Records from 1999 to 2026. Most recent: inspection, 26 February 2026.
Inspection history · 74
26 February 2026
MTSA Verification · MARPOL Annex II Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8317205
7 May 2025
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8193895
2 December 2024
COI Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8040658
7 May 2024
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7907961
4 February 2024
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7860313
20 January 2024
Damage Survey
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7852524
4 September 2023
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7785356
20 August 2023
Bulk Liquid Transfer Monitor
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7772492
3 May 2023
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7671246
17 January 2023
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7622141
25 November 2022
Administrative Inspection · Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7599498
25 March 2022
Periodic Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7418419
24 January 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7384739
14 October 2021
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 7332506
12 October 2021
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7331394
22 June 2021
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7227932
15 October 2019
Deficiency Check · Drydock Exam · Hull Examination · Re-Inspection · Administrative Inspection · Internal Structural Exam · Construction Oversight · In-Service Inspection · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6836640
13 May 2019
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6683258
14 March 2019
Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6647348
31 October 2018
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6572390
12 September 2018
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6538900
17 January 2018
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6339353
8 January 2018
Damage Survey
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6334898
8 January 2018
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6379595
8 November 2017
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6305920
2 October 2017
MTSA Verification · Periodic Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6279467
8 June 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6169474
19 May 2017
Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6152739
17 November 2016
MARPOL Annex II Examination · Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6040474
20 August 2016
Administrative Inspection · Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5979950
2 February 2016
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5805023
21 January 2015
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5056394
20 January 2015
Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5056049
6 September 2014
Administrative Inspection · In-Service Inspection · Internal Structural Exam · COI Inspection · Cargo Tank Internal
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4984613
12 February 2014
Annual Inspection · MTSA Verification · MARPOL Annex VI Survey · MARPOL Annex II Examination · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4798643
20 November 2013
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4756372
25 September 2013
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4722964
24 July 2012
Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4390942
9 January 2012
MARPOL Annex II Examination · MARPOL Annex I Examination · MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4221269
30 December 2010
Deficiency Check · Administrative Inspection · Ballast Water Examination · Annual Inspection · MTSA Verification
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3917042
20 July 2010
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3800830
18 May 2010
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3741363
11 January 2010
Administrative Inspection · COI Inspection · Deficiency Check · Internal Structural Exam · Drydock Exam · MARPOL Annex I Examination · MARPOL Annex V Examination · MTSA Verification · MARPOL Annex VI Survey · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3656789
17 March 2009
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3436836
31 October 2008
Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3353917
13 August 2008
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3297178
28 July 2008
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3281991
1 January 2008
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3124950
28 September 2007
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3068350
27 September 2007
MTSA Verification · Annual Inspection · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3067416
8 December 2006
MARPOL Annex I Examination · COI Inspection · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2836522
13 November 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2819917
1 November 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2812358
10 March 2006
Annual Inspection · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2599833
25 March 2005
Periodic Inspection · MTSA/ISPS Verification · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2319259
11 January 2005
Cargo Tank Internal · Hull Examination · Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2272519
19 February 2004
Annual Inspection · Administrative Inspection · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2008939
11 March 2003
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1755841
7 January 2003
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1727187
1 November 2002
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1699489
28 October 2002
Annual Inspection · Internal Structural Exam
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1697043
1 August 2002
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1657888
13 December 2001
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 772884
30 July 2001
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 474015
30 July 2001
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 475204
13 December 2000
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1373324
17 June 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 524107
12 June 2000
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 818685
15 May 2000
Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 817685
15 May 2000
Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 817687
27 April 2000
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1049062
19 April 2000
Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1049309
27 March 2000
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1047530
13 December 1999
Initial Construction-Excluding Oversight · Hull Examination · COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1468104
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 January 2025
Resolved
At each COI the MI shall conduct tests and inspections of auxilery machinery as they feel necessary to check for safe operation.
Both BWTS generators had fuel leaks in the fuel supply lines before the primary filter. Repair leaks to the satisfaction of the MI.
46 CFR 61.20-3
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 January 2025
Resolved 22 January 2025
Resolution: Fuel leaks repaired, SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 17 January 2025
Resolved
At each COI the MI shall conduct tests and inspections of auxiliary machinery as they feel necessary to check for safe operation.
The port side engine house had bags of oil soaked rags stored in the corner, both pumps engines and storage tanks had oil under and around them. This space shall be cleaned and all un necessary flammable/hazardous material removed to the satisfaction of the MI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 January 2025
Resolved 23 January 2025
Resolution: Housekeeping items have been corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 December 2024
Resolved
At each COI the MI shall conduct tests and inspections of auxiliary machinery as they feel necessary to check for safe operation.
