MAURY USCG vessel records
← All vessels

FLOYD J. LUPTON

Built
2000
Last inspected
11 June 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 11 June 2026
…with no type recorded7
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WCZ6289
507990
Flag
UNITED STATES
Maury page id
psix-507990

Documentation record

Registered dimensions (L × B × D)167.7 ft × 44.0 ft × 10.5 ft
Registered tonnagegross 374 / net 289
ITC dimensions (L × B × D)167.7 ft × 44.0 ft × 10.5 ft
ITC tonnagegross 437 / net 148
BuilderMOSS POINT MARINE INC · ESCATAWPA MS, UNITED STATES · built 2000
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portMANNS HARBOR, NC
Endorsements, as the file codes themcw_un
DocumentationValid · issued 9 April 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it374 - Regulatory (Subpart C or D), Gross Ton
437 - Convention (Subpart B), Gross Ton
289 - Regulatory (Subpart C or D), Net Ton
148 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 80 inspections, each with its date, unit and type; 54 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 80

11 June 2026 Damage Survey · Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8400977
3 June 2026 Re-Inspection · Examination of Repairs · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8385442
13 April 2026 In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8347200
5 April 2026 In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8343172
1 April 2026 In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8340653
14 March 2026 In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8326186
12 March 2026 COI Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8322863
26 February 2026 Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8316821
21 January 2026 Deficiency Check · In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8299249
21 January 2026 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 8299618
13 January 2026 Deficiency Check · In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8295575
18 December 2025 Re-Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8285139
25 November 2025 Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8274879
23 November 2025 In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8272825
8 November 2025 Administrative Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8266580
18 September 2025 Re-Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8236582
29 July 2025 Deficiency Check · In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8197584
18 June 2025 Re-Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8161773
20 March 2025 COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8088673
31 January 2025 Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8063412
11 December 2024 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8046223
3 December 2024 Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8044187
20 September 2024 Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8017812
25 July 2024 Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7969749
1 July 2024 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7947053
18 April 2024 MTSA Verification · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7885796
8 November 2023 Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7832271
21 September 2023 COI Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7793832
2 September 2023 Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7782878
6 July 2023 Re-Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7734404
12 June 2023 Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7712805
11 June 2023 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 7763309
7 May 2023 Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7682993
23 March 2023 Re-Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7655432
14 December 2022 Re-Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7608920
20 October 2022 Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7580992
30 September 2022 Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7569169
22 September 2022 MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7557136
1 September 2022 In-Service Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7548714
11 August 2022 Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7530912
14 July 2022 MTSA Verification · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7503787
16 May 2022 Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 7452280
24 March 2022 Re-Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7417676
9 December 2021 Re-Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7365088
26 November 2021 In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7358390
26 November 2021 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 7358647
19 September 2021 MTSA/ISPS Verification · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7317594
16 September 2021 Deadweight Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7316682
19 May 2021 Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7219671
9 February 2021 Deficiency Check · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7137803
1 January 2021 In-Service Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7119461
1 January 2021 Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7134013
9 October 2020 Deficiency Check · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7074613
11 September 2020 Damage Survey · In-Service Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7055842
12 August 2020 Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7025376
22 October 2019 Administrative Inspection · Damage Survey · Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6839722
9 August 2019 Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6778180
29 April 2019 Administrative Inspection · MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6672496
20 December 2018 Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6566403
9 November 2018 Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6578134
10 October 2018 Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6558664
9 October 2018 Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6570613
27 September 2018 Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6512562
8 June 2018 Administrative Inspection · COI Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6437829
16 March 2018 Examination of Repairs · Hull Examination · Damage Survey · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6384268
26 February 2018 Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6362542
21 February 2018 Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6358523
14 December 2017 Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6324026
14 September 2017 Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6265043
27 July 2017 Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6234061
29 June 2017 MTSA Verification · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6198289
8 June 2017 Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6169483
5 May 2017 Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6143230
28 March 2017 Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6113738
28 March 2017 Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6123836
13 February 2017 Administrative Inspection · MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6087590
21 December 2016 Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6061790
19 September 2016 Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6006089
20 June 2016 Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5910305
4 March 2016 MTSA Verification · Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 5827076

