A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 35
5 December 1994
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 871276
1 July 1993
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 845896
10 June 1993
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1425336
10 September 1992
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1266854
9 June 1992
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1420649
11 November 1991
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1251789
4 October 1991
Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 938718
27 August 1991
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 934791
30 July 1991
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 642208
22 June 1991
Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 917920
13 June 1991
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1233827
20 June 1990
Re-Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1223669
14 November 1989
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 911200
13 June 1989
COI Inspection · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1039750
11 June 1989
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1038208
14 June 1988
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 891762
13 October 1987
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1012379
28 August 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1339281
17 July 1987
Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1336814
12 June 1987
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1012908
25 March 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1021014
9 October 1986
Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1318219
2 September 1986
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1014407
3 February 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 997336
2 October 1985
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1300117
24 September 1985
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1298220
3 July 1985
COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1292193
8 January 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 977757
9 November 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1282361
16 August 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1282767
27 June 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1281464
22 November 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 971297
21 January 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1278409
5 November 1982
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 971033
22 June 1982
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1276565
Engineering
Issued 10 June 1993
Resolved
PROVIDE COPY OF ENGINEERING AUTOMATION TEST PROCEDURES FOR APPROVAL.
Condition: Unknown
Due 10 June 1993
Resolved 10 June 1993
Deck/Cargo
Issued 10 June 1993
Resolved
HYDROSTATICLY TEST FUEL TRANSFER HOSES.
Condition: Unknown
Due 10 June 1993
Resolved 10 June 1993
Deck/Cargo
Issued 10 June 1993
Resolved
RENEW/RESET BULK TANK RELIEF VALVES. FURTHER USE OF BULK SYSTEM NOT AUTHORIZED UNTIL CORRECTED.
Condition: Unknown
Due 10 June 1993
Resolved 10 June 1993
Construction/Loadline
Issued 13 June 1991
Resolved
REPAIR BOTH PORT AND STARBOARD ENGINE ROOM HATCHES. TENSION SPRINGS MUST HOLD HATCHES UP UNASSISTED.
Condition: Unknown
Due 13 June 1991
Resolved 13 June 1991
Deck/Cargo
Issued 13 June 1991
Resolved
REPLACE ALL RELIEF VALVES ON DRY BULK TANKS. DRY BULK TANKS ARE NOT TO BE OPERATED UNTIL THIS REQUIREMENT IS MET.
Condition: Unknown
Due 13 June 1991
Resolved 13 June 1991
Electrical
Issued 13 June 1989
Resolved
REPLACE TEMPORARY LOUD-HAILER WIRING WITH PERMANENT WIRING.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Electrical
Issued 13 June 1989
Resolved
PERMANENTLY INSTALL ANTENNA LEAD FOR CELLULAR PHONE.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Electrical
Issued 13 June 1989
Resolved
REMOVE WIRE NUTS FROM TIMER WIRING IN WALK-IN REEFER.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Lifesaving
Issued 13 June 1989
Resolved
POST "LIFE-SAVING SIGNALS".
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Fire Fighting
Issued 13 June 1989
Resolved
PROVIDE TO [name withheld], UPDATED FIRE CONTROL PLAN.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Engineering
Issued 13 June 1989
Resolved
STENCIL ALL REMOTE REACH ROD LOCATIONS FOR FUEL SYSTEM.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Fire Fighting
Issued 13 June 1989
Resolved
CONDUCT SERVICING OF HALON SYSTEM, INCLUDING ALARMS AND SHUTDOWNS OF ALL MACHINERY AND ENG RM VENTILATION.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Construction/Loadline
Issued 13 June 1989
Resolved
MAKE TEMPORARY REPAIRS TO WATERTIGHT BULKHEAD BETWEEN ENGINEROOM AND FWD TUNNEL.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Construction/Loadline
Issued 13 June 1989
Resolved
MAKE BULKHEAD BETWEEN ENGINEROOM AND FORWARD TUNNEL WATERTIGHT AND INSTALL PROPER CLASS I QUICK-ACTING WATERTIGHT DOOR.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Navigation
Issued 13 June 1989
Resolved
ADJUST ELECTRIC STOP ON STEERING GEAR PUMPS TO GIVE A MAXIMUM OF 30 DEGREESSWING FROM HARDOVER TO HARDOVER.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Navigation
Issued 13 June 1989
Resolved
REPAIR AND CONDUCT OPERATIONAL TEST OF #2 STEERING PUMP.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Deck/Cargo
Issued 13 June 1989
Resolved
REPAIR AND CONDUCT OPERATIONAL TEST OF THE FOLLOWING: (A)FUEL OIL TRANSFER PUMP, (B)FUEL OIL PURIFIER, (C)DIRTY OIL PUMP, AND (C)ENG RM VENTILATION.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Engineering
Issued 13 June 1989
Resolved
INSTALL FUEL OIL SHUT-OFF VALVES ON FUEL TANK AND AT ENGINE FOR DECK TUGGERWINCH.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Lifesaving
Issued 13 June 1989
Resolved
INSTALL 6" CLEATS AT BOTH LIFERAFT LAUNCHING STATIONS.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Lifesaving
Issued 13 June 1989
Resolved
REPLACE 2 RING LIFEBUOYS.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Deck/Cargo
Issued 13 June 1989
Resolved
INSTALL MISSING DRAIN PLUGS FOR ALL CONTAINMENT BOXES.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Navigation
Issued 13 June 1989
Resolved
SWING SHIP AND UPDATE DEVIATION TABLE FOR MAGNETIC COMPASS AFTER REMOVAL OF NON-FUNCTIONING SS TRANSCEIVER.
