KFMS 47

KFMS 47 is a 1958 freight barge. The Coast Guard has recorded 51 inspections since 1981, most recently in October 2016, along with 62 deficiencies and 1 operational control.

Records from 1981 to 2016. Most recent: inspection, 6 October 2016.

Built
1958
Last inspected
6 October 2016
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.

This record may be incomplete: the most recent inspection recorded for this vessel was 10 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 6 October 2016
…with no type recorded9
Operational controls None recorded without a removal date
Years with a record 30 calendar years (1981–2016)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

Flag
UNITED STATES
Maury page id
psix-50842

Documentation record

Tonnage as PSIX records it185 - Regulatory (Subpart C or D), Net Ton
185 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page

51 inspections, each with its date, unit and type; 62 deficiencies with the resolution recorded against each; 1 operational control with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 51

6 October 2016 Administrative Inspection
Administrative · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 6017651
1 January 2015 Administrative Inspection
Administrative · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 5067450
9 September 2014 Drydock Exam · Damage Survey
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 4979136
18 February 2014 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 4801409
30 April 2012 Drydock Exam
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 4299470
11 October 2011 COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 4160129
16 August 2010 Drydock Exam · Annual Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3825566
1 February 2010 Internal Structural Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3673235
5 November 2008 MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 3362330
12 February 2008 Hull Examination · Deficiency Check
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3146354
14 November 2007 Deficiency Check
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3098179
9 November 2007 Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3095769
27 October 2006 COI Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2809147
7 November 2005 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2530010
30 September 2005 Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2503728
5 January 2005 Hull Examination · MTSA Verification · Cargo Tank Internal · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2283506
31 August 2004 Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2182550
30 December 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1976902
5 November 2003 Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1942450
6 January 2003 Cargo Tank Internal · Re-Inspection · Hull Examination · Internal Structural Exam
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1726901
25 October 2001 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1459751
23 October 2000 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 824168
23 October 2000 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1405092
23 November 1999 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1423289
4 November 1999 COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 804819
20 October 1998 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1408195
7 November 1997 Hull Examination · COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1433280
9 January 1997 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1098012
6 January 1997 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1459276
15 November 1995 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 872345
8 November 1995 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1451017
23 November 1994 Hull Examination · Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1466915
9 November 1993 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1444764
18 November 1992 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 830800
18 November 1992 Hull Examination · Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1459790
29 October 1992 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1268556
17 October 1991 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1252525
8 October 1991 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1429670
13 November 1989 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1214196
26 October 1989 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1045256
14 October 1987 Hull Examination · COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1015468
18 November 1986 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1020058
12 November 1985 Credit Drydock · COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 992763
20 October 1985 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 993298
13 September 1985 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 496305
16 November 1984 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1283240
21 October 1983 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 965455
21 October 1983 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1279676
7 April 1983 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 968013
3 June 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1273065
28 April 1981 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1276455