The #1 hydraulic pump was leaking from the aft pump seal while the system was not operating. Repair the pump seal and conduct an operational test to the satisfaction of the MI.
46 CFR 61.20-3
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 January 2025
Resolved 22 January 2025
Resolution: Hydraulic leak was repaired, operational test SAT.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 20 January 2024
Resolved
Barge reported that the inert gas system was not keeping up with cargo discharge rate due to gas regulating valve not operating as designed. Vessel is currently discharging in port of New Haven loaded with home heating oil. The flash point of the heating oil is 126-205 fahrenheit and is not required to be inserted. Vessel is authorized to discharge cargo using atmospheric venting. Vessel is required to prove proper operation of the inert gas system to the satisfaction of attending USCG prior to loading a flammable cargo.
Action required: 705 - Other - as specified
Resolved 25 January 2024
Resolution: Received Technical report from Instruments and Controls Inc. identifying the problem and that it has been resolved. Cleared CG-835 issued 20JAN24.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 3 May 2023
Resolved
Each nameplate for a circuit breaker must show the electrical load served and the setting of the circuit breaker.
MI found breaker panel L1 in the aft generator room to have multiple breakers without labels.
46 CFR 31.35-1
46 CFR 111.40-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2023
Resolved 5 May 2023
Resolution: Vessel verified and labeled breakers inside panel.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 3 May 2023
Resolved
30 × 30 corrosion-resistant wire mesh shall be fitted on all openings to atmosphere. Flame screens shall be made of corrosion-resistant wire.
MI found the flame screens on 8 of the cargo tank P/V vales to be clogged and corroded.
46 CFR 39.2011(b)
46 CFR 162.017 3(n)
46 CFR 162.017 3(e)
Action required: 17 - Rectify deficiencies prior to departure
Due 3 May 2023
Resolved 5 May 2023
Resolution: Vessel cleaned and or replaced 8 flame screens.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 3 May 2023
Resolved
All tank vessels of 150 gross tons or over navigating the oceans are subject to the regulations in Subchapter E. Machinery space ventilators shall be fitted with strong covers of steel permanently attached in their proper positions and capable of being secured weather-tight.
MI found the dogs for the watertight door on the forward generator space to be seized and unable to properly close. The gaskets for the forward generator space ventilators do not make the fitting weather-tight when closed.
46 CFR 31.25-146
46 CFR 42.15-35 (b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2023
Resolved 5 May 2023
Resolution: Vessel unseized dogs on door, and put a bolt in place for the vent closure.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 3 May 2023
Resolved
Piping systems shall conform to the requirements of Sub-chapter F. The respective piping systems installed on barges shall be safe and efficient for operation of the vessel.
MI found a wasted gasket in the water inlet piping flange for the deck seal and holed piping in the water inlet piping for the deck seal on the inert gas system.
46 CFR 32.35-1
46 CFR 56.01-1
Action required: 17 - Rectify deficiencies prior to departure
Due 3 May 2023
Resolved 5 May 2023
Resolution: Vessel repaired hole in piping and replaced gasket on the flange.
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 25 November 2022
Resolved
Following installation of a ballast water management system (BWMS), the master, owner or operator of the vessel must properly maintain the BWMS in accordance with all manufacturer specifications. Vessel reported the starboard BWMS is inoperable. Repair starboard BWMS and provide technical report to the satisfaction of the U.S. Coast Guard in no later than 30 days. Vessel may continue to conduct ballast water operations as long as the port BMWS is fully functional and meets the ballast water discharge standards found in 33 CFR 151.2030.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 December 2022
Resolved 17 January 2023
Resolution: 3rd party attendend and made repairs and tested satisfactorily
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 24 April 2020
Resolved
All tank vessels of 150 gross tons or over, or 79 feet in length or greater, navigating the oceans, coastwise waters, and Great Lakes are subject to the regulations in parts 42 to 45, inclusive, subchapter E (Load Lines), of this chapter, as applicable.
Vessel does not have a valid International Load Line
Certificate. Vessel restricted to inland waters until valid certificate is issued.
IAW: 46 CFR 31.25-1
Action required: 705 - Other - as specified
Resolved 25 April 2020
Resolution: Valid ILL issued by class, ABS, SAT.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 24 April 2020
Resolved
The last 1.0 meter (3.3 feet) of vapor piping upstream of the vessel vapor connection and each end of a vapor hose must be painted in the sequence of red/yellow/red. The width of the red bands must be 0.1 meter (0.33 foot) and the width of the middle yellow band must be 0.8 meter (2.64 feet) and be labeled with the word “VAPOR” painted in black letters at least 50.8 millimeters (2 inches) high.
