Records from 1999 to 2019. Most recent: operational control imposed, 25 March 2019.
Inspection history · 41
25 March 2019
COC-GAS Renew · In-Service Inspection · Administrative Inspection · Deficiency Check · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6647458
1 December 2017
ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6308890
22 November 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6312793
9 March 2017
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 6104502
15 November 2016
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6041698
14 November 2016
Ballast Water Examination · COC-GAS Annual · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6038934
15 September 2016
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6001718
11 February 2016
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5813570
30 October 2015
COC-GAS Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5754353
29 August 2014
Deficiency Check · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4965847
22 August 2005
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2471278
20 August 2005
Type not recorded
No type recorded · USCGC ASSATEAGUE (WPB 1337) · USCG Oceania District (CGD-O) · Activity 2472678
24 January 2005
COC-GAS Annual · Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2280128
1 September 2004
ISPS II Exam
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2183498
15 April 2004
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2044791
10 April 2004
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2041169
9 April 2004
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2041044
26 January 2004
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1992853
28 December 2003
Type not recorded
No type recorded · USCGC KITTIWAKE (WPB 87316) · USCG Oceania District (CGD-O) · Activity 1981266
28 December 2003
Type not recorded
No type recorded · USCGC KITTIWAKE (WPB 87316) · USCG Oceania District (CGD-O) · Activity 1981267
18 December 2003
Deficiency Check · Certificate of Compliance
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1966588
26 August 2003
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1887964
2 February 2003
Security Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1738685
17 January 2003
Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1732198
16 January 2003
Security Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1731946
22 November 2002
Security Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1709408
17 November 2002
Security Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1706660
6 November 2002
Security Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1707449
5 May 2002
Security Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1613440
7 January 2002
Control Verification
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1476098
10 December 2001
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 296176
10 December 2001
Letter of Compliance (Initial/Renewal)
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 772722
9 December 2001
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 296205
4 November 2001
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 295270
9 October 2001
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 294539
18 February 2001
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 287194
8 January 2001
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 499509
8 January 2001
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1376409
19 November 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 435043
10 November 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 435029
10 November 1999
Letter of Compliance (Initial/Renewal)
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 806158
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 25 March 2019
Resolved
06199 - On ships carrying flammable or toxic products or both, a water-spray system for cooling, fire prevention and crew protection should be installed to cover exposed cargo tank domes and any exposed parts of cargo tanks, cargo liquid and vapour discharge and loading manifolds, and boundaries of superstructures and cargo compressor rooms (facing the cargo area) [11.3.1]. The system should be capable of covering all areas mentioned in 11.3.1 with a uniformly distributed water-spray of at least 10 l/m2 per minute for horizontal projected surfaces and 4 l/m2 per minute for vertical surfaces [11.3.2].
Per Certificate of Fitness, vessel is authorized carriage of multiple flammable and toxic products and has recently carried flammable products. Furthermore, vessel intended to load propylene upon completion of USCG port state control exam.
During operational test, PSCOs noted that installed deck water spray system provided inadequate coverage to the following required locations: #1 and #2 cargo tank domes/exposed cargo tank tops, port manifold, starboard manifold, cargo compressor room boundary, and boundary at front of superstructure. 74 SOLAS (14) VII/13.1 REF IGC 93/11.3 30abc
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 30 March 2019
Resolution: Received class report and witnessed satisfactory operation after crew aligned fire/G.S. pump to work with deck spray. See activity notes and special note regarding use of both pumps.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 25 March 2019
No resolution recorded
06199-Electrical installations should be such as to minimize the risk of fire and explosion from flammable products [IGC 10.1.2]. Electrical equipment, cables, and wiring should not be installed in hazardous locations unless it conforms with the standards not inferior to those acceptable to the Organization [IGC 10.1.4, refers to IEC 60092:502]. Cables shall enter an explosion protected enclosure only by means of a gland or equivalent device cable of maintaining the integrity of the enclosure [IEC 7.5.1].
Cable entrance to explosion-proof junction box for #2 cargo pump motor casing found to be missing the appropriate gland or equivalent means, compromising the integrity of the enclosure.
