VOYAGER is a 1975 passenger vessel (inspected). The Coast Guard has recorded 32 inspections since 2016, most recently in March 2026, along with 34 deficiencies and 1 casualty investigation in 2020.

Records from 2016 to 2026. Most recent: inspection, 17 March 2026.

Built
1975
Last inspected
17 March 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 17 March 2026
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDH8901
Flag
UNITED STATES
Maury page id
psix-51276

Documentation record

Registered dimensions (L × B × D)90.0 ft × 23.0 ft × 7.9 ft
Registered tonnagegross 90 / net 61
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGULF CRAFT INC · PATTERSON, LA, UNITED STATES · built 1975
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPOINT PLEASANT BEACH, NJ
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationValid · issued 16 February 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it90 - Regulatory (Subpart C or D), Gross Ton
61 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

32 inspections, each with its date, unit and type; 34 deficiencies with the resolution recorded against each; 1 casualty investigation, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 32

17 March 2026 Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8331602
20 May 2025 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8139642
16 April 2025 Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8112718
21 March 2025 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8097192
4 March 2025 Internal Structural Exam · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8087840
23 April 2024 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7899947
31 January 2024 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7864375
19 September 2023 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7794047
15 August 2023 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7769236
4 May 2023 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7688990
27 March 2023 Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7657437
28 February 2023 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7643119
29 May 2022 Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7463513
3 May 2022 Internal Structural Exam · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7443307
21 October 2021 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7336909
30 August 2021 Deficiency Check · Plan Review "T" Boat
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7298111
14 July 2021 Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7255949
28 April 2021 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7185049
16 March 2021 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7156699
11 December 2020 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7115163
15 April 2020 COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6939517
10 April 2020 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6937931
7 October 2019 Plan Review "T" Boat · Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6829488
22 April 2019 Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6667891
22 February 2019 Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6630761
6 September 2018 Inclining Experiment · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6534309
9 August 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6505569
17 April 2018 Annual Inspection · DAPI Audit · Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6389103
25 April 2017 Administrative Inspection · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6131732
14 February 2017 Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6102000
23 March 2016 DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5838678
18 February 2016 Drydock Exam · Deficiency Check · Plan Review "T" Boat · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5817632

