← All vessels
BAYOU MAXENT
BAYOU MAXENT is a 1956 tank barge. The Coast Guard has recorded 17 inspections since 1982, most recently in August 1989, along with 19 deficiencies.
Records from 1982 to 1989. Most recent: inspection, 4 August 1989.
- Built
- 1956
- Last inspected
- 4 August 1989
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 19 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
272069
50945
Flag
UNITED STATES
—
Maury page id
psix-50945
Inspections, by type
…with no type recorded9
Years with a record
8 calendar years (1982–1989)
The 17 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 37 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Documentation record
Tonnage as PSIX records it1262 - Regulatory (Subpart C or D), Gross Ton
1262 - Regulatory (Subpart C or D), Net Ton
1262 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 17
4 August 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 891846
2 February 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1209885
15 November 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1204885
9 November 1988
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 891126
8 December 1987
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1316051
25 August 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1030835
24 June 1987
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 465258
24 September 1986
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 483547
17 September 1986
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1314647
10 September 1986
COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1271809
6 September 1985
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1295761
12 February 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 981003
4 December 1984
Type not recorded
No type recorded · MSO CINCINNATI · Activity 1285378
12 September 1984
Type not recorded
No type recorded · MSO CINCINNATI · Activity 974503
12 September 1984
Type not recorded
No type recorded · MSO CINCINNATI · Activity 1284812
27 April 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1279683
20 September 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1279260
Deficiency record · 19
Electrical
Issued 9 November 1988
Resolved
REBUILD OR REMOVE GENERATOR. 46CFR111.12
Electrical
Issued 9 November 1988
Resolved
SECURE THE CARGO PUMP ENGINE STARTING BATTERY. 46CFR111.15 TO BE COMPLETED PRIOR TO LOADING OR TRANSPORTING ANY CARGO.
Construction/Loadline
Issued 9 November 1988
Resolved
REFRESH THE HULL MARKINGS WITH PAINT. 46CFR32.05
Deck/Cargo
Issued 9 November 1988
Resolved
REPLACE THE PRESSURE GUAGE ON THE CROSS DECK HEADER. 46CFR32.50-5 TO BE COMPLETED PRIOR TO OFFLOADING ANY CARGO.
Deck/Cargo
Issued 9 November 1988
Resolved
REPLACE THE TACHOMETER AND TEMPERATURE GUAGE FOR THE CARGO PUMP ENGINE. 46CFR58 PLUG THE ENDS OF THE CUT OFF/NOT USED FUEL LINES. 46CFR56 TO BE COMPLETED PRIOR TO OFFLOADING ANY CARGO.
Accommodation/Occupational Safety
Issued 9 November 1988
Resolved
REMOVE CABLES, DRUMS,PIPES AND DEBRIS FROM VESSEL. 46CFR31.01-5 TO BE COMPLETED PRIOR TO LOADING OR TRANSPORTING CARGO.
Deck/Cargo
Issued 9 November 1988
Resolved
REPAIR THERMAL FLUID LINE INSULATION. 46CFR36.05-10 TO BE COMPLETED PRIOR TO HEATING ANY GRADE "E" CARGO
Construction/Loadline
Issued 9 November 1988
Resolved
REMOVE THERMAL FLUID FROM #4 STBD. WING VOID. 33USC3313A TO BE COMPLETED PRIOR TO LOADING OR TRANSPORTING CARGO.
Deck/Cargo
Issued 9 November 1988
Resolved
REPLACE GOOSENECKS TO #4 STBD. AND PORT, #1 STBD, AND STERN VOID.46USC3313ATO BE COMPLETED PRIOR TO LOADING OR TRANSPORTING ANY CARGO.
Deck/Cargo
Issued 9 November 1988
Resolved
REPLACE BUTTERWORTH COVERS AND BOLT INTO PLACE. 46CFR35.30-10;32.60-10(B)2)TO BE COMPLETED PRIOR TO LOADING OR TRANSPORTING ANY CARGO.
Deck/Cargo
Issued 9 November 1988
Resolved
REPLACE P/V VALVES ON #2 P & S CARGO TANKS, REPLACE BOLTS ON #4 PORT P/V VALVE AND RENEW FLAME SCREEN ON #4S CARGO TANK. 46CFR32.55-30 TO BE COMPLETED PRIOR TO LOADING OR TRANSPORTING ANY CARGO.
Deck/Cargo
Issued 9 November 1988
Resolved
RE-PACK THE CARGO PUMP PACKING GLAND. 46CFR32.50-1 TO BE COMPLETED PRIOR TO OFFLOADING ANY CARGO.
Construction/Loadline
Issued 12 September 1984
Resolved
RE-ATTACH FLAME SCREENS ON VENTS FOR NO.4 WING TANK (PORT) AND ALSO THE STERN RAKE.
Electrical
Issued 12 September 1984
Resolved
RENEW INSULATION AS NECESSARY ON THE GENERATOR EXHAUST.
Deck/Cargo
Issued 12 September 1984
Resolved
PROVIDE A GUARD FOR THE COUPLING FROM THE REDUCTION GEAR TO THE CARGO PUMP.
Engineering
Issued 12 September 1984
Resolved
PROVE THE OPERATION OF ALL AUTOMATIC CONTROL DEVICES AND OPEN THE FIRE BOX FOR INTERNAL INSPECTION.
Construction/Loadline
Issued 12 September 1984
Resolved
REMOVE EXCESS WATER FROM THE BOW RAKE.
Unknown
Issued 27 April 1983
Resolved
THE FOLLOWING DEFICIENCY PERTAINS TO THE VESSEL BAYOU MAXENT, DN272069.
Deck/Cargo
Issued 27 April 1983
Resolved
CONDUCT OPERATIONAL TEST OF THE THERMAL FLUID HEATER TO THE SATISFACTION OFA COAST GUARD INSPECTOR PRIOR TO ITS OPERATION OR PRIOR TO 27MAY83.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.