Condition: Unknown
Due 13 June 1989
Resolved 13 June 1989
Electrical
Issued 12 June 1987
Resolved
REPLACE OR REPAIR PORT ENGINE ROOM EXHAUST MOTOR
Condition: Unknown
Due 12 June 1987
Resolved 12 June 1987
Construction/Loadline
Issued 25 March 1987
Resolved
MAKE PERMANENT REPAIRS TO PLATE WASTEAGE IN WAY OF MAIN DECK FRAMES 20-42
Condition: Unknown
Due 25 March 1987
Resolved 25 March 1987
Deck/Cargo
Issued 2 September 1986
Resolved
CONDUCT AND DOCUMENT THE ANNUAL HYDROSTATIC TEST OF ALL DISCHARGE PIPING AND HOSES USED FOR THE TRANSFER OF GRADE "E" LIQUID MUD AS SPECIFIED IN 33 CFR 156.170.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Fire Fighting
Issued 2 September 1986
Resolved
PROVIDE THE FIRE DETECTION PANEL ON THE BRIDGE WITH AN OPERATIONAL AUDIBLE ALARM.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Fire Fighting
Issued 2 September 1986
Resolved
PROVIDE THE FIRE DETECTION PANEL ON THE BRIDGE WITH INDICATORS WHICH WILL SHOW WHETHER THE FIRE ALARM IS FOR A FIRE IN THE GALLEY, ENGINE ROOM, OR BOW THRUSTER.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Navigation
Issued 2 September 1986
Resolved
REPAIR OR REPLACE THE INOPERATIVE FATHOMETER ON THE BRIDGE.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Navigation
Issued 2 September 1986
Resolved
PROVIDE THE EPIRB WITH A CURRENT DATED BATTERY AND WITH A HOLDER WHICH WILLALLOW FLOAT FREE OPERATION.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Construction/Loadline
Issued 2 September 1986
Resolved
REPLACE THE MISSING DOGS ON THE MACHINERY SPACE VENTILATION COVERS ON THE MAIN DECK.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Navigation
Issued 2 September 1986
Resolved
PROVIDE ALL PERKO NAVIGATION LIGHTS WITH APPROVED LIGHT BULBS OR REPLACE THESE LIGHTS WITH OTHER APPROVED NAVIGATION LIGHTS.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Accommodation/Occupational Safety
Issued 2 September 1986
Resolved
REPAIR OR REPLACE THE INOPERATIVE WALK IN REEFER DOOR INSIDE SAFETY RELEASE.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Accommodation/Occupational Safety
Issued 2 September 1986
Resolved
FREE UP THE STBD SIDE ENGINE ROOM ESCAPE HATCH COVER AND RENEW THE COVER'S TOP HAND WHEEL TO ENSURE PROPER OPERATION.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Accommodation/Occupational Safety
Issued 2 September 1986
Resolved
RENEW THE SECTIONS OF SEWAGE PIPING OVER THE BOW THRUSTER WHICH HAVE BEEN TEMPORARILY REPAIRED WITH EPOXY PATCHES.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Electrical
Issued 2 September 1986
Resolved
INVESTIGATE THE PURPOSE OF THE RED SHUTDOWN BOX NEXT TO THE GENERAL ALARM BOX IN THE GALLEY TO ENSURE THAT NO SAFETY SYSTEM IS AFFECTED.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Deck/Cargo
Issued 2 September 1986
Resolved
IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR RETEST THE INOPERATIVE REMOTE FUEL OIL SHUTDOWN FROM THE AFT DECK STATION.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Electrical
Issued 2 September 1986
Resolved
PROVIDE REVERSE POWER RELAYS ON BOTH ENGINE ROOM GENERATORS WHICH CAN BE RUN IN PARALLEL OPERATION.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Unknown
Issued 2 September 1986
Resolved
MAKE PERMANENT REPAIRS TO THE AIR LINE ON THE PORT SIDE, MAIN DECK, AFT OF THE WALK IN REEFER, WHICH HAS BEEN REPAIRED WITH A SOFT PATCH.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Navigation