Deficiency record · 62

Construction/Loadline › Hull › Hull Plating
Issued 18 February 2014 Resolved
approximate 8" X 1.5" gash located in the port quarter bilge knuckle. Permanent repairs to be completed prior to movement.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 7 March 2014
Resolution: Permanent repairs completed satisfactorily.
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 18 February 2014 Resolved
replace flame screen on starboard bow P/V valve prior to carrying cargo.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 7 March 2014
Resolution: Flame screen replaced.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 18 February 2014 Resolved
repaint port bow draft marks.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 March 2014
Resolved 7 March 2014
Resolution: All draft marks repainted.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 30 April 2012 Resolved
Draft marks need to be repainted.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 May 2012
Resolution: Draft marks have been painted.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Flame Screens
Issued 30 April 2012 Resolved
All four cargo hatch flame screens need to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 May 2012
Resolution: Flame screens have been replaced.
Construction/Loadline › Hull › Side Shell
Issued 30 April 2012 Resolved
Improper size/radius inserts were identified: 3 port side, 3 starboard side, 1 bow rake, 1 deck port stern. To be replaced with proper inserts by Aug. 2013
Action required: 705 - Other - as specified
Due 31 August 2013
Resolved 28 January 2013
Resolution: Inserts have not been replaced. However, MI determined that the inserts that are currently in are holding well and are watertight.
Construction/Loadline › Hull › Side Shell
Issued 11 October 2011 Resolved
All temporary repairs to be made permanent with appropriate inserts. Several locations on deck and side shell were patched with epoxy. No sail 835 issued.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 February 2012
Resolution: All temporary repairs have been completed with proper inserts.
Construction/Loadline › Hull › Hull Plating
Issued 11 October 2011 Resolved
Approximately 3' section of port bow knuckle has multiple pinholes on deck and through hull penetrations at waterline. To be repaired by appropriate inserts. No sail 835 issued.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 February 2012
Resolution: Port bow knuckle repaired with proper insert.
Construction/Loadline › Hull › Hull Plating
Issued 11 October 2011 Resolved
Permanently repair with proper inserts chain damage under fenders causing pinhole leaks on deck. No sail 835 issued.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 February 2012
Resolution: Proper inserts completed.
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 11 October 2011 Resolved
On deck diesel tank has hole penetrating through tank. Make permanent repairs. No sail 835 issued.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 February 2012
Resolution: Diesel tank has been completely replaced.
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 11 October 2011 Resolved
On deck diesel tank vent has no flame screen. Install flame screen. No sail 835 issued.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 February 2012
Resolution: Flame screen has been installed.
Fire Fighting › Remote Fuel Shutoff › General
Issued 11 October 2011 Resolved
Emergency shutdown for cargo pump engine is not operational. No sail 835 issued.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 February 2012
Resolution: Emergency shutdown is operational.
Engineering › Fuel Oil Service System › Hose
Issued 11 October 2011 Resolved
Replace nonmetallic flexible fuel lines on cargo pump engine with lengths no longer than 30" and that meet J1942 standards. Within 7 days.
Action required: 705 - Other - as specified
Due 18 October 2011
Resolved 9 February 2012
