Inspection history · 16
28 April 2025
Annual Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8121722
1 May 2024
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7900304
5 January 2024
Drydock Exam · Internal Structural Exam · Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7845488
9 May 2023
Deficiency Check · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7671480
3 February 2022
COI Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7390121
3 December 2021
Administrative Inspection · Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7361153
15 March 2021
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7156749
27 January 2021
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7132381
23 September 2020
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7063762
26 November 2019
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6861913
20 November 2018
Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6575340
31 August 2018
Damage Survey · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6533846
9 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6505914
31 October 2017
Examination of Repairs · Administrative Inspection · DAPI Audit · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6290965
1 December 2016
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6050529
19 January 2016
Annual Inspection · Deficiency Check · Administrative Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5799827
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 April 2025
Resolved
Connections must be made to battery terminals with permanent type connectors. Spring clips or other temporary type clamps are prohibited. Vessel had temporary type clamps on batteries in the engine room.
//46 CFR 184.350(d)//
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2025
Resolved 20 May 2025
Resolution: Vessel replaced temporary connectors with permanent type connectors.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 April 2025
Resolved
All cable and wire must be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to bundling or retention of multiple cable installations, and not used as a means of support, except that on vessels of not more than 65 feet in length. Overhead cable and wiring in the engine room was supported using plastic tie wraps.
//46 CFR 183.340(b)(4)//
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2025
Resolved 20 May 2025
Resolution: Metal supports were installed for supporting electrical cables in engine room.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 April 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. The centerline flowmeter wires were
exposed, and the flowmeter was disconnected.
//46 CFR 183.200(b)//
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2025
Resolved 20 May 2025
Resolution: Flowmeter was reconnected with no exposed wires.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 April 2025
Resolved
Flexible nonmetallic materials (hose) may be used in vital and non-vital systems where permitted by paragraph (e) of this section. Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J-1942. Hose end fittings must comply with SAE J-1475. Flexible hoses on fire main/bilge system in the engine room were dry rotted and not in compliance with SAE J-1942. Hoses were double clamped with no hose end fittings complying with SAE J-1475.
//46 CFR 182.720(b)//
//46 CFR 182.720(e)//
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2025
Resolved 20 May 2025
Resolution: Vessel replaced flexible hoses with permanent steel pipe.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 May 2023
Resolved
General design, installation, and maintenance requirements. Electrical equipment on a vessel must be installed and maintained to: (c) Minimize accidental personnel contact with energized parts. Vessel's electrical 240 panel had an exposed peephole of approx. 1.5in in diameter.
46 CFR 183.200(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2023
Resolved 10 May 2023
Resolution: Vessel covered opening with a metal plate.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 May 2023
Resolved
Each portable fire extinguisher on a vessel must be of an approved type. The minimum number of portable fire extinguishers required on a vessel must be acceptable to the cognizant OCMI, but must not be fewer than the minimum number required by ... provisions of this section. Required fire extinguisher on the port side aft accommodation space on the 01 deck was undercharged.
46 CFR 181.500(a)
Action required: 10 - Deficiency Rectified
Resolved 9 May 2023
Resolution: Vessel installed a new fire extinguisher to meet requirement in the presence of MI.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 May 2023
Resolved
At least one ring life buoy must be fitted with a lifeline. If more than one ring life buoy is carried, at least one must not have a lifeline attached. Vessel had lifelines attached on all ring life buoys on board.
46 CFR 180.70(c)
Action required: 10 - Deficiency Rectified
Resolved 9 May 2023
Resolution: Vessel removed lifeline from remaining life rings in the presence of MI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 9 May 2023
Resolved
A hatch exposed to the weather must be watertight, except that the following hatches may be weathertight:...a hatch cover must (1) have securing devices; and (2) be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Vessel lazarette hatch did not have a securing device attached to it.
