Records from 1981 to 2004. Most recent: inspection, 23 February 2004.
Inspection history · 54
23 February 2004
Administrative Inspection
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2011412
2 October 2003
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1937889
15 November 2002
Plan Review "T" Boat · COI Inspection · Construction Oversight
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1711132
13 November 2002
Inclining Experiment
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1695634
10 September 2002
Excursion Permit
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1673857
23 July 2002
Damage Survey
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1651074
25 June 2002
Deficiency Check · Annual Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1637919
7 June 2002
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1628017
13 May 2002
Internal Structural Exam · Hull Examination
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1616221
26 November 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1401598
20 September 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 641226
13 September 2001
Construction Oversight · COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1405294
10 August 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 214851
19 March 2001
Inclining Experiment
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1412243
13 February 2001
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1403321
20 September 2000
Examination of Repairs
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 823190
20 September 2000
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1365967
20 September 2000
Examination of Repairs · Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1373174
13 October 1999
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1444236
7 April 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 49020
5 April 1999
Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 786616
4 April 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 43645
29 October 1998
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 159359
8 September 1998
Re-Inspection · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1381333
27 October 1997
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1368466
9 September 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 786504
13 September 1996
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1418039
29 August 1996
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 939112
19 August 1996
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 139874
28 August 1995
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1427111
2 September 1994
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1411020
25 October 1993
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1458114
14 November 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 477999
29 October 1992
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1395879
10 March 1992
Drydock Extension
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1255942
11 December 1991
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 716600
6 November 1991
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 937113
22 October 1991
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 938648
7 January 1991
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 910491
26 October 1990
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 900202
19 April 1990
Drydock Extension
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 901611
27 October 1989
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1307485
28 October 1988
COI Inspection · Deficiency Check · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 893304
7 December 1987
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1314475
5 November 1986
COI Inspection · Hull Examination
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1323263
9 May 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 988042
21 November 1985
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 988859
29 November 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 977353
3 May 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 977280
4 May 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 963989
16 June 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 963360
19 May 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1271325
9 March 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 966919
21 May 1981
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 963933
Deck/Cargo › Holds/Tanks
Issued 2 October 2003
Resolved
[name withheld] issued a CG-835 to remove all excess oil from bilge prior to vessel sailing
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 October 2003
Resolved 3 October 2003
Resolution: removed excess oil from bilge
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 November 2002
No resolution recorded
Provide an up-to-date Electrical drawing of all electrical systems.
Condition: Unknown
Due 24 March 2003 — due date passed with no resolution recorded
Construction/Loadline › Penetrations › Gasket
Issued 15 November 2002
No resolution recorded
Provide "hinged" deadlight covers for all portlights.
Condition: Unknown
Due 24 March 2003 — due date passed with no resolution recorded
Construction/Loadline › Structures › Transverse Bulkhead
Issued 15 November 2002
No resolution recorded
Provide lightening holes in bulkhead #83 as per approved plans.
Condition: Placed in Improper Service
Due 24 March 2003 — due date passed with no resolution recorded
Lifesaving › Inflatable Liferafts
Issued 13 November 2002
Resolved
Properly install liferaft cradle. LEGACY COMPONENT DESC: Painter
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 December 2002
Resolved 24 February 2003
Engineering › Bilge Water Management System
Issued 13 November 2002
Resolved
Properly install check valves in all ballast tanks as required by 46 CFR 182.510(c). LEGACY COMPONENT DESC: Valve
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 December 2002
Resolved 24 February 2003
Accommodation/Occupational Safety › Sleeping Accommodations
Issued 13 November 2002
Resolved
Remove accommodations from the space foreward of the collision bulkhead. The space does not meet the requirements of 46 CFR 177.500. LEGACY COMPONENT DESC: Berth
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 December 2002
Resolved 24 February 2003
Deck/Cargo › Ballast
Issued 13 November 2002
Resolved
Make ballast tanks #4 and #5 empty to determine where water and oil leaks are emanating. LEGACY COMPONENT DESC: Tank
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 December 2002
Resolved 24 February 2003
Stability › Unintentional Flooding
Issued 23 July 2002
Resolved
Discovered both port and starboard shaft packings streaming water into the engine room bilges. Noted the shaft padking couplings were already maxed out and could not be tightened down any further to reduce the stream of water.. LEGACY COMPONENT DESC: Shaft Packing
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 July 2002
Resolved 9 August 2002
Pollution Prevention/Response › Prevention Equipment
Issued 23 July 2002
Resolved
Discovered 17 inches of a black oil like substance and water mixture in the engine room bilges. Issued 835 to have the bilge water/oil removed and provide receipts for disposal services.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 July 2002
Resolved 8 August 2002
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 25 June 2002
Resolved
Repair exhaust leak on starboard main engine.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2002
Lifesaving › Lifejacket/PFD (Type I)
Issued 25 June 2002
Resolved
Stow all lifejackets in designated marked storage areas. LEGACY COMPONENT DESC: Storage
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2002
Electrical › Electrical Distribution System (service)
Issued 25 June 2002
Resolved
Provide a single line drawing and load analysis of the entire AC electrical system. This item will not be considered cleared until the plan is approved and vessel electrical system checked for compliance with the plan.
