Inspection history · 41
29 May 2003
Re-Inspection · Hull Examination · Internal Structural Exam
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1793546
17 April 2001
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1062623
19 March 2001
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1459681
28 April 2000
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1049489
17 March 2000
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1389042
19 March 1999
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1386459
18 September 1998
Hull Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 800816
17 August 1998
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 795898
13 April 1998
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1464771
16 April 1997
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1098684
27 March 1997
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 402016
27 March 1997
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1427335
27 September 1996
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 658913
24 September 1996
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 538008
16 April 1996
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1443688
4 April 1995
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1149709
14 February 1995
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 477907
19 October 1994
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1183100
16 October 1994
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 54315
22 September 1994
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 439013
7 April 1994
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1167473
3 May 1993
Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1148117
9 April 1993
Hull Examination · COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1450761
6 March 1992
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1319752
1 March 1991
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 924001
27 March 1990
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 913775
7 March 1990
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 905977
21 February 1990
Damage Survey
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1243107
23 May 1989
Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1206480
8 May 1989
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1346837
13 April 1989
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1210703
2 February 1989
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 501049
13 April 1988
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 893330
17 February 1988
MARPOL Annex II Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1020496
9 January 1988
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 454339
7 April 1987
Deficiency Check · Hull Examination · Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1329445
2 June 1986
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 984982
12 May 1986
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1294426
25 April 1986
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1306368
28 August 1985
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 991089
9 August 1985
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 985696
Engineering
Issued 19 March 2001
Resolved
Install battery box and cover on lube oil prime mover starting battery. Install guard on exposed fan belt pulley.
Condition: Unknown
Due 17 April 2001
Resolved 17 April 2001
Lifesaving
Issued 19 March 2001
Resolved
Update transfer procedure piping diagram.
Condition: Unknown
Due 17 April 2001
Resolved 17 April 2001
Engineering
Issued 19 March 2001
Resolved
Properly secure and repair leak on lube oil prime mover diesel fuel line.
Condition: Unknown
Due 17 April 2001
Resolved 17 April 2001
Engineering
Issued 19 March 2001
Resolved
Install cover on prime mover starting battery.
Condition: Unknown
Due 17 April 2001
Resolved 17 April 2001
Engineering
Issued 17 March 2000
Resolved
INSTALL GUARD ON LUBE OIL PRIME MOVER EXHAUST.
Condition: Unknown
Due 17 March 2000
Resolved 17 March 2000
Engineering
Issued 17 March 2000
Resolved
INSTALLLUBE OIL PRIME MOVER FUEL TANK CORRECTLY. INSTALL FUEL SHUT OFF VALVES.
Condition: Unknown
Due 17 March 2000
Resolved 17 March 2000
Engineering
Issued 17 March 2000
Resolved
PROVE PROPER OPERATION OF LUBE OIL PRIME MOVER AND EMERGENCY SHUTDOWN.
Condition: Unknown
Due 17 March 2000
Resolved 17 March 2000
Construction/Loadline
Issued 18 September 1998
Resolved
Crop out & renew as original: forward transverse watertight bulkhead in wayof #2 stbd void from side shell plating extending inboard to approx 12-18 inches, from bottom plating to a height of 10-12 feet.
Condition: Unknown
Due 28 October 1998
Resolved 28 October 1998
Construction/Loadline
Issued 18 September 1998
Resolved
Vee out and reweld pickups (p/u's) in the following locations: 6 p/u's in #3 stbd void; 12 p/u's & reattach ladder mounting in stern void; cargo tankbulkhead longitudinal welds fractured; 12 p/u's in #2 port void; 18 p/u's along headlog in rake void.
Condition: Unknown
Due 28 October 1998
Resolved 28 October 1998
Engineering
Issued 13 April 1998
Resolved
Provide proper fuel system for deck gear pump.
Condition: Unknown
Due 13 April 1998
Resolved 13 April 1998
Deck/Cargo
Issued 13 April 1998
Resolved
Properly mark prime mover emergency shutdown.
Condition: Unknown
Due 13 April 1998
Resolved 13 April 1998
Engineering
Issued 13 April 1998
Resolved
Properly secure fuel piping (diesel) on prime mover.
Condition: Unknown
Due 13 April 1998
Resolved 13 April 1998
Deck/Cargo
Issued 13 April 1998
Resolved
Prove proper operation of deck gear pump.
Condition: Unknown
Due 13 April 1998
Resolved 13 April 1998
Lifesaving
Issued 27 March 1997
Resolved
Repair hand rail on port water tank cat walk.
Condition: Unknown
Due 27 March 1997
Resolved 27 March 1997
Construction/Loadline
Issued 27 March 1997
Resolved
Draft marks need to be painted on both sides of vessel.
Condition: Unknown
Due 27 March 1997
Resolved 27 March 1997
Construction/Loadline
Issued 6 March 1992
Resolved
CROP AND RENEW TO ORIGINAL #1 PORT WING VOID ACCESS HATCH AND COAMING.
