Inspection history · 123
29 April 2026
Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8358321
15 April 2026
Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8350449
11 March 2026
Administrative Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8324844
18 February 2026
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8311857
13 February 2026
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8311863
22 January 2026
VRP Review
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8300419
17 October 2025
Deficiency Check · Administrative Inspection · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8254753
8 September 2025
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8237704
1 August 2025
Administrative Inspection
Administrative · Marine Safety Detachment American Samoa · USCG Oceania District (CGD-O) · Activity 8200432
21 July 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8191088
13 July 2025
Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8184270
9 January 2025
Drydock Exam · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8060393
25 November 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8040812
25 November 2024
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8042948
10 September 2024
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8002132
9 September 2024
Deficiency Check · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8000353
25 August 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7988987
21 July 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7963355
29 June 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7946755
10 June 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7932234
23 April 2024
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7874183
21 February 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7869464
30 October 2023
In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7822263
14 August 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7768514
7 June 2023
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7695312
5 June 2023
In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7704949
18 April 2023
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7671949
27 January 2023
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7628317
10 January 2023
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7619031
9 January 2023
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7622828
16 December 2022
Administrative Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7609939
15 December 2022
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7612023
19 August 2022
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7543834
18 June 2022
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7491966
13 May 2022
MARPOL Annex I Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7450261
13 May 2022
MARPOL Annex IV Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7450274
9 May 2022
COI Inspection · MARPOL Annex VI Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7453321
6 April 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7425954
18 December 2021
Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7370425
15 December 2021
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7370461
6 October 2021
Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7329364
22 August 2021
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7296203
16 August 2021
ISM Oversight
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7288956
16 May 2021
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7219871
7 May 2021
Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7192224
19 April 2021
Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7178784
26 March 2021
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7163605
17 October 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7079106
12 October 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7075835
28 September 2020
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7067913
14 September 2020
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7060523
8 September 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7053825
29 August 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7047207
29 August 2020
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7049771
27 August 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7044292
20 May 2020
Internal Structural Exam · Periodic Inspection · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6910822
16 April 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6943026
11 December 2019
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6871645
6 December 2019
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6868397
9 October 2019
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6832264
2 October 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6826110
17 July 2019
In-Service Inspection · Administrative Inspection · MARPOL Annex I Examination · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6753782
25 June 2019
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6725691
7 June 2019
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6707888
6 March 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6654788
5 March 2019
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6642199
26 February 2019
Administrative Inspection · DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6623826
14 February 2019
Bulk Liquid Transfer Monitor
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6626212
14 September 2018
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6567070
10 May 2018
Examination of Repairs · Administrative Inspection · Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6411178
14 November 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6307020
22 May 2017
Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6153465
9 May 2017
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6156477
10 February 2017
Examination of Repairs · Construction Oversight · Drydock Exam · Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6096365
22 November 2016
Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6045600
7 June 2016
Plan Review (Other than "T") · Administrative Inspection · Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5899660
28 March 2016
Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5842343
28 December 2015
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5792979
22 November 2015
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5822307
5 August 2014
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4945002
30 May 2014
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4874601
7 January 2012
Examination of Repairs · Damage Survey · Administrative Inspection · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4220571
6 January 2012
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4220248
23 September 2011
Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4155931
12 July 2011
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4079430
12 January 2011
Deficiency Check · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3925636
30 March 2010
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3705851
11 March 2010
Excursion Permit · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3693640
17 February 2010
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3701531
16 February 2010
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3681137
25 January 2010
Internal Structural Exam · Hull Examination
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3651351
27 February 2009
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3431807
29 January 2009
Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3402761
2 January 2009
Excursion Permit
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3387729
6 December 2008
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3444562
19 February 2008
MTSA Verification · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3149710
5 March 2007
Hull Examination · MARPOL Annex V Examination · MTSA/ISPS Verification · COI Inspection · MARPOL Annex I Examination
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 2878215
14 August 2006
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2750970
18 July 2006
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 2716612
22 June 2006
Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2627416
21 October 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2519470
23 June 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2400515
20 June 2005
MTSA/ISPS Verification
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2397117
1 June 2005
Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2381694
23 March 2005
Annual Inspection · Liferaft Servicing · Hull Examination · MARPOL Annex I Examination · MARPOL Annex V Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 2296572
11 July 2004
MTSA/ISPS Verification
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2109985
24 May 2004
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2077240
4 March 2004
Annual Inspection · MARPOL Annex I Examination · Administrative Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1984819
29 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1981702
20 December 2003
Administrative Inspection
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1967611
13 November 2003
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1946461
31 October 2003
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1939632
27 October 2003
Administrative Inspection
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1937258
23 July 2003
Administrative Inspection
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1856827
16 June 2003
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1840726
25 March 2003
Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1752721
10 February 2003
In-Service Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1742661
24 January 2003
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1737010
27 November 2002
Damage Survey
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1711810
4 September 2002
Excursion Permit · Administrative Inspection · In-Service Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1665118
29 April 2002
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1630992
26 April 2002
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1632111
9 February 2001
COI Inspection · Construction Oversight
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1484356
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 29 April 2026
Resolved
A fixed fire-extinguishing system required by paragraph 5 may be any of the following systems. A fixed gas fire-extinguishing system complying with the provisions
of the FSS.
FSS CH 5. Two seperate controls shall be provided for releasing CO2. Positive means shall be providedso they can only be operated in the correct order.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 April 2026
Resolution: Vessel installed positive means to ensure discharge is operated in correct order.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 15 April 2026
Resolved
Operational readiness. Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Designated rescue boat unable to operate in astern propulsion. Repair to the satisfaction of the attending USCG marine inspector prior to departure of next port.
46 CFR 188.27-1
46 CFR 199.190(a)
Action required: 705 - Other - as specified
Resolved 29 April 2026
Resolution: Rescue boat worked as required
08 - Alarms › N/A - No Subsystem › General alarm
Issued 15 April 2026
Resolved
Each general emergency alarm signal must be marked “GENERAL ALARM—WHEN EMERGENCY ALARM SIGNAL RINGS GO TO YOUR STATION” in red letters at least 1/2 inch high. Markings regarding general alarm were not present throughout the vessel as required by regulation. Affix general alarm markings throughout the vessel to the satisfaction of the attending USCG marine inspector.
