MAURY USCG vessel records Sign in
← All vessels

SCOUT

SCOUT is a 1970 passenger vessel (inspected). The Coast Guard has recorded 65 inspections since 1984, most recently in June 2026, along with 42 deficiencies.

Records from 1984 to 2026. Most recent: inspection, 25 June 2026.

Built
1970
Last inspected
25 June 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WYD9434
Flag
UNITED STATES
—
Maury page id
psix-50624

Inspections, by type

…with no type recorded2
Years with a record 39 calendar years (1984–2026)
The 65 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Tonnage as PSIX records it4 - Simplified, Gross Ton
3 - Simplified, Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 65

25 June 2026 Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8413741
13 November 2025 Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8090964
17 June 2025 COI Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8090903
26 September 2024 Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7873730
20 June 2024 Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7942742
16 November 2023 Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7826072
28 September 2023 Annual Inspection · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7624439
16 December 2022 Deficiency Check · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7613385
7 July 2022 Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7411351
5 November 2021 Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7161165
19 August 2021 Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7161414
1 July 2020 COI Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6908349
5 November 2019 Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6849611
11 July 2019 DAPI Audit · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6637821
13 July 2018 DAPI Audit · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6375170
30 November 2017 Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6307560
13 July 2017 Deficiency Check · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6105939
7 July 2016 DAPI Audit · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5830695
7 April 2016 Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5829321
21 March 2014 DAPI Audit · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 4820365
8 May 2012 Re-Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 4246458
17 February 2012 Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 4246454
7 December 2011 Plan Review "T" Boat
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 4203429
1 February 2011 DAPI Audit · Re-Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3937290
17 March 2010 DAPI Audit · COI Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3697342
17 March 2010 Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3697470
11 May 2009 Re-Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3416743
13 May 2008 Re-Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3188754
17 April 2008 Internal Structural Exam · Hull Examination
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3166315
24 April 2007 Re-Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2911060
25 May 2006 Re-Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2629344
24 March 2006 Hull Examination
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2609056
18 May 2005 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2345066
1 April 2004 COI Inspection · Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2035330
30 April 2002 Hull Examination · Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1611353
28 June 2001 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1391655
8 February 2001 Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1056061
22 June 2000 COI Inspection · Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1445788
14 June 1999 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1127723
17 May 1999 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1087777
27 April 1999 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1126483
9 June 1998 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 798060
18 June 1997 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 777375
16 April 1997 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1108620
15 May 1996 Re-Inspection · Deficiency Check · Plan Review "T" Boat
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1134268
14 June 1995 Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 879395
23 May 1995 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1432909
4 April 1995 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1453116
24 October 1994 Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 863415
3 June 1994 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1440812
24 June 1993 Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1152043
1 June 1993 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1443382
1 April 1993 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1373822
4 June 1992 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1261816
6 June 1991 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 931081
5 April 1991 Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1231595
29 March 1991 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1230506
4 June 1990 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 900958
26 April 1990 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1235201
12 July 1989 Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1044762
8 July 1988 COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1030594
31 March 1988 Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 994052
16 June 1986 Credit Drydock
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 995899
8 July 1985 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1291355
8 November 1984 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1286862

