MAURY USCG vessel records Sign in
← All vessels

TROPIC UNITY

TROPIC UNITY is a 2002 freight ship. The Coast Guard has recorded 73 inspections since 2002, most recently in May 2026, along with 44 deficiencies and 10 operational controls.

Records from 2002 to 2026. Most recent: inspection, 28 May 2026.

Built
2002
Last inspected
28 May 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9225275 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
512357
Flag
SAINT VINCENT AND THE GRENADINES
—
Maury page id
psix-512357

Inspections, by type

…with no type recorded16
Years with a record 23 calendar years (2002–2026)
The 73 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it10851 - Convention (Subpart B), Gross Ton
3601 - Convention (Subpart B), Net Ton
10998 - Dead Weight, Metric Ton
5900 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 73

28 May 2026 PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8380950
25 November 2025 PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8273389
16 May 2025 PSC B
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8135645
6 November 2024 PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8029191
30 April 2024 PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7902001
30 October 2023 PSC A
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7816294
4 April 2023 PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7662322
5 October 2022 PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7572891
17 September 2022 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7560759
3 September 2022 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7550016
18 April 2022 Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7433033
1 April 2022 PSC A
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7422742
28 September 2021 PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7312916
15 June 2021 Deficiency Check · PSC A
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7225693
4 May 2021 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7188836
6 April 2021 PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7168721
12 November 2020 Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7093993
16 October 2020 Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7078420
2 October 2020 PSC B
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7066720
24 March 2020 PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6930854
11 February 2020 Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6907030
25 September 2019 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6820619
27 March 2019 Ballast Water Examination · NPV Safety Exam · ISPS III Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6650105
7 October 2018 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6555537
5 April 2018 ISPS III Exam · Ballast Water Examination · NPV Safety Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6386477
5 October 2017 Ballast Water Examination · PII Safety Exam · ISPS III Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6280545
6 April 2017 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6118077
1 October 2016 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6010532
30 March 2016 Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5843847
24 March 2016 ISPS III Exam · PII Safety Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 5839841
13 October 2015 Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5741108
10 October 2015 Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 5739982
18 September 2015 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 5722374
26 March 2014 Deficiency Check · Administrative Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 4823383
14 March 2014 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 4815927
25 July 2012 Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 4390233
22 February 2012 ISPS III Exam · PII Safety Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 4248704
14 August 2011 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 4113795
5 July 2009 Loadline Exam · ISPS III Exam · PII Safety Exam · MARPOL Annex V Examination · MARPOL Annex I Examination · MARPOL Annex VI Survey · Ballast Water Examination
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3523630
3 July 2008 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 3255336
21 April 2008 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3188829
21 March 2008 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3170923
20 March 2008 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3168311
12 March 2008 Type not recorded
No type recorded · Station Lake Worth Inlet · USCG Southeast District (CGD-SE) · Activity 3162682
9 March 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3161053
9 November 2007 Administrative Inspection
Administrative · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3095793
6 July 2007 Administrative Inspection
Administrative · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2985666
14 June 2007 ISPS II Exam · PII Safety Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2961400
1 June 2007 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2948863
23 April 2007 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2913909
11 April 2007 Administrative Inspection
Administrative · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2905797
27 March 2007 Type not recorded
No type recorded · Station Lake Worth Inlet · USCG Southeast District (CGD-SE) · Activity 2896001
26 March 2007 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2895128
22 February 2007 Administrative Inspection
Administrative · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2875928
31 January 2007 Administrative Inspection
Administrative · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2864818
26 September 2006 Type not recorded
No type recorded · Station Lake Worth Inlet · USCG Southeast District (CGD-SE) · Activity 2787151
25 September 2006 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2786716
18 May 2006 ISPS II Exam · PII Safety Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2652361
30 January 2006 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2576333