46 CFR 179.360(b)(1),(2)
Action required: 10 - Deficiency Rectified
Resolved 9 May 2023
Resolution: Vessel drilled a hole and attached the captive chain in the presence of the MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 February 2022
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. Fuel shut off linkage cable sheathing is broken at the valves, prohibiting the ability to reopen the valves without chafing the wire.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 March 2022
Resolved 4 March 2022
Resolution: Operator installed new cable linkage to fuel shut-off valves.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 February 2022
Resolved
Nonconducting mats or grating must be provided on the deck in front of each switchboard and, if accessible from the rear, on the deck in the rear of the switchboard. No nonconducting matting in front of switchboard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 March 2022
Resolved 4 March 2022
Resolution: Operator installed electrical safe mat in front of switchboard
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 February 2022
Resolved
provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Port damper does not close
completely.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 February 2022
Resolution: Operator welded tab to allow air damper pull to close the damper and maintain closed when let go.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 23 February 2022
Resolved
A space containing diesel machinery must be fitted with adequate means such as drip proof ventilators, ducts, or louvers, to provide sufficient air for proper operation of main engines and auxiliary engines. Fresh air intake ventilation fan covered in grease
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 March 2022
Resolved 4 March 2022
Resolution: Operator cleaned intake fan
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 February 2022
Resolved
Each life jacket, immersion suit, and ring life buoy must be marked in clearly legible block capital letters with the vessel's name. Old vessel name is on one side of life jackets.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 February 2022
Resolution: Operator covered the name of the old vessel on life jackets
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 February 2022
Resolved
Each rescue boat and ring life buoy must be marked with Type II retroreflective material approved in accordance with 46 CFR 164.018 or other standard specified by the Commandant. Ring buoy missing retroreflexive material.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 February 2022
Resolution: Operator installed proper retrofelective material on ring buoy
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 February 2022
Resolved
At least one ring life buoy must be fitted with a lifeline. If more than one ring life buoy is carried, at least one must not have a lifeline attached. Life buoy missing lifeline.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 February 2022
Resolution: Operator attached lifeline to ring buoy
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 23 February 2022
Resolved
A bilge suction must be fitted with a suitable strainer having an open area not less than three times the area of the bilge pipe. Suction strainer in tank space broken.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 March 2022
Resolution: Operator installed new strainer on bilge suction
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 23 February 2022
Resolved
Recovery of a helpless person must be observed from the operating station. Provide proof of ability to observe man overboard from operating station.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 March 2022
Resolution: Operator installed cameras to provide satisfactory view of exterior of vessel to maintain visual contact of person in the water
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 3 February 2022
Resolved
Portable watertight containers for distress flares and smoke signals shall be of a bright color, and containers shall be clearly marked in legible contrasting letters at least 12.7 millimeters (0.5 inches) high: “DISTRESS SIGNALS”. Found label on container falling off.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 March 2022
Resolved 4 March 2022
Resolution: Operator properly labeled Distress Signal kit
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 3 February 2022
Resolved
A durable placard must be posted next to all radiotelephone installations with the emergency broadcast instructions and information, specific to the individual vessel.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 March 2022
Resolution: Operator posted location/vessel specific emergency broadcast instructions
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 3 February 2022
Resolved
A hatch exposed to the weather must be watertight. Hatch to lazarrette has severe corrosion on the retaining ring for the hatch. Corret during next available drydock.
Action required: 705 - Other - as specified
Resolved 10 May 2023
Resolution: Vessel installed new hatch & ring during drydock act#7361153. Hatch chalk testing witnessed during act#7671480.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 3 December 2021
Resolved
A hatch exposed to the weather must be watertight. Realign engine room and aft compartment hatches to eliminate further leaking.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 January 2022
Resolution: All hatches have been realigned.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 3 December 2021
Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space including fuel tanks, and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. Frames are deteriorated in multiple locations. See Narrative.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 January 2022
Resolution: All items have been properly repaired.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018
Resolved
Vsl is broadcasting: No static draft information.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2018
Resolved 6 November 2018
Resolution: AIS informaiton updated.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Automatic Heat Detectors
Issued 31 October 2017
Resolved
RT01: Demonstrate proper operation of automatic activation of fixed firefighting system for E/R. Fire fighting inspection certificate shall specify maintenance done and faulty components. 46 CFR 181.410(c)(2)(i) Prior To Carry Passengers.
Condition: Invalid
Action required: 705 - Other - as specified
Due 4 November 2017
Resolved 2 November 2017
Resolution: Received report from fire system testing company.