Inspection history · 43
5 May 2026
Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8325009
8 May 2025
COI Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8130759
8 March 2024
Internal Structural Exam · Annual Inspection · Drydock Exam · Cargo Tank Internal
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7875259
28 March 2023
Periodic Inspection · Cargo Tank Internal · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7658152
29 March 2022
Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7418675
13 April 2021
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7174653
6 May 2020
COI Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6943290
6 December 2019
Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6868584
24 August 2019
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6807652
16 April 2019
Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6655574
19 February 2019
Internal Structural Exam · Cargo Tank Internal · Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6620779
19 June 2018
Deficiency Check · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6449626
30 May 2018
Periodic Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6411779
15 November 2017
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6323275
26 May 2017
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6156081
21 April 2016
Annual Inspection · Deficiency Check · Cargo Tank Internal
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 5859472
28 May 2015
Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 5129824
7 April 2015
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 5098314
24 April 2014
Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4815435
24 April 2014
MTSA Verification · Periodic Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4848240
11 June 2013
Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4617092
23 May 2012
Annual Inspection · Cargo Tank Internal
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4293388
2 June 2010
COI Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3754569
8 March 2010
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3820341
5 August 2009
Annual Inspection · MTSA Verification
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3556084
9 March 2009
Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3422282
23 September 2008
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3331080
3 June 2008
Internal Structural Exam · Annual Inspection · Cargo Tank Internal · MTSA Verification
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3225198
1 December 2007
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3107866
25 July 2007
Annual Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3008006
1 September 2006
Security Plan Review - VSP · Annual Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 2770597
7 March 2006
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 2597598
14 July 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2426496
6 June 2005
Internal Structural Exam · MTSA Verification · Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2381151
24 November 2004
MTSA Verification · Periodic Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2249555
10 November 2004
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2238924
4 May 2004
Cargo Tank Internal · Internal Structural Exam
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2058764
6 April 2004
Examination of Repairs
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2038993
29 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1997394
10 November 2003
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1945009
30 November 2002
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1712481
11 September 2001
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1439258
30 August 2000
Initial Construction-Excluding Oversight · Hull Examination · Initial Certification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1389180
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 16 April 2024
Resolved
No person may use any equipment listed in paragraph (c) of this section for transfer operations unless the vessel or facility operator, as appropriate, tests and inspects the equipment in accordance with paragraphs (b), (c) and (f) of this section. Vessels transfer hose was overdue for annual inspection. 33 CFR 156.170(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 April 2024
Resolution: Received photos of records and hose markings, all sat.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 16 April 2024
Resolved
Cargo pump pressure gage shall be tested at least once a year for accuracy. Provide calibration report for cargo pump gages to CG Inspector. 46 CFR 35.35-70(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 23 April 2024
Resolution: Received photos of new cargo gages installed, all sat.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 16 April 2024
Resolved
If the annual inspection reveals deficiencies in your vessel's maintenance, you must make any or all repairs or improvements within the time period specified by the [name withheld] containment had trash and debris inside, reducing the capacity of the designed containment. 46 CFR 31.10-17(a)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 3 May 2024
Resolution: Received photographic evidence of the clean containment. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 28 March 2023
Resolved
Nothing in this subpart limits the marine inspector from conducting such tests or inspections he or she deems necessary to be assured of the vessel's seaworthiness. Portside aft void hatch dog attachments were found deteriorated. Renew in kind.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 25 April 2023
Resolution: New hatch dog installed.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 28 March 2023
Resolved
Each tank vessel must meet the applicable requirements in subchapter S of this chapter. Stbd side mid void goose neck was found deteriorated at the opening. Make proper repairs.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 25 April 2023
Resolution: New section of the goose neck installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 March 2023
Resolved