1 November 2005 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2525986
28 October 2005 Random ISPS/MTSA/PSC
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2526425
22 October 2005 Ballast Water Examination · Random ISPS/MTSA/PSC · MARPOL Annex I Examination · MARPOL Annex V Examination
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2519541
26 May 2005 Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2368866
21 May 2005 PII Safety Exam · ISPS II Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2363196
20 November 2004 Re-Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2244275
23 June 2004 ISPS II Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2108327
18 April 2004 Annual Inspection · MARPOL Annex I Examination
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2041726
6 April 2004 Administrative Inspection
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2038316
21 September 2003 Re-Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 1904487
18 March 2003 Annual Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 1758984
23 February 2003 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 1748218
22 November 2002 Re-Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 1705949
20 February 2002 Passenger/Freight Vessel Examination
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 1488530

Deficiency record · 44

07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 28 May 2026 Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: structural fire protection including fire-resisting divisions, and protection of openings and penetrations in those divisions. The gaskets installed in the fire doors in the oil purifier room, engineer store, emergency escape trunk on platform 8600, the paint store, and the BOSN store are heavily deteriorated or dry rotted and do not maintain the fire boundary requirements.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 26 June 2026
Resolution: CLASS REPORT WAS RECEIVED FROM BV
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 28 May 2026 Resolved
All life - saving appliances and arrangements shall comply with the applicable requirements of the Code. the normal equipment of every lifeboat shall consist of: watertight receptacles containing a total of 3 L of fresh water for ach person the lifeboat is permitted to accommodate... The freefall lifeboat can accommodate a total of 20 persons and should carry a total of 60 L of fresh water, but is only provided with 24L of fresh water.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 26 June 2026
Resolution: CLASS REPORT WAS RECEIVED FROM BV
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 May 2026 Resolved
Efficient guard rails or bulwarks shall be fitted to all exposed parts of the freeboard and superstructure decks. Guard rail and stanchion located port side at cargo hold #3 are severely damaged.
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 26 June 2026
Resolution: CLASS REPORT WAS RECEIVED FROM BV
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 28 May 2026 Resolved
... On ships carrying at least two search and rescue dry locating devices and equipped with free-fall lifeboats one of the search and rescue locating devices shall be stowed in a free-fall lifeboat and the other located in the immediate vicinity of the navigation bridge... The ship is equipped with a free-fall lifeboat but both SARTS were stowed on the navigation bridge.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 26 June 2026
Resolution: CLASS REPORT WAS RECEIVED FROM BV
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 28 May 2026 Resolved
Rescue boats shall be stowed: in a stat of continuous readiness for launching n not more than 5 min... The crew took longer than minutes to start the rescue boat engine.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 26 June 2026
Resolution: CLASS REPORT WAS RECEIVED FROM BV
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 6 November 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During annual maintenance, company identified the pelican hook for the free fall lifeboat had major deterioration and needed to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 November 2024
Resolved 4 December 2024
Resolution: Received Class Report attesting to the repairs fo the Pelican hook.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 30 October 2023 Resolved
tHE ANGULAR POSITION OF THE RUDDER SHALL BE RECOGNIZEABLE IN THE STEERING GEAR COMPARTMENT. DURING STERAING GEAR TEST PSCO OBSERVED RUDDER INCDICATOR REPEATER DEVIATED FIVER DEGREES.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 November 2023
Resolved 15 November 2023
Resolution: Repairs done by shore technicians with replaced new poteniometers. Operational testcarried out and found satisfactory.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 30 October 2023 Resolved
The condiction of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all repsects will remain fit to proceed to sea without danger to the ship or persons onboard. During deck walk PSCO identified a hole in maitenance deck air pipe on port side near by 15.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 November 2023
Resolved 15 November 2023
Resolution: The air pipe in question was replaced with new section; length of 3500mm. inspected under working pressure and found satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 April 2023 Resolved
Fire-fighting systems and appliances shall be kept in good working order and ready for immediate use. 04 fire hoses were observed by PSCO to not be in proper working order with leaks identified.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 April 2023
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 5 October 2022 Resolved
Before the ship leaves port at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO's observed failure of the rescue boat engine to start within the allotted timeframe of five minutes on three separate occasions.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 October 2022
Resolution: Vessel replaced rescue boat engine with a new outboard motor approved by Class.