46 CFR 195.05-1(a)
46 CFR 113.25-20(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 April 2026
Resolution: Accepted as a COC by ABS.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 18 February 2026
Resolved
All ships of 3,000 gross tonnage and upwards shall, in addition to meeting the requirements of paragraph 2.5, have: a 3GHz radar or, where considered appropriate by the Administration, a second 9GHz radar. Vessel's secondary S-Band, 10cm, 3GHz radar system is inoperable. Vessel unable to affect repairs while in Apra Harbor, Guam and is required to repair system by next port, Honolulu, HI.
74 SOLAS (2020 Cons.) V/19.2.7.1
- 15 c.
Action required: 15 - Rectify deficiencies by next port
Resolved 11 March 2026
Resolution: Received tech report attesting to the satisfactory repair of S-Band Radar.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 August 2025
Resolved
Vessel entered the port of Pago Pago prior to submitting a one-time waiver for a Vessel Response Plan that did not cover American Samoa.
33 CFR 155.5025(a)
Action required: 705 - Other - as specified
Due 31 August 2025
Resolved 5 August 2025
Resolution: Letter of Warning accepted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 July 2025
Resolved
Each battery must meet the requirements of this subpart. Wingnuts were found at battery terminal connections, where a normal hex nut should be used for marine applications. Replace all wingnuts with hex nuts to make a more secure connection for vessel operations.
46 CFR 188.25-1
46 CFR 111.15-1
IEEE 45-2002
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 August 2025
Resolved 28 October 2025
Resolution: All wingnuts replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 July 2025
Resolved
Each panel board must meet section 17.1 of IEEE 45-2002 for good marine practice. Missing blanks were found throughout several panel boards exposing the bus bar. Check all grey power panels and install blanks where missing throughout vessel.
46 CFR 188.25-1
46 CFR 111.40-1
IEEE 45-2002
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 August 2025
Resolved 28 October 2025
Resolution: Blanks installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 July 2025
Resolved
Table 193.50-10(a) indicates the minimum required classification for each space listed. Vessel missing the required 160-B for the incinerator room in accordance with the table cited above and the vessel's COI. Provide the approved semi-portable fire extinguishing in accordance with Table 193.50-10(a) to the satisfaction of the attending marine inspector. To be resolved by October 8, 2025.
46 CFR 193.50-10(b)
Action required: 705 - Other - as specified
Due 8 October 2025
Resolved 8 September 2025
Resolution: Received an email from vessel Port Engineer with a photograph of the new 160B semi-portable extinguisher in the incinerator room.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 June 2025
Resolved
Complete but simple instructions for the operation of the systems must be located in a conspicuous place at or near all pull boxes, stop valve controls and in the CO2 cylinder storage room. On systems in which the CO2 cylinders are not within the protected space, these instructions must also include a schematic diagram of the system and instructions detailing alternate methods of discharging the system should the manual release or stop valve controls fail to operate. Each control valve to branch lines must be marked to indicate the related space served. CO2 cylinders are located outside the protected spaces with no schematic diagram of the system as described above posted in the CO2 cylinder space.
Provide schematic diagram of the system as described in the regulation to the satisfaction of the attending Marine Inspector.
46 CFR 193.15-10(h)
Action required: 705 - Other - as specified
Resolved 15 April 2026
Resolution: Schematic provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 June 2025
Resolved
The electrical engineering details shall be in accordance with subchapter J (Electrical Engineering) of this chapter. Hazmat Locker intake fan electrical automatic damper is not certified for use in a hazardous location or explosive atmosphere. Install an approved electrical automatic damper meeting the regulations prescribed in 46 CFR 111.105-9 to the satisfaction of the attending Marine Inspector.
46 CFR 188.25-1(a)
Action required: 705 - Other - as specified
Due 8 October 2025
Resolved 15 April 2026
Resolution: Approved damper installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 June 2025
Resolved
The electrical engineering details shall be in accordance with subchapter J (Electrical Engineering) of this chapter. The wiring for the Hazmat Locker intake fan electrical automatic damper is spliced and the connections encapsulated in electrical tape. Wire the new certified electrical automatic damper for the Hazmat Locker intake fan as per 46 CFR 111.105-9 to the satisfaction of the attending Marine Inspector.
46 CFR 188.25-1(a)
Action required: 705 - Other - as specified
Due 8 October 2025
Resolved 15 April 2026
Resolution: Damper wired appropriately.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 9 September 2024
Resolved
Each self-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical engine order telegraph system from the navigating bridge to the engine room. Vessel reported issue with engine control: recurring delay on the starboard engine response to command. Once safely moored, vessel is restricted from movement until proper operation of the engine is demonstrated to the satisfaction of an attending marine inspector.
46 CFR 113.35-3(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 September 2024
Resolution: Proper operation verified by attending marine inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 23 April 2024
Resolved
Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. Systems addressed must include fire detection and extinguishing, flooding safety, propulsion, maneuvering, electric power generation and distribution, and emergency internal communications. PSTPs have not been updated. Current crew not able to use the current PSTPs to achieve proper shut down.
46 CFR 61.40-6
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2024
Resolved 25 July 2024
Resolution: Vessel submitted updated PSTP to MSC.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 8 November 2023
Resolved
Each survival craft must be stowed so as not to require lifting from its stowed position in order to launch, except that a davit-launched liferaft may be lifted by a manually powered winch from its stowed position to its embarkation position. The vessel's 25 person liferafts' maximum weight of 4945.5 lbs exceeds the port and starboard liferaft davits' manufacturer established safe working load of 4629 lbs. Provide documentation from the davit manufacturer that the davits' safe working load can be increased or submit a proposal to the cognizant OCMI to address this issue. The vessel's total persons allowed is reduced to 46 persons until this deficiency is cleared to satisfaction of the attending marine inspector. 46 CFR 199.130 (a) (7) (i)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 December 2023
Resolved 24 April 2024
Resolution: Survival craft is properly installed. See attached photographs.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 18 April 2023
Resolved
All ships 3,000 gross tons an upwards shall, in addition to having a 9 GHz radar, have a 3 GHz radar. The vessel's 3 GHz radar is not operational. Repair radar.