Action required: 705 - Other - as specified
Due 3 August 2002
Resolved 8 August 2002
Documentation › Certificates/Documents › FCC SSL
Issued 25 June 2002
Resolved
Provide an FCC Safety Radio Certificate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2002
Electrical › Electrical Distribution System (emergency)
Issued 25 June 2002
Resolved
Provide a secure mounting system for the battery and power supply under the pilot house control panel on the port side.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2002
Fire Fighting › Fire Main
Issued 25 June 2002
Resolved
Make the starboard fire main accessible on the 2nd deck and provide a bracket for the fire hose.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2002
Engineering › Bilge Water Management System
Issued 25 June 2002
Resolved
Provide a bilge pumping (dewatering) system for the forward ex-fuel tank voids #1, #2 and #3. LEGACY COMPONENT DESC: Piping
Action required: 705 - Other - as specified
Due 3 August 2002
Resolved 9 August 2002
Engineering › Compressed Air System (start air)
Issued 25 June 2002
Resolved
Provide a properly sized relief valve for the starboard engine room air receiver. The air receiver may not be used until this item is provided to the satisfaction of an attending marine inspector.
Action required: 705 - Other - as specified
Due 3 October 2002
Resolved 24 February 2003
Electrical › Electrical Distribution System (service) › Switch
Issued 25 June 2002
Resolved
Provide a main battery cut-off switch for the starboard generator start battery.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2002
Engineering › Fuel Oil Service System › Hose
Issued 25 June 2002
Resolved
Provide a fuel piping system for both generators that meets 46 CFR 182.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2002
Accommodation/Occupational Safety › Sleeping Accommodations
Issued 25 June 2002
Resolved
Provide an emergency escape ladder for the lower berthing area escape hatch.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2002
Construction/Loadline
Issued 25 June 2002
Resolved
Remove all habitation forward of the collision bulkhead.
Action required: 705 - Other - as specified
Due 3 August 2002
Resolved 9 August 2002
Electrical › Electrical Distribution System (service)
Issued 25 June 2002
Resolved
Provide electrical receptacles and switches that are located on the exterior, of a type suitable for the location.
Action required: 705 - Other - as specified
Due 3 August 2002
Resolved 9 August 2002
Deck/Cargo › Cargo Transfer (solid)
Issued 25 June 2002
Resolved
Repair the starboard crane foundation in accordance with approved repair procedures. The starboard crane may not be used until repaired.
Action required: 705 - Other - as specified
Due 3 October 2002
Resolved 9 August 2002
Engineering › Steering Gear System
Issued 25 June 2002
Resolved
Repair worn hingle joints on both the port and starboard steering hydraulic rams.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 October 2002
Resolved 9 August 2002
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 25 June 2002
Resolved
Provide a means to secure the escape ladder in the lower berthing area, when it is put into position for use.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 August 2002
Resolved 9 August 2002
Construction/Loadline › Penetrations
Issued 25 June 2002
Resolved
Provide a captive chain or similar retention device for the engine room escape hatch.
Action required: 705 - Other - as specified
Due 3 August 2002
Resolved 8 August 2002
Engineering
Issued 25 June 2002
Resolved
Provide a sewage vent which cannot be blocked by liquid in the vent line.