01 - Certificates & Documentation › 011 - Ships Certificates › Safety Management Certificate (SMC/ ISM)
Issued 1 April 2022 Resolved
A safety management certificate shall be issued to every ship by the Administration or an Organization recognized by the Administration. Ships ISM-SMC was expired. Ship has surveys scheduled for next port. 74 SOLAS 2020 cons CH IX Reg 4.3
Action required: 15 - Rectify deficiencies by next port
Resolved 2 April 2022
Resolution: Class issued 1 month extension on ISSC
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 1 April 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with provisions of the present convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. Ship could not demonstrate proper operation of the oily water separator. MARPOL 73/78 2011 Cons Annex I Reg 6.4.1
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 1 April 2022
Resolution: Received report of survey from class.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 1 April 2022 Resolved
Ships shall be maintained in compliance with the mechanical requirements of a class society. PSCO observed an air leak on an air line that supplies the secondary starting charge cylinder for the Emergency Generator. 74 SOLAS 04 Cons CH II-1 Reg 3-1.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 2 April 2022
Resolution: Received report of survery from Class.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 28 September 2021 Resolved
The fire damper shall operate automatically but shall also be capable of being closed manually from both sides of the bulkhead or deck. The fire dampers located in the purifier room were incapable of closing manually - 74 SOLAS (2001) II-2/48 - 10C
Action required: 10 - Deficiency Rectified
Resolved 28 September 2021
Resolution: PSCO verified fire dampers located in the purifier room. All was found in proper working order. Deficiency Cleared.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 28 September 2021 Resolved
Where the emergency source of electrical power is a generator, unless a second independent means of starting the emergency generator is provided the single source of stored energy shall be protected to preclude its complete depletion by the automatic starting system. PSCO identified cross over valve open from the emergency air supply tank to the main. 74 SOLAS (2004) II-1/43.3.1.2 - 10c
Action required: 10 - Deficiency Rectified
Resolved 28 September 2021
Resolution: PSCO verified cross over valve from the emergency air supply tank to the main was closed. All was found in proper working order. Deficiency Cleared.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 September 2021 Resolved
After any survey of the ship under regulations 7, 8, 9, or 10 has been completed no change shall be made in the structural arrangements, machinery, equipment without the sanction of the administration. Thermal oil cabinet located in the engine room that control quick closing valves for this system have been disabled by the crew. 74 SOLAS(2020) I/11(b) 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2021
Resolved 30 September 2021
Resolution: MSD LW received and accepted BV survey report attesting to the corrective action taken with the thermal oil system/heater. Deficiency Cleared.
