Records from 2022 to 2026. Most recent: inspection, 10 August 2026.
Documentation record
Registered dimensions (L × B × D)54.8 ft × 15.8 ft × 8.3 ft
Registered tonnagegross 48 / net 38
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSEA RAY BOATS INC · MERRITT ISLAND, FL, UNITED STATES · built 2000
Hull materialFRP (Fiberglass)
PropulsionDiesel Direct
Hull shapeShip
Hull configurationMonohull
Hailing portCHICAGO, IL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 7 April 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it48 - Simplified, Gross Ton
38 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 August 2026
Resolved
A vessel on which a pre-engineered system is installed must have a light to indicate discharge and an audible alarm to indicate discharge. The light and audible alarm are not working.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 17 August 2026
Resolution: switch was replaced, photos provided.
11 - Life Saving Appliances › N/A - No Subsystem › Radio life-saving appliances
Issued 10 August 2026
No resolution recorded
Each EPRIB on-board a vessel must be float free. The hydrostatic release for the EPRIB is expired. Vessel is restricted to within 1 mile from shore.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 August 2026
Resolved
Electrical equipment on a vessel must be installed to protect passengers and crew. The electrical outlet on the 2nd deck has a broken cover.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2026
Resolved 17 August 2026
Resolution: outlet cover was renewed, photo was provided.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 20 June 2024
Resolved
AS APPROPRIATE FOR THE INTENDED VOYAGE, A VESSEL MUST CARRY ADEQUATE AND UP-TO-DATE U.S. COAST PIOLET AND COAST GUARD LIGHT LIST. VESSEL COAST PIOLET AND LIGHT LIST ARE OUT-OF-DATE. PROVIDE CURRENT COAST PIOLET AND LIGHT LIST.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 July 2024
Resolved 21 June 2024
Resolution: documents added.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 20 June 2024
Resolved
DECK RAILS MUST BE DESIGNED AND CONSTRUCTED TO WITHSTAND A POINT LOAD OF 200 POUNDS APPLIED AT ANY POINT IN ANY DIRECTION. PORT BOW RAILING AREA HAS A BROKEN WELD AT A STANTION BASE. MAKE REPAIR TO RAILING STANTION.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2024
Resolved 21 June 2024
Resolution: Handrail was repaired.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 20 June 2024
Resolved
A PRE-ENGINEERED FIXED GAS FIRE EXTINGUISHING SYSTEM MUST AUTOMATICALLY SHUT DOWN ALL POWER VENTILATION SYSTEMS AND ALL ENGINES THAT DRAW INTAKE AIR FROM WITHIN THE PROTECTED SPACE. STBD ENGINE INTERMITENTLY SHUTS DOWN DURING TESTING. PERFORM MAINTENANCE/TROUBLESHOOT SYSTEM AND RE-TEST WITH [name withheld] WITH PASSENGERS.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2024
Resolution: Fire boy tested all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 15 May 2023
Resolved
ADDITIONAL RAIL COURSES ARE NEEDED ON PORT/STBD FWD RAILINGS.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2023
Resolved 18 May 2023
Resolution: Railings banners were installed to meet intent.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 15 May 2023
Resolved
A CREWMEMBER WITH A RADIO OPERATING PERMIT MUST BE PRESENT DURING VOYAGED ON GREAT LAKES, NOT A "RESTRICTED" PERMIT.
47 CFR 80
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2023
Resolved 18 May 2023
Resolution: All crewmembers have taken exam for Marine Radio Operator Permit.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 May 2023
Resolved
PROVIDE A 40-B:C PORTABLE FIRE EXTINGUISHER FOR ENGINE SPACE.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2023
Resolved 18 May 2023
Resolution: Extinguisher has been provided for Engine Space.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 15 May 2023
Resolved
NAV LIGHTS LENS ARE SCRATCHED AND DULL DECREASING RANGE VISIBILITIES. REPLACE ALL NAV LIGHTS WITH CORRECT RANGE ABILILITIES.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2023
Resolved 20 July 2023
Resolution: Nav lights have been replaced.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 15 May 2023
Resolved
PROVIDE AND POST CONTACT INFORMATION/NUMBERS FOR EAP.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2023
Resolved 23 June 2023
Resolution: EAP contact info phone numbers have been posted.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 15 May 2023
Resolved
MACHINERY SPACE BOUNDRY MUST BE LINED WITH NON-COMBUSTIBLE PANELS OR INSULATION APPROVED IN ACCORDANCE WITH 164.009 IN SUBCHAPTER Q.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2023
Resolved 13 June 2023
Resolution: Vessel machinery space has been lined with 22 gauge sheet steel.