Action required: 705 - Other - as specified
Due 3 August 2002
Resolved 8 August 2002
Electrical › Electrical Distribution System (service)
Issued 25 June 2002
Resolved
Secure all electrical cables thoughout vessel and engine room as per 46 CFR 183. LEGACY COMPONENT DESC: Wiring
Action required: 705 - Other - as specified
Due 3 August 2002
Resolved 8 August 2002
Lifesaving › Buoyant Apparatus
Issued 25 June 2002
Resolved
Provide primary lifesaving for 14 additional persons. The number of passengers allowed is reduced to 30 until this item is corrected.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 October 2002
Resolved 24 February 2003
Personnel › Training
Issued 25 June 2002
Resolved
Demonstrate proper execution of fire and man-overboard drills in accordance with vessel's written procedures and industry standards.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 August 2002
Resolved 8 August 2002
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 25 June 2002
Resolved
Service all portable fire extinguishers. All portable fire extinguishers were last serviced more than 1 year ago.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 August 2002
Resolved 9 August 2002
Fire Fighting
Issued 25 June 2002
Resolved
Provide proper brackets for all portable fire extinguishers. Several portable fire extinguishers have no brackets, several have improper brackets.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 August 2002
Resolved 9 August 2002
Fire Fighting
Issued 25 June 2002
Resolved
Provide batteries for all smoke detectors.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 August 2002
Resolved 9 August 2002
Fire Fighting › Fire Main
Issued 25 June 2002
Resolved
Provide a fire main which will supply 60 psi at 50 gpm and will provide a effective stream from both hoses simultaneously.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 August 2002
Resolved 9 August 2002
Accommodation/Occupational Safety
Issued 25 June 2002
Resolved
Provide proper securing brackets for the oxygen and acetylene cylinders in the engine room.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 August 2002
Resolved 9 August 2002
Resolution: Oxygen and acetylene tanks were removed from the vessel.
Lifesaving › Lifejacket/PFD (Type I)
Issued 25 June 2002
Resolved
Segregate the child and adult lifejackets in properly marked stowage areas.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 August 2002
Resolved 9 August 2002
Lifesaving › Lifejacket/PFD (General)
Issued 25 June 2002
Resolved
Remove the Type II and Type III PFD's from the marked lifejacket stowage area for Type I PFD's.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 August 2002
Resolved 9 August 2002
Stability › Unintentional Flooding
Issued 25 June 2002
Resolved
Make the deck penetrations located at the starboard side aft in way of the aftermost (old) engine deck hatch with metal pipe, at least 12" above the deck, terminating with a 180* gooseneck to prevent flooding.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 August 2002
Resolved 9 August 2002
Operations/Management
Issued 25 June 2002
Resolved
Remove the wood located in the starboard stack space next to and against the muffler. The wood is a fire hazard.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 August 2002
Resolved 9 August 2002
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 25 June 2002
Resolved
Provide a blank for the open breaker place in panel C.
Action required: 705 - Other - as specified
Due 23 August 2002
Resolved 9 August 2002
Lifesaving › Lifebuoys
Issued 25 June 2002
Resolved
Renew the line on the starboard pilothouse ring buoy.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 August 2002
Resolved 9 August 2002
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 25 June 2002
Resolved
Provide operable lights on all Type I PFD lifejackets.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 August 2002
Resolved 9 August 2002
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 June 2002
Resolved
Provide a new electrical cable from the starboard crane motor junction box to motor.