Deficiency record · 54

09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 3 June 2026 Resolved
A-End main engine exhaust piping lagging is not suitably insulated. Repair to satisfaction of the marine inspector. 46 CFR 72.03-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2026
Resolved 18 June 2026
Resolution: Added new 6' wide strip of lagging all the way around exhaust pipe to completely cover pipe.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2026 Resolved
Light fixture protective cover found cracked and broken on fixture in B-End Voith space. Repair/replace to satisfaction of marine inspector. 46 CFR 111.75-20
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2026
Resolved 18 June 2026
Resolution: Replaced light fixture protective cover with new. All SAT
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 April 2026 Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery must be at least equivalent to the standards established by the ABS Marine Vessel Rules. Vessel operator reported that the vessel experienced a overspeed alarm on the B-main which resulted in a loss of propulsion. Effective repairs to the satisfaction of the Coast Guard, IAW manufacturer specifications.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 10 April 2026
Resolved 6 April 2026
Resolution: Replaced with new engine speed switch.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 22 January 2026 Resolved
Nonmetallic flexible hoses installed in fluid powered systems must be in accordance with SAE J1942. The new hydraulic hose installed on the rescue boat davit does not indicate the correct type approval; provide proof of SAE J1942 type approval or replace the hoses with an approved type. 17FEB26 Note: Updated CG835 code to "705: Other" to reflect extension granted pending response from Coast Guard Type Approval Office regaurding the European-Manufactured (Indunorm EN 5832SN) hoses installed on approved Global Boat Davit GMBH System.
Action required: 705 - Other - as specified
Resolved 26 February 2026
Resolution: Installed hoses are part of the "Q" specification type approval and in accordance with the manufacturers original equipment installation.
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 8 November 2025 Resolved
Each power-driven steering-gear system must be provided with at least one steering-gear control system. The "B"end number 2 steering system produces a bind alarm and presents with a clicking when actuated. Conduct analysis and repair to the satisfaction of a U.S. Coast Guard Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 8 November 2025
Resolved 10 November 2025
Resolution: Vessel replaced actuator and conducted sea trials.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 20 March 2025 Resolved
It shall be the duty of the master to see that all watertight doors in subdivision bulkheads that may be opened at sea, and all mechanisms remote controls, and indicators connected therewith, shall be periodically inspected at least once in each week that the vessel is navigated to the be assured that they are in proper operating condition. The watertight door on the weather deck leading to the engine room has an inoperable sensor.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2025
Resolved 24 March 2025
Resolution: MI witnessed operation of the new working sensor.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 March 2025 Resolved
Each vessel must carry lifebuoys approved under approval series 160.150. Lifebuoy located outside the bridge was found to be heavily deteriorated.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2025
Resolved 24 March 2025
Resolution: MI witnessed the installation of a new ring lifebuoy.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 December 2024 Resolved
A end voith unit overheated and shutdown.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 December 2024
Resolved 16 December 2024
Resolution: A-end MDE Keel Cooler was found to have a failed drain plug causing coolant loss. Witnessed completion of repairs and operational test
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 21 September 2023 Resolved
At each annual inspection, the inspector must ensure that the following tests and inspections of fire detection and extinguishing equipment have been conducted: Fixed fire extinguishing systems must be checked as noted in table 71.25–20(a)(2). Annual service not conducted anticipating upcoming dry-dock. 705c-Upon completing upcoming dry-dock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 18 April 2024
Resolution: Annual servicing has been completed. Witnessed operational test of fixed systems; all sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 21 September 2023 Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated. Found 03 CO2 portable extinguisher brackets on deck wasted. 705c-Upon completing upcoming dry-dock
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 18 April 2024
Resolution: All weathered extinguisher brackets have been replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 September 2023 Resolved
Tests and inspections of the lifesaving equipment shall be carried out during each inspection for renewal of certification and periodic inspection, and shall include, as applicable, a demonstration of— The proper condition of flotation equipment such as lifebuoys and associated equipment. B side waterlight for life ring buoy not flashing properly. 705c-Upon completing upcoming dry-dock
Action required: 705 - Other - as specified
Resolved 18 April 2024
Resolution: Conducted test of floating waterlights; all sat.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 21 September 2023 Resolved
Vessel must be equipped with dsc VHF radio. Properly integrate VHF radio with GPS and conduct proper radio check. 705c- Upon completing upcoming dry-dock
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 18 April 2024
Resolution: Inspected newly installed DSC capable radio; sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 21 September 2023 Resolved
At each annual inspection, the inspector shall conduct the following tests and inspections of hull equipment: (1) All subdivision bulkheads shall be examined to determine that their watertight integrity has not been impaired. Watertight doors in subdivision bulkheads have wrong type of gasket. 705c- Upon completing upcoming dry-dock
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 18 April 2024
Resolution: Inspected all watertight door gaskets and witnessed chaulk tests; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 7 May 2023 Resolved
46 CFR 58.01-35: Auxiliary Machinery vital to the main propulsion system must be provided in duplicate unless the system served is provided in independent duplicate, or otherwise provides continued or restored propulsion capability in the event of failure or malfunction of any single auxiliary component. Propulsion system showed error code on S2 B end, not allowing the operator to switch between S1 and S2. Restore system to working system prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 May 2023
