Records from 1985 to 2017. Most recent: inspection, 20 December 2017.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 61
20 December 2017
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6327246
19 December 2017
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6326362
5 September 2017
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6260089
14 August 2017
Annual Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6213188
23 May 2017
Deficiency Check · In-Service Inspection · Administrative Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6168210
10 August 2016
Annual Inspection · DAPI Audit · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5968760
18 August 2015
Internal Structural Exam · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5219204
27 May 2014
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4871267
10 May 2014
DAPI Audit · Internal Structural Exam · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4855047
25 July 2012
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4391095
12 August 2011
Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4113746
15 April 2009
Deficiency Check · Hull Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3444925
2 October 2008
Deficiency Check · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3335298
18 December 2007
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3115183
2 April 2007
Hull Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2899834
12 September 2006
Simplified Stability Test · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2776195
14 January 2006
Examination of Repairs
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2583175
7 October 2005
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2509882
19 April 2005
Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2337475
23 September 2004
Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2203139
24 August 2004
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2175022
13 July 2004
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2130768
8 March 2004
Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2020697
12 May 2003
Deficiency Check · Hull Examination · Periodic Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1791765
17 December 2002
Hull Examination
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1720229
26 April 2002
Deficiency Check
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1609658
21 March 2002
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1485542
5 March 2001
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1060113
12 February 2001
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1376456
6 January 2000
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1406622
18 June 1999
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1189567
16 February 1999
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1365068
21 October 1998
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1454610
31 March 1998
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1124566
11 February 1998
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 773682
7 December 1997
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 26518
5 June 1997
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1109353
7 May 1997
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1104609
7 April 1997
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1097947
31 March 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1097471
17 March 1997
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1100465
22 November 1996
Examination of Repairs · Hull Examination · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1187477
21 February 1996
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1185350
28 February 1995
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1162008
17 February 1995
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 842740
9 November 1994
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1174198
8 March 1994
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1164787
19 February 1994
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1163932
17 February 1993
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1151189
23 November 1992
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1139263
19 February 1992
COI Inspection · Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 943968
24 January 1991
Deficiency Check · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1301672
9 January 1990
Hull Examination · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1218951
19 January 1989
COI Inspection · Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1205496
10 February 1988
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1335373
19 January 1988
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1335371
28 January 1987
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1329100
21 January 1987
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1329099
21 January 1986
Credit Drydock · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 995258
4 June 1985
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1287365
10 January 1985
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 977136
Construction/Loadline › Hull › Hull Plating
Issued 5 September 2017
Resolved
You reported your vessel sustained damage due to Hurricane Harvey. All Repairs or alterations to the hull, machinery or equipment that effects the safety of the vessel must not be made without approval of the cognizant OCMI. Prior to any repairs, you are directed to schedule a damage inspection and assessment of all repair plans for approval to the satisfaction of the attending CG marine inspector within 7 days.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 January 2018
Resolution: Vessel was declared a total loss by owners insurance company, due to damaged received during Hurricane Harvey.
Operations/Management › Navigation Safety › Proper Use of Navigation/Anchor Lights
Issued 14 August 2017
Resolved
Port side navigational light is non operational. Restricted to Daylight Operations Only. Repair/Replace to working condition.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 29 January 2018
Resolution: Vessel was declared a total loss by owners insurance company, due to damaged received during Hurricane Harvey.
Navigation › Piloting/Steering › Marine Charts
Issued 14 August 2017
Resolved
Vessel is missing the appropriate size scale charts and updated Light List. Documents must be obtained and placed on vessel
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 August 2017
Resolved 17 August 2017
Resolution: Emailed reciept of purchase for charts and Light List.
Construction/Loadline › Structures › Deck Plating
Issued 6 June 2017
Resolved
Failed/cracked welds along framing supports of upper PAX deck causing separation. Whenever damage or deterioration to structural members may affect the seaworthiness of a vessel, the OCMI may require the vessel to effect permanent repairs. Vessel rep shall provide repair proposal to effect permanent repairs to support framing welds and upper deck plating. PAX restricted from upper deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 July 2017
Resolved 29 January 2018
Resolution: Vessel was declared a total loss by owners insurance company, due to damaged received during Hurricane Harvey.