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 15 June 2021 Resolved
All external high-pressure fuel delivery lines between the high-pressure fuel pumps and fuel injectors shall be protected with a jacketed piping system capable of containing fuel from a high-pressure line failure. A jacketed pipe incorporates an outer pipe into which the high-pressure fuel pipe is placed, forming a permanent assembly. The jacketed piping system shall include a means for collection of leakages and arrangements shall be provided with an alarm in case of a fuel line failure. The Port Main Diesel Engine leakage alarm was found inoperative and in alarm since 21May2021 - 74 SOLAS (2001 Cons) Ch II-2/15.2.9 - 30ac
Action required: 30 - Ship detained
Resolved 18 June 2021
Resolution: Repairs were made to the satisfaction of Class and the CG. See the class survey reports in docs for details.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 15 June 2021 Resolved
In a ship in which oil fuel is used, the arrangements for the storage, distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. No fuel oil leaks shall be situated where spillage or leakage therefore can constitute a hazard by falling on heated surfaces. The port main diesel engine secondary duplex fuel filters were found excessively leaking fuel. The port main diesel engine crankcase breather discharge was found routed into a five gallon bucket with approximately 2.5 gallons of fuel in it located outboard side of the engine. A fuel oil leak was discovered on the governors for both main engines, which then drained into two five gallon buckets. The main engines’ fuel supply lines had a temporary repair that was leaking and being collected in a five gallon bucket. The fuel module system in the purifier room is leaking from the relief valve and being captured into drum then transferred to the number 40 overflow tank via portable pump. Cardboard was found to be placed around the fuel oil leaks on the main engines’ governors; the pieces of cardboard were saturated with fuel oil creating an extreme fire hazard. Portable buckets and drums were found throughout the engine room nearly completely full from the collection of leaking fuel oil.- 74 SOLAS (2001 Cons) Ch II-2/15.2 - 30ac
Action required: 30 - Ship detained
Resolved 18 June 2021
Resolution: Repairs were made to the satisfaction of Class and the CG. See the class survey reports in docs for details.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2021 Resolved
All electrical apparatuses shall be so constructed and so installed as not to cause injury when handled or touched in a normal manner. PSCO identified exposed wires forward of anchoring arrangements on the bow of the main deck - 74 SOLAS (2004 Cons) Ch II-1/45.1.3 - 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 June 2021
Resolved 18 June 2021
Resolution: Repairs were made to the satisfaction of Class and the CG. See the class survey reports in docs for details.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 15 June 2021 Resolved
The Oil Record Book Part I shall be completed on each occasion, on a tank-to-tank basis if appropriate, whenever any of the following machinery space operations takes place in the ship: collection and disposal of oil residues (sludges). The oil residue/ sludge that was found to be leaking from the main engines was not recorded in the Oil Record Book - MARPOL 2017 ANNEX I/17.2.3 - 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 June 2021
Resolution: Repairs were made to the satisfaction of Class and the CG. See the class survey reports in docs for details.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 June 2021 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The central sea water cooling pipe for both main engines was found to be leaking then collected, piped to the vessel’s bilge pocket, and subsequently to the slop tanks via portable pump - 74 SOLAS (2020 Cons) Ch 1/11(a) - 30ac
Action required: 30 - Ship detained
Resolved 18 June 2021
Resolution: Repairs were made to the satisfaction of Class and the CG. See the class survey reports in docs for details.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 15 June 2021 Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements, which may be established by the company. In meeting these requirements, the company should ensure that: the inspections are held at appropriate intervals; any non-conformity is reported, with its possible cause, if known; appropriate corrective action is taken. Due to the objective evidence in the above deficiencies, the vessel is not in substantial compliance with relevant conventions, calling into question the adequacy and implementation of the vessel’s SMS under the ISM code. PSCOs collected objective evidence that the vessel was not identifying non-conformities and following the inspection and reporting requirements of its SMS. An external audit conducted by the Flag is required within 30 days to determine whether the ship is operating in accordance with the ISM Code. Provide a copy of the completed audit report to USCG prior to departure from port - 74 SOLAS (2014 Cons) Ch IX/Reg 3.1 ISM Code Part A Reg 6.4 10.2.2, 5.1.5, and 9.1 - 30ac
Action required: 30 - Ship detained
Resolved 18 June 2021
