Records from 2002 to 2010. Most recent: inspection, 29 January 2010.
Inspection history · 13
29 January 2010
Hull Examination · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3672235
22 March 2006
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2608724
2 May 2005
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2347481
4 August 2004
In-Service Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2155655
10 May 2004
Annual Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2063608
18 April 2004
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2056204
24 March 2004
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2029758
22 February 2004
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2011987
30 April 2003
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1783375
27 September 2002
In-Service Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1680923
29 May 2002
Initial Certification · Simplified Stability Test
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1622863
28 May 2002
Administrative Inspection
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1621743
4 April 2002
Construction Oversight
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1492605
Engineering › Bilge Water Management System › Valve
Issued 22 March 2006
No resolution recorded
Install positive control valves at the hull for all electric submersible pumps.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 March 2006 — due date passed with no resolution recorded
Engineering › Electric Propulsion System › Battery
Issued 22 March 2006
No resolution recorded
Complete removal of batteries and associated equipment.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 March 2006 — due date passed with no resolution recorded
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 August 2004
Resolved
Vsl failed Simpilified Sub-Division, provide a proposal to bring all the vessels in compliance. The proposal is due no later than 01 September 2004 for work to be completed on all vessels no later than 01 January 2005
Condition: Improper Installation
Due 31 August 2004
Resolved 3 May 2005
Resolution: Foam installed and new stability letter issued.
Electrical › Electric Supply System (service) › Battery Installation
Issued 24 March 2004
Resolved
Provide containment around all batteries.
Due 24 May 2004
Resolved 1 May 2005
Electrical
Issued 27 September 2002
Resolved
Provide generator with 50 deg Centergrade ambient temp rating or derate to 80% or demonstrate ambient temp does not exceed 40 deg Centergrade
Action required: 705 - Other - as specified
Due 5 November 2002
Resolved 12 December 2002
Resolution: Generator manufacturer provide additional ambient temperature rating specification information. Generator does meet required ambient temperature rating. New information plate reflecting this rating has been attached to generator.
Fire Fighting › Fixed Fire Detection System
Issued 29 May 2002
Resolved
Auxillary equipment room requires heat detection, general purpose resin was used for machinery space boundary. 177.410) LEGACY COMPONENT DESC: Heat Detectors
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2002
Engineering › Fuel Oil Service System › Valve
Issued 29 May 2002
Resolved
Fuel shut-off valve at the engine is missing
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2002