Construction/Loadline › Hull › Longitudinal Frame
Issued 6 June 2017
Resolved
Excessive pitting found along bottom longs in stbd hull aft near insert. Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of the vessel is discovered, the OCMI may require the vessel to effect permanent repairs. Vessel rep shall replace, in kind, marked sections of bottom longs to effect permanent repairs. Prior to vessel entering water.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 11 July 2017
Resolution: Crop and renew of effected area completed and tested ALL SAT.
Construction/Loadline › Hull › Hull Plating
Issued 23 May 2017
Resolved
Holes found on inboard stbd side hull. Whenever damage or deterioration to hull plating is discovered, the OCMI may conduct an Internal Structural Exam and may require the vessel to be drydocked to effect permanent repairs. Vessel rep to schedule a drydock exam and effect permanent repairs to identified damaged hull plating. To be completed prior to vessel entering water.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 11 July 2017
Resolution: Crop and renew of effected area completed and tested ALL SAT.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 15 May 2014
Resolved
Prove proper operation of navigation lights. Vessel restricted to daylight operations.
Condition: Improper/Lack of Maintenance
Due 30 May 2014
Resolved 28 May 2014
Resolution: Replaced Navigation light.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 15 May 2014
Resolved
Clad weld pitting in port aft compartment as a temporary repair until next dry docking.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2014
Resolved 28 May 2014
Resolution: Clad welded pit. All Sat.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 12 August 2011
Resolved
Remove and replace 6 child life jackets due to retro tape. Vessel had more than minimum amount of child life jackets. Removal did not impact COI requirements.
Action required: 705 - Other - as specified
Due 30 September 2011
Resolved 24 August 2012
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 12 August 2011
Resolved
Provide radio safety certificate.
Action required: 705 - Other - as specified
Due 30 September 2011
Resolved 24 August 2012
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 12 August 2011
Resolved
Remove and replace float light batter per manufactory instructions.
Action required: 705 - Other - as specified
Due 30 September 2011
Resolved 24 August 2012
Documentation › Logs/Records › Drug Test Records
Issued 12 August 2011
Resolved
Provide DAPI paperwork on pre-employment, background check, 24 hour testing location, and 1-800 employee assistant number.
Action required: 705 - Other - as specified
Due 30 September 2011
Resolved 24 August 2012
Communications › Radio Communications › EPIRB
Issued 18 December 2007
Resolved
Replace battery & hydrostatic release on EPIRB or remove EPIRB
Action required: 705 - Other - as specified
Due 18 January 2008
Resolved 2 October 2008
Resolution: EPIRB removed.
Construction/Loadline › Structures › Deck Plating
Issued 18 December 2007
Resolved
Repair broken tack welds on bottom of top deck
Action required: 705 - Other - as specified
Due 18 January 2008
Resolved 2 October 2008
Resolution: Top deck rewelded.
Construction/Loadline › Hull › Hull Plating
Issued 2 April 2007
Resolved
Gouge and weld pinhole located STBD side hull, inboard amidships.
Action required: 705 - Other - as specified
Due 5 April 2007
Resolved 25 January 2008
Resolution: Welded pinhole sufficiently.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 April 2007
Resolved
Reweld bracket holding port side engine controls located under deck amidships between port hull and fuel tank.
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 April 2007
Resolved 18 January 2008
Resolution: Bracket welded satisfactorily.
Personnel › Training › First Aid/CPR
Issued 14 October 2005
Resolved
Provide documentation for completion of CPR and First Aid Course(s).
Action required: 705 - Other - as specified
Due 14 November 2005
Resolved 19 October 2006
Resolution: Received CPR and First Aid
Navigation › Piloting/Steering › Coast Guard Light List
Issued 13 July 2004
Resolved
Provide light list.
Due 13 August 2004
Resolved 23 August 2004
Resolution: Received faxed invoice for light list.
Lifesaving › Buoyant Apparatus › Float-free Link
Issued 13 July 2004
Resolved
Provide approved weak link for life float.
Due 13 August 2004
Resolved 23 August 2004
Resolution: Received faxed invoice for weak link.
Personnel › Training › First Aid/CPR
Issued 13 July 2004
Resolved
Provide CPR training for 50% of the crew.
