← All vessels
TEEWINOT
Passenger (Inspected) · Passenger Ship class · Built 1980s · USCG Heartland District (CGD-H) · Other hulls named TEEWINOT
TEEWINOT is a 1980 passenger vessel (inspected). The Coast Guard has recorded 26 inspections since 2002, most recently in May 2026, along with 61 deficiencies.
Records from 2002 to 2026. Most recent: inspection, 27 May 2026.
- Built
- 1980
- Last inspected
- 27 May 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 61 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
1230449
508032
Flag
UNITED STATES
—
Maury page id
psix-508032
Inspections, by type
The 26 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)40.6 ft × 13.2 ft × 6.4 ft
Registered tonnagegross 22 / net 18
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGLACIER PARK BOAT BUILDERS · KALISPELL, MT, UNITED STATES · built 1980
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portMORAN, WY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 8 April 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it22 - Simplified, Gross Ton
18 - Simplified, Net Ton
18 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 26
27 May 2026
DAPI Audit · Annual Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8319441
28 May 2025
Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8106646
29 May 2024
Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7922801
30 May 2023
Administrative Inspection · COI Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7684667
12 May 2022
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7449201
9 April 2021
Administrative Inspection · Deficiency Check · Hull Examination · COI Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7172116
8 October 2020
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7073792
3 August 2020
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7023587
7 June 2019
Deficiency Check · DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6690451
7 June 2018
DAPI Audit · Annual Inspection · Administrative Inspection · Deficiency Check · MARPOL Annex VI Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6429944
8 July 2017
Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6211891
7 June 2017
MARPOL Annex VI Survey · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6142990
16 May 2016
Deficiency Check · Administrative Inspection · DAPI Audit · Special · Hull Examination · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5878659
6 August 2014
Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4946150
9 June 2014
Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4874164
25 June 2012
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4358378
10 May 2012
COI Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4307552
20 July 2009
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3540487
13 May 2009
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3473972
21 November 2008
Drydock Extension
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3367329
22 May 2008
Annual Inspection · Administrative Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3213787
4 June 2007
COI Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 2951149
1 June 2005
Re-Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2375819
3 June 2004
Annual Inspection · Hull Examination
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2092538
4 June 2003
Annual Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1816413
16 July 2002
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1639271
Deficiency record · 61
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 June 2019
Resolved
Ensure the leaking stbd MDE aft impeller pump raw water hose is replaced. (hose has been temporarily repaired)
Engineering › Diesel Engine (propulsion-reduction gear) › Seal
Issued 7 June 2018
Resolved
Clean the stbd MDE air filter and determine the cause of the excessive oil accumulation. Repair as necessary.
Lifesaving › Emergency Outfit › Lifeline and Belt/Harness
Issued 7 June 2018
Resolved
Properly install the new SOS rescue sling and ensure the crew is properly trained on how to deploy the new system.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 7 June 2017
Resolved
Conduct dockside training with realistic weights to ensure that the crew knows how to operate the life sling davit.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 7 June 2017
Resolved
Ensure the vessel’s emergency procedures reflect now the vessel will actually respond to an emergency and that the drills are conducted as per those procedures.
Lifesaving › Inflatable Buoyant Apparatus › Stowage
Issued 7 June 2017
Resolved
Manufacture and install a new saddle bracket for the vessel’s life raft to ensure the weight of the life raft is more dispersed to prevent cracking of the fiberglass cabin top.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 31 May 2016
Resolved
Ensure the first aid kit has the proper contents and that the items are not expired.
Engineering › Engine Controls (Electric/Electronic) › Linkage
Issued 31 May 2016
Resolved
Tighten the port engine throttle cable retaining bracket.
Engineering › Steering Gear System › Bracket/Clamp
Issued 31 May 2016
Resolved
Tighten the steering ram bracket.