74SOLAS(20)V/19.2.7.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 May 2023
Resolved 7 June 2023
Resolution: MI witnessed satisfactory radar test and vessel provided technician report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 January 2023
Resolved
The installation of all systems of an electrical engineering shall be in accordance with the requirements of Subchapter J. Electric installations on vessels must ensure maintenance of services necessary for safety under normal and emergency conditions. It was reported that the number 1 main diesel generator experienced an under-excitation event, which caused a "blackout" condition, resulting in a loss of propulsion. Demonstrate the proper operation of the number 1 main diesel generator to the satisfaction of the attending USCG Marine Inspector.
46 CFR 188.25-1 (a)
46 CFR 111.01-1 (a)(1)
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Due 23 January 2023
Resolved 13 January 2023
Resolution: Witnessed operational test of #1 generator.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 20 May 2022
Resolved
The boundary bulkheads of general laboratory areas, chemical storerooms, galleys, paint and lamp lockers and emergency generator rooms shall be of “A” class construction. In the chemical lab aft of the fwd door there is a cable penetration that is not fully installed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2022
Resolved 19 August 2022
Resolution: Attended vessel and visually inspected the cable penetration in the chemical lab; all sat.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 20 May 2022
Resolved
The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation shall be in accordance with the requirements of Subchapter J (Electrical Engineering) of this chapter. Systems of this type include the following: Emergency Lighting and Power Systems. The emergency light located at the port forward 01 deck by fan room 4 has an in operable lightbulb.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2022
Resolved 19 August 2022
Resolution: Attended vessel and witnessed the 01 port forward emergency light illuminate on the final emergency power source.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 20 May 2022
Resolved
The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation shall be in accordance with the requirements of Subchapter J (Electrical Engineering) of this chapter. A series of multi-output power adapters are connected in a series in the ceiling of the gym.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2022
Resolved 26 August 2022
Resolution: Hardwired an outlet receptacle to the distribution panel next to the TV. Attending MI verified it was wired into a breaker that was labeled on the panel.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 20 May 2022
Resolved
The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation shall be in accordance with the requirements of Subchapter J (Electrical Engineering) of this chapter. In the MCC on circuit breaker panel Prop Control & Alarm Panel EP103 there is an open space leading to the internal components of the circuit breaker panel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2022
Resolved 19 August 2022
Resolution: Attended vessel and examined the breaker panel EP 103 breaker spare cover plate installed.
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 20 May 2022
Resolved
An audible and visible alarm must activate in the machinery space upon failure of any phase of a three-phase power supply. The phase failure alarm for the number 2 port steering pump failed to alarm when the fuses for the phase failure relay were disconnected during annual PSTP testing. Resolve and prove proper operation to the satisfaction of the attending MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2022
Resolved 19 August 2022
Resolution: Attended vessel and witnessed the C/E individually remove each number 2 port steering gear phase fuse resulting in three seperate phase failure alarms.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 20 May 2022
Resolved
Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. Tests must be conducted at periodic intervals specified by the Coast Guard to confirm that vital systems and safety features continue to operate in a safe, reliable manner. Generator number 3 high differential pressure alarm locked out. Resolve to the satisfaction of the attending MI or remove from the KILOMANA’s PSTP.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2022
Resolved 9 September 2022
Resolution: Witnessed a satisfatory test of the #3 main generator's lube oil high differential alarm, all sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 20 May 2022
Resolved
No repairs or alterations affecting the stability or safety of the vessel with regard to the hull, machinery, and equipment shall be made without the knowledge of the Officer in Charge, Marine Inspection. Port ballast water treatment system online chlorine and TRO monitor (TRO 4) inoperable. Repair in-kind and prove proper operation to the satisfaction of the attending MI.
Action required: 705 - Other - as specified
Due 23 July 2022
Resolved 9 September 2022
Resolution: Verified that the port ballast water treatment system TRO 4 was operational and witnessed an operational test of the port ballast water treatment system, all sat.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 20 May 2022
Resolved
All vessels on an international voyage are required to have a Cargo Safety Construction Certificate.
The renewal and periodical surveys shall include an inspection of the equipment referred to in paragraph (b)(i). (b)(i) says complete inspection of the fire safety systems and appliances life-saving appliances and arrangements except radio installations, the shipborne navigational equipment, means of embarkation for pilots and other equipment to which chapter II-1, II-2, III, and V apply.
All ships of 150 gross tonnage and upwards and passenger ships irrespective of size, shall, in addition to the requirements of paragraph 2.1, be fitted with a spare magnetic compass, interchangeable with the magnetic compass as referred to in paragraph 2.1.1.
The vessel does not have a spare magnetic compass.
Action required: 705 - Other - as specified
Due 20 July 2022
Resolved 19 August 2022
Resolution: Attended vessel and confirmed the vessels spare magnetic compass.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 18 December 2021
Resolved
The applicable standards established by the ABS Steel Vessel Rules (incorporated by reference 46 CFR 58.03-1) may be used as the standard for design, construction, and testing of main and auxiliary machinery except as modified in this subchapter. Vessel starboard MDE has been taken offline due to a grounded motor fan, and respective crew cannot repair while underway. Utilize towing vessel(s) of adequate horsepower and maneuverability to enter the Honolulu Harbor and all mooring operations.
46 CFR 58.05-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 January 2022
Resolution: Motor fans on both MDEs have been replaced. Operational test sat.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 19 April 2021
Resolved
All enclosed spaces within the vessel shall be properly vented or ventilated. Means shall be provided to close off all vents and ventilators. The Motor Room #2 exhaust ventilation closer activation handle broke during operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2021
Resolved 21 April 2021
Resolution: Repair completed on the Motor Room #2 exhaust ventilation closer activation handle.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 19 April 2021
Resolved
Each drain and scupper is closed by the mechanical means required by 155.310. All containments did not have the mechanical plug readily available.