Resolution: Component replaced and sea trials conducted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 22 September 2022 Resolved
A-End SSDG keel cooler supply and return hose replace due to cracking and deterioration. 46CFR70.20.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2022
Resolved 29 September 2022
Resolution: New hoses installed and tested SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 September 2022 Resolved
Update PSTPs to correct MDS overspeed RPM setting and add over speed testing. 46CFR62
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2022
Resolved 20 October 2022
Resolution: Updated PSTPs submitted to MSC for review.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 1 September 2022 Resolved
Each machinery space must be ventilated to ensure that, when machinery or boilers are operated at full power in all weather including heavy weather, an adequate supply of air is maintained for the operation of the machinery. Vessel's representative reported that the emergency diesel generator has to operate with the emergency generator space's doors open to prevent the engine from overheating. Troubleshoot and provide adequate ventilation to prevent emergency generator from overheating IAW 46CFR112.05-5.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 October 2022
Resolved 25 July 2024
Resolution: Observed EDG's ability to operate in high ambient temperatures with the space doors closed.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 1 September 2022 Resolved
The emergency power source must meet table 112.05-5(a)....Passenger vessels other than Ocean, Great Lakes, or coastwise and not on an international voyage must have a final emergency power source capable of operating for a minimum of 8 hours or twice the time of run, which ever is less. Vessel's representative reported the emergency generator overheats causing the engine to shutdown while under a load. Provide a final emergency power source capable of operating for a minimum of 8 hours or twice the time of run, which ever is less IAW 46CFR58.01-45.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 October 2022
Resolved 25 July 2024
Resolution: Observed EDG's ability to operate in high ambient temperatures on two consecutive trips (Hatteras to Ocracoke and Ocracoke to Hatteras).
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 14 July 2022 Resolved
A end sound powered phone bell is inoperable. Repair/replace in accordance with 46CFR113.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 August 2022
Resolved 11 August 2022
Resolution: Phone tested SAT new bell installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 July 2022 Resolved
Permanently mount AC unit and AC electrical panel in engine room in accordance with 46CFR58.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 August 2022
Resolved 11 August 2022
Resolution: Ac properly mounted along with electrical panel properly mounted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 26 November 2021 Resolved
Each self-propelled vessel and each mobile offshore drilling unit must have at least two electric generating sources; Vessel's #2 generator suffered a crack in the water cooled exhaust manifold.
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Due 26 November 2021
Resolved 29 November 2021
Resolution: Crew replaced exhaust manifold.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 September 2021 Resolved
B-end thrust actuator on the voith propulsion unit is excessively vibrating. Repair to the satisfaction of the attending CG Marine Inspector iaw 46 CFR 61.40-6.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 23 September 2021
Resolution: NCDOT shipyard personnel tightened thrust actuator mount.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 September 2021 Resolved
Bilge dewatering control valve for B-end has suction gauge that is inoperable. Gauge is used in normal operation to indicate vaccum, prime, and suction. Repair or replace to the satisfaction of the attending CG Marine Inspector iaw 46 CFR 56.50-50.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 September 2021
Resolution: New suction gauges installed and tested on A-end and B-end
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 23 September 2021 Resolved
Sound powered phone in the B-end Voith Compartment is not loud enough to properly hear and communicate. Repair or replace to the satisfaction of the attending CG Marine Inspector iaw 46 CFR 58.25-15
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 September 2021
Resolution: New sound powered phone provided and tested SAT.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 23 September 2021 Resolved
Emergency lighting on main deck por side is not installed and/or inoperable. Repair/install new or provide evidence that e-lighting is not required on port side iaw 46 CFR 112.15-1(f).
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 December 2021
Resolution: Spoke w/ Vessel Master and determined flood light switches in pilot house to be mislabled.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 February 2021 Resolved
B-end MDE emrgency shut down (low oil), prove proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2021
Resolution: The MDE L/O shutdown was adjusted and tested satisfactory by the NCDOT electrician.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 February 2021 Resolved
#1 SSDG low lube oil shut down not operational. Prove proper operation
Action required: 10 - Deficiency Rectified
Resolved 10 February 2021
Resolution: Proved proper operation of the L/O shutdown on the SSDG
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 10 February 2021 Resolved
Prove merchant mariner credential for engineer. Not onboard
Action required: 705 - Other - as specified
Due 10 February 2021
Resolved 10 February 2021
Resolution: DDE picked up his MMC and presented to the USCG prior to leaving the vessel.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Bulwarks and freeing ports
Issued 10 February 2021 Resolved
B-end cargo net attachment points worn out. Crop and renew.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 March 2021
Resolved 17 August 2021
Resolution: New attachments installed while in dry-dock.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 10 February 2021 Resolved
A-end re-mark/properly mark escape hatch.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 March 2021
Resolved 23 September 2021
Resolution: New markings were on all hatches deck hatches.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 10 February 2021 Resolved
B-end engine room vent not closing 100%. Adjust and prove proper operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 March 2021
Resolved 16 February 2021
Resolution: Maintenance crew made adjustments and will properly close.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 10 February 2021 Resolved