Cable entrances to differential pressure switches, level switches for #1 and #2 intercoolers, and level switch for #2
knockout drum within the cargo compressor room found loose
and exposed.
Both the #2 cargo pump motor casing and the switches in the cargo compressor room are located in hazardous locations (gas-dangerous zones, as defined by IGC 93/1.3.17).
74 SOLAS (14) VII/13.1 REF IGC 93/10.1 30abc
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 26 March 2019 — due date passed with no resolution recorded
01 - Certificates & Documentation › 011 - Ships Certificates › Liquefied Gases in Bulk (ICoF/IGC Code)
Issued 25 March 2019
Resolved
01112-An International Certificate of Fitness (COF) for the Carriage of Liquefied Gases in Bulk, should be drawn up in the form corresponding to the model given in the appendix.
The appendix for the model form of the International COF for the Carriage of Liquefied Gases in Bulk requires all cargo tanks and their associated numbers to be listed along with their authorized products and conditions of carriage.
IGC 93/1.3.11 defines a cargo tank as a liquid tight shell designed to be the primary container of the cargo and includes all such containers whether or not associated with insulation or secondary barriers or both.
PSCOs noted the vessel is equipped with port and starboard deck tanks capable of carrying 22.5 m3 of liquefied gases in bulk.
Neither deck tank is listed on the COF. 74 SOLAS (14) VII/13.1 REF IGC 93/1.5.4.2 17ac
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 March 2019
Resolution: Received class report that tanks are isolated and not to be used. Annotated COC to reflect that tanks are not to be used in US waters.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 25 March 2019
Resolved
06199-Each cargo tank with a volume exceeding 20 m3 should be fitted with at least two pressure relief valves [8.2.1]. Pressure relief valves should be set and sealed by a competent authority acceptable to the Administration [8.2.5].
Deck tanks are 22.5 m3 in size. Pressure relief valve on port deck tank found to not be properly sealed, allowing for adjustment of the valve's set pressure without breaking of the seal. Furthermore, the relief valves on both deck tanks are sealed in various conditions and would not prevent tampering. 74 SOLAS (14) VII/13.1 REF IGC 93/8.2 17ac
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 March 2019
Resolution: Received class report that tanks are isolated and not to be used. Annotated COC to reflect that tanks are not to be used in US waters.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 25 March 2019
Resolved
06109-An International Certificate of Fitness for the Carriage of Liquefied Gases in Bulk should be drawn up in the form corresponding to the model given in the appendix.
Vessel's Certificate of Fitness, No. 18BC0394-GAS, has 6.1, 6.2, and 6.3 (different options pertaining to how the ship shall be loaded) lined out. The only verbiage not lined out is "where it is required to load in the ship other than in accordance with the above instructions, then the necessary calculations to justify the proposed loading condition shall be communicated to the certifying Administration who may authorize in writing the adoption of the proposed loading condition."
There is no objective evidence of communication with the certifying Administration, and all three regular options for how the ship shall be loaded are lined out. 74 SOLAS (14) VII/13.1 REF IGC 93/1.5.4 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 March 2019
Resolution: Received class report. A new COF will be issued after dry dock to reflect correct loading instrument arrangement.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 25 March 2019
Resolved
15109- The Company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the Company [10.1]. In meeting these requirements, the Company should ensure that any non-conformity is reported [10.2.2] and appropriate corrective action is taken [10.2.3].
As detailed in deficiency #1, objective evidence exists that the deck water spray system has not been maintained in conformity with the provisions of the relevant rules (IGC Code 11.3). PSCOs noted records of periodical / pre-cargo testing of deck water spray system as in acceptable condition. This is directly contradicted by the condition of the system observed by the attending PSCOs.
As detailed in deficiency #2, objective evidence exists that the electrical systems, specifically within the cargo area, has not been maintained in conformity with the provisions of the relevant rules (IGC Code 10.1.2).
*Based on the above, an internal ISM audit, focusing on cargo
specific requirements, is required. 74 SOLAS (14) IX/3.1 REF ISM 10 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 May 2019
Resolution: Recieved Internal ISM audit results from vessel's company.