Action required: 10 - Deficiency Rectified
Resolved 19 April 2021
Resolution: The vessel remedied this by affixing the appropriate plug with a retaining wire in the correct containment area.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 26 March 2021
Resolved
An inflatable liferaft or inflatable buoyant apparatus must be serviced at a facility specifically approved by the Commandant for the particular brand, and in accordance with servicing procedures meeting the requirements of part 160, subpart 160.151, of this chapter no later than the month and year on its servicing sticker affixed under 46 CFR 160.151-57(n), except that servicing may be delayed until the next scheduled inspection of the vessel, provided that the delay does not exceed 5 months. Vessel's annual inflatable liferaft servicing date will occur while vessel is underway. Vessel's inflatable liferafts shall undergo their annual servicing at a USCG approved facility at earliest opportunity upon returning to port, but no later than 5 months beyond the annual servicing date.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 September 2021
Resolved 19 April 2021
Resolution: Vessels liferafts were serviced on 4/5/2021.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 October 2020
Resolved
The installation of all systems of an electrical engineering shall be in accordance with the requirements of Subchapter J. Electric installations on vessels must ensure maintenance of services necessary for safety under normal and emergency conditions. Vessel has had three blown fuses in the field power supply of the port and stbd main propulsion motors, one on October 11th and two on October 17th, all resulting in losses of propulsion. Provide an OEM technicians repair proposal that identifies the cause of the fuse failures, a recommended repair plan, & preventative actions to prevent recurrence of these failures. While transiting to or from a harbor or within 1 nm from shore the vessel must have assistance from a towing vessel of adequate horsepower and maneuverability. Such assistance towing vessels must be under the direction and control of an individual holding a license or a Merchant Marine Credential (MMC) authorizing them to engage in assistance towing under the provisions of 46 CFR 11.482.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2020
Resolved 16 November 2020
Resolution: Tech report recieved, see deficiency documents tab.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 October 2020
Resolved
No repairs or alterations affecting the stability or safety of the vessel with regard to the hull, machinery, and equipment shall be made without the knowledge of the Officer in Charge, Marine Inspection. A fuse on the vessel's port propulsion motor opened causing a loss of propulsion while the vessel was performing dynamic positioning for research purposes. The fuse was replaced in kind and control of the port propulsion drive motor was regained.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 12 October 2020
Resolution: Cheif Engineer replaced blown fuse and was able to regain normal operations of the vessels port propulsion motor.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 September 2020
Resolved
No repairs or alterations affecting the stability or safety of the vessel with regard to the hull, machinery, and equipment shall be made without the knowledge of the Officer in Charge, Marine Inspection. It has been reported that the vessel's starboard propulsion motor "tripped" off line becoming not operational while the vessel was underway. Trouble shoot the cause of the starboard propulsion motor's failure and provide a repair proposal to the cognizant USCG [name withheld] the cognizant USCG OCMI has approved the repair proposal, complete the repairs to the satisfaction of the attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 October 2020
Resolved 14 October 2020
Resolution: Received technician's report attesting to the repair and proper operation of the starboard motor propulsion system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 September 2020
Resolved
No repairs or alterations affecting the stability or safety of the vessel with regard to the hull, machinery, and equipment shall be made without the knowledge of the Officer in Charge, Marine Inspection. It has been reported that the vessel's starboard propulsion motor "tripped" off line becoming not operational twice over a 1 month period while the vessel was underway. Repair the vessel's starboard propulsion motor to the satisfaction of the attending USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 September 2020
Resolution: Verified installation of 175W resister to stbd propulsion drive per MSC approved Propulsion Electrical Upgrade Field Power Supply Schematic Serial: E2-2003232 dated 25 Sept 2020.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 August 2020
Resolved
It was reported that the number 4 main diesel generator's voltage regulation capabilities failed which resulted in the vessel experiencing a dead ship casualty. Demonstrate the proper operation of the number 4 main diesel generator to the satisfaction of the attending USCG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 September 2020
Resolved 14 September 2020
Resolution: Witnessed a satisfactory operational test of the #4 Main Diesel Generator.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 August 2020
Resolved
Vessel reported stbd propulsion main drive faulted resulting in a loss of propulsion. Faulty damping resistor was replaced.
Action required: 10 - Deficiency Rectified
Due 27 August 2020
Resolved 27 August 2020
Resolution: Faulty part was replaced in kind.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 2 October 2019
Resolved
At all times, each lifesaving appliance must be in working order. The rescue boat davit's hydraulic pump does not operate as designed. Prove proper operation of vessel's rescue boat davit prior to departure from Sector San [name withheld] zone.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2019
Resolution: Pressure regulator replaced, ops tested sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 March 2019
Resolved
The starboard SCR suffered a circuit board failure. Make permanent repairs to SCR, provide tech report and prove proper operation of propulsion motor.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 March 2019
Resolved 7 March 2019
Resolution: Vessel replaced failed circuit board and completed satisfactory propulsion tests.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 February 2019
Resolved
Each pressure vessel must be examined or tested every 5 years. The extent of the test or examination should be that necessary to determine that the pressure vessel's condition is satisfactory and that the pressure vessel is fit for the service intended. In addition, each pressure vessel listed on the Certificate of Inspection that is fitted with a manhole or other inspection opening so it can be satisfactorily examined internally, must be opened for internal examination every 5 years. Prepare air receiver on main deck for internal inspection.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 June 2019
Resolved 17 July 2019
Resolution: Visually examined internal of the pressure vsl.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 February 2019
Resolved
The marine inspector must check the settings of the safety or relief valves on all pressure vessels twice every 5 years. No more than 3 years may elapse between any check and its immediate predecessor. Demonstrate proper operation of relief valves on air receiver on main deck.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 June 2019
Resolved 17 July 2019
Resolution: Witnessed operational relief of pressure relief valve at 95 PSI/
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 26 February 2019
Resolved
Remove 2" Discharge Hose Connections, 2" Wafer Butterfly Valves, 2" Wafer Check Valves, and T- Pipes with flange installed for portable pump quick connections located in 1st Platform Port and Starboard Scientific Stores and Machinery Rooms as drawn in Pages 3 and 4 of Bilge System Modifications Drawing Number 12008-529-01.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 June 2019
Resolved 17 July 2019
Resolution: Vessel removed spool piping connected to sideshell valve and installed blank flange to isolate the system and to be used as "Emergency Bilge Discharge" piping in case of flodding.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 26 February 2019
Resolved
Provide weathertight louvers/closure doors to exhaust/intake located in superstructure for both port and stbd engineroom and emergency generator room. Machinery space ventilators in an exposed position shall be fitted with strong covers of steel or other equivalent material permanently attached in their proper position and capable of being secured watertight.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 June 2019
Resolved 20 May 2020
Resolution: Port and starboard engine room stack louvers were removed and slots facilitating bushing renewal were individually covered with tabs via GTAW. Operational tests of louvers revealed they sealed reasonably tight with no excessive gaps.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 26 February 2019
Resolved
Remove holdback hooks for A-Class space entry doors to maintain A-Class structural boundries. General construction of the vessel shall be such as to minimize fire hazards.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 June 2019
Resolved 17 July 2019
Resolution: All holdback hooks removed for A-class doors.