Vapor Piping missing red/yellow/red sequence and "vapor" stenciling.
IAW: 46 CFR 39.2001(h)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 April 2020
Resolution: Verified vapor piping was painted with red/yellow/red pattern, and stenciled with "VAPOR".
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 24 April 2020
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter (0.5 inch) diameter and is at least 25.4 millimeters (1 inch) long. It must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern.
Port Aft vapor connection missing permanent stud at top of flange.
IAW: 46 CFR 39.2001(j)
Action required: 705 - Other - as specified
Resolved 24 April 2020
Resolution: Permanent stud was installed at the top of flange on the port aft connection, SAT.
Deck/Cargo › Inert Gas System › Venting System
Issued 8 January 2018
Resolved
Provide technician report identifing the source of the fire in the IGS atmosphere vent line. IGS is not to be used until report is provided and system is tested in the presence of an attending Coast Guard Marine Inspector. The following IGS components must remain secured until proper IGS operation is verified: 1. Main gas valve 2. Deck seal (double block) valves. 3. Tank IGS isolation valves. 4. IGS fuel valve. 5. IGS blower breakers.
Action required: 705 - Other - as specified
Resolved 12 January 2018
Resolution: Witnessed proper operation of the IGS, and conducted alarms and shutdowns.
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 17 November 2016
Resolved
The individual P/V valves for each cargo tank need to be tested to 1.75 psi. Provide documentation to the attending marine inspector upon completion of testing.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 November 2016
Resolved 18 November 2016
Resolution: Boland Marine provided documentation attesting that the P/V valves for each cargo tank had been tested to 1.75psi.
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 17 November 2016
Resolved
The 4 high-velocity valves need to be tested to 1.75 psi. Provide documentation to the attending marine inspector upon completion of testing.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 November 2016
Resolved 18 November 2016
Resolution: Boland Marine provided documentation that the high-velocity valves had been tested to 1.75 psi.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 17 November 2016
Resolved
Provide documentation for proper calibration procedure of the O2 analyzer on the Inert Gas System. [name withheld] states that the span gas air sample used for calibration comes from within the inert gas system itself.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 November 2016
Resolved 18 November 2016
Resolution: Inert Gas System manufacturer called and discussed proper calibration procedure for the O2 analyzer. The system draws its span gas air sample from the ship service air system, labeled as instrument air in the operation manual.
Engineering › Compressed Air System (control) › Valve
Issued 17 November 2016
Resolved
Reducing valve and relief valve on main air supply line coming off receivers were both inoperable. Reducing valve was to bring psi down from 150 to 100 and relief valve was set to go off at 110psi, the gauge reading was 140psi. Repair/replace to satisfaction of attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 November 2016
Resolved 19 November 2016
Resolution: C & W Air Repair, Inc attended vessel 19NOV16. Replaced regulator and installed new 120PSI relief valve. Tested relief valve exhausting at 120 PSI and then set the regulator at 100 PSI as per tagged on the wall for barge air operations.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 17 November 2016
Resolved
Provide request for barge manning IAW CG-CVC Policy Letter 16-04 dated 26 July 2016. Vessel is currently "permissively manned" and wants to move to "conditional occupancy".
Condition: Invalid
Due 16 December 2016
Resolved 19 November 2016
Resolution: Received documentation from [name withheld], Port Captain for Kirby Offshore Marine, requesting COI amendment to reflect "conditional occupancy" vice "permissively manned".
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 17 November 2016
Resolved
Reapir/make tight hole in bottom of flammable paint locker on deck.
Action required: 705 - Other - as specified
Due 24 November 2016
Resolved 18 November 2016
Resolution: Vessel provided documention that hole in bottom of paint locker was made tight.
Operations/Management › Vessel Activity › Underway
Issued 20 August 2016
Resolved
Provide two tug assists to enter the Columbia River at the C/R Buoy for the transit to Portland due to the port rudder casualty on the TUG LINCOLN SEA. Barge is authorized to offload cargo but may not onload cargo until adequate tug is provided.
Action required: 705 - Other - as specified
Due 20 September 2016
Resolved 30 August 2016
Resolution: Tug LINCOLN SEA replaced port rudder and proved proper operation to the satisfaction of ABS. Tug conducted river trials to verify underway manuverability.
