Records from 2002 to 2019. Most recent: inspection, 19 August 2019.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 25
19 August 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6787990
14 June 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6760640
8 February 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6622359
22 August 2018
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6519698
21 March 2018
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6388101
3 January 2018
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6331868
14 February 2017
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6090455
18 February 2016
COI Inspection · Administrative Inspection · Hull Examination · Plan Review "T" Boat · Deficiency Check · Internal Structural Exam
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5819729
15 August 2014
Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4955738
21 September 2011
Deficiency Check · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4166574
5 October 2010
Examination of Repairs · Internal Structural Exam · Drydock Exam · Administrative Inspection · COI Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3865058
2 March 2010
Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3685572
9 December 2009
In-Service Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3653013
29 April 2009
Internal Structural Exam · Hull Examination · Annual Inspection · Damage Survey
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3454429
26 March 2008
Annual Inspection · DAPI Audit
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3162959
18 April 2007
Hull Examination · Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 2889373
17 May 2006
Annual Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2646582
3 April 2006
Administrative Inspection
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2615325
8 March 2005
Annual Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2293730
1 March 2005
Administrative Inspection
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2301508
25 February 2004
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2000572
16 December 2003
Administrative Inspection
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1965171
15 April 2003
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1739809
22 January 2003
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1733960
4 February 2002
Construction Oversight
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1483816
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 19 February 2019
No resolution recorded
Prior to resuming vessel operations, company must
demonstrate compliance with new Conditions of Operation listed on Amended COI to the satisfaction of attending Coast Guard marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Engineering › Bilge Water Management System › Piping
Issued 21 March 2018
No resolution recorded
Bilge piping and GPM rate is not in compliance with MSC Letter E1-0504811. Vessel to operate with 2 total hand bilge pumps and will require manning as appropriate. This is to be corrected by 2019 operating season.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 April 2018 — due date passed with no resolution recorded
Construction/Loadline › Penetrations › Gasket
Issued 16 March 2016
Resolved
Leak found at steering box penetration.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 March 2016
Resolved 8 April 2016
Resolution: Received satisfactory verification that leak is repaired.
Engineering › Bilge Water Management System › Piping
Issued 8 June 2011
Resolved
Ensure the electrical bilge pump flaps automatically close.
Condition: Improper/Lack of Maintenance
Due 8 July 2011
Resolved 23 June 2011
Resolution: Flap modified to ensure automatic closure.
Stability › Watertight Integrity › General
Issued 8 June 2011
Resolved
Provide a copy of spreadsheet showing all modifications completed during refurbishment and weight tickets to compare with ongoing parent hull weight.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 June 2011
Resolution: Vessel rep provided documenation of modifications and weight tickets showing weight changes within 2% allowance.
Construction/Loadline › Hull › Weld
Issued 8 June 2011
Resolved
External ribs on stern wheel wells, weld bend stress relief cuts (double side continuous).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 July 2011
Resolved 23 June 2011
Resolution: Ribs welded both sides.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 2 March 2010
Resolved
Properly provide proof that 35 pound CO2 cylinder has been properly serviced.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 June 2011
Resolution: Viewed service documentation.
Engineering › Pressure Vessel › Marking and Stamping
Issued 9 December 2009
Resolved
Prove proper installation of pressure vessels used for axel housing low air pressurization system.
Action required: 705 - Other - as specified
Due 9 January 2010
Resolved 8 June 2011
Resolution: Pressure vessel removed, axel housing vented to atmosphere.
Construction/Loadline › Hull › Hull Plating
Issued 29 April 2009
Resolved
Provide repair proposal and make permanent repairs to holed stbd stern quarter side shell.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 May 2009
Resolved 8 June 2011
Resolution: Credited dry dock exam. All repairs completed.
Fire Fighting › Fixed Fire Detection System
Issued 25 February 2004
Resolved
Replace faulty vapor detector in the bilge compartment. LEGACY COMPONENT DESC: Vapor Detector
Condition: Unknown
Due 25 February 2004
Resolved 25 February 2004
Resolution: New vapor detector installed.
Engineering › Gasoline Engine (propulsion)
Issued 16 December 2003
Resolved
Properly install engine space ventilation blower as per 46 CFR 182.460. LEGACY COMPONENT DESC: Ventilation
Condition: Improper Installation
Due 17 March 2004
Resolved 25 February 2004
Construction/Loadline › Hull
Issued 22 January 2003
Resolved
Make permanent repairs to both front exhaust area's prior to carrying passengers. LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 April 2003