Issued 2 September 1986
Resolved
MAKE OPERATIONAL THE SHAFT TACHOMETERS LOCATED ON THE BRIDGE AND IN THE ENGINEROOM.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Electrical
Issued 2 September 1986
Resolved
REPOSITION THE EMERGENCY LIGHTS IN THE ENGINE ROOM TO ILLUMINATE THE EMERGENCY EXITS.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Engineering
Issued 2 September 1986
Resolved
IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR, TEST THE OVERSPEED TRIPSON BOTH OF THE MAIN ENGINES.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Deck/Cargo
Issued 2 September 1986
Resolved
PROVIDE A STANDARD DISCHARGE CONNECTION ON THE OILY WASTE DISCHARGE LINE.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Engineering
Issued 2 September 1986
Resolved
REPLACE THE THROTTLE HANDLE ON THE STBD MAIN ENGINE.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Electrical
Issued 2 September 1986
Resolved
PRIOR TO DEPARTING CAMERON, LA. MAKE OPERATIONAL ALL GENERAL ALARMS AND CONTACT MAKERS IN THE ENGINE ROOM AND GALLEY AREA.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Electrical
Issued 2 September 1986
Resolved
REPLACE THE ELECTRICAL MAT IN FRONT OF THE ELECTRICAL SWITCHBOARD IN THE ENGINE ROOM.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Engineering
Issued 3 July 1985
Resolved
PITTED PORT TAILSHAFT WAS ALLOWED TO BE REPAIRED AND TO REMAIN IN SERVICE TEMPORARILY. PORT TAILSHAFT SHALL BE RENEWED PRIOR TO 03OCT85. INSTALLATIONAND INSPECTION SHALL BE AS REQUIRED BY THE ATTENDING CG MARINE INSPECTOR. THERE ARE NO ROUTE OR OPERATIONAL RESTRICTIONS PRIOR TO COMPLETION OF THIS.
Condition: Unknown
Due 3 July 1985
Resolved 3 July 1985
Unknown
Issued 9 November 1984
Resolved
MAKE PERMANENT REPAIRS TO THE STARBOARD GENERATOR FLEXIBLE EXHAUST PIPE LOCATED ABOVE THE HALON SYSTEM BOTTLES.
Condition: Unknown
Due 9 November 1984
Resolved 9 November 1984
Construction/Loadline
Issued 9 November 1984
Resolved
MAKE NECESSARY REPAIRS TO THE AFT DECK INSERTS THAT ARE FRACTURED AND DETERIORATED.
Condition: Unknown
Due 9 November 1984
Resolved 9 November 1984
Construction/Loadline
Issued 9 November 1984
Resolved
REMOVE THE DOUBLER ON THE AFTER BULKHEAD IN #7 STARBOARD BALLAST TANK AND INSTALL AN INSERT.
Condition: Unknown
Due 9 November 1984
Resolved 9 November 1984
Deck/Cargo
Issued 9 November 1984
Resolved
RENEW THREE (3) SEA CHEST INLET NIPPLES ON THE BOW THRUSTER SEA CHEST AND THE SIX INCH STARBOARD SEA CHEST GATE VALVE.
Condition: Unknown
Due 9 November 1984
Resolved 9 November 1984
Deck/Cargo
Issued 9 November 1984
Resolved
RENEW THE STARBOARD CHAIN LOCKER HATCH AND COAMING.
Condition: Unknown
Due 9 November 1984
Resolved 9 November 1984
Construction/Loadline
Issued 9 November 1984
Resolved
RENEW THE COUNTER BALANCE SPRINGS ON THE PORT AND STARBOARD ENGINE ROOM ESCAPE HATCHES.
Condition: Unknown
Due 9 November 1984
Resolved 9 November 1984
Unknown
Issued 27 June 1984
Resolved
INSTALL AUTOMATIC SHUTDOWN ON MUD PUMP DIESEL ENGINE TO CAUSE ENGINE TO SHUTDOWN WHEN HALON FIX FIREFIGHTING SYSTEM IS ENERGIZED.
Condition: Unknown
Due 27 June 1984
Resolved 27 June 1984
Unknown
Issued 27 June 1984
Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE VENTURA, DN612647.
Condition: Unknown
Due 27 June 1984
Resolved 27 June 1984
Construction/Loadline
Issued 27 June 1984
Resolved
REPAIR POWERED BILGE PUMP VALVES.
Condition: Unknown
Due 27 June 1984
Resolved 27 June 1984