Documentation › Safety Management System › Company Responsibility/Authority Documentation
Issued 20 January 2015
Resolved
Provide repair proposal of cargo transfer system for the #6 starboard cargo tank, to include a marine chemist certificate, to the local OCMI, that would oversee repairs. Request permit-to-proceed, if repairs are to be done at another port.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 January 2015
Resolved 25 January 2015
Resolution: Kirby Marine made communication and provided details to the OCMI for repairs to be done. A permit-to-proceed was not required.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 20 January 2015
Resolved
Prove proper operation of the cargo transfer system for the #6 starboard cargo tank, prior to new cargo operations. The internal tank piping valve is in a closed/shut position, with the reach-rod assembly not seeming to work/operate to open the valve.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 January 2015
Resolution: Kirby Marine provided phone communication and e-mail documentation to the OCMI that the universal joint to the #6 starboard cargo tank reach-rod system had failed. The universal joint was removed, repaired, re-installed and the valve tested sat.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 30 December 2010
Resolved
Replace Starboard water light line and configure as per 46 CFR 199.70.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 30 December 2010
Resolution: Line was replaced at locations indicated.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 30 December 2010
Resolved
Paint and Re-stencil STBD Vapor Line (Last 1 Meter) 33 CFR 154.810(b).
Action required: 705 - Other - as specified
Resolved 30 December 2010
Resolution: Vapor line was re-stenciled properly.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 30 December 2010
Resolved
Replace broken fwd water light as per 46 CFR 199.70.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 30 December 2010
Resolution: Water light was replaced in kind.
Lifesaving › Lifebuoys › Serviceable
Issued 30 December 2010
Resolved
Replace retroflective tape on inboard and outboard fwd life rings as per 46 CFR 199.70.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 30 December 2010
Resolution: Tape was renew on indicated life rings.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 30 December 2010
Resolved
Renew damaged section of port quarter railing as per 46 CFR 32.02-10.
To be completed prior to next Internal Structure Exam.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 September 2012
Resolved 9 January 2012
Resolution: All handrails were repaired satisfactorly.
Engineering › Diesel Engine (auxiliary) › Pump, Positive Displacement
Issued 30 December 2010
Resolved
Demonstrate Emergency Shutdowns of Pump Engines and Generators to Satisfaction of Attending Marine Inspector as per 46 CFR 61.20-3.
Action required: 705 - Other - as specified
Due 27 January 2011
Resolved 16 February 2011
Lifesaving › Immersion Suits › Serviceable
Issued 16 February 2010
Resolved
Replace/renew immersion suit.
Action required: 705 - Other - as specified
Due 16 March 2010
Resolved 19 February 2010
Resolution: Immersion suit replaced.
Lifesaving › Rigid Liferafts › Carriage Requirement
Issued 16 February 2010
Resolved
Provide vessel with SOLAS-approved 6-man liferaft under international voyages IAW 46 CFR 199.261.
Action required: 705 - Other - as specified
Due 16 March 2010
Resolved 19 February 2010
Resolution: Vessel received SOLAS-approved 6-man liferaft.
Deck/Cargo › Vapor Control Systems
Issued 19 February 2004
Resolved
Vapor escaping from P/V atop cargo hatch. LEGACY COMPONENT DESC: Vessel Vapor Overpressure/Vacuum Protection
Condition: Improper/Lack of Maintenance
Due 20 February 2004
Resolved 20 February 2004
Resolution: Cew completed repairs to all suspected leaks.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 28 October 2002
Resolved
Circuit breaker box in accomodation/office space missing two metal blanks. Duct tape was covering opening.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 29 October 2002
Engineering › Diesel Engine (auxiliary)
Issued 28 October 2002
Resolved
Install plugs on #1 & #2 hydraulic pump engine Racor Filters as per 46 CFR 56.50-75. LEGACY COMPONENT DESC: Racor Filters
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 January 2003
Resolved 1 November 2002
Resolution: Valves installed on filters.
Accommodation/Occupational Safety › Occupational Safety
Issued 28 October 2002
Resolved
Provide approved plan for drawing # 32764 or remove fiberglass steps on companionway inclined ladder and replace with approved type. LEGACY COMPONENT DESC: Fiberglass Steps
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 January 2003
Resolved 7 January 2003
Resolution: VESSEL REP PROVIDED APPROVED PLANS (ABS).
Lifesaving › Inflatable Liferafts
Issued 28 October 2002
Resolved
Provide liferaft for aft installation that meets the maximum stowage height requirements as per 46 CFR 199.130(c)(2). Current 8 meter raft is not rated for the height of the current location on top of accomodation house (approx 35 ft). This vessel may not be manned until this requirement is met. LEGACY COMPONENT DESC: Stowage Height
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 1 November 2002
Resolution: Rafts were reinspected, seapainters changed and the rated hieght changed to meet the reruirements in 46 CFR 199.130(c)(2).