Remove oil from bilges under #2 SSDG.
Action required: 705 - Other - as specified
Resolved 12 February 2021
Resolution: Vessel maintenance removed the oil from the bilges.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 January 2021 Resolved
Complete permanent repair to throttle air controls/ air compressor prior to carring passengers. Once repairs are completed and tested, provide a technicians report and a signed captians attestation of repair and operational test to CG [name withheld].
Action required: 60 - Rectify deficiencies prior to movement
Resolved 2 January 2021
Resolution: New check valve installed on air supply compressor air line.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 4 November 2020 Resolved
Temperature gauge on B end voith is damaged/inoperative.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 November 2020
Resolved 20 November 2020
Resolution: Temperature gauge was replaced and installed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 November 2020 Resolved
B fwd (stbd) sound power phone hardware is damaged/missing.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 November 2020
Resolved 20 November 2020
Resolution: Installed hardware on the sound power phone.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 4 November 2020 Resolved
B end pilothouse horn handle had loose hardware.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 4 November 2020
Resolved 4 November 2020
Resolution: Tightened the hardware on the horn handle.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 September 2020 Resolved
During routine testing, the No. 2 generator would not properly maintain electrical load. Make effective repairs and prove proper operation to the attending Marine Inspector. Vessel is restricted from carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 September 2020
Resolution: New #2 gen set installed after unapproved temp repairs failed. MI inspected new install and full load test, ALL SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 12 August 2020 Resolved
A and b end nets replace with new due deterioration.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2020
Resolved 25 August 2020
Resolution: A and B end nets were properly renewed.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 12 August 2020 Resolved
Deck hatch security marks needs to be painted.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 August 2020
Resolved 18 August 2020
Resolution: security marks properly painted.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 12 August 2020 Resolved
Bridge and engine room first aid kits expired/missing meds
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2020
Resolved 25 August 2020
Resolution: First aid kits were replaced.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 12 August 2020 Resolved
B end radio antenna bracket broken. Crop and renew.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2020
Resolved 25 August 2020
Resolution: Antenna brackets were replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 August 2020 Resolved
B end child life jacket storage box damaged. Top hinge broken and exposed fiberglass.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2020
Resolved 25 August 2020
Resolution: Deck box lid was properly repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 12 August 2020 Resolved
Rescue boat release hook cotter pin. Wasted replace with new.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 12 August 2020
Resolution: Release hook cotter pin was renewed.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 12 August 2020 Resolved
B end bilge suction not operating
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 12 August 2020
Resolution: Witnessed satisfactory bilge suction on the 1b void.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 12 August 2020 Resolved
CO2 Portable #16 tank room, @ FR 25B, cracked hose
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 12 August 2020
Resolution: Cracked hose was replaced in kind.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 12 August 2020 Resolved
B end frame #12 stuffing box over WTD missing packing not watertight.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 21 August 2020
Resolved 18 August 2020
Resolution: Properly made stuffing box watertight.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 12 August 2020 Resolved
Fixed CO2 stop valve leaking during the test.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 12 August 2020
Resolution: Stop valve was tightened up and retested; all sat
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 12 August 2020 Resolved
WTD frame 28B door seal is not water tight, 1/2" gap at the top of the door.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 12 August 2020
Resolution: Filled in the 1/2" gap with gasket material and made the door watertight.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 12 August 2020 Resolved
Rescue boat aft line needs quick release installed.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2020
Resolved 18 August 2020
Resolution: New quick release was properly installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 12 August 2020 Resolved
Portable ext #17 engine room hose cracked
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2020
Resolved 3 September 2020
Resolution: The hose was properly replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 9 August 2019 Resolved
An indicator light for the #1 watertight door is malfunctioning. Door is watertight but is indicating open from the bridge while door is closed.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 August 2019
Resolved 27 August 2019
Resolution: Watertight door indicator now operational.
Electrical › Electric Supply System (service) › Battery Charger
Issued 26 February 2018 Resolved
Found the propulsion control system 2 battery charger faulty and both batteries dead. Replace the charger and both batteries.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 March 2018
Resolution: Inspected installation of new battery charger and batteries; all sat.
Engineering › Sea-water System (primary cooling) › Piping
Issued 29 June 2017 Resolved
Found a leak in the A/C cooling water overboard discharge pipe at the flow meter. During discussion/ research a comment, dated 11/28/2016, was found on file stating that repairs had been made using putty but it still leaked.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 29 July 2017
Resolved 27 July 2017
Resolution: Flow meter was replaced.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 May 2017 Resolved
Wire connection was loose and casued shipboard electrical failure. Repair loose wire connection to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 6 May 2017
Resolved 5 May 2017
Resolution: Loose connection was replaced with a tightly crimped replacement connection.

Ownership record