Each panelboard must have: (2) A circuit directory that has: (i) The circuit designation of each circuit; Missing placards on pump switch panel and 120V Dist panel. Install new placards.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 25 April 2023
Resolution: Installed new placards.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 March 2023
Resolved
Electric equipment must be arranged, as far as practicable, to prevent dripping liquids. Drip guard for portside aft cargo pump motor found holed out. Replace in kind.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2023
Resolved 25 April 2023
Resolution: Drip guard fabricated and installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 4 May 2021
Resolved
Port #3 void aft hatch nut wasted at the hinge. Renew in kind
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2021
Resolved 6 May 2021
Resolution: Hatch nut replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 4 May 2021
Resolved
Starboard #5 void gooseneck is holed out at the bend. Crop and renew in kind
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2021
Resolved 6 May 2021
Resolution: Goose neck cropped out and renewed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 4 May 2021
Resolved
Port stern #5 void hatch cover is wasted. Renew in kind.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2021
Resolved 6 May 2021
Resolution: Void hatch was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 6 May 2020
Resolved
Safety Chains broken on handrails due to wastage. Inspect and replace all wasted or damaged safety chains.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2020
Resolved 27 May 2020
Resolution: Vsl rep. sent photos of all safety chain with new chains and quick releases. SAT
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 6 May 2020
Resolved
Clogged flame screens on cargo tanks.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 May 2020
Resolution: Vsl rep. provided photos of flame screen cleaned. SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 6 May 2020
Resolved
Loose deck plates missing hardware and loose.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2020
Resolved 27 May 2020
Resolution: New deck plate clamps installed as provided by vsl rep. via photos.SAT
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 6 May 2020
Resolved
Cargo tank hatches wasted bolts, missing bolts and loose bolts.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 May 2020
Resolution: VSL REP provided photos of hatches with new bolts. SAT
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 April 2019
Resolved
FWD electrical conduit fractured, wasted at Tee and loose cover.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2019
Resolved 30 April 2019
Resolution: All new fittings installed and painted. objective evidence (photos and statement) supplied.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 30 May 2018
Resolved
#1 FWD cargo tank level indicator electrical coupler wasted.
Action required: 703 - Prior to bunkering operations
Resolved 2 July 2018
Resolution: Verified that a new coupling was installed; all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 30 May 2018
Resolved
#1 FWD cargo tank butterworth hatch hinge bolts and dogs wasted.
Action required: 705 - Other - as specified
Due 29 June 2018
Resolved 29 June 2018
Resolution: Verified new hardware was installed; all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 30 May 2018
Resolved
Hatch dog mounts wasted as ID'd. Void 1-5 STBD side.
Action required: 705 - Other - as specified
Due 29 June 2018
Resolved 20 June 2018
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 30 May 2018
Resolved
Wasted hatches #3 and #4 void stbd side.
Action required: 703 - Prior to bunkering operations
Resolved 20 June 2018
Resolution: Verifed hatches had been replaced. Witnessed chalk testing of the hatch gasket; all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 30 May 2018
Resolved
Bow rack compartment inset port side from collision with dock. Conduct repairs at ship yard. Provide repair proposal.
Action required: 703 - Prior to bunkering operations
Resolved 2 July 2018
Resolution: Verified that adequate repairs were completed on the damaged port bow rake. Witnessed NDT of all welds; all sat.
Deck/Cargo › Holds/Tanks › Flame Arrester
Issued 13 June 2017
Resolved
#1 Cargo tank fwd flame screen damaged.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 July 2017
Resolved 25 March 2019
Resolution: All flame screens were replaced and inspected during drydock.
Construction/Loadline › Penetrations › Pipe Flange
Issued 13 June 2017
Resolved
Port #2 Goose neck vent wasted. #2 void
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 July 2017
Resolved 25 February 2019
Resolution: Wasted section of gooseneck was replaced.
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 31 May 2016
Resolved
Repair all welds as indicated in Cargo Tanks #1 and #2.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 July 2016
Resolved 28 July 2016
Resolution: Inspected repaired weld seams in cargo tanks 1 & 2
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 31 May 2016
Resolved
Port Motor on #2 cargo tank was not secure.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 July 2016
Resolved 28 July 2016
Resolution: Verified motor was secure.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 11 June 2013
Resolved
Vessels navigation side light screens were not IAW inland navigation rules for being painted matte black.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to navigation side light screens (painting).
Construction/Loadline › Hull › Longitudinal Frame
Issued 11 June 2013
Resolved
Attending inspectors called out 03 fractured weldments IWO starboard bow void.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to fractured weldments.
Construction/Loadline › Hull › Bracket
Issued 11 June 2013
Resolved
Attending inspectors called out 01 bracket IWO starboard void #1, bay #1.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to "tripped" bracket.
Construction/Loadline › Hull › Transverse Frame
Issued 11 June 2013
Resolved
Attending inspectors called out 03 transverse frames IWO starboard void #1, bay(s): #4,5,6.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to transverse framing.