Construction/Loadline › Markings
Issued 28 October 2002
Resolved
Make port loadline markings visible as per International Loadline Reg 8 at next US port call (Houston). Vsl scheduled to depart Houston for LOSMS, via Panama Canal. Stbd loadline marking was also worn but was painted prior to inspection completion. LEGACY COMPONENT DESC: Load Line Mark
Action required: 705 - Other - as specified
Resolved 1 November 2002
Resolution: Markings painted on port side.
Accommodation/Occupational Safety › Occupational Safety
Issued 28 October 2002
Resolved
Oxygen bottles were stowed in the berthing area. Corrected on the spot. LEGACY COMPONENT DESC: Oxygen Bottles
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 29 October 2002
Lifesaving › Launching Appliances › Davit
Issued 28 October 2002
Resolved
Properly grease wire rope for rescue boat. Corrected during the course of inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 29 October 2002
Construction/Loadline
Issued 27 March 2000
Resolved
PRIOR TO LOADING ANY CARGO PROVIDE COPY OF DIVER'S SURVEY REPORT VERIFYING THAT VESSEL DID NOT SUFFER SIGNIFICANT DAMAGE OR BREACH THE HULL AS A RESULT OF THE GROUNDING SUFFERED ON 26 MARCH 00.
Condition: Unknown
Due 28 March 2000
Resolved 28 March 2000
Lifesaving
Issued 13 December 1999
Resolved
PRESENT TUG MOHAWK FOR INSPECTION BY A CG MARINE INSPECTOR FOR INSTALLATIONTESTS TO THE RESCUE BOAT AND DAVIT SYSTEM AND INSPECTION OF ADDITIONAL LIFESAVING EQUIPMENT REQUIRED ON COI.
Condition: Unknown
Due 13 December 1999
Resolved 13 December 1999
Documentation
Issued 13 December 1999
Resolved
SUBMIT FOR APPROVAL TO G-MSC A HAZARDOUS LOCATION PLAN.
Condition: Unknown
Due 13 March 2000
Resolved 2 February 2000
Deck/Cargo
Issued 13 December 1999
Resolved
PRESENT COMBUSTIBLE GAS INDICATOR FOR INSPECTION.
Condition: Unknown
Due 13 December 1999
Resolved 13 December 1999
Navigation
Issued 13 December 1999
Resolved
DEMONSTRATE THE ABILITY OF THE TUG "MOHAWK" TO SAFELY AND READLY DISCONNECTFROM THE "SENECA IAW NVIC 2-81 CHANGE 1 ENCLOSURE 1 SECTION 5.e.(4).
Condition: Unknown
Due 13 December 1999
Resolved 13 December 1999
Documentation
Issued 13 December 1999
Resolved
SUBMIT DESIGN INFORMATION TO G-MSC TO SUPPORT THE ABILITY OF THE TUG/BARGE TO ROUTINELY DISCONNECT AT SEA STATES DESIGNATED BY THE DESIGNER IAW NVIC 2-81 CHANGE 1 ENCLOSURE 1 SECTION 5.e.(4).
Condition: Unknown
Due 13 December 1999
Resolved 13 December 1999
Documentation
Issued 13 December 1999
Resolved
PRIOR TO THE CARRIAGE OF CARGO PRESENT AN APPROVED RESPONSE PLAN AND SOPEP.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Documentation
Issued 13 December 1999
Resolved
PROVIDE PROOF OF BARGE CREWS PARTICIPATION IN THE MOBIL OIL DRUG AND ALCOHOL PROGRAM.
Condition: Unknown
Due 13 March 2000
Resolved 20 January 2000
Documentation
Issued 13 December 1999
Resolved
PRIOR TO THE TRANSFER OF ANY CARGO OR FUEL OIL PRESENT A COAST GUARD APPROVED OIL TRANSFER PROCEDURE.
Condition: Unknown
Due 13 December 1999
Resolved 13 December 1999
Navigation
Issued 13 December 1999
Resolved
PROVIDE ANCHOR LIGHT (STERN) TO COMPLY WITH RULE 30 COREGS.
Condition: Unknown
Due 3 February 2000
Resolved 3 February 2000
Lifesaving
Issued 13 December 1999
Resolved
INSTALL GENERAL ALARM SYSTEM IN ACCORDANCE WITH 46CFR32.25-1 & 46CFR120.550
Condition: Unknown
Due 13 December 1999
Resolved 13 December 1999