This record may be incomplete: the most recent inspection recorded for this vessel was 20 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
122 - Regulatory (Subpart C or D), Gross Ton
122 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-51155
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
Barge rep is to surrender the COI. Provide letter of intention and gas freed the vessel.
Action required: 705 - Other - as specified
Due 28 February 2004
Resolved 26 February 2004
Resolution: Rep provided the gas freed certificated, Marine Chemist cert. and the COI.
Condition: Unknown
Due 22 June 1998
Resolved 22 June 1998
Deck/Cargo
Issued 4 June 1998Resolved
OIL TRANSFER PROCEDURE, COMPLIANCE
Condition: Unknown
Due 22 June 1998
Resolved 22 June 1998
Lifesaving
Issued 2 February 1998Resolved
remove 12vdc starting system, including all wiring,switches and battery from prime mover or prove system meets national electric code and 46 cfr sub "J" for installations in hazardous locations.
Condition: Unknown
Due 17 February 1998
Resolved 17 February 1998
Engineering
Issued 2 February 1998Resolved
Install hard piping at prime mover that ensure flexible hose lenght does not exceed 30 inches in lenght.
Condition: Unknown
Due 2 March 1998
Resolved 17 February 1998
Electrical
Issued 2 February 1998Resolved
Renew all stuffing tubes at all junction boxes within hazardous locations.
Condition: Unknown
Due 2 March 1998
Resolved 17 February 1998
Engineering
Issued 2 February 1998Resolved
Install new cover on prime mover to replace missing cover.
Condition: Unknown
Due 2 March 1998
Resolved 17 February 1998
Engineering
Issued 2 February 1998Resolved
Install fuel cutout valve at fuel tank for prime mover.
Condition: Unknown
Due 2 March 1998
Resolved 17 February 1998
Engineering
Issued 31 January 1996Resolved
RENEW WASTED DECK MOUNTS ON PRIME MOVER DIESEL TANK AT TIME OF DRYDOCK (31MAR96).
Condition: Unknown
Due 31 January 1996
Resolved 31 January 1996
Construction/Loadline
Issued 31 January 1996Resolved
REPAINT DRAFT MARKS & VSL NAME/HAILING PORT ON STERN BY O3MAR96.
Condition: Unknown
Due 31 January 1996
Resolved 31 January 1996
Unknown
Issued 12 February 1988Resolved
UPON RECEIPT OF A NEW DOCUMENT REFLECTING THE VESSEL'S NAME CHANGE, SUBMIT A COPY TO OCMI, PORT ARTHUR, TEXAS.
Condition: Unknown
Due 12 February 1988
Resolved 12 February 1988
Unknown
Issued 6 November 1984Resolved
REPLACE THE REQUIRED CARGO WARNING SIGN.
Condition: Unknown
Due 6 November 1984
Resolved 6 November 1984
Unknown
Issued 6 November 1984Resolved
PAINT SIDE SCREENS BLACK.
Condition: Unknown
Due 6 November 1984
Resolved 6 November 1984
Unknown
Issued 6 November 1984Resolved
INSTALL NEW GASKET MATERIAL ON HATCHES WHERE MISSING.
Condition: Unknown
Due 6 November 1984
Resolved 6 November 1984
Unknown
Issued 6 November 1984Resolved
PAINT OR LABEL DRAFT MARKS, PUMP FUEL TANK, WARNING SIGN AND NEW VESSEL NAME.
Condition: Unknown
Due 6 November 1984
Resolved 6 November 1984
Unknown
Issued 6 November 1984Resolved
REPACK CARGO VALVE REACHRODS FOR NO.2 P&S CARGO TANKS.
Condition: Unknown
Due 6 November 1984
Resolved 6 November 1984