Resolution: Fuel lines have been replaced.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 11 October 2011 Resolved
Rain hood on cargo pump engine is wasted through. Within 7 days.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 October 2011
Resolved 9 February 2012
Resolution: Rain hood has been renewed.
Construction/Loadline › Structures › Rake
Issued 11 October 2011 Resolved
Stern rake has approximately 3' of water. Dewater rake for inspection. No sail 835 issued.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 October 2011
Resolution: Stern rake dewatered. All sat.
Construction/Loadline › Hull › Hull Plating
Issued 1 February 2010 Resolved
Bow stbd side headlog has a fracture at the junction of the rake.
Action required: 705 - Other - as specified
Resolved 2 February 2010
Resolution: It was discovered that the fracture was at a weld seam. Area cleaned and re-welded.
Construction/Loadline › Hull › Side Shell
Issued 1 February 2010 Resolved
Cargo tank #1 raised trunk, hatch access has a wasted nipple.
Action required: 705 - Other - as specified
Resolved 2 February 2010
Resolution: Nipple cut off and replaced as new.
Accommodation/Occupational Safety › Occupational Safety › Spark Producing Device
Issued 5 November 2008 Resolved
Install or retro-fit electrical components for Class I, Division I locations.
Due 5 November 2009
Resolved 23 October 2009
Resolution: Company has removed all electrical wiring. An air starting system has been installed on the cargo pump engine and has been verified to meet 46 CFR part 54. The UPV has a capacity of less than 5 cu feet.
Construction/Loadline › Hull › Hull Plating
Issued 12 February 2008 Resolved
Small pin hole found on stern stbd rake transitioning into headlog aprx 18in from side shell. Crop and renew agreed upon area.
Action required: 705 - Other - as specified
Resolved 19 February 2008
Resolution: Area has been croped and renewed, and repair has been approved.
Construction/Loadline › Structures › Manhole
Issued 12 February 2008 Resolved
Renew #1 stbd cargo man hole hatch. Hatch was found to have significant corrosion, thus significantly reducing its securability.
Action required: 705 - Other - as specified
Resolved 19 February 2008
Resolution: A new man hole hatch has been fabricated and installed, all sat.
Construction/Loadline › Structures › Manhole
Issued 12 February 2008 Resolved
Renew #4 port man hole hatch. Hatch has significant corrosion.
Action required: 705 - Other - as specified
Resolved 19 February 2008
Resolution: A new man hole hatch has been fabricated and installed, all sat.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 12 February 2008 Resolved
Fixed containment below manifold has a hole, 8 inches above deck, centerline. Make permanent repairs.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 19 February 2008
Resolution: Area has been cropped and renewed, all sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 9 November 2007 Resolved
Repack all 04 reach rods.
Action required: 705 - Other - as specified
Due 15 November 2007
Resolved 13 November 2007
Resolution: All reach rods have been repacked and operationally tested. All sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 9 November 2007 Resolved
Prove proper operation of stern stbd cargo piping valve.
Action required: 705 - Other - as specified
Due 13 November 2007
Resolved 13 November 2007
Resolution: Cargo tank was emptied, gas freed, and a new gated valve was installed and operationally tested. All sat.
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 27 October 2006 Resolved
Repair or replace pipe flange on cargo tank P/V valves due to heavy corrosion prior to cargo operations (46CFR32.55-25).
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 October 2006
Resolved 30 October 2006
Resolution: Pipe Flange was disassembled and grinded down to bare metal for visual inspection. No apparent leaks or pitting were noted. New gaskets and hardware were installed.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 30 September 2005 Resolved