Construction/Loadline › Structures › Superstructure
Issued 30 May 2016
Resolved
Prior to operating the vessel in 2017, open up the gel coat fracture in the cabin top, stbd side, in vicinity of the life raft, so the internal framing can dry out. Once the framing is dry, repair as necessary. Ensure a fire retardant resin is used and that the Peoria Coast Guard is involved in the repair proposal.
Construction/Loadline › Hull › Side Shell
Issued 30 May 2016
Resolved
Prior to operating the vessel in 2017, repair the two gouges, stbd side, exterior, amidships area, approximately 12 “above the waterline.
Engineering › Freshwater System (jacketwater cooling) › Suction Strainer
Issued 30 May 2016
Resolved
Tighten the stbd sea chest raw water strainer.
Fire Fighting › Ventilation Systems › Operating Controls
Issued 9 June 2014
Resolved
Prove proper operation of the stbd aft vent closure.
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 9 June 2014
Resolved
Replace raw water hose on port MDE.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 9 June 2014
Resolved
Repair starboard side main cabin entrance railing.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 9 June 2014
Resolved
Remove four (4) condemned child life jackets from the vessel.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 9 June 2014
Resolved
Conduct and document survival craft weekly & monthly maintenance/inspections as required by 46 CFR 185.720 & 722 (weekly visuals & monthly as per manufactures instructions).
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 25 June 2012
Resolved
Install a mounting bracket for the accommodation space, B-II, portable fire extinguisher. Do to space limitations, the extinguisher may be mounted in the forward cabin void providing a sign (fire extinguisher inside) is posted on the door.
Documentation › Markings/Placards › Official Number (US)
Issued 10 May 2012
Resolved
Ensure the vessel's hailing port is displayed on the vessel's stern and the official number is permanently affixed to an internal structural member. Items were already on order.
Communications › Radio Communications › VHF Radiotelephone
Issued 10 May 2012
Resolved
Ensure the vessel master has an FCC restricted radio operators permit.
Documentation › Certificates/Documents › Stability Letter
Issued 10 May 2012
Resolved
Post the vessel's new stability letter. USCG will provide a replacement letter.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 10 May 2012
Resolved
Ensure the first aid kit meets the requirements of 33CFR160-041. Item was already on order.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 10 May 2012
Resolved
Repair or replace the missing forward window fan guard located at the operator's station.
Lifesaving › Lifefloat › Serviceable
Issued 10 May 2012
Resolved
Replace the vessel's life ring. Ring was onboard but starting to show signs of deterioration.
Operations/Management › Drug and Alcohol Testing › Testing, Pre-employment
Issued 10 May 2012
Resolved
Ensure the company has negative pre employment test results before placing the crew in safety sensitive positions.
Engineering › Fuel Oil Storage/Transfer System › Gauge
Issued 13 May 2009
Resolved
Properly repair the leaking fuel tank, capacity sensor. Remove all residue oil from the bilge.
Fire Fighting › Ventilation Systems › Ducts
Issued 13 May 2009
Resolved
Stern engineroom vent closures are not operating properly and the vents can't be secured in case of a fire.
Engineering › Bilge Water Management System › Pump
Issued 13 May 2009
Resolved
Prove proper operation of the cabin void bilge pump.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 13 May 2009
Resolved
Prior to operating the vessel at night or in reduced visibility, replace the life ring float light battery
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 13 May 2009
Resolved
Prove proper operation of the vessel’s anchor light. Properly wire and install the vessel’s anchor light.
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 May 2009
Resolved
Properly install the search light armored cable and seal the fracture in the search light base plate cover.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 13 May 2009
Resolved
Properly install and support the fuel tank vent line in fore peak and cabin void. (Use metal bands; no plastic bands).
Engineering › Bilge Water Management System › Pump
Issued 13 May 2009
Resolved
Replace the damage engine room bilge pump. Ensure the new pump is U/L approved.