Deficiency record · 42

02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 13 November 2025 Resolved
At each inspection, the owner or managing operator shall have the vessel ready for inspections of the hull structure and its appurtenances. A crack was identified in the hull gel coat with water weeping approximately 1 inch above the keel on the port side below the transducer. Grind the gel coat back and prepare the area for further inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2026
Resolved 25 June 2026
Resolution: Area was repaired without further visits from CG. All sat. No major damaged was found according to rep.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 13 November 2025 Resolved
At each inspection, the owner or managing operator shall have the vessel ready for inspections of the hull structure and its appurtenances. Wood rot identified along aft steering gear hatch support frame. Renew.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2026
Resolved 25 June 2026
Resolution: All damged wood was replaced in kind. All sat.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 13 November 2025 Resolved
At each inspection, the owner or managing operator shall have the vessel ready for inspections of the hull structure and its appurtenances. Initial signs of wood rot/angel hair was identified along the interior port side of the transom and frames. Clean the affected area and preserve against further decay.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2026
Resolved 25 June 2026
Resolution: Area was cleaned. No additional damage noted.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 13 November 2025 Resolved
At each inspection, the owner or managing operator shall have the vessel ready for inspections of the hull fittings and sea valves. Provide the sea valve for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2026
Resolved 25 June 2026
Resolution: Provided and tested. All sat.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 28 September 2023 Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Vessel did not have means to secure ventilation to engine space on board.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 October 2023
Resolved 25 October 2023
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 28 September 2023 Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation. Fuel shutoff markings were barely legible and need to be re-stenciled.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 October 2023
Resolved 25 October 2023
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 7 July 2022 Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space...and may require the vsl to be dry docked to assess the extent of the damage. Found wood rot on a starboard bottom plank located in the forward compartment, in way of the previously plugged through-hull fitting. Vessel is directed to submit a repair proposal to adequately address noted rot to the satisfaction of the attending CGMI during winter haul out period of 2022-2023, no later than March 01, 2023. 46 CFR 176.600(d) NVIC 07-95
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 March 2023
Resolved 30 December 2022
Resolution: See Activity Number 7613385
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 7 July 2022 Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space...and may require the vsl to be dry docked to assess the extent of the damage. Found a wooden plug in what appears to be a keel bolt pilot hole; located in the engine compartment, directly aft of the transverse frame that has the exhaust manifold strapped down to it. Vessel is directed to haul the vessel, make determination with the attending marine inspector if the plug is covering a missing keel bolt, no later than March 01, 2023. 46 CFR 176.600(d) NVIC 07-95
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 March 2023
Resolved 3 January 2023
Resolution: See Activity Number 7613385
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 August 2021 Resolved
Each ring life buoy with a floating waterlight must have a lanyard of at least 3ft but not more than 6ft in length. Line is worn and falling apart.
Action required: 10 - Deficiency Rectified
Resolved 19 August 2021
Resolution: replaced line to waterlight and remarked.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 1 July 2020 Resolved
Magnetic compass was inoperable. Replace magnetic compass.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 July 2020
Resolved 7 July 2020
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 1 July 2020 Resolved
Vessel's sound signal was inoperable. Provide sound signals.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 July 2020
Resolved 7 July 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 July 2020 Resolved
Bilge pump was inoperable. Provide bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 July 2020
Resolved 7 July 2020
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 13 July 2017 Resolved
Missing brackets, utilizing hook and loop set up.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 July 2017
Resolved 18 July 2017
Resolution: Install new approved brackets on vessel.
Lifesaving › Lifefloat › Serviceable
Issued 13 July 2017 Resolved
Found lifefloat grab line rotten, ring not servicable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 July 2017
Resolved 13 July 2017
Resolution: New ring installed and proper labeling, withline and light.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 March 2014 Resolved
Unsupported wiring hanging down into bilge.
Action required: 705 - Other - as specified
Due 24 July 2014