Mark all cargo hoses in accordance with 33 CFR 154.500 . Test pressures should not be marked on hoses. Provide written records of hose and pipe line testing.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 30 October 2005
Construction/Loadline › Hull › Bottom Plating
Issued 5 January 2005 Resolved
2 small concrete patches were found in stern rake. One in the bilge knuckle covering what appeared to be a pin-hole and one on the corner wrapper covering what appeared to be a 3" fracture. Required removal of concrete and CG approved repairs.
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 January 2005
Resolved 20 January 2005
Resolution: The corner wrapper was renewed and the pin-hole ground out and re-welded.
Deck/Cargo › Holds/Tanks › Hatch
Issued 5 January 2005 Resolved
Ladders into bow and stern rake voids were severely wasted. Renew ladders for bow & stern voids.
Action required: 705 - Other - as specified
Due 20 January 2005
Resolved 20 January 2005
Resolution: Ladders were replaced with new ones.
Construction/Loadline › Structures › Rake
Issued 5 January 2005 Resolved
Bow and stern rakes each had 2 diagonal stiffeners that had been sheered off at the bottom truss.
Action required: 705 - Other - as specified
Due 20 January 2005
Resolved 20 January 2005
Resolution: Replaced.
Electrical › Electric Supply System (service) › Battery Installation
Issued 5 November 2003 Resolved
RENEW / REPLACE BATTERY BOX FOR CARGO PUMP STARTING BATTERIES.
Condition: Unknown
Due 5 December 2003
Resolved 20 January 2005
Resolution: Done.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 5 November 2003 Resolved
RENEW / REPLACE FRACTURED CARGO TANK HACHES ON #1 & 3 CARGO TANKS.
Condition: Unknown
Due 5 December 2003
Resolved 20 January 2005
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 5 November 2003 Resolved
MARK TRANSFER HOSE WITH "OIL SERVICE".
Condition: Unknown
Due 5 December 2003
Resolved 20 January 2005
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Flame Screens
Issued 5 November 2003 Resolved
INSTALL MISSING BOLTS ON FLAME SCREEN HOLDER FOR CARGO TANK HATCHES.
Condition: Unknown
Due 5 December 2003
Resolved 20 January 2005
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 5 November 2003 Resolved
REPLACE/ RENEW PACKING ON ALL 4 CARGO TANKS REACH RODS.
Condition: Unknown
Due 5 December 2003
Resolved 20 January 2005
Engineering
Issued 23 October 2000 Resolved
Cargo pump's fuel tank stand has a support leg fractured and requires repair.
Condition: Unknown
Due 13 December 2000
Resolved 13 December 2000
Deck/Cargo
Issued 23 October 2000 Resolved
Bolts holding down the water tank strap restraints are corroded, and require to be renewed.
Condition: Unknown
Due 13 December 2000
Resolved 13 December 2000
Construction/Loadline
Issued 23 November 1999 Resolved
Port bow rake has a fracture. Crop and renew damaged area.
Condition: Unknown
Due 29 November 1999
Resolved 29 November 1999
Construction/Loadline
Issued 4 November 1999 Resolved
CARGO HATCHES MUST BE MARKED DANGER KEEP OUT
Condition: Unknown
Due 4 November 1999
Resolved 4 November 1999
Construction/Loadline
Issued 4 November 1999 Resolved
MAKE PERMANENT REPAIRS TO HULL FRACTURES AT PORT BOW DECK GUNWALE AND PORT STERN TRANSITION KNUCKLE/HEADLOG
Condition: Unknown
Due 4 November 1999
Resolved 4 November 1999
Construction/Loadline
Issued 4 November 1999 Resolved
CARGO TRANSFER HOSE MUST BE TESTED TO AT LEAST 225 PSI
Condition: Unknown
Due 4 November 1999
Resolved 4 November 1999
Construction/Loadline
Issued 4 November 1999 Resolved
PROVIDE INSULATION FOR SPARK ARRESTOR AT CARGO PUMP ENGINE
Condition: Unknown
Due 4 November 1999
Resolved 4 November 1999
Construction/Loadline
Issued 4 November 1999 Resolved
PROVIDE ADEQUATE MARKINGS FOR CARGO PUMP EMERGENCY SHUT DOWN
Condition: Unknown
Due 4 November 1999
Resolved 4 November 1999
Construction/Loadline
Issued 7 November 1997 Resolved
REWELD FRACTURES ON BOTTOM #2, #3, #4, TRANSVERSE SUPPORT BRACKETS, WHERE THE MEET THE SIDE SHELL.
Condition: Unknown