Construction/Loadline › Structures › Manhole
Issued 11 June 2013
Resolved
Attending inspectors called out wasted hatch covers IWO starboard void #1 (fwd), starboard void #1 (aft), starboard void #2 (fwd), starboard void #2 (aft), port void #4, and port void #5.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to hatch covers and witnessed chalk testing of each.
Construction/Loadline › Structures › Manhole
Issued 11 June 2013
Resolved
Attending inspectors called out wasted hatch coamings IWO bow void (port & starboard), starboard void #1 (fwd), port void #1 (fwd), port void #2 (fwd), and port void #2 (aft)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to hatch coaming(s). Attending inspectors performed an operational and chalk test on each hatch.
Construction/Loadline › Hull › Bracket
Issued 11 June 2013
Resolved
Attending inspectors called out 01 bracket IWO starboard void #2, bay #6.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to "tripped" bracket.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 11 June 2013
Resolved
#1 Starboard cargo pump was not unable to be tested at time of inspection due to being disconnected both electrically and mechanically (pump was removed for maintenance/repair).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors performed operational test of cargo pump at local and remote shut-downs, test sat.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 11 June 2013
Resolved
Attending inspectors noted that the ground detection system was tagged out due to repairs being made to starboard #1 cargo pump.
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors performed an operational test of vessels ground detection system, test sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 11 June 2013
Resolved
Attending inspectors called out the local controller (start/stop) for the #1 starboard cargo pump due to being disconnected/tagged out.
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors performed an operational test of local controller for cargo pump (starboard #1), test sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 11 June 2013
Resolved
Attending inspectors called out cargo piping markings (un-readable)
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified markings on cargo pipeline.
Electrical › Electrical Distribution System (service) › Wiring
Issued 11 June 2013
Resolved
Attending inspectors called out wiring conduit for navigation lights IWO bow due to severe wastage.
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to conduit and wiring IWO bow.
Construction/Loadline › Structures › Deck Plating
Issued 11 June 2013
Resolved
Attending inspectors called out pitted area IWO starboard bow deck plating and required ultra-sonic testing to be performed to determine plate thickness.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified UT test report for starboard bow deck plating. All areas were within specification.
Deck/Cargo › Mooring/Anchoring › Brake
Issued 11 June 2013
Resolved
Attending inspectors called out 04 winch foot brakes that were wasted and no longer in use.
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors veriifed the removal of winch (foot) brakes.
Construction/Loadline › Hull › Bracket
Issued 11 June 2013
Resolved
Attending inspectors called out 01 bracket IWO port bow void (rake), third from top.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to "tripped" bracket.
Construction/Loadline › Hull › Bracket
Issued 11 June 2013
Resolved
Attending inspectors called out 01 bracket IWO port void #1, bay #1.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to "tripped" bracket.
Construction/Loadline › Structures › Air Pipe
Issued 11 June 2013
Resolved
Attending inspectors called out ventilation closure IWO port void #2.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to ventilation closure/cap.
Construction/Loadline › Hull › Girder
Issued 11 June 2013
Resolved
Attending inspectors called out damaged side chord IWO port void #3, bay #3.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to side chord.
Construction/Loadline › Hull › Girder
Issued 11 June 2013
Resolved
Attending inspectors called out 02 tripped long angles and 01 vertical deep flange (girder) IWO port stern void (transom)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to stern void.
Construction/Loadline › Hull › Girder
Issued 11 June 2013
Resolved
Attending inspectors called out starboard stern void vertical framing (girder).
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to starboard stern void vertical framing.
Construction/Loadline › Hull › Transverse Frame
Issued 11 June 2013
Resolved
Attending inspectors called out starboard stern void transverse framing (upper).
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 1 July 2013
Resolution: Attending inspectors verified repairs made to starboard stern void transverse framing.
Electrical › Lighting (service) › Conductor
Issued 23 May 2012
Resolved
Secure nav-light cables throughout barge (standpipes).
Action required: 705 - Other - as specified
Due 30 June 2012
Resolved 1 July 2013
Resolution: Attending inspectors verified installation of stand-off''s for navigation lights.
Deck/Cargo › Holds/Tanks › Cargo Tank Drainage
Issued 23 May 2012
Resolved
Repair cargo pump motor drip guards.