Resolution: Repairs were made to the satisfaction of Class and the CG. See the class survey reports in docs for details.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 June 2021 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Spring loaded gate valves on the #33 & 34 lube oil tanks were tied open and unable to be automatically closed - 74 SOLAS (2020 Cons) Ch 1/11(a) - 30ac
Action required: 30 - Ship detained
Resolved 18 June 2021
Resolution: Repairs were made to the satisfaction of Class and the CG. See the class survey reports in docs for details.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 15 June 2021 Resolved
Fire extinguishers shall be situated ready for use. Portable extinguishers which have been discharged shall immediately be recharged or replaced with an equivalent unit. Fire extinguisher #23 in the engine room is low on pressure and therefore not in compliance. - 74 SOLAS (2020 Cons) Ch II-2/10.3.2.4 - 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 June 2021
Resolution: Repairs were made to the satisfaction of Class and the CG. See the class survey reports in docs for details.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 15 June 2021 Resolved
No person may operate any vessel equipped with installed toilet facilities unless it is equipped with an operable Type II device. Vessels marine sanitation device type II chemical treatment system is inoperable - 33 CFR 159.7(a)(1) - 10c
Action required: 10 - Deficiency Rectified
Resolved 15 June 2021
Resolution: PSCO Verified corrective action taken by shipboard personnel and witnessed an satisfactory test the the marine sanitation device type II. Deficiency cleared.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 6 April 2021 Resolved
The following fire protection systems shall be kept in good order so as o ensure required performance if fire occurs; structural fire protection and protection of openings. Emergency escape door frame located in the lower level engine room has wastage compromising fire integrity. - 74SOLAS(2014) 11-2/14.2.1.1 - 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 May 2021
Resolved 4 May 2021
Resolution: Received class report and accepted this correspondence from [name withheld] stating " Emergency escape door frame located in lower engine room was replaced with new". MSD Lake Worth has accepted this report and deficiency is cleared.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 2 October 2020 Resolved
service spaces protected by class A-0 doors must be self closing at all levels. The Galley an laundry class A-0 doors do not self close. 74 Solas (01) 11-2/46.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2020
Resolved 16 October 2020
Resolution: recieved proper documentatin from technician and chief engineer
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 October 2020 Resolved
Piping systems shall be of construction adequate for the service for which they are intended and should be installed and protected to reduce danger to persons on board due to hot surfaces and other hazards. The fuel service line in the purifyer room is kincked and multiple lagging pieces are missing. 74 Solas (04) II-1/26.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2020
Resolved 16 October 2020
Resolution: recieved proper documentation from technician and chief engineer
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 October 2020 Resolved
Machinery installations shall be protected to reduce any danger to persons on board with due regard to hazards. 05 oil buckets are in the engine room, shaft seal is full of oil in the bilge, forward bilge on star/port full of oily water. Bilge alarm not functioning. 74 Solas (04) II-1/26.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2020
Resolved 16 October 2020
Resolution: Recieved proper documentatoin from technician and chief engineer
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 24 March 2016 Resolved
FSD bewteen changing room and engine room has a closing mechanism which prevents the door from being secured and will not stay closed.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 9 April 2016
Resolved 30 March 2016
Resolution: FSD fixed and functioning properly.
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 20 September 2015 Resolved
The machinery, boilers and other pressure vessls, associated piping systems and fitings shall be of a design and construction adequate for the service for which they are intended. Lube oil piping directly above #2 main engine purifier is leaking. SOLAS74(04 Cons) Ch. II-1/Reg 26.1 16a
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 October 2015
Resolved 13 October 2015
Resolution: Received class report attesting to proper repairs
Engineering › Steering Gear System › Hydraulic Hose
Issued 14 March 2014 Resolved
1499 - Steering Gear System - The design pressure for steering gear piping shall be at least 1.5 times the max working pressure expected. Actuator return hydraulic lines are different than originally installed and are not marked with working pressure. Class to attest to proper component installation and working pressure. 74 SOLAS 09 con. II-1/29
Action required: 705 - Other - as specified
Due 14 April 2014
Resolved 26 March 2014
Resolution: Received Bureau Veritas survey statement MIA0/2014/J0057 stating that the steering gear hoses in question have been replaced and are constructed IAW SOLAS requirements.