Fire Fighting › Combustible Materials › Partial Bulkheads/Decks
Issued 13 May 2009
Resolved
Remove the non-approved cushion foam from beneath the aft bench seat and install CG approved insulation material to isolate the wooden bench seat at the stern of the engine room.
Engineering › Feedwater/Condensate Water System › Piping
Issued 13 May 2009
Resolved
Remove the abandoned rubber heater waterline where they penetrate the engine room forward bulkhead.
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 May 2009
Resolved
Proper hang the cabin void bilge wires with metal supports where the plastic supports have broken.
Communications › Public Address System › Loudspeaker
Issued 13 May 2009
Resolved
Properly install the P/A system control box wires (currently plastic wire twisted) at the operator station.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 13 May 2009
Resolved
Ensure first aid kit includes instructions.
Fire Fighting › Combustible Materials › Draught Stops
Issued 13 May 2009
Resolved
Remove the house hold type foam insulation and install (Fire Stop) or equivalent material in the holes in the forward engine room bulkhead.
Navigation › Piloting/Steering › Magnetic Compass
Issued 13 May 2009
Resolved
Install a marine compass.
Fire Fighting › Ventilation Systems › Ducts
Issued 13 May 2009
Resolved
Ensure the Port side supply vent requires a non-combustible fixed closure device.
Navigation › Piloting/Steering › Marine Charts
Issued 13 May 2009
Resolved
Ensure chart of lake on each vessel.
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 13 May 2009
Resolved
Remove residue fuel puddle under fuel tank.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 13 May 2009
Resolved
Update emergency procedures to include throwing of a buoyant object immediately upon man over board.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 13 May 2009
Resolved
Port side rear seat, inboard mount is loose.
Documentation › Certificates/Documents › Stability Letter
Issued 13 May 2009
Resolved
Post Stability Letter & COI
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 May 2009
Resolved
Make the stern light wiring thru hull watertight.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 13 May 2009
Resolved
Place on board 2 flashlights, one near the engine room and one near the operator's station.
Lifesaving › Inflatable Liferafts › Markings
Issued 13 May 2009
Resolved
Install the vessel name on life raft shell & on life ring (requires re-stenciling).
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 13 May 2009
Resolved
Post instructions for donning child size PFDs.
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 13 May 2009
Resolved
Verify fixed firefighting agent capacity is 200 cubic feet or greater.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 22 May 2008
Resolved
Amend Company Drug and Alcohol program to seperate requirements for marine crew in regards to preemplyment testing and post casulty testing.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 22 May 2008
Resolved
Provide CG approved life bouy waterlight. Daylight operations only until complied with.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 22 May 2008
Resolved
Replace 50 foot lofe line with 60 foot iaw with CG requirements.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 3 June 2004
Resolved
Both cutlass bearings must be replaced and both motors need re-allignment to within tolerance. LEGACY COMPONENT DESC: Stern Tube Bearing
Construction/Loadline › Penetrations › Pipe Flange
Issued 3 June 2004
Resolved
Fiberglass exhaust piping on stern to be replaced due to heat and wear. LEGACY COMPONENT DESC: Pipe Flange
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 3 June 2004
Resolved
Relocate circuit breaker next to battery to shorten length and prevent accidental shorting. LEGACY COMPONENT DESC: Circuit Breaker
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 3 June 2004
Resolved
Service fixed halon fire extinguishing system prior to carriage of passengers.
Engineering › Fuel Oil Service System › Piping
Issued 3 June 2004
Resolved
Fuel line on stbd engine exceeds 30 inches, replace section with rigid piping.
Construction/Loadline › Hull › Side Shell
Issued 3 June 2004
Resolved
Make permanent repairs to temporary patch on port side of hull at waterline approx. 15 feet from bow. Make permanent repairs also to stiffeners at the same area.
Construction/Loadline › Hull › Hull Plating
Issued 3 June 2004
Resolved
Repair hull under fuel tank where hull has blistered and stain has shown on hull.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.