Resolved 18 July 2014
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 21 March 2014 Resolved
Replace battery annually.
Action required: 705 - Other - as specified
Due 24 July 2014
Resolved 18 July 2014
Documentation › Certificates/Documents › Stability Letter
Issued 8 May 2012 Resolved
Passenger capacity is reduced to 18 IAW new 185 AAWPP.
Action required: 705 - Other - as specified
Due 8 May 2012
Resolved 7 January 2013
Resolution: New Stability Letter issued.
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 8 May 2012 Resolved
Installed fire fighting system is discharged. Renew prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2012
Resolved 15 May 2012
Construction/Loadline › Hull › Transverse Frame
Issued 17 March 2010 Resolved
Frames fore and aft of console on the port side were found to be rotted due to water intrusion. In addition inner planking between the two frames was rotted. Temporary repair approved and inspected, permanent repair required at the conclusion of the operating season.
Action required: 705 - Other - as specified
Due 30 September 2010
Resolved 9 May 2011
Resolution: Temporary repairs accepted as permanent since they were proven in service over one operating season. Area to be closely monitored at further dry docks. Inspection note entered.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 17 March 2010 Resolved
Complete inspection for certification prior to carriage of passengers.
Due 21 June 2010
Resolved 1 July 2010
Fire Fighting › Remote Fuel Shutoff › General
Issued 24 April 2007 Resolved
Label fuel shutoff and mark direction.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 29 May 2007
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 18 May 2005 Resolved
Replace life buoy light and life line.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 19 May 2005
Resolution: Light and lifeline found satisfactory.
Engineering › Bilge Water Management System › Pump
Issued 18 May 2005 Resolved
Replace portable bilge pump.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 19 May 2005
Resolution: Bilg pump demonstrated to be operational.
Electrical › Electric Supply System (service) › Battery Installation
Issued 18 May 2005 Resolved
Replace wing nuts on battery terminals with permanant connections.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 19 May 2005
Resolution: Wingnuts replaced.
Fire Fighting › Fixed Halon Fire Extinguishing System
Issued 1 April 2004 Resolved
Provide proof of proper servicing, testing, weighing of the extinguishers
Due 24 May 2004
Resolved 17 May 2004
Fire Fighting › Fixed Halon Fire Extinguishing System
Issued 30 April 2002 Resolved
Provide proof of testing /servicing of the fixed fire fighting system
Action required: 705 - Other - as specified
Resolved 7 August 2002
Resolution: Witnessed satisfactory testing of FFF system.
Construction/Loadline › Structures
Issued 30 April 2002 Resolved
Address decaying wood cover for the life jacket boxes
Due 18 June 2002
Resolved 12 June 2002
Operations/Management › Pollution
Issued 30 April 2002 Resolved
Provide oil pollution placard.
Due 18 June 2002
Resolved 12 June 2002
Construction/Loadline
Issued 27 April 1999 Resolved
1 ft by 1 ft area of wet-rot in side shell(well above waterline) in way of operators console. O/O to repair at end of season haul-out.
Condition: Unknown
Due 25 February 2000
Resolved 25 February 2000
Construction/Loadline
Issued 18 June 1997 Resolved
Prior to carrying passengers, renew wasted bolts and make watertight-just aft of shaft log.
Condition: Unknown
Due 2 July 1997
Resolved 2 July 1997
Documentation
Issued 15 May 1996 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 18 September 1996
Resolved 18 September 1996
Lifesaving
Issued 15 May 1996 Resolved
PERFORM REQUIRED ANNUAL UNDERWAY DRILLS IN THE PRESENCE OF A MARINE INSPECTOR._x001C_
Condition: Unknown
Due 18 September 1996
Resolved 18 September 1996
Documentation
Issued 15 May 1996 Resolved
CONDUCT CHEMICAL DRUG TESTING PROGRAM TRAINING FOR VSL OPERATORS._x001C_
Condition: Unknown
Due 18 September 1996
Resolved 18 September 1996
Documentation
Issued 15 May 1996 Resolved
PROVIDE PROVISIONS FOR CHEMICAL TESTING DURING AFTER HOURS.
Condition: Unknown
Due 18 September 1996
Resolved 18 September 1996
Documentation
Issued 15 May 1996 Resolved
CONDUCT PRE-EMPLOYMENT CHEMICAL TESTING AND ENROLEMENT FOR VSL OPERATORS.
Condition: Unknown
Due 18 September 1996
Resolved 18 September 1996
Construction/Loadline
Issued 23 May 1995 Resolved
REMOVE OIL FROM BILGES OF VSL.
Condition: Unknown
Due 15 June 1995
Resolved 23 June 1995
Lifesaving
Issued 23 May 1995 Resolved
PLACE VSL NAME ON RINGBUOY.
Condition: Unknown
Due 15 June 1995
Resolved 23 June 1995
Lifesaving
Issued 23 May 1995 Resolved
STOW CHILD LIFEJACKETS SEPERATE FROM ADULT LIFEJACKETS. MARK LOCATION AS APPROPRIATE.
Condition: Unknown
Due 15 June 1995
Resolved 23 June 1995
Lifesaving
Issued 23 May 1995 Resolved
PERFORM REQUIRED FIRE, MAN OVERBOARD, AND ABANDON SHIP DRILLS IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 15 June 1995
Resolved 23 June 1995
Documentation
Issued 23 May 1995 Resolved
PROVIDE ORIGINAL OPERATOR LICENSE.
Condition: Unknown
Due 15 June 1995
Resolved 23 June 1995
Lifesaving
Issued 1 June 1993 Resolved
CONDUCT DRILLS IN PRESENCE OF A COAST GUARD MARINE INSPECTOR
Condition: Unknown
Due 22 June 1993
Resolved 21 June 1993
Construction/Loadline
Issued 1 June 1993 Resolved
ROUTE ENGINE COMPARTMENT VENT DUCTING TO COWL FOR PROPER SUPPLY AIR FLOW.
Condition: Unknown
Due 22 June 1993
Resolved 21 June 1993

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.