Condition: Unknown
Due 6 March 1992
Resolved 6 March 1992
Construction/Loadline
Issued 6 March 1992
Resolved
CROP AND RENEW TO ORIGINAL DAMAGED KNUCKLE, BOTTOM PLATE AND ASSOCIATED INTERNAL STRUCTURAL MEMBERS IN WAY OF #2 STARBOARD WING VOID, AND D0UBLE BOTTOM.
Condition: Unknown
Due 6 March 1992
Resolved 6 March 1992
Construction/Loadline
Issued 6 March 1992
Resolved
CROP AND RENEW TO ORIGINAL, PORT HEADLOG CORNER RADIUS AND ASSOCIATED INTERNAL STRUCTURAL MEMBERS.
Condition: Unknown
Due 6 March 1992
Resolved 6 March 1992
Engineering
Issued 7 March 1990
Resolved
GAS FREE AND MAKE PERMANENT REPAIR TO DIESEL FUEL DAY TANK, FRACTURED WELD AT BASE OF VENT PIPE.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Construction/Loadline
Issued 7 March 1990
Resolved
REPAINT STARBOARD DRAFT MARKS AND HAILING PORT.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Deck/Cargo
Issued 7 March 1990
Resolved
HYDRO TEST CARGO HOSES TO 1.5 TIMES MAWP. BUT NOT LESS THAN 225 PSIG.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Fire Fighting
Issued 7 March 1990
Resolved
PROVIDE ONBOARD APPROVED B-II FIRE EXITNGUISHER MOUNTING BRACKET.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Fire Fighting
Issued 7 March 1990
Resolved
SERVICE B-II FIRE EXTINGUISHER.
Condition: Unknown
Due 7 March 1990
Resolved 7 March 1990
Construction/Loadline
Issued 21 February 1990
Resolved
THE SIDE, DECK KNUCKLE AND DECK ARE SET IN APPROX. 24"(MAX. DEPRESSION), TORN, AND BUCKLED BEGINNING ABOUT 57' FWD OF THE TRANSOM IN #2S WING VOID AND EXTENDING FOR ABOUT 16' FORWARD AND 4' DOWN FROM GUNWALE. INTERNAL STRUCTURAL MEMBERS IN WAY OF SET IN AREA ARE BROKEN, BENT AND TORN.
Condition: Unknown
Due 21 February 1990
Resolved 21 February 1990
Construction/Loadline
Issued 21 February 1990
Resolved
THE STBD SIDE SHELL IN THE BOW RAKE HAS WHAT APPEARS TO BE A PUNCTURE AT ABOUT THE 4'6" DRAFT. MAKE PERMANENT REPAIRS PRIOR TO LOADING THE NEXT CARGO TO THE SATISFACTION OF THE ATTENDING U.S.C.G. INSPECTOR.
Condition: Unknown
Due 21 February 1990
Resolved 21 February 1990
Deck/Cargo
Issued 21 February 1990
Resolved
THE #2S CARGO TANK IS INDENTED NEAR THE DECK AND MAY BE FRACTURED IN WAY OFTORN STRUCTURAL MEMBERS. MAKE NECESSARY REPAIRS AND PROVE THE INTEGRITY OFTHE TANK TO THE SATISFACTION OF THE ATTENDING U.S.C.G. INSPECTOR PRIOR TO LOADING THE NEXT CARGO.
Condition: Unknown
Due 21 February 1990
Resolved 21 February 1990
Construction/Loadline
Issued 13 April 1989
Resolved
RENEW/REPAIR VOID HATCH GASKETS FOR STERN, #2 PORT AND #1 STBD VOIDS.
Condition: Unknown
Due 13 April 1989
Resolved 13 April 1989
Construction/Loadline
Issued 13 April 1989
Resolved
GAS FREE PORT VOIDS AND BOW VOID TO MAKE PERMANENT REPAIRS TO SIDE SHELL FRACTURES. EXAMINE SIDE SHELL FURTHER FOR ADDITIONAL FRACTURES.
Condition: Unknown
Due 13 April 1989
Resolved 13 April 1989
Deck/Cargo
Issued 13 April 1989
Resolved
PROVIDE FLAME SCREEN IN VOID GOOSENECK TO #2 STBD VOID.
Condition: Unknown
Due 13 April 1989
Resolved 13 April 1989
Documentation
Issued 13 April 1989
Resolved
PROVIDE COMPLETE COPY OF OIL TRANSFER PROCEDURES ON BOARD.
Condition: Unknown
Due 13 April 1989
Resolved 13 April 1989
Documentation
Issued 13 April 1989
Resolved
PROVIDE DOCUMENTATION OF CERTIFICATE OF FINANCIAL RESPONSIBILITY. RENEWAL PRIOR TO 18 APRIL 1989 TO [name withheld].
Condition: Unknown
Due 13 April 1989
Resolved 13 April 1989
Deck/Cargo
Issued 13 April 1989
Resolved
RENEW POSITIVE BATTERY CABLE ON LUBE OIL PUMP.
Condition: Unknown
Due 13 April 1989
Resolved 13 April 1989
Construction/Loadline
Issued 13 April 1989
Resolved
DURING NEXT LOADING OF BARGE PUMP AND PROVE BOW & STERN VOID WATERTIGHTNESS.