Construction/Loadline › Structures › Superstructure
Issued 10 May 2018
Resolved
Code 01108: During and after any survey made by the assigning and issuing authority, those items, fitting, etc., which are found to be in an unsatisfactory condition by the surveyor shall be repaired or renewed in order to place the vessel in a satisfactory condition. No load line certificate shall be issued, endorsed, extended, or reissued or delivered to a vessel subject to this subchapter until after unsatisfactory conditions have been corrected. Found three steel ventilation hatches and steel structural fire protection bulkheads for ventilation hatch closures holed, corroded, and wasted. Ventilators pass through the superstructure and shall have substantial constructed coamings of steel or other equivalent material. The following windows were found pitted •SR 01-08,
•SR 01-09, •SR 01-10, •SR 01-1246. 46 CFR 42.09-45
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 May 2018
Resolved 14 May 2018
Resolution: Temporary repairs made with epoxy to the satisfaction of the attending class surveyor for conditions on the Loadline Certificate.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 10 May 2018
Resolved
Code 07109: A pressure relief valve set to relieve between 2,400 and 2,800 lbs per square inch shall be installed in the distribution manifold to protect the carbon dioxide extinguishing system piping in the event that all branch line shutoff valves are closed. Pressure relief valve data plate found painted over and inspector was unable to verify set pressure. Clean data plate or replace in kind. 46 CFR 193.15-15 (d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2018
Resolved 25 May 2018
Resolution: Relief valve data plate cleaned and verified to be iaw regulations.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 10 May 2018
Resolved
Code 07109: All carbon dioxide extinguishing system distribution valves and controls shall be of an approved type. CO2 pressure switch found installed in the system to protect the machinery space does not display a Coast Guard approval number. Provide Q spec Coast Guard approval for fixed extinguishing system protecting the engine space. 46 CFR 193.15-10 (g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2018
Resolved 25 May 2018
Resolution: Q spec provided for system and verified to be accurate.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 14 November 2017
Resolved
Update PSTP procedures and demonstrate proper operation of remaining PSTP items listed on the worklist dated 14 NOV 2017. Must be completed by next scheduled annual inspection or NLT 24 AUG 2017 (end of 90 window for next annual inspection), which ever comes first.
Condition: Invalid
Action required: 705 - Other - as specified
Due 24 August 2018
Resolved 26 February 2019
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 31 July 2017
Resolved
Update procedures and demonstrate remaining PSTPs listed on the outstanding worklist dated 31JUL2017
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 November 2017
Resolved 14 November 2017
Resolution: Issued new worklist dated 14NOV2017. Issued new CG-835 to complete new worklist.
Operations/Management › Pollution › Retention of Oily Mixture
Issued 4 May 2017
Resolved
Remove 2" Discharge Hose Connections, 2" Wafer Butterfly Valves, 2" Wafer Check Valves, and T- Pipes with flange installed for portable pump quick connections located in 1st Platform Port and Starboard Scientific Stores and Machinery Rooms as drawn in Pages 3 and 4 of Bilge System Modifications Drawing Number 12008-529-01. Re-design piping to direct flow directly overboard.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 31 July 2017
Resolution: Connections and hoses identified in the 835 are listed on the vessel's approved bilge piping drawings. Spoke with Sector Hono CID and he is good with clearing the 835 w/o change to the vessels piping since the arrangement was reviewed and approved by MSC.
Engineering › Compressed Air System (start air) › Piping
Issued 10 February 2017
Resolved
Provide list of material specifications for plan review of start air system piping prior to commissioning. This part of the system to remain locked out / tagged out until corrected.
Action required: 705 - Other - as specified
Resolved 21 July 2017
Resolution: Reviewed class approval of piping materials for small section of piping added to start air system needed to install devices necessary for the systems PSTP. Witnessed proper operation of system. All sat.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 22 November 2016
Resolved
Each vessel must carry life jackets approved under approval series 160.155,160.176 or 160.177, each life jacket provided on board the vessel was approved under approval series 160.055 for domestic voyages only. The vessel is restricted to a domestic route.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 10 October 2017
Resolved 4 October 2017
Resolution: Verified lifejackets on board were approved to 160.155.
Electrical › Electric Generation Source (service) › Conductor
Issued 22 November 2016
Resolved
Prove the proper installation of the vessel’s automation upgrade in accordance with the approved plans.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 24 August 2018
Resolved 26 February 2019
Documentation › Manuals/Policy Documentation › Vessel Specific Watch Policy/Procedures
Issued 22 November 2016
Resolved
Provide an approved PSTP and DVTP, NLT the vessel's COI renewal inspection or 9MAR17.
Due 9 March 2017
Resolved 31 July 2017
Resolution: Witnessed approved PSTP. Approved DVTP was witnessed back in November 2016 by [name withheld] from the Marine Safety Center.