Personnel › Training › Search and Rescue
Issued 14 June 2007 Resolved
Conducted rescue boat drill with unsatisfactory results. Crew members assigned to rescue boat were unable to release the hook promptly upon boat reaching the water. Crew also experienced difficulty making the hook ready for retreival of rescue boat. Issued requirement to prove crew profenciency prior to departure to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 15 June 2007
Resolved 15 June 2007
Resolution: Witnessed crew training on operation of rescue boat falls. Crew rotated through the rescue boat for hands on training.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 31 January 2007 Resolved
Vessel has not submitted a Vessel Response Plan according to the E-VRP website. In accordance with ALCOAST 398/05 a new regulation is going to be issued for non-tank vessels over 400 gross tons to submit a Vessel response plan. Currently the NTVRP has been submitted and approved for the following COTP zones: Jacksonville, FL, Miami, FL, and Tampa, FL.
Action required: 705 - Other - as specified
Resolved 3 July 2008
Resolution: Verified that a NTVRP was submitted to the Coast Guard.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 1 November 2005 Resolved
Cargo hold 3, fuel tank 18 punctured with 7" hole due to container being dropped on tank top. Provide report from flag state or direct representative of flag approving temporary repairs.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 November 2005
Resolved 1 November 2005
Documentation › Safety/Response Plans/Programs › Ballast Water Management Plan
Issued 22 October 2005 Resolved
Provide ballast water management plan IAW 33CFR151.2035 prior to 22NOV05. Comply with 33CFR151 subpartD ballast water practices until provided to satisfaction of Coast Guard inspector.
Action required: 705 - Other - as specified
Due 22 November 2005
Resolved 1 November 2005
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 22 October 2005 Resolved
Fire Control Plan was altered from approved conditions to place both Firemen's outfits in one location. Return fireman's outfit to locations as shown on approved plan prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2005
Documentation › Logs/Records › Oil Record Book
Issued 22 October 2005 Resolved
Commence making ORB entries in accordance with instructions of MARPOL annex I.
Action required: 705 - Other - as specified
Resolved 22 October 2005
Fire Fighting › Means of Escape › Doorways
Issued 22 October 2005 Resolved
Repair broken hinge on emergency exit from engine room located adjacent to oily water separator prior to 29OCT05 to the satisfaction of Class or Coast Guard Inspector.
Due 29 October 2005
Resolved 28 October 2005
Fire Fighting › Fire Hydrants › Material
Issued 21 May 2005 Resolved
The two fire hydrants on the main deck in front of the accommodations are a different type than the other hydrants on the vessel. They have threaded connections vice twist on quick connects. Provide hydrants and hoses that are interchangeable through out vessel. Prior from departure [name withheld] Beach. Until all hydrants and hoses are compatible the 2 different hoses and hydrants must remain connect
Action required: 705 - Other - as specified
Due 28 May 2005
Resolved 26 May 2005
Construction/Loadline › Structures › Door
Issued 21 May 2005 Resolved
Dog on water tight hatch for pipe tunnel in engine room is stripped and unable to be tightened. Replace dog to the satisfaction of class prior to 28May05.
Action required: 705 - Other - as specified
Due 28 May 2005
Resolved 26 May 2005
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 21 May 2005 Resolved
Check valve from sludge pump to overboard balve installed backwards. Install check valve to its proper location as depicted on approved vessels drawings prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 May 2005
Resolved 21 May 2005
Navigation › Collision/Grounding Avoidance
Issued 20 February 2002 Resolved
provide operation of port arpa radar alarm. LEGACY COMPONENT DESC: Automatic Radar Plotting Aid (ARPA)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 20 February 2002
Resolved 21 February 2002
Resolution: arpa alarm operational
Lifesaving › Lifebuoys
Issued 20 February 2002 Resolved
provide 4 working ring buoy water lights. LEGACY COMPONENT DESC: Self-igniting Lights
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 20 February 2002
Resolved 21 February 2002
Resolution: working ring buoy water lights.

Ownership record