Inspection history · 19
23 March 1994
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1165981
9 September 1992
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1251220
8 September 1992
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1265535
7 April 1992
COI Inspection · Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1267635
26 November 1991
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 949948
3 July 1991
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 949947
1 June 1990
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 912469
16 October 1989
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1346368
10 October 1989
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1335039
5 July 1989
COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1338383
3 May 1989
Examination of Repairs
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1208344
21 April 1989
Permit to Proceed
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 895336
16 June 1988
Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 893447
4 June 1987
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1005475
15 December 1986
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 532720
21 November 1986
Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1329121
23 September 1985
COI Inspection · Credit Drydock
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1300813
6 September 1984
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 974311
2 September 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1277490
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW HOLED AND DETERIORATED 1" PIPING THAT IS LOCATED INBOARD OF #6 CARGO TANK DOME._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Construction/Loadline
Issued 3 July 1991
Resolved
LOOSEN AND LUBRICATE DOG BOLTS TO WATERTIGHT HATCH TO BOW VOID.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Construction/Loadline
Issued 3 July 1991
Resolved
REPLACE ONE DOG BOLT TO WATERTIGHT HATCH TO BOW VOID.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Navigation
Issued 3 July 1991
Resolved
RENEW LIGHT SCREENS AND ENSURE THEY ARE PAINTED FLAT BLACK AND CORRECTLY ALIGNED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW MISSING DOG BOLT TO #2 STBD CARGO TANK BUTTERWORTH HATCH.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
LOOSEN AND LUBRICATE ALL DOG BOLTS TO #4 PORT CARGO TANK BUTTERWORTH HATCH.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW PACKING GLAND AND PACKING TO REACH ROD ASSEMBLY THAT PENETRATES #2 CARGO TANK DOME._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
INSTALL FLAME SCREEN ON #1 CARGO TANK ULLAGE OPENING.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW PIPE CLAMPS ON STRIPPING LINE ON OPEN DECK.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Documentation
Issued 3 July 1991
Resolved
PROVIDE VALID CERTIFICATE OF DOCUMENTATION._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
CLEAN ALL P/V VALVES AND RENEW BROKEN BOLTS TO P/V VALVE INSPECTION COVERS.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
ENSURE ALL VALVES INSTALLED ON BOARD BARGE HAVE VALVE HANDLES.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
ENSURE ALL DEAD END PIPING ARE EITHER CAPPED OR PLUGED._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
ENSURE ALL WINCHES AND MOORING GEAR ARE IN A SERVICEABLE CONDITION._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Engineering
Issued 3 July 1991
Resolved
ENSURE FUEL TANKS FOR MACHINERY ARE PROPERLY STENCILED._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
PROVIDE EVIDENCE THAT CARGO RELIEF VALVE HAS BEEN TESTED WITHIN THE PAST YEAR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
ENSURE CARGO HEADER PRESSURE GAGE IS OPERABLE AND ACCURATE WITHIN 10 PERCENT.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Documentation
Issued 3 July 1991
Resolved
PROVIDE OIL TRANSFER PROCEDURES AND ENSURE THEIR CONTENTS ARE IN ACCORDANCEWITH 33 CFR 155.750._x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
ENSURE ALL CARGO TANK HATCHES ARE MARKED, "DANGER - KEEP OUT".
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW DETERIORATED P/V VALVE RISER PIPE FROM #8 CARGO TANK DOME._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW DETERIORATED FLAME SCREEN TO P/V VALVE ON #8 CARGO TANK DOME.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW PACKING TO REACH ROD ASSEMBLY AT DECK PENETRATION ON #8 CARGO TANK DOME.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW FLAME SCREEN TO P/V VALVE ON #10 CARGO TANK._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW FLAME SCREEN TO P/V VALVE ON #7 AND #9 CARGO TANKS.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW SECURING BOLTS TO DRIVE SHAFT GUARD ON CARGO PUMP PRIME MOVER.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Construction/Loadline
Issued 3 July 1991
Resolved
REPAINT DRAFT MARKS SO THEY ARE PLAINLY AND LEGIBLY MARKED UPON THE VESSEL._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
REPAIR OR RENEW CARGO OIL DISCHARGE CONTAINMENT ON STARBOARD SIDE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Lifesaving
Issued 3 July 1991
Resolved
PROVE OPERATION OF EMERGENCY SHUTDOWN FOR CARGO PUNP PRIME MOVER._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
PROVIDE EVIDENCE OF HYDRO TEST OF CARGO PIPING TO 1.5 TIMES MAXIMUM ALLOWABLE WORKING PRESSURE WITHIN THE PAST YEAR.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW PACKING TO REACH ROD ASSEMBLY AT DECK PENETRATION ON #3 AND #4 CARGO TANK DOMES._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
INSTALL FLAME SCREEN TO ULLAGE OPENING ON SLOP TANK.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Deck/Cargo
Issued 3 July 1991
Resolved
RENEW DETERIORATED FLAME SCREEN TO P/V VALVE ON SLOP TANK.
Condition: Unknown
Due 3 July 1991
Resolved 3 July 1991
Construction/Loadline
Issued 10 October 1989
Resolved
DISCHARGE CARGO, PLACE VESSEL IN A GAS FREE CONDITION, AND EFFECT PERMANENTREPAIRS TO THE TWO PIN HOLES APPROXIMATELY ONE FOOT BELOW THE DECK ON THE SIDESHELL OF THE #1 STARBOARD CARGO TANK.
Condition: Unknown
Due 10 October 1989
Resolved 10 October 1989
Deck/Cargo
Issued 21 November 1986
Resolved
PROVIDE WRITTEN PROOF TO [name withheld], AL THAT THE ANNUAL TESTS OF CARGO PIPING, CARGO HOSES AND RELIEF VALVES REQUIRED BY 33CFR165.170 HAVE BEEN CONDUCTED.
Condition: Unknown
Due 21 November 1986
Resolved 21 November 1986
Construction/Loadline
Issued 2 September 1982
Resolved
ITEMS 1 THRU 9 VARIOUS DECK ITEMS MISSING DOGS HADWHEELS STENCILING WARNINGSIGNS ETC.
Condition: Unknown
Due 2 September 1982
Resolved 2 September 1982
Construction/Loadline
Issued 2 September 1982
Resolved
ITEMS 1 THRU 15 ARE IN CARGO TANKS 1 THRU 10, 1 THRU 14 ARE CRACKED WELDS IN VARIOUS CARGO TANKS ITEMS 15 IS DRYDOCKING REQUIREMENT.
Condition: Unknown
Due 2 September 1982
Resolved 2 September 1982