Engineering › Steering Gear System › Rudder Stock
Issued 1 December 2017
Resolved
1499- Steerling Gear- Steerling gear control shall be provided for the main steering gear, both on the navigational bridge and in the steering gear compartment; where the main steering gear is arranged in accordance with paragraph 6, by two independent control systems both operable from the navigational bridge. Vessel experienced a steering failure while conducting test of the steering gear. Vessel is to provide class and tec report prior to vessel movement. SOLAS (14) II-1/29.7, 60a
Condition: Placed in Improper Service
Action required: 60 - Rectify deficiencies prior to movement
Resolved 2 December 2017
Resolution: Reviewed and accepted class report from NKK. The report stated the vessel experienced asteering failure while conducting fest of the # 2 steering gear. Some contamination was found and removed. Steerling gear was then retested and found satisfactory.
Lifesaving › Lifeboat › Handholds/Handrails
Issued 14 November 2016
Resolved
0610 - Starboard side lifeboat entry door handrail was wasted. 74SOLAS(1997cons.)IIII/44.2.6 17AC
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2016
Resolution: PSC HOU/GAL received a class report from NKK satisfying the requirement.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 14 November 2016
Resolved
0750 - 3 self closing fire doors in galley were found to be non self closing. 74SOLAS(14)II-2/14-2.1.1.1 10C
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 14 November 2016
Resolution: Crew members installed self closing hinges prior to end of the exam, deficiency rectified to satisfaction of CG inspector.
Deck/Cargo › Cargo Heating › General
Issued 24 January 2005
Resolved
Class must verify feasibility of testing temperature alarms for cargo system. Temperature alarms could not be tested during COC. During loading operation in Houston cargo officer must always monitor temperature and log every 30 minutes.
Action required: 15 - Rectify deficiencies by next port
Resolved 20 August 2005
Resolution: DOES NOT APPLY TO THE VESSEL AS THE DEF WAS ISSUED IN ERROR.
Deck/Cargo › Cargo Stowage › General
Issued 24 January 2005
Resolved
Class must verify condition of fusible links. If painted over, paint must be removed.
Action required: 15 - Rectify deficiencies by next port
Resolved 20 August 2005
Resolution: CLASS SOCIETY FAXED REPORT STATING THE FUSIBLE LINKS WERE IN PROPER WORKING CONDITION.
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 24 January 2005
Resolved
Deck tanks may not be used to carry cargo in U.S. until SOE has been amended to indicate appropriate MARV setting, and max allowable temperatures.
Action required: 15 - Rectify deficiencies by next port
Resolved 20 August 2005
Resolution: DOES NOT APPLY TO THE VESSEL AS THE DEF WAS ISSUED IN ERROR.
Operations/Management › Cargo Transfer/Lightering
Issued 18 December 2003
Resolved
Prove proper operaion of remote shutdowns in accordance with 46 CFR 39.30-1. LEGACY COMPONENT DESC: Transfer Pump Emergency Shutdowns
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 29 December 2003
Resolved 22 January 2004
Resolution: Satisfactory, as per Coast Guard Marine Inspector
Deck/Cargo › Holds/Tanks
Issued 18 December 2003
Resolved
Prove proper operation of high pressure cargo tank alarms in accordance with 46 CFR 39.20-13. LEGACY COMPONENT DESC: Tank Pressure Monitoring Device
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 23 December 2003
Resolved 22 January 2004
Resolution: Inspected satisfactory, as per Coast Guard Marine Inspector
Deck/Cargo › Inert Gas System
Issued 18 December 2003
Resolved
Prove proper operation of nitrogen generation system in accordance with SOLAS Ch. II-2 Reg. 26.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 23 December 2003
Resolved 22 January 2004
Resolution: Inspected satisfactory, as per Coast Guard Marine Inspector