Action required: 705 - Other - as specified
Due 23 August 2002
Resolved 9 August 2002
Electrical › Electrical Distribution System (service)
Issued 25 June 2002
Resolved
Provide proper watertight fittings for the port crane hydraulic motor power supply cable. LEGACY COMPONENT DESC: Wiring
Action required: 705 - Other - as specified
Due 9 September 2002
Resolved 24 February 2003
Engineering › Shafting/Propeller Arrangements
Issued 13 May 2002
Resolved
Replace damaged port prop. LEGACY COMPONENT DESC: Propeller (fixed pitch)
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2002
Resolved 7 June 2002
Engineering › Shafting/Propeller Arrangements
Issued 13 May 2002
Resolved
Provide marine surveyors report to determine condition of rudders, rudder posts and bearing.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2002
Resolved 7 June 2002
Lifesaving
Issued 13 May 2002
Resolved
Provide epirb registration
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2002
Resolved 7 June 2002
Lifesaving › Buoyant Apparatus
Issued 13 May 2002
Resolved
Re-rig sea painter to bouyant apparatus
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2002
Resolved 7 June 2002
Lifesaving › Inflatable Liferafts
Issued 13 May 2002
Resolved
Service liferafts
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2002
Resolved 3 July 2002
Lifesaving › Lifejacket/PFD (Type V) › Lights
Issued 13 May 2002
Resolved
Connect float lite to BA
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2002
Resolved 7 June 2002
Fire Fighting
Issued 13 May 2002
Resolved
Make all smoke detectors operable
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2002
Resolved 7 June 2002
Engineering › Fuel Oil Service System
Issued 13 May 2002
Resolved
Show proper operation of emergency fuel cutoff valves
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2002
Resolved 7 June 2002
Engineering › Steering Gear System
Issued 13 May 2002
Resolved
Repack electrical cable on steering pump
Due 6 July 2002
Resolved 8 August 2002
Deck/Cargo
Issued 13 May 2002
Resolved
Attach controller to crane junction box
Due 6 July 2002
Resolved 8 August 2002
Electrical › Electrical Distribution System (service)
Issued 13 May 2002
Resolved
Permanently mount battery boxes throughout vessel
Due 6 July 2002
Resolved 8 August 2002
Construction/Loadline
Issued 13 May 2002
Resolved
Provide captive chains to all deck hatches
Due 6 July 2002
Resolved 9 August 2002
Accommodation/Occupational Safety
Issued 13 May 2002
Resolved
Grind down sharp edges on hand rails aft stbd qtr of main deck
Due 6 July 2002
Resolved 8 August 2002
Electrical
Issued 13 May 2002
Resolved
Repack electrical cables for hot tub electrical boxes
Due 6 July 2002
Resolved 8 August 2002
Electrical
Issued 13 May 2002
Resolved
Replace power cable for foredeck floodlight
Due 6 July 2002
Resolved 8 August 2002
Accommodation/Occupational Safety
Issued 13 May 2002
Resolved
Provide list for first aid kit contents and renew outdated items
Due 6 July 2002
Resolved 8 August 2002
Accommodation/Occupational Safety
Issued 13 May 2002
Resolved
Provide bulb cover on berthing light lower berthing
Due 6 July 2002
Resolved 8 August 2002
Construction/Loadline
Issued 13 May 2002
Resolved
Replace ladder in port aft rudder compartment
Due 6 July 2002
Resolved 8 August 2002
Accommodation/Occupational Safety
Issued 13 May 2002
Resolved
Secure all engine room deck plates to deck supports
Due 6 July 2002
Resolved 9 August 2002
Electrical
Issued 13 May 2002
Resolved
Install covers on all electrical junction boxes and controllers
Due 6 July 2002
Resolved 9 August 2002
Electrical
Issued 13 May 2002
Resolved
Remove or use all dead end wires throughout the vessel or terminate in enclosure
Due 6 July 2002
Resolved 3 July 2002
Engineering
Issued 13 May 2002
Resolved
Repair oil leaks on port generator
Due 6 July 2002
Resolved 3 July 2002
Engineering
Issued 13 May 2002
Resolved
Show proper operation of air receiver relief valves
Due 6 July 2002
Resolved 3 July 2002
Engineering
Issued 13 May 2002
Resolved
Install missing nut on exhaust manifold on port engine
Due 6 July 2002
Resolved 3 July 2002
Engineering
Issued 13 May 2002
Resolved
Install lagging on stbd generator exhaust
Due 6 July 2002
Resolved 3 July 2002
Engineering
Issued 13 May 2002
Resolved
Install double hose clamps on all salt water and fuel oil hose connections
Due 6 July 2002
Resolved 3 July 2002
Accommodation/Occupational Safety
Issued 13 May 2002
Resolved
Secure all loose items on deck and in engine room for sea
Due 6 July 2002
Resolved 3 July 2002
Engineering
Issued 13 May 2002
Resolved
Repair salt water leak on hose connection in port engine
Due 6 July 2002
Resolved 3 July 2002
Engineering
Issued 13 May 2002
Resolved
Install pipe hangers on PVC pipe in engine room ladder well
Due 6 July 2002
Resolved 3 July 2002
Engineering
Issued 13 May 2002
Resolved
Stencil location of emergency fuel stops.