Extended due date.
Due 27 August 2004
Resolved 23 August 2004
Resolution: Received faxed CPR training card for Master.
Personnel › Certificates/Documents/Licenses
Issued 24 June 2003
Resolved
Provide new address/name of company that will be used as new random drug testing company.
Due 24 June 2003
Resolved 18 August 2003
Resolution: Corrected
Accommodation/Occupational Safety › Structures
Issued 24 June 2003
Resolved
Provide written proposal to cognizant USCG COTP/OCMI re; hand railing spacing on upper deck.
Due 1 August 2003
Resolved 18 August 2003
Resolution: Corrected.
Fire Fighting › Miscellaneous Items
Issued 20 June 2003
Resolved
Fire Buckets...3 required.
Due 30 June 2003
Resolved 24 June 2003
Resolution: Corrected
Lifesaving › Hand Flares › Quantity
Issued 12 May 2003
Resolved
Additional red hand flares (3) needed.
Due 30 June 2003
Resolved 24 June 2003
Resolution: Corrected
Lifesaving › Liferaft Equipment › Paddle
Issued 12 May 2003
Resolved
2 paddles, with lanyard and stenciled with vsl name needed with lifefloat.
Due 30 June 2003
Resolved 24 June 2003
Resolution: Corrected.
Construction/Loadline › Hull
Issued 29 April 2003
Resolved
Clean forward one-third of the vessel's hulls under the water line to bare metal to facilitate a more thorough inspection of hull plating. (numerous small fractures and pitting noted)
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 April 2003
Construction/Loadline › Hull
Issued 17 March 2003
Resolved
Clean areas of welds as described by the attending Marine Inspector for further inspection. LEGACY COMPONENT DESC: Bottom Plating
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 17 March 2003
Construction/Loadline › Hull
Issued 17 March 2003
Resolved
Provide a gauging report of the pitted areas of both hulls to determine the amount of wastage caused by electrolysis. All gauging must be conducted by an accredited Marine Surveyor.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 17 March 2003
Construction/Loadline › Hull
Issued 17 March 2003
Resolved
Port Hull: Drill stop, vee and weld fracture in way of bow rubrail where the main deck meets the hull.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 17 March 2003
Construction/Loadline › Hull
Issued 17 March 2003
Resolved
Once cleaned and re-examined by an attending Marine Inspector, make permanent repairs to 15 inch fracture in way of the inboard spray of the starboard hull.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 17 March 2003
Construction/Loadline › Hull
Issued 17 March 2003
Resolved
Make permanent repairs to fracture/ holed welds in way of in board chine, located 94 inches from the starboard transom and 129 inches from the starboard bow.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 17 March 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 17 March 2003
Resolved
Install additional course rails, mesh or netting between the top most course and the O-1 deck so that no space is greater than 4 inches where passengers have access to the railing. LEGACY COMPONENT DESC: Deck Rail
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 17 March 2003
Construction/Loadline › Penetrations
Issued 17 March 2003
Resolved
Crop and remove obsolete though-hull penetration on the starboard hull and insert new plate. Minimum insert shall not be less than 8 inch by 8 inch circle in that area. LEGACY COMPONENT DESC: Obsolete through-hull fitting
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 March 2003
Construction/Loadline › Hull
Issued 17 December 2002
Resolved
Vee and reweld fractured weld in way of frame no.3, (counting from the chine) in the no.1 compartment, port side.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 17 December 2002
Construction/Loadline › Hull
Issued 17 December 2002
Resolved
Submit an amended repair proposal for fracture located inboard, amidship on the starboard hull in way of chine and bottom plate where new weld has caused fracture to travel.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 17 December 2002
Navigation › Collision/Grounding Avoidance
Issued 21 March 2002
Resolved
Renew cloudy Navigation Light Lenses on Port and Starboard running lights and install a proper lens for the all around white light. LEGACY COMPONENT DESC: Navigation Lights
Due 21 April 2002
Resolved 20 April 2002
Resolution: Corrected.