Action required: 705 - Other - as specified
Due 30 June 2012
Resolved 11 June 2013
Resolution: Attending inspectors verified installation of cargo pump motor drip guards.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 May 2012
Resolved
Secure FWD nav-light (flashing yellow).
Action required: 705 - Other - as specified
Due 30 June 2012
Resolved 11 June 2013
Resolution: Attending inspectors verified repairs made to fwd navigation light.
Documentation › Markings/Placards › Official Number (US)
Issued 23 May 2012
Resolved
Re-paint hull markings in contrasting color.
Action required: 705 - Other - as specified
Due 30 June 2012
Resolved 11 June 2013
Resolution: Attending inspectors verified hull markings.
Construction/Loadline › Penetrations › Weld
Issued 2 June 2010
Resolved
Crop and renew dogs on fwd stbd side void aft hatch and fwd rake hatch on Stbd side no later than 30 June, 2010
Action required: 705 - Other - as specified
Due 30 June 2010
Resolved 25 May 2011
Construction/Loadline › Penetrations › Gasket
Issued 2 June 2010
Resolved
Renew all gaskets on all void hatches no later than 30 June, 2010
Action required: 705 - Other - as specified
Due 30 June 2010
Resolved 25 May 2011
Deck/Cargo › Cargo Transfer (solid) › General
Issued 2 June 2010
Resolved
Install missing flange shielding on cargo piping flanges, Corrected
Action required: 705 - Other - as specified
Due 3 June 2010
Resolved 2 June 2010
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 2 June 2010
Resolved
Provide two B-II fire extinguishers for transfer operations, Corrected
Action required: 705 - Other - as specified
Due 3 June 2010
Resolved 2 June 2010
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 2 June 2010
Resolved
Repair broken eye wash shower on Stbd side, Corrected.
Action required: 705 - Other - as specified
Due 2 June 2010
Resolved 2 June 2010
Construction/Loadline › Hull › Side Shell
Issued 3 June 2008
Resolved
Crop and renew port aft rake top corner on frame #1 as marked.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 12 June 2008
Construction/Loadline › Hull › Side Shell
Issued 3 June 2008
Resolved
Gouge and weld port aft rake top corner on frame #2 on side long above #1 as marked Grind down old weld to good base metal.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 12 June 2008
Construction/Loadline › Hull › Side Shell
Issued 3 June 2008
Resolved
Crop and renew port aft rake top corner on frame # 2 as marked.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 12 June 2008
Construction/Loadline › Hull › Side Shell
Issued 3 June 2008
Resolved
Crop and renew stbd aft rake corner bracket on frame #1 in way of side long 3 and 4 as marked.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 12 June 2008
Construction/Loadline › Hull › Side Shell
Issued 3 June 2008
Resolved
Crop and renew stbd aft rake corner bracket on frame #1 in way of side long 1 and 2 and again on 3 and 4 as marked.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 12 June 2008
Construction/Loadline › Hull › Side Shell
Issued 3 June 2008
Resolved
Gouge and weld fractured weld on frame 2.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 12 June 2008
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 3 June 2008
Resolved
Renew gasket on #1 cargo tank hatch.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 12 June 2008
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 3 June 2008
Resolved
Grind and weld wasted area in #2 cargo hold midway aft on stbd side.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 12 June 2008
Deck/Cargo › Cargo Stowage › General
Issued 24 November 2004
Resolved
REPLACE FLAME SCREENS FOR ULLAGE OPENINGS AND VENTS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 November 2004
Resolution: FLAME SCREENS REPLACED.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 24 November 2004
Resolved
REPLAVE ERL VIEWING PORTS PROTECTIVE COVERS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 November 2004
Resolution: COVERS PROPERLY INSTALLED.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 24 November 2004
Resolved
REPLACE BROXEN NAVIGATION [name withheld].
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2004
Resolution: NEW ELECTRICAL JUNCTION BOX INSTALLED.
Deck/Cargo › Holds/Tanks › Flame Arrester
Issued 30 November 2002
Resolved
FLAME SCREENS MISSING FROM GOOSENECK CARGO TANK VENTS.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 30 November 2002
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 30 November 2002
Resolved
NAME, HAILING POST AND DRAFT MARKS NEED REPAINTING.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 November 2002
Resolved 30 November 2002
Resolution: PAINTED IN PRESENCE OF INSPECTOR.