Electrical › Electric Supply System (service) › Cable
Issued 22 November 2016
Resolved
Provide adequate banding and chafing gear to ensure proper support and protection for all cable installed on the vessel.
Due 9 March 2017
Resolved 31 July 2017
Resolution: Verified banding and chafe gear was installed for electric cables, did not notice any runs which did not have adequate support during our 3 day attendance.
Engineering › Steering Gear System › Rudder
Issued 28 March 2016
Resolved
VESSEL RUDDER HAS A FAULT, DOES NOT MOVE FROM RIGHT TO LEFT WITHIN THE REGULATED TIMEFRAME. SEE ATTACHED 835 FOR MORE INFORMATION.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2016
Resolution: Completed overhaul of starboard steering gear unit and successfully tested unit.
Engineering › Bilge Water Management System › Pump
Issued 7 January 2012
Resolved
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 January 2012
Resolved 24 January 2012
Construction/Loadline › Hull › Hull Plating
Issued 7 January 2012
Resolved
Vessel installed temporary cofferdam. Permanent repairs to be completed at dry-dock Portland Oregon.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 January 2012
Resolved 24 January 2012
Construction/Loadline › Hull › Hull Plating
Issued 7 January 2012
Resolved
Provide UT gauging report for hull areas directly beneath bilge suctions located in port and starboard hull pump rooms.
Action required: 705 - Other - as specified
Due 10 January 2012
Resolved 24 January 2012
Construction/Loadline › Hull › Hull Plating
Issued 7 January 2012
Resolved
Provide original scantlings for hull plating in way of port and starboard pump rooms.
Action required: 705 - Other - as specified
Due 10 January 2012
Resolved 24 January 2012
Stability › Intact Righting Energy › General
Issued 7 January 2012
Resolved
Based on master concerns in the ability to properly evaluate the stability and make corrective actions after a flooding incident, provide 3rd party verification of completeness, accuracy and crews execution of trim and stability book. At a minimum this should include: draft mark verification, weight survey, and samples of weight shifts.
Action required: 705 - Other - as specified
Due 11 January 2012
Resolved 24 January 2012
Engineering › Bilge Water Management System › Pump
Issued 7 January 2012
Resolved
Bilge pumps must be installed in separate watertight compartments. Vessel currently has 04 bilge pumps (2 per hull). Each set of bilge pumps are installed in the same watertight compartment. Separate installed bilge pumps IAW 46CFR56.50-55(e)(1).
Action required: 705 - Other - as specified
Due 29 February 2012
Resolved 12 March 2012
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 12 January 2011
Resolved
The company has a designated employee representative that is in the testing pool. Company is looking at alternative ways to manage this.
Due 12 February 2011
Resolved 9 February 2011
Resolution: The company designated their administrative assistant to take on the role of the DER. She was present at this follow-up and was knowledgeable of the program.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 12 January 2011
Resolved
The company is currently not requesting background checks as per 49CFR40.25
Due 12 February 2011
Resolved 9 February 2011
Resolution: The records were not available at the time of our last inspection. All records are being kept and were verified.
Operations/Management › Drug and Alcohol Testing › Testing, Random
Issued 12 January 2011
Resolved
The company's random testing needs to be equally spread out throughout the year.
Due 12 February 2011
Resolved 9 February 2011
Resolution: The company now has a contract with Quest Diagnostics. Quest will notify them each quarter with a list of employee names. The company will then be responsible to equally spread out those names througout the quarter.
Operations/Management › Drug and Alcohol Testing › Testing, Random
Issued 12 January 2011
Resolved
The company is not currently using a statistical method for deterimining the random drug testing.
Due 12 February 2011
Resolved 9 February 2011
Resolution: The company now has a contract with Quest Diagnostics. Quest will notify them each quarter with a list of employee names. The company will then be responsible to equally spread out those names througout the quarter.
Operations/Management › Drug and Alcohol Testing › Testing, Random
Issued 12 January 2011
Resolved
The company is not including all personnel in their random testing pool. They currently only use the personnel that are phsically present on the day of testing.
Due 12 February 2011
Resolved 9 February 2011
Resolution: The company now sends all their employee names to quest diagnostics to be put in their random pool.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 12 January 2011
Resolved
The company does not currently have their policy statement and hotline number posted for their Employee Assistance Program.
Due 12 February 2011
Resolved 9 February 2011
Resolution: The company''s policy statement and hotline number are now available for their employees.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 12 January 2011
Resolved
Currently the company's supervisors are not receiving an annual 1 hour EAP training.
Due 12 February 2011
Resolved 9 February 2011
Resolution: All supervisors are now receiving the annual 1 hour training.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 12 January 2011
Resolved
The company does not currently have a Substance Abuse Professional contact number and name for their employees.
Due 12 February 2011
Resolved 9 February 2011
Resolution: They company now has a SAP contact available for the employees.
Operations/Management › Drills/Instruction › Launching/Recovery of Survival Craft
Issued 16 February 2010
Resolved
Provide operating instructions for starboard life raft davit. Launching procedures.
Condition: Unknown
Action required: 705 - Other - as specified
Due 16 March 2010
Resolved 19 February 2010
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 February 2010
Resolved
Repair or remove dead end wires from missing light in exercise room.
Condition: Unknown
Action required: 705 - Other - as specified
Due 16 March 2010
Resolved 19 February 2010
Engineering › Steering Gear System › Power Unit
Issued 16 February 2010
Resolved
Prove proper operation of starboard steering pump phase monitor to OCMI/ABS or provide servicing report attesting to proper opeation.
Condition: Unknown
Action required: 705 - Other - as specified
Due 16 March 2010
Resolved 11 March 2010
Resolution: Proved proper operation of starboard steering pump phase monitor to the satisfaction of Coast Guard Marine Inspector.