Navigation › Piloting/Steering
Issued 21 March 2002
Resolved
Provide required publications, CG Light List, Coast Pilot [name withheld], Rules of the Road, and Tidal current tables. LEGACY COMPONENT DESC: Coast Guard Light List
Condition: Unknown
Due 21 April 2002
Resolved 20 April 2002
Resolution: Corrected.
Communications › Radio Communications
Issued 21 March 2002
Resolved
Repair or replace 406 EPIRB prior to operating beyond 3 miles from shore. LEGACY COMPONENT DESC: EPIRB
Condition: Damaged By Earlier Event
Due 21 April 2002
Resolved 20 April 2002
Resolution: Corrrected
Lifesaving › Lifejacket/PFD (Type I)
Issued 21 March 2002
Resolved
Renew retro-reflective tape on PFDs.
Condition: Improper/Lack of Maintenance
Due 21 April 2002
Resolved 20 April 2002
Resolution: Corrected.
Lifesaving › Lifebuoys
Issued 21 March 2002
Resolved
Renew and properly place retro-reflective tape on ring buoy
Condition: Improper/Lack of Maintenance
Due 21 April 2002
Resolved 20 April 2002
Resolution: Corrected.
Communications › Radio Communications
Issued 21 March 2002
Resolved
Renew hydrostatic release for EPIRB prior to operating beyond 3 miles from shore. LEGACY COMPONENT DESC: EPIRB
Condition: Improper/Lack of Maintenance
Due 21 April 2002
Resolved 20 April 2002
Resolution: Corrected
Construction/Loadline › Structures
Issued 21 March 2002
Resolved
Properly adjust both watertight hatches on aft deck and replace gaskets where needed no later than 21Apr02. LEGACY COMPONENT DESC: Deck Plating
Condition: Improper/Lack of Maintenance
Due 21 April 2002
Resolved 20 April 2002
Resolution: Corrected.
Construction/Loadline › Structures
Issued 21 March 2002
Resolved
Grind and reweld upper deck support located above head, and on No. 6 frame for upper deck both port and starboard sides of operating station not later than 12Apr02. LEGACY COMPONENT DESC: Superstructure
Condition: Unknown
Due 21 April 2002
Resolved 8 May 2002
Resolution: Corrected.
Construction/Loadline › Structures
Issued 21 March 2002
Resolved
Remove BONDO from No. 6 frame to allow for closer inspection. To be corrected not later than 21Apr02. LEGACY COMPONENT DESC: Superstructure
Condition: Unknown
Due 21 April 2002
Resolved 20 April 2002
Resolution: Corrected.
Engineering › Bilge Water Management System
Issued 21 March 2002
Resolved
Provide strainers for bilge suctions which are 3 times the nominal pipe size. To be corrected not later than 21Apr02. LEGACY COMPONENT DESC: Strainer
Condition: Improper Installation
Due 21 April 2002
Resolved 20 April 2002
Resolution: Corrected
Engineering › Bilge Water Management System
Issued 21 March 2002
Resolved
Remove or repair all electric automatic bilge pumps and if repaired, provide a visual indicator at the operating station not later than 21Apr02.
Due 21 April 2002
Resolved 20 April 2002
Resolution: Corrected by removing electric bilge pumps.
Lifesaving
Issued 12 February 2001
Resolved
Provide 6 Hand-Held red flares.
Condition: Unknown
Due 13 February 2001
Resolved 14 February 2001
Electrical
Issued 12 February 2001
Resolved
Clean up & repair wiring under operator station.
Condition: Unknown
Due 12 February 2001
Resolved 12 February 2001
Construction/Loadline
Issued 12 February 2001
Resolved
Repair all fractured welds on the 2nd deck support stanchions. Complete by28FEB01.
Condition: Unknown
Due 12 February 2001
Resolved 12 February 2001
Lifesaving
Issued 6 January 2000
Resolved
Provide logbook w/correct entries: Drills, L/S equipment inspection.
Condition: Unknown
Due 7 January 2000
Resolved 10 January 2000
Fire Fighting
Issued 6 January 2000
Resolved
Service all portable extinguishers.
Condition: Unknown
Due 7 January 2000
Resolved 10 January 2000
Lifesaving
Issued 6 January 2000
Resolved
EPIRB inoperable & hydrostatic release expired. Correct prior to placing vessel into service.
