Records from 2016 to 2026. Most recent: inspection, 5 May 2026.
Inspection history · 15
5 May 2026
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8299943
9 April 2025
Deficiency Check · Annual Inspection · Internal Structural Exam · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8108144
2 May 2024
Annual Inspection · Deadweight Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7848214
4 May 2023
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7619187
6 April 2023
Internal Structural Exam · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7619155
5 May 2022
COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7378146
5 May 2021
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7199026
7 April 2021
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7170848
6 May 2020
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6949675
8 May 2019
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6679348
3 April 2019
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6654877
9 May 2018
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6410837
4 May 2017
COI Inspection · Simplified Stability Test · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6138293
22 December 2016
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6061240
4 May 2016
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5869393
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 May 2024
Resolved
Each ring life buoy on a vessel must be approved in accordance with with 46 CFR 160.050 or other standard specified by the Commandant. During the inspection, vessel's ring life buoy grab line was found to be deteriorated so as to call into question its breaking strength. Grab line shall be replaced on the ring life buoy to meet standard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2024
Resolved 9 May 2024
Resolution: Grab lines were replaced with new material.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 22 December 2016
Resolved
PROVE PROPER OPERATION OF NEW ENGINE AND ASSOCIATED SYSTEMS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2017
Resolution: Vessel rep. proved proper operation of propulsion machinery.
Stability › Incline Test › General
Issued 22 December 2016
Resolved
Conduct new stability test due to engine swap and weight changes exceeding 300 lbs.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2017
Resolution: Conducted satisfactory stability test.