Inspection history · 21
20 April 2026
Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8332420
7 April 2025
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8100209
27 November 2024
Drydock Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8040856
1 March 2024
Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7872889
8 November 2023
Simplified Stability Test · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7822280
22 March 2023
Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7654899
8 February 2023
COI Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7634153
19 October 2022
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7588706
6 April 2022
Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7424312
16 February 2022
Administrative Inspection
Administrative · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7397423
4 February 2021
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7136283
8 December 2020
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7107443
21 January 2020
Deficiency Check · DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6892925
1 October 2019
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6825341
15 January 2019
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6611051
6 December 2018
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6593054
19 October 2018
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6565177
1 February 2018
COI Inspection · Administrative Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6344214
29 March 2017
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6113647
6 December 2016
Deficiency Check · Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6053558
22 March 2016
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 5837599
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 7 April 2025
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. Masthead navigation light was inoperable. Vessel is restricted to daylight operation only until repaired.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 9 April 2025
Resolution: Deficiency cleared. Vessel provided video evidence of operational navigation light.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 1 March 2024
Resolved
At each subsequent inspection for certification, the owner or managing operator must be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment, including the following; all smoke and fire detection systems. Marine Inspector asked crew to test smoke detectors and the crew stated they had no way to test. Test.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 March 2024
Resolution: Vessel provided a copy of the fire alarm system inspection report provided by J & J Fire
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 1 March 2024
Resolved
Rails or equivalent protection must be installed near the periphery of all decks of a vessel. Marine Inspector observed mounting screws holding the railing to the deck to be loose. Repair.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 March 2024
Resolution: Vessel was repaired with 1 inch long stainless steel Phillips head screws and tightened.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 February 2023
Resolved
Each battery used in an item of lifesaving equipment, must be replaced during the annual inspection if the expiration of the battery has passed. While both operational, ring life buoy water light battery & port life float battery were expired. Vessel is limited to daylight operations only until batteries are replaced with unexpired batteries.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 27 February 2023
Resolved 24 March 2023
Resolution: lights replaced with LED lights
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 February 2023
Resolved
Each life jacket must be marked with Type 1 retroreflective material approved in 46 CFR 164.018 or other standard specified by the Commandant. 14 adult life jackets and 7 children life jackets require renewed retroreflective material. The number of passengers is reduced to 22 adults, 0 children until the retroreflective material has been renewed to the satisfaction of the Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 February 2023
Resolved 24 March 2023
Resolution: Retroreflective tape renewed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 February 2023
Resolved
Each life jacket carried on a vessel on oceans, coastwise, or Great Lakes route, must have a life jacket light approved in accordance with § 161.012 in subchapter Q of this chapter, or other standard specified by the Commandant, not limited to, approval series 160.112. 2 life jackets require new lights.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2023
Resolved 24 March 2023
Resolution: New lights installed
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 February 2023
Resolved
Each ring life buoy must be marked with Type II approved in 46 CFR 164.018 or other standard specified by the Commandant. Retroreflective material on ring life buoy is missing in places and needs to be renewed.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2023
Resolved 24 March 2023
Resolution: Retroreflective tape renewed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 13 February 2023
Resolved
Each generator must have a nameplate attached to it containing the information required by Article 445 of NFPA 70, and for a generator derated in accordance with paragraph (b)(2) of this sector, the derated capacity. Generator missing derated capacity placard.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2023
Resolved 23 March 2023
Resolution: Received picture of generator derating placard.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 13 February 2023
Resolved
All fiber reinforced plastic (FRP) vessels constructed with general purpose resins must be fitted with a smoke activated fire detection system of an approved type. Smoke detector in accommodation space missing cover and not operating as intended.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2023
Resolved 24 March 2023
Resolution: New smoke detector installed.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 4 February 2021
Resolved
Provide proof of valid FCC Station License.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 February 2021
Resolution: Received proof of valid FCC Station license.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 4 February 2021
Resolved
Make both engine room vent closures air tight.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 February 2021
Resolution: Recieved proof of air tight vent closures.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 February 2021
Resolved
Properly secure stern bilge pump.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 February 2021
Resolution: Reveived proof of properly secured bilge pump
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 February 2021
Resolved
Provide a total of 3 fire buckets.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 February 2021
Resolution: Received proof of 3 fire buckets
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 February 2021
Resolved
Provide an adequate portable hand pump.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 February 2021
Resolution: Received proof of adaquate portable hand pump.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 4 February 2021
Resolved
Replace starboard life float water light lanyard.
Action required: 10 - Deficiency Rectified
Resolved 4 February 2021
Resolution: Lanyard renewed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 February 2021
Resolved
Isolate leak in deck bait boxes, identify extent of FRP delamination and provide a repair proposal.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 February 2021
Resolution: Received repair proposal to repair delamnation to baid box.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 January 2020
Resolved
Ensure all connections for newly installed LED Lighting are of the approved type and are housed in junction boxes.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2020
Resolved 31 January 2020
Resolution: Received pictures of new installed junction box and installed with crimp style connectors.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 January 2020
Resolved
Main deck life ring buoy plug was missing. Replace life ring buoy with approved type
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2020
Resolved 31 January 2020
Resolution: Received picture with new life ring buoy installed
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 23 January 2020
Resolved
Update light list, coast pilot, tide tables, and charts to ensure 2020 copies are on-board.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2020
Resolved 31 January 2020
Resolution: All new light lists, coast pilot, tide tables and charts were verified to be updated and on-board.
Construction/Loadline › Penetrations › Valve Flange
Issued 6 December 2016
Resolved
Generator through hull fitting handle broke off.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 December 2016
Resolved 5 January 2017
Resolution: Repaired handle.
Construction/Loadline › Hull › Side Shell
Issued 6 December 2016
Resolved
Bow has fiberglass damage called tabbing near bow showing cracks.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 6 December 2016
Resolved 5 January 2017
Resolution: Damage was repaired.
Construction/Loadline › Structures › Scupper
Issued 6 December 2016
Resolved
Bow bolts are replaced.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 December 2016
Resolved 5 January 2017
Resolution: Bolts were replaced.
Construction/Loadline › Penetrations › Bottom Plug Packing
Issued 6 December 2016
Resolved
Strut bearing worn down below 50 percent.
Condition: Invalid
Action required: 705 - Other - as specified
Due 6 December 2016
Resolved 5 January 2017
Resolution: Shaft was replaced.