Condition: Unknown
Due 7 January 2000
Resolved 10 January 2000
Lifesaving
Issued 6 January 2000
Resolved
Provide 3 orange smoke flares by 07JAN00.
Condition: Unknown
Due 7 January 2000
Resolved 10 January 2000
Construction/Loadline
Issued 6 January 2000
Resolved
Repair stbd aft bilge pump & correct wiring to pump. Correct by 07JAN00.
Condition: Unknown
Due 7 January 2000
Resolved 10 January 2000
Lifesaving
Issued 6 January 2000
Resolved
RE-stencil name on lifefloat & capacity.
Condition: Unknown
Due 7 January 2000
Resolved 10 January 2000
Construction/Loadline
Issued 6 January 2000
Resolved
Replace all valves on bilge piping system that do not have handles.
Condition: Unknown
Due 7 January 2000
Resolved 10 January 2000
Lifesaving
Issued 16 February 1999
Resolved
Replace battery in ring buoy light. Provide 60' of dark color line and replace 36" line to light w/proper line and clip.
Condition: Unknown
Due 16 February 1999
Resolved 16 February 1999
Lifesaving
Issued 16 February 1999
Resolved
Crew drug test results verified. Provide complete drug program in accordance with 46 CFR Part 16. Provide by 02MAR99.
Condition: Unknown
Due 16 February 1999
Resolved 16 February 1999
Navigation
Issued 16 February 1999
Resolved
Provide replacement bulbs for port/stbd nav lights. Provide by 17FEB99. Daylight ops only until replaced.
Condition: Unknown
Due 17 February 1999
Resolved 22 February 1999
Fire Fighting
Issued 16 February 1999
Resolved
Replace/service BI extinguisher, stbd side, at the operator station.
Condition: Unknown
Due 16 February 1999
Resolved 16 February 1999
Lifesaving
Issued 16 February 1999
Resolved
Repalce 3 expired orange smoke signal devices and provide proper container.
Condition: Unknown
Due 16 February 1999
Resolved 16 February 1999
Construction/Loadline
Issued 21 October 1998
Resolved
Cracked weld IWO the forward port #1 void, vertical stiffener at the joint of the transverse frame.
Condition: Unknown
Due 6 November 1998
Resolved 15 November 1998
Construction/Loadline
Issued 21 October 1998
Resolved
Forward repair proposal and ultrasonic testing results conducted on 23OCT98. Repair proposal is for the hole in the port hull, centerline, in the #2 void.
Condition: Unknown
Due 6 November 1998
Resolved 15 November 1998
Construction/Loadline
Issued 21 October 1998
Resolved
Starboard #1 void, cracked weld IWO the joint between the transverse frame and the vertical stiffener.
Condition: Unknown
Due 6 November 1998
Resolved 15 November 1998
Construction/Loadline
Issued 21 October 1998
Resolved
Starboard #3 void, fractured weld IWO the bottom stiffener forward of the transverse frame.
Condition: Unknown
Due 6 November 1998
Resolved 15 November 1998
Construction/Loadline
Issued 21 October 1998
Resolved
Starboard #1 void, fractured weld IWO the #3 bottom stiffener.
Condition: Unknown
Due 6 November 1998
Resolved 15 November 1998
Construction/Loadline
Issued 21 October 1998
Resolved
Port #2 void, cracked transverse frame IWO #3 stiffener.
Condition: Unknown
Due 6 November 1998
Resolved 15 November 1998
Construction/Loadline
Issued 21 October 1998
Resolved
Cracked weld in the forward port corner rail frame.
