Records from 2016 to 2026. Most recent: inspection, 3 April 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 13
3 April 2026
Vessel Attendance · COI Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8334154
18 April 2025
Internal Structural Exam · Administrative Inspection · Drydock Exam · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8106212
11 April 2024
Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7877746
29 September 2023
Deficiency Check · Examination of Repairs · Internal Structural Exam · Drydock Exam · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7795757
6 May 2022
Annual Inspection · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7419871
13 April 2021
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7163334
6 April 2021
Deficiency Check · COI Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7163330
13 April 2020
Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6939381
13 May 2019
Deficiency Check · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 6683234
18 April 2019
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6650375
16 April 2018
Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6349665
13 April 2017
Annual Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6097091
11 April 2016
DAPI Audit · COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 5851591
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 April 2026
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel was unable to start engine. Operator must troubleshoot issue and conduct a satisfactory sea trial in the presence of a MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2026
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 29 September 2023
Resolved
The fuel shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. Valve was not operable, prove proper operation of the remote fuel shutoff prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2023
Resolved 5 October 2023
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 29 September 2023
Resolved
A device must be provided to automatically shut down the engines that draw intake air from a fixed fire extinguishing system protected space prior to release of
the extinguishing agent into the space. Vessel's FireBoy would not shut down engine, prove proper operation of fireboy system shutdown and overide.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2023
Resolved 13 October 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 May 2022
Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets. Child life jackets are stowed with adult life jackets.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2022
Resolved 20 May 2022
Resolution: Child life jackets are stowed separately from adult life jackets.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 April 2021
Resolved
Except as allowed by paragraph (d) of this section, each life jacket must be approved in accordance with either 160.002, 160.005, or 160.05 in sub-chapter Q of this chapter, or other standards specified by the Commandant. Vessel is equipped with non-approved [name withheld] model number 603 life-jackets and are in need of replacement.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 April 2021
Resolution: Replaced non-conpliant life-jackets as per regulation.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 April 2021
Resolved
Each ring life buoy on a vessel must: (1) Be approved in accordance with 160.050 in sub-chapter Q of this chapter, or other standard specified by the Commandant. The grab line attached to the life buoy is dry rotted and in need of full replacement in kind.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 April 2021
Resolution: Replaced life buoy in kind.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 13 April 2020
Resolved
Fire extinguishing systems on board were overdue for inspection. Provide fire servicing certificate.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 April 2020
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 13 May 2019
Resolved
he following spaces must be equipped with a fixed gas fire extinguishing system...(1) A space containing propulsion machinery. Gasket for machinery space hatch is worn and missing, full replacement is needed to seal machinery space in event of fixed extinguishing discharge.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 21 June 2019
Resolution: Rubber gasket was replaced in kind, all sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 April 2018
Resolved
The high water level alarm was inoperable.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 14 May 2018
Resolved 17 May 2018
Resolution: Fixed bilge high water alarm.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 11 April 2016
Resolved
Vessels pre engineered fixed gas system does not shut down engine when acuated. System should shutdown engine when acuated. Fix prior to carrying passengers.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 April 2016
Resolved 18 April 2016
Resolution: vessel fixed pre engineered system.