Due 12 November 1997
Resolved 12 November 1997
Deck/Cargo
Issued 6 January 1997 Resolved
Renew/repair bolts on fastners holding down the potable water tanks.
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Deck/Cargo
Issued 6 January 1997 Resolved
Repair cargo pump engine remote shutdown. No cargo operations to be conducted until repairs are completed.
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Fire Fighting
Issued 8 November 1995 Resolved
Renew fire extinguisher horn.
Condition: Unknown
Due 8 November 1995
Resolved 8 November 1995
Deck/Cargo
Issued 8 November 1995 Resolved
Stencil all cargo hoses with test date.
Condition: Unknown
Due 8 November 1995
Resolved 8 November 1995
Construction/Loadline
Issued 8 November 1995 Resolved
Paint vessels name and homeport on hull.
Condition: Unknown
Due 8 November 1995
Resolved 8 November 1995
Deck/Cargo
Issued 8 November 1995 Resolved
Resplice or cable clamp emergency shutdown pull cable at handle.
Condition: Unknown
Due 8 November 1995
Resolved 8 November 1995
Engineering
Issued 13 November 1989 Resolved
REINSTALL FLEXIBLE FUEL HOSE BETWEEN FUEL TANK AND METAL FUEL LINE.
Condition: Unknown
Due 13 November 1989
Resolved 13 November 1989
Fire Fighting
Issued 13 November 1989 Resolved
REMOVE PORTABLE FIRE EXTINGUISHERS AND REPLACE WITH COAST GUARD APPROVED ORU.L. LISTED TYPE B SIZE II PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 13 November 1989
Resolved 13 November 1989
Deck/Cargo
Issued 13 November 1989 Resolved
REPLACE AS ORIGINAL FLAME SCREEN FOR #1 CARGO TANK VENT.
Condition: Unknown
Due 13 November 1989
Resolved 13 November 1989
Engineering
Issued 13 November 1989 Resolved
REMOUNT FLAME SCREEN TO CARGO TRANSFER PUMP FUEL TANK VENT.
Condition: Unknown
Due 13 November 1989
Resolved 13 November 1989
Deck/Cargo
Issued 26 October 1989 Resolved
CROP AND RENEW TEMPORARY REPAIRS IN #2 CARGO TANK IN INBOARD AFT CORNER, ONE IN AFTER BULKHEAD, ONE IN BOTTOM PLATE.
Condition: Unknown
Due 26 October 1989
Resolved 26 October 1989
Construction/Loadline
Issued 26 October 1989 Resolved
CROP AND RENEW NUMBER 2 VERTICAL SIDE SHELL FRAME IN #1 CARGO TANK FROM APPROXIMATELY THREE AND ONE HALF FEET ABOVE BOTTOM PLATE TO MAIN DECK LEVEL
Condition: Unknown
Due 26 October 1989
Resolved 26 October 1989
Construction/Loadline
Issued 26 October 1989 Resolved
GRIND AND REWELD CRACKED/SEPARATED WELDS IN WAY OF VERTICAL SIDE SHELL FRAME AT EACH FLOOR AND UNDERDECK BEAM ATTACHMENT IN #3 CARGO TANK.
Condition: Unknown
Due 26 October 1989
Resolved 26 October 1989
Construction/Loadline
Issued 26 October 1989 Resolved
GRIND AND REWELD CRACKED/SEPARATED WELDS IN AFT RAKE IN WAY OF LONGITUDINALSIDE SHELL FRAMES PORT AND STARBOARD SIDE.
Condition: Unknown
Due 26 October 1989
Resolved 26 October 1989
Construction/Loadline
Issued 26 October 1989 Resolved
GRIND AND REWELD CRACKED/SEPARATED WELDS IN AFT RAKE IN WAY OF FLOORS, UNDERDECK BEAMS, AND AFTER FRAMES IN PORT QUARTER.
Condition: Unknown
Due 26 October 1989
Resolved 26 October 1989
Construction/Loadline
Issued 26 October 1989 Resolved
CROP AND RENEW AFTERMOST 2.5' OF OUTBOARD LONGITUDINAL UNDERDECK BEAM PORT SIDE OF AFT RAKE.
Condition: Unknown
Due 26 October 1989
Resolved 26 October 1989
Construction/Loadline
Issued 26 October 1989 Resolved
CROP AND RENEW 2' BY 2' SECTION IN STARBOARD QUARTER, AFTER RAKE IN WAY OF SIDE SHELL/MAIN DECK/STERN JOINT.
Condition: Unknown
Due 26 October 1989
Resolved 26 October 1989
Construction/Loadline
Issued 26 October 1989 Resolved
CROP AND RENEW AFTERMOST TRANSVERSE BEAM IN AFT RAKE, FROM SIDE SHELL STARBOARD SIDE INBOARD 3.5'.
Condition: Unknown
Due 26 October 1989
Resolved 26 October 1989
Construction/Loadline
Issued 26 October 1989 Resolved
CROP AND RENEW SIDE SHELL IN WAY OF FORWARD TRANSVERSE UNDERDECK BEAMS IN CARGO TANKS 1 AND 2 AND IN WAY OF AFTER TRANSVERSE UNDERDECK BEAMS IN CARGO TANKS 3 AND 4.
Condition: Unknown
Due 26 October 1989
Resolved 26 October 1989

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.