Condition: Unknown
Due 6 November 1998
Resolved 15 November 1998
Electrical
Issued 11 February 1998
Resolved
Remove wire nuts on port bilge pump._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 February 1998
Resolved 11 February 1998
Electrical
Issued 11 February 1998
Resolved
Provide 2 flashlights._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 February 1998
Resolved 11 February 1998
Documentation
Issued 11 February 1998
Resolved
Provide an FCC operators permit._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 February 1998
Resolved 11 February 1998
Lifesaving
Issued 11 February 1998
Resolved
Provide proof of registration of EPIRB._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 February 1998
Resolved 11 February 1998
Documentation
Issued 11 February 1998
Resolved
Provide a vessel log book with all required entries._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 February 1998
Resolved 11 February 1998
Navigation
Issued 11 February 1998
Resolved
Repair navigation lights._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 February 1998
Resolved 11 February 1998
Accommodation/Occupational Safety
Issued 11 February 1998
Resolved
Re-stencil passenger capacity for upper deck._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 February 1998
Resolved 11 February 1998
Lifesaving
Issued 11 February 1998
Resolved
Provide an emergency broadcast placard._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 February 1998
Resolved 11 February 1998
Documentation
Issued 31 March 1997
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 31 March 1997
Resolved 31 March 1997
Lifesaving
Issued 31 March 1997
Resolved
Provide 6 orange hand held flares.
Condition: Unknown
Due 8 April 1997
Resolved 8 April 1997
Accommodation/Occupational Safety
Issued 31 March 1997
Resolved
Reinforce railing stanchions on upper deck, starboard side.
Condition: Unknown
Due 8 April 1997
Resolved 8 April 1997
Lifesaving
Issued 31 March 1997
Resolved
Renew painter for lifefloat.
Condition: Unknown
Due 8 April 1997
Resolved 8 April 1997
Fire Fighting
Issued 31 March 1997
Resolved
Provide 3 fire buckets with lanyards.
Condition: Unknown
Due 8 April 1997
Resolved 8 April 1997
Lifesaving
Issued 17 February 1995
Resolved
Stencil vessel name and capacity on lifefloat. Also, stencil vessel name on paddles.
Condition: Unknown
Due 17 February 1995
Resolved 17 February 1995
Engineering
Issued 17 February 1995
Resolved
Replace plastic fuel fill extension and cap with aluminum parts._x001C_ (PVC Plastic not acceptable for use in fuel systems, particularly gasoline)
Condition: Unknown
Due 17 February 1995
Resolved 17 February 1995
Lifesaving
Issued 17 February 1995
Resolved
Post stability letter at steering station. Post lifejacket placard.
Condition: Unknown
Due 17 February 1995
Resolved 17 February 1995
Lifesaving
Issued 17 February 1995
Resolved
Stencil "Maximum number of persons on upper deck 10" or words to that effect at ladder leading to deck as discussed with inspector.
Condition: Unknown
Due 17 February 1995
Resolved 17 February 1995
Lifesaving
Issued 17 February 1995
Resolved
Clean lifejackets.
Condition: Unknown
Due 17 February 1995
Resolved 17 February 1995
Fire Fighting
Issued 17 February 1995
Resolved
Install fire extinguisher bracket for both B-II fire extinguishers.
Condition: Unknown
Due 17 February 1995
Resolved 17 February 1995
Lifesaving
Issued 17 February 1995
Resolved
Mark location of B-I fire extinguisher._x001C_ (extinguisher stowed in boat box next to vessel operator)
Condition: Unknown
Due 17 February 1995
Resolved 17 February 1995
Construction/Loadline
Issued 9 November 1994
Resolved
Repair cracks on bow fairweathers are marked by CG Marine Inspector.
Condition: Unknown
Due 9 November 1994
Resolved 9 November 1994
Construction/Loadline
Issued 9 November 1994
Resolved
Provide access openings into #4 voids Port and Starboard to allow internal examination by CG Marine Inspector.
Condition: Unknown
Due 9 November 1994
Resolved 9 November 1994
Lifesaving
Issued 19 February 1994
Resolved
Provide paddles for 11 and 6 man lifefloats.
Condition: Unknown
Due 9 March 1994
Resolved 9 March 1994
Lifesaving
Issued 19 February 1994
Resolved
Provide water light for 11 man lifefloat.
Condition: Unknown
Due 9 March 1994
Resolved 9 March 1994
Fire Fighting
Issued 19 February 1994
Resolved
Provide suitable portable fire pump.
Condition: Unknown
Due 9 March 1994
Resolved 9 March 1994
Accommodation/Occupational Safety
Issued 19 February 1994
Resolved
Install overboard discharge valve capable of being locked in toilet overboard pipe.
Condition: Unknown
Due 9 March 1994
Resolved 9 March 1994