Due 6 July 2002
Resolved 3 July 2002
Electrical › Electric Generation Source (service)
Issued 5 March 2002
Resolved
Provide installation plans for the new 30kW generator in the engine room. They should include 1. a single line electrical diagram, 2. cooling water system, 3. fuel system, 4. exhaust system. LEGACY COMPONENT DESC: Generator
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 20 March 2002
Resolved 3 July 2002
Electrical
Issued 26 November 2001
Resolved
Provide a removable guard over the pilothouse electrical master circuit breaker, to prevent inadvertent tripping.
Condition: Unknown
Due 26 December 2001
Resolved 26 December 2001
Electrical
Issued 26 November 2001
Resolved
Provide grounding conductors to all A.C. receptacles and appliances under pilothouse control panel
Condition: Unknown
Due 26 December 2001
Resolved 26 December 2001
Electrical
Issued 26 November 2001
Resolved
Permanently mount the 12 VDC power supply under the pilothouse console.
Condition: Unknown
Due 26 December 2001
Resolved 26 December 2001
Electrical
Issued 26 November 2001
Resolved
Secure the 12V battery, under the pilothouse console, from moving.
Condition: Unknown
Due 26 December 2001
Resolved 26 December 2001
Navigation
Issued 26 November 2001
Resolved
Repair the steering linkages, at both the port and starboard rudder post arm to hydraulic cylinder clevis joints.
Condition: Unknown
Due 26 February 2002
Resolved 26 February 2002
Accommodation/Occupational Safety › Cooking Systems
Issued 15 September 2001
Resolved
Provide sea-rails for the galley stove.
Action required: 705 - Other - as specified
Due 15 October 2001
Resolved 15 October 2001
Accommodation/Occupational Safety › Cooking Systems
Issued 15 September 2001
Resolved
Make all surfaces within 36" of the stove meet B-15 fire standards.
Action required: 705 - Other - as specified
Due 15 October 2001
Resolved 15 October 2001
Deck/Cargo
Issued 15 September 2001
Resolved
Make the port crane non-operational. The crane must be stowed in a safe position until removed.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 October 2001
Resolved 15 October 2001
Lifesaving
Issued 13 February 2001
Resolved
Provide a new stability letter issued by the Coast Guard Marine Safety Center (MSC). Vessel may not operate with passengers until a new stabilityletter is issued.
Condition: Unknown
Due 13 July 2001
Resolved 29 October 2001
Electrical
Issued 20 September 2000
Resolved
Install operable emergency lighting in below deck accomodations by each escape route prior to utilizing space. Provide local Coast Guard with copyof invoice or receipt.
Condition: Unknown
Due 19 October 2000
Resolved 20 October 2000
Construction/Loadline
Issued 20 September 2000
Resolved
Provide chains / lines to attach main deck hatch covers to vessel's hull.
Condition: Unknown
Due 19 October 2000
Resolved 20 October 2000
Accommodation/Occupational Safety
Issued 20 September 2000
Resolved
Install tempered glass in way of pilothouse starboard side window. Providelocal Coast Guard with copy of invoice or receipt prior to operating underway.
Condition: Unknown
Due 19 October 2000
Resolved 20 October 2000
Construction/Loadline
Issued 20 September 2000
Resolved
Reweld cracked frame on port side in forepeak upper level.
Condition: Unknown
Due 19 October 2000
Resolved 20 October 2000
Electrical
Issued 20 September 2000
Resolved
Install blanks in unused open spaces in electrical panel.
Condition: Unknown
Due 19 October 2000
Resolved 20 October 2000
Lifesaving
Issued 20 September 2000
Resolved
Conduct man overboard drill to the satisfaction of attending USCG Marine Inspector.