Engineering › Diesel Engine (propulsion-electric) › Governor
Issued 16 February 2010
Resolved
Prove proper operation of #2 generator prior to getting underway.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 February 2010
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 16 February 2010
Resolved
Provide servicing report attesting to proper operation of ships fixed CO2 systems and hydro test all pilot cylinders prior to getting underway.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 February 2010
Operations/Management › Drills/Instruction › Fire
Issued 16 February 2010
Resolved
Align operating instructions posted and in SMS manual for all fixed fire systems IAW original plans.
Condition: Unknown
Action required: 705 - Other - as specified
Due 16 March 2010
Resolved 11 March 2010
Resolution: Operating instruction posted were aligned with fixed fire systems original plans to the satisfaction of attending Coast Guard Marine Inspector.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 16 February 2010
Resolved
Properly mark convention oven and griddle breakers.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 16 March 2010
Resolved 19 February 2010
Engineering › Freshwater Generation System › Piping
Issued 16 February 2010
Resolved
Make proper repairs to evaporator piping.
Condition: Unknown
Action required: 705 - Other - as specified
Due 16 March 2010
Resolved 11 March 2010
Resolution: Verified repairs made to #1 and #2 evaporator piping and repairs appear to be adequate and to the satisfaction of attending Coast Guard Marine Inspector.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 29 January 2009
Resolved
Provide proof of SOPEP annual review submitted to CG Vessel Response Plan Review Office
Action required: 705 - Other - as specified
Due 12 February 2009
Resolved 11 February 2009
Electrical › Lighting (emergency) › Lighting Fixture
Issued 29 January 2009
Resolved
Renew emergency light and cover for port and starboard Generator Room escape trunk.
Action required: 705 - Other - as specified
Due 12 February 2009
Resolved 11 February 2009
Engineering › Feedwater/Condensate Water System › Conditioner
Issued 29 January 2009
Resolved
Permanently wire feedwater treatment system in port and starboard Generator machinery space.
Action required: 705 - Other - as specified
Due 12 February 2009
Resolved 11 February 2009
Electrical › Electrical Distribution System (service) › Wiring
Issued 29 January 2009
Resolved
Remove dead-end wire in way of #1 and #3 electrical panels for generators.
Action required: 705 - Other - as specified
Due 12 February 2009
Resolved 11 February 2009
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 29 January 2009
Resolved
Provide A-60 insulation in overhead where missing starboard generator machinery space.
Action required: 705 - Other - as specified
Due 12 February 2009
Resolved 11 February 2009
Fire Fighting › Means of Escape › Blocked
Issued 29 January 2009
Resolved
Move digital voltage regulator box in way of generator #1 to provide adequate egress.
Action required: 705 - Other - as specified
Due 12 February 2009
Resolved 11 February 2009
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 29 January 2009
Resolved
Prove proper closure of fire screen doors in accommodation.
Action required: 705 - Other - as specified
Due 12 February 2009
Resolved 11 February 2009
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 29 January 2009
Resolved
Fire pump #2 pressure gauge inoperative.
Due 29 January 2009
Resolved 29 January 2009
Resolution: Gauge replaced.
Fire Fighting › Structural - A Class Divisions › Special Category Spaces
Issued 29 January 2009
Resolved
Loose A60 insulation in Tension Cable room, forward bulkhead, approximately 7' from floor and 3' inboard.
Due 29 January 2009
Resolved 29 January 2009
Resolution: A-60 insulation re-secured.
Electrical › Lighting (service) › Lighting Fixture
Issued 29 January 2009
Resolved
Improperly installed wire run in port steering room overhead.
Due 29 January 2009
Resolved 29 January 2009
Electrical › Lighting (service) › Lighting Fixture
Issued 29 January 2009
Resolved
Missing light cover over switchboard in control room.
Due 29 January 2009
Resolved 29 January 2009
Resolution: Light cover replaced.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 22 June 2006
Resolved
Prove proper operation of Oily Water Separator IAW 33CFR155.380
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 July 2006
Resolved 1 July 2006
Resolution: Received ABS survey of OWS and verified the machinery working properly. Signed [name withheld]
Electrical › Electrical Distribution System (service)
Issued 4 March 2004
Resolved
1. Prove reverse power relays for main propulsion generators. LEGACY COMPONENT DESC: Circuit Breaker
Due 16 March 2004
Resolved 5 March 2004
Engineering › Diesel Engine (auxiliary)
Issued 4 March 2004
Resolved
Prove overspeed and high jacket water temp. alarms for emergency generator
Due 16 March 2004
Resolved 5 March 2004
Accommodation/Occupational Safety
Issued 4 March 2004
Resolved
Prove non conductive matting for main switchboard.
Due 16 March 2004
Resolved 15 March 2004
Lifesaving › Lifejacket/PFD (Type I)
Issued 4 March 2004
Resolved
Remove and re-stow lifejackets in main engineering control room. LEGACY COMPONENT DESC: Storage
Due 16 March 2004
Resolved 15 March 2004
Documentation › Logs/Records › Logbook (official)
Issued 4 March 2004
Resolved
Repair alarm log system on main engineering control room primary computer. Log was not keeping accurate time.
Due 20 June 2004
Resolved 18 June 2004
Engineering › Bilge Water Management System › Piping
Issued 4 March 2004
Resolved
Provide drip pan for A/C condensate over main engineering control room console.
Due 20 June 2004
Resolved 18 June 2004
Operations/Management › Drills/Instruction
Issued 4 March 2004
Resolved
Conduct and log emergency steering drill.
Due 16 March 2004
Resolved 15 March 2004
Electrical › Electric Supply System (service)
Issued 4 March 2004
Resolved
Remove and properly mount hanging electrical cords and power strip in conference room.
Due 16 March 2004
Resolved 15 March 2004
Fire Fighting › Fire Hydrants
Issued 2 March 2004
Resolved
Repair leaking hydrant valve on fire station #24. LEGACY COMPONENT DESC: Condition
Due 16 March 2004
Resolved 5 March 2004
Electrical › Electric Generation Source (service)
Issued 2 March 2004
Resolved
Properly mount electrical J-box in computer room on fwd bulkhead.