Fire Fighting › Emergency Fire Pumps
Issued 18 December 2003
Resolved
Repair hand crank locking pin on emergency fire pump in accordance with SOLAS Ch. II-2 Reg 4. LEGACY COMPONENT DESC: Hand crank
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 23 December 2003
Resolved 22 January 2004
Resolution: Inspected satisfactory, as per Coast Guard Marine Inspector
Engineering › Diesel Engine (auxiliary)
Issued 18 December 2003
Resolved
Repair jacket water leaks on cylinder head of #1 ship service generator in accordance with SOLAS Ch II-1 Reg.26. LEGACY COMPONENT DESC: Cylinder Head
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 23 December 2003
Resolved 22 January 2004
Resolution: Inspected satisfactory, as per Coast Guard Marine Inspector
Construction/Loadline › Markings
Issued 18 December 2003
Resolved
Paint in contrasting color load line in accordance with ICLL Reg 8. LEGACY COMPONENT DESC: Load Line Mark
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 23 December 2003
Resolved 22 January 2004
Resolution: Inspected satisfactory, as per Coast Guard Marine Inspector
Construction/Loadline › Markings
Issued 18 December 2003
Resolved
Paint name of vessel on bow in accordance with ICLL. LEGACY COMPONENT DESC: Vessel Name/Home Port
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 23 December 2003
Resolved 22 January 2004
Resolution: Inspected satisfactory, as per Coast Guard Marine Inspector
Construction/Loadline › Markings
Issued 18 December 2003
Resolved
Paint marking for bow thruster marker on hull in accordance with ILLC. LEGACY COMPONENT DESC: Bow thruster marking
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 23 December 2003
Resolved 22 January 2004
Resolution: Inspected satisfactory, as per Coast Guard Marine Inspector
Construction/Loadline › Markings
Issued 18 December 2003
Resolved
Paint bulbous bow indicator on hull. LEGACY COMPONENT DESC: Bulbous bow
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 23 December 2003
Resolved 22 January 2004
Resolution: Inspected satisfactory, as per Coast Guard Marine Inspector
Lifesaving › Launching Appliances
Issued 18 December 2003
Resolved
Repair brake release cable for starboard lifeboat in accordance with SOLAS Ch. III Reg. 16. LEGACY COMPONENT DESC: Winch Brake
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 December 2003
Resolved 24 December 2003
Resolution: Repaired cable.
Lifesaving › Launching Appliances
Issued 18 December 2003
Resolved
Repair davit limit switch in accordance with SOLAS Ch. III Reg. 16. LEGACY COMPONENT DESC: Davit
Action required: 705 - Other - as specified
Due 24 December 2003
Resolved 24 December 2003
Resolution: Repaired davit limit switch.
Deck/Cargo
Issued 10 November 1999
Resolved
PROVE PROPER OPERATION OF CARGO HIGH PRESSURE ALARMS, 46 CFR 154.1335(B)(5).
Condition: Unknown
Due 10 December 1999
Resolved 22 November 1999
Electrical
Issued 10 November 1999
Resolved
ENSURE ALL PIPE PASSAGE FITTINGS ARE GAS TIGHT BETWEEN MOTOR ROOM AND COMPRESSOR ROOM BULKHEAD, 46 CFR 154.315.
Condition: Unknown
Due 10 December 1999
Resolved 22 November 1999
Navigation
Issued 10 November 1999
Resolved
PROCURE TIDAL CURRENT TABLES IAW 33 CFR 164.33A.
Condition: Unknown
Due 10 December 1999
Resolved 22 November 1999
Lifesaving
Issued 10 November 1999
Resolved
PROVE PROPER OPERATION OF GAS DETECTION SYSTEM POWER FAILURE ALARM, 46 CFR 154.1350(F)(6).
Condition: Unknown
Due 10 December 1999
Resolved 22 November 1999
Navigation
Issued 10 November 1999
Resolved
PROVIDE COMPLETE MANEUVERING INFORMATION (BOW THRUSTER) ON BRIDGE IAW 33 CFR 164.35(G)(5).
Condition: Unknown
Due 10 December 1999
Resolved 22 November 1999
Fire Fighting
Issued 10 November 1999
Resolved
DEMONSTRATE PROPER OPERATION/MAKE NECESSARY REPAIRS OR MODIFICATION OF EMERGENCY FIRE PUMP UNDER ALL CONDITIONS (BALLAST). SOLAS 74 AMENDED, REG 4.2.5.
Condition: Unknown
Due 10 December 1999
Resolved 22 November 1999