Condition: Unknown
Due 19 October 2000
Resolved 20 October 2000
Construction/Loadline
Issued 20 September 2000
Resolved
Install ball for down flooding control in starbaord side ballast tank vent.
Condition: Unknown
Due 19 October 2000
Resolved 20 October 2000
Construction/Loadline
Issued 20 September 2000
Resolved
Plug small diameter bolt holes in superstructure aft bulkhead.
Condition: Unknown
Due 19 October 2000
Resolved 20 October 2000
Construction/Loadline
Issued 20 September 2000
Resolved
Make superstructure doors weathertight._x001C_
Condition: Unknown
Due 19 October 2000
Resolved 20 October 2000
Engineering
Issued 20 September 2000
Resolved
Install pressure relieving devices on air receivers.
Condition: Unknown
Due 19 October 2000
Resolved 20 October 2000
Lifesaving
Issued 20 September 2000
Resolved
Install operable EPIRB on board, provide copy of invoice or receipt to local Coast Guard prior to operating.
Condition: Unknown
Due 19 October 2000
Resolved 20 October 2000
Construction/Loadline
Issued 5 April 1999
Resolved
INSPECT ALL CHECK VALVES IWO BILGE MANIFOLD AND LINES. VLV IWO AFT BILGE SUCTION LINE APPARENTLY LEAKED BY ALLOWING FLOODING OF E/R. TO BE COMPLETEDPRIOR TO GETTING U/W.
Condition: Unknown
Due 14 April 1999
Resolved 14 April 1999
Electrical
Issued 5 April 1999
Resolved
MAKE NECESSARY REPAIRS TO BOTH AUX GENERATORS. UNITS WERE WATERLOGGED DURING FLOODING OF E/R. TO BE COMPLETED PRIOR TO DEPARTING PORT.
Condition: Unknown
Due 14 April 1999
Resolved 14 April 1999
Construction/Loadline
Issued 5 April 1999
Resolved
BILGE HIGH LEVEL ALARMS FAILED TO ACCUATE DURING FLOODING OF E/R.
Condition: Unknown
Due 14 April 1999
Resolved 14 April 1999
Engineering
Issued 28 August 1995
Resolved
REPLACE PORT MAIN ENGINE EXHAUST INSULATION AS NECESSARY.
Condition: Unknown
Due 28 September 1995
Resolved 22 September 1995
Navigation
Issued 28 August 1995
Resolved
REPIN AND REBUSH RUDDER PIVOT POINTS
Condition: Unknown
Due 28 August 1995
Resolved 22 September 1995
Electrical
Issued 25 October 1993
Resolved
REPAIR BROKEN BUNK LIGHTS THROUGH OUT VESSEL.
Condition: Unknown
Due 25 November 1993
Resolved 2 November 1993
Engineering
Issued 25 October 1993
Resolved
REPLACE STBD AIR RECEIVER RELIEF VALVE WITH ASME APPROVED RELIEF VALVE AND PROVE OPERATION OF SAME.
Condition: Unknown
Due 25 November 1993
Resolved 2 November 1993
Fire Fighting
Issued 25 October 1993
Resolved
REPAIR DAMAGED SECTION OF FIRE MONITOR PIPING IN ENGINE ROOM USING CERTIFIED WELDER AND APPROVED PROCEDURE.
Condition: Unknown
Due 25 November 1993
Resolved 2 November 1993
Unknown
Issued 26 October 1990
Resolved
PROVIDE FCC SAFETY RADIO CERTIFICATE AS REQUIRED BY 47 CFR.
Condition: Unknown
Due 26 October 1990
Resolved 26 October 1990
Accommodation/Occupational Safety
Issued 27 October 1989
Resolved
SECURE WASHER AND DRYER.
Condition: Unknown
Due 27 October 1989
Resolved 27 October 1989
Deck/Cargo
Issued 27 October 1989
Resolved
REPAIR INOPERATIVE ANCHOR CAPSTAN.
Condition: Unknown
Due 27 October 1989
Resolved 27 October 1989
Documentation
Issued 7 December 1987
Resolved
PROVIDE ON BOARD CURRENT DOCUMENT.
Condition: Unknown
Due 7 December 1987
Resolved 7 December 1987