Due 16 March 2004
Resolved 15 March 2004
Engineering › Diesel Engine (propulsion-electric)
Issued 14 November 2003
Resolved
CG-835 issued 03/25/2003 is to be completed not later than the completion of the non-credit drydock scheduled for 26NOV03 through 10DEC03. Prior to completion of this item two generators are to be kept on line whenever entering or leaving any port in the Hawaiian Islands.
Action required: 705 - Other - as specified
Due 10 December 2003
Resolved 15 March 2004
Fire Fighting › International Shore Connection › Gasket
Issued 25 March 2003
Resolved
Provide washers and gaskets to international shore connections in accordance with SOLAS 74 II-2 reg 19.4.
Condition: Improper Installation
Due 24 April 2003
Resolved 3 April 2003
Fire Fighting › Ventilation Systems
Issued 25 March 2003
Resolved
Provide proper flame screens for fuel tank vents located at port transfer station (inboard of 2) and aft of port transfer station (aft of 2). 33 CFR 155.320.
Condition: Improper Installation
Due 24 April 2003
Resolved 3 April 2003
Documentation › Markings/Placards
Issued 25 March 2003
Resolved
Provide a placard of lifesaving signals in accordance with SOLAS 74 V reg 16.
Due 24 April 2003
Resolved 3 April 2003
Fire Fighting › Means of Escape
Issued 25 March 2003
Resolved
Prove proper operation of escape hatch from "I-Met" lab to port bow. Hatch cannot be opened from within space. Both hatches on port bow & hatch to bos'n stores on stbd bow are difficult to open even from outside. Bos'n stores would be impossible to open from inside if closed w/ person inside.
Condition: Design Flaw
Due 17 June 2003
Resolved 16 June 2003
Resolution: Confirmed proper operation of escape hatch from Met-Lab (new, larger spring was installed on hinge).
Fire Fighting › Means of Escape › Escape Route Signs
Issued 25 March 2003
Resolved
Properly mark "I-Met" escape hatch ouside in accordance with 46 CFR, "Emergency Escape Keep Clear".
Condition: Improper Installation
Due 24 April 2003
Resolved 3 April 2003
Construction/Loadline › Markings › Load Line Mark
Issued 25 March 2003
Resolved
Repaint port loadline deck reference line.
Condition: Damaged By Earlier Event
Due 24 April 2003
Resolved 3 April 2003
Lifesaving › Embarkation Appliances/Stations
Issued 25 March 2003
Resolved
Provide a boarding ladder to the rescue boat.
Condition: Improper Installation
Due 24 April 2003
Resolved 26 March 2003
Navigation › Collision/Grounding Avoidance › Echo-sounding Device Recorder
Issued 25 March 2003
Resolved
Prove the recording fathometer meets the requirements of 33 CFR 164.
Due 24 April 2003
Resolved 26 March 2003
Pollution Prevention/Response › Prevention Equipment
Issued 25 March 2003
Resolved
Provide MARPOL std discharge connection. LEGACY COMPONENT DESC: Standard Discharge Connection
Condition: Improper Installation
Due 17 June 2003
Resolved 16 June 2003
Resolution: Confirmed MARPOL standard discharge connection is on board vessel.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 25 March 2003
Resolved
Stencil "Open/Close" arrow on bottom of emergency escape scuttles.
Due 24 April 2003
Resolved 3 April 2003
Stability › Watertight Integrity
Issued 25 March 2003
Resolved
Prove watertight integrity of blkd pentrations in way of new electrical installations. LEGACY COMPONENT DESC: Bulkhead Penetrations
Due 17 June 2003
Resolved 16 June 2003
Resolution: Confirmed watertight integrity of new electrical installation penetrations.
Communications › Internal Communications System
Issued 25 March 2003
Resolved
Provide emergency phone number list at each phone.
Due 24 April 2003
Resolved 3 April 2003
Electrical › Electrical Distribution System (emergency) › Junction Box
Issued 25 March 2003
Resolved
Provide explosion proof j-box in hazardous storeroom to supply vent electric element for auto closure.
Condition: Damaged By Earlier Event
Due 24 April 2003
Resolved 3 April 2003
Engineering › Generator (propulsion-electric) › Bus
Issued 25 March 2003
Resolved
Prove to attending Coast Guard Marine Inspector satisfactory operation of main propulsion and emergency generator automation alarms and shutdowns. LEGACY COMPONENT DESC: Automation Alarms & Shutdowns
Due 20 November 2003
Resolved 18 June 2004
Engineering › Diesel Engine (propulsion-electric)
Issued 27 November 2002
Resolved
Prior to operating prove satisfactory operation of #4 Propulsion Generator prime mover. LEGACY COMPONENT DESC: Air Cleaner
Due 6 December 2002
Resolved 2 December 2002
Resolution: Rcvd faxed copy of servicing facility & Port Engineers stmts re cause & testing.
Engineering › Diesel Engine (propulsion-electric)
Issued 4 September 2002
Resolved
Make permanent repairs to main breakers to #1 SSDG and port propulsion buss, and prove satisfactory operation to the attending Coast Guard marine inspector. LEGACY COMPONENT DESC: Main Circuit Breaker
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 September 2002
Resolved 9 September 2002
Resolution: Observed satisfactory operation of breakers.
Electrical › Electric Generation Source (emergency) › Generator
Issued 4 September 2002
Resolved
Prove satisfactory operation of emergency generator.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 September 2002
Resolved 9 September 2002
Resolution: Observed satisfactory operation of emergency generator.
Operations/Management › Drills/Instruction
Issued 9 February 2001
Resolved
Vessel Fire control plan need to be updated with changes the vessel. Vsl had an approved plan CID Ltr issued 07 May 02 Ships Captain & crew move equipment around vessel for better storage. LEGACY COMPONENT DESC: Safety Orientation
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 December 2002
Resolved 25 March 2003
Operations/Management › Drills/Instruction
Issued 9 February 2001
Resolved
Vessel Life saving equipment plan not complete awaiting DWG from PE firm LEGACY COMPONENT DESC: Safety Orientation
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 December 2002
Resolved 25 March 2003