Condition: Unknown
Due 13 April 1989
Resolved 13 April 1989
Construction/Loadline
Issued 13 April 1989
Resolved
RENEW FLAME SCREEN IN VOID GOOSENECK VENT AT #2 STBD VOID.
Condition: Unknown
Due 13 April 1989
Resolved 13 April 1989
Deck/Cargo
Issued 25 April 1986
Resolved
RENEW TWO 2" LUBE OIL HOSES.
Condition: Unknown
Due 25 April 1986
Resolved 25 April 1986
Documentation
Issued 25 April 1986
Resolved
PROVIDE A COPY OF THE CERTIFICATE OF FINANCIAL RESPONSIBILITY ON BOARD THE VESSEL. VESSEL TO REMAIN MOORED UNTIL RELEASED BY CAPTAIN OF THE PORT, ST. LOUIS, MISSOURI
Condition: Unknown
Due 25 April 1986
Resolved 25 April 1986
Electrical
Issued 25 April 1986
Resolved
PROVIDE LINER IN BATTERY BOXS OF LEAD OR PLASTIC MATERIAL.
Condition: Unknown
Due 25 April 1986
Resolved 25 April 1986
Construction/Loadline
Issued 25 April 1986
Resolved
GOUGE AND WELD ELEVEN FRACTURES LISTED ON FORM CG-835 DATED 25 APRIL 1986 ISSUED BY [name withheld], MISSOURI
Condition: Unknown
Due 25 April 1986
Resolved 25 April 1986
Construction/Loadline
Issued 25 April 1986
Resolved
REPLACE DOG EARS ON #2 PORT AND #3 STARBOARD WING VOID HATCH COVERS.
Condition: Unknown
Due 25 April 1986
Resolved 25 April 1986
Deck/Cargo
Issued 9 August 1985
Resolved
PLUG OR CAP AS NECESSARY ALL CONTAINMENT DISCHARGE VALVES.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Deck/Cargo
Issued 9 August 1985
Resolved
PLUG DRAIN VALVE ON AFT CARGO ENGINE DIESEL TANK DRAIN VALVE.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Deck/Cargo
Issued 9 August 1985
Resolved
INSTALL PUMP DISCHARGE HEADER PRESSURE GAGE ON EACH INDIVIDUAL CARGO PIPING SYSTEM SO AS TO BE READ FROM THE PUMP CONTROL STATION.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Deck/Cargo
Issued 9 August 1985
Resolved
INSTALL GASKET ON SLOP TANK HATCH COVER. ALSO STENCIL "DANGER KEEP OUT" ON HATCH.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Construction/Loadline
Issued 9 August 1985
Resolved
GAS FREE AS NECESSARY AND MAKE PERMANENT REPAIRS TO HOLE IN DECK OVER #3 PORT CARGO TANK.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Construction/Loadline
Issued 9 August 1985
Resolved
REPLACE PIPE PLUG IN AIR TEST FITTING NEXT TO #2 WING VOID HATCH.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Construction/Loadline
Issued 9 August 1985
Resolved
REPLACE GASKET OR HATCH AS NECESSARY ON STERN VOID.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Construction/Loadline
Issued 9 August 1985
Resolved
REPLACE DOGS AS NECESSARY AND GASKET ON PORT #3 WING VOID.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Construction/Loadline
Issued 9 August 1985
Resolved
REPLACE HATCH DOGS AND GASKET AS NECESSARY ON #2 STARBOARD WING VOID HATCH.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Construction/Loadline
Issued 9 August 1985
Resolved
REPLACE HATCH ASSEMBLY ON #1 PORT WING VOID.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Deck/Cargo
Issued 9 August 1985
Resolved
STENCIL CARGO HOSES WITH THE WORDS "OIL SERVICE" OR THE PRODUCT FOR WHICH THE HOSE IS USED.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Deck/Cargo
Issued 9 August 1985
Resolved
PROVIDE PROOF OF ANNUAL TESTS REQUIRED ON (A) CARGO PIPING SYSTEM (B) CARGO HEADER DISCHARGE GAGES (C) CARGO HOSES
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Deck/Cargo
Issued 9 August 1985
Resolved
PROVIDE SUITABLE COVERS FOR CARGO ENGINE STARTING BATTERIES.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Deck/Cargo
Issued 9 August 1985
Resolved
GASFREE AND MAKE PERMANENT REPAIRS TO APPARENT PINHOLE LEAK IN STERN CARGO PIPING SYSTEM.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Construction/Loadline
Issued 9 August 1985
Resolved
GAS FREE BOW RAKE, GOUGE AND WELD FRACTURE(APPROX. 2' LONG) ON CENTERLINE OF BOW HEADLOG.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Construction/Loadline
Issued 9 August 1985
Resolved
GAS FREE BOW RAKE AND MAKE PERMANENT SUITABLE REPAIRS TO FRACTURES ON PORT BOW CORNER.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985
Deck/Cargo
Issued 9 August 1985
Resolved
REPLACE GASKET ON #1 STARBOARD WING VOID HATCH.
Condition: Unknown
Due 9 August 1985
Resolved 9 August 1985