown
Due 14 June 1990
Resolved 14 June 1990
Electrical
Issued 14 June 1990
Resolved
REPLACE THE MISSING BATTERY BOX COVER, INBOARD OF THE DIESEL AIR COMPRESSORROOM.
Condition: Unknown
Due 14 June 1990
Resolved 14 June 1990
Deck/Cargo
Issued 5 May 1989
Resolved
PROVIDE DRIP PANS (FLASH SHIELDS) FOR THE RAYCOR FUEL FILTERS IN THE #2 AND #4 PUMP ENGINE HOUSE.
Condition: Unknown
Due 5 May 1989
Resolved 5 May 1989
Deck/Cargo
Issued 8 March 1988
Resolved
PROVIDE SHIELDS FOR RACOR FILTERS LOCATED IN ALL PUMP ENGINE SPACES.
Condition: Unknown
Due 8 March 1988
Resolved 8 March 1988
Deck/Cargo
Issued 8 March 1988
Resolved
PROVIDE TEST OF AIR RECEIVERS AND RELIEF VALVES IN PRESENCE OF CG MARINE INSPECTOR.
Condition: Unknown
Due 8 March 1988
Resolved 8 March 1988
Deck/Cargo
Issued 2 May 1985
Resolved
ANNUAL HYDRO TEST OD CARGO PIPING REQUIRED
Condition: Unknown
Due 2 May 1985
Resolved 2 May 1985