Deficiency record · 34

09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 17 March 2026 Resolved
Vessels described by 46 CFR 175.110(d) must comply with the regulations in § 177.500. Vessel's two means of escape from overnight accommodation space lead to the same compartment. Passengers cannot utilize overnight accommodations. 46 CFR 177.115(c)
Action required: 705 - Other - as specified
Due 26 April 2026
Resolved 22 July 2026
Resolution: Vessel added partition to reduce square footage of space, allowing them to only need one means of escape. Vessels existing stairs are satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 17 March 2026 Resolved
A ladder leading to a deck scuttle may not be used as a means of escape except:(1) On a vessel of not more than 19.8 meters (65 feet) in length, a vertical ladder and a deck scuttle may be used as not more than one of the means of escape from passenger accommodation space. Submit proposal for modifications to the satisfaction of MI. 46 CFR 177.500(j)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2026
Resolved 22 July 2026
Resolution: Vessel added partition to reduce square footage of space, allowing them to only need one means of escape. Vessels existing stairs are satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 March 2025 Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are readily accessible and visible to the crew and passengers. Vessel has life jacket placard for only one of the three types of life jackets on board. 46 CFR 185.516
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 April 2025
Resolved 13 April 2025
Resolution: O/O replaced old lifejackets with same in kind on placards.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 March 2025 Resolved
All fittings on fire hose shall be of brass, copper, or other suitable corrosion resistant material. Nozzles on port and starboard fire hose were severely corroded. 46 CFR 181.15-10(f) Old T
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 April 2025
Resolved 21 March 2025
Resolution: Fittings provided.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 23 April 2024 Resolved
The scope of the annual inspection is the same as the inspection for certification... At each initial and subsequent inspection for certification, the marine inspector may require that an abandon ship or man overboard drill be held under simulated emergency conditions specified by the inspector. Due to main engine low oil pressure vessel unable to get u/w.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 May 2024
Resolved 25 April 2024
Resolution: MDE was repaired. Got vsl u/w. Due to sea conditions drill was done dockside. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 April 2024 Resolved
At each initial and subsequent inspection for certification of a vessel, the ....operator shall be prepared to conduct tests and have the vessel ready for inspections of ...Operation of the main propulsion machinery both ahead and astern. One MDE was inop.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 May 2024
Resolved 25 April 2024
Resolution: MDE Lube Oil relief valve was renewed & tested sat. Vessel was tested u/w sat.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 23 April 2024 Resolved
Stability information (stability details indicated a stability letter), is required on...A vessel which,...complies with requirements in subchapter S of this chapter. Vessel exceeded the limits of Stab Ltr onboard
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2024
Resolved 25 April 2024
Resolution: The stability letter was reissued due to errors. The revised stability letter was located and posted while the exististing, incorrect, letter was discarded.
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 23 April 2024 Resolved
...a test communication on a required frequency in the 1605 to 27500 kHz band...Operator was unable to demonstrate proper function of the SSB
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2024
Resolved 25 April 2024
Resolution: SSB was tested sat by contacting a vessel in the NY Area.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 23 April 2024 Resolved
One or more metallic shutoff valves must be installed adjacent to the fitting...two metallic shutoff valves are installed, one on either side of the bulkhead,... Vessel had flexible hoses penetrating void 2/3 WT Blkhd.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2024
Resolved 21 March 2025
Resolution: Shutoff valves installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 April 2024 Resolved
...Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. The Port Generator RW discharge hose had several bulges. The bilge suction hose was badly worn.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 November 2024
Resolution: The generator hose was renewed 25 Apr 2024. The bilge piping was repaired with a dresser coupling 7 Nov 2024. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 April 2024 Resolved
Auxiliary boilers and heating boilers and their associated piping and fittings will be given separate consideration and must meet the applicable requirements of subchapter F...heating boilers must be tested or examined every three years. There were no records of boiler or furnace testing. Hoses were not CG approved fire rated.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2024
Resolved 7 November 2024
Resolution: Boilers were removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 April 2024 Resolved
Electrical installations shall be to the satisfaction of the [name withheld] cord connections were used for fixed lighting and compressor.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2024
Resolved 7 November 2024
Resolution: Installations were hard wired 25 Apr 2024 & were installed in enclosures 7 Nov 2024.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 April 2024 Resolved
..a vessel for which an extension is granted under paragraph (1)(C) shall provide on the website of such owner or operator of the vessel, the vessel, and each ticket for a passenger a prominently displayed notice that the vessel is exempt from meeting the Coast Guard safety compliance standards concerning egress as described in such section.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2024
Resolved 17 March 2026
Resolution: Verified owner had the required wording on their website
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 4 May 2023 Resolved
Vessel is restricted from carrying overnight passengers until watch alert system required by 46 CFR 184.410 (b) is approved, installed, and verified by attending Marine Inspector.
Action required: 705 - Other - as specified
Due 1 December 2023
Resolved 19 September 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 28 February 2023 Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years. Vessel missed it's drydock that was due 28FEB23. Vessel must complete drydock examination prior to carrying passengers. 46 CFR 176.600
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 April 2023
Resolution: Drydock inspection complete.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 3 May 2022 Resolved
MI observed a crack in the steering scuttle outer framing/ knife edge where the gasket would sit. 46CFR176.01-10(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2022
Resolved 30 May 2022
Resolution: re-welded the crack. Orderd and has a new hatch on hand to replace at the dry dock.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 May 2022 Resolved
MI observed that on the Generator switchboard the ammeter and the frequency (hertz) meter were inop. Require vsl repair/replace equipment for proper operation. 46cfr183.10-5(g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2022
Resolved 30 May 2022
Resolution: both ammeter and frequency meters were replace and working.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 3 May 2022 Resolved
MI observed ground detection on the generator switchboard inop. Require repair/replace equipment for proper operation. 46cfr111.05-21
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2022
Resolved 3 November 2022
Resolution: Received tech report.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 May 2022 Resolved
MI observed numerous black ground cables on the engine room batteries had cuts and crack on the insulation. Require cables be replaced with proper battery cables. 46cfr183.05-40(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2022
Resolved 30 May 2022
Resolution: replace all cracked ground cables from batteries.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 April 2021 Resolved
Identified misalignment of installed portable fire extinguishers with revised regulations and policy. Vessel has one legacy B-II CO2 fire extinguisher in ER, with remaining fire extinguishers NFPA-10/UL rated or dual rated w/USCG rating. In addition, when the COI was revised to list the new performance-based rating, the required arrangement was not updated. For the current operating arrangements, layout, and configuration, the VOYAGER should have (1) 10-B:C on the upper deck/ operating station, (2) 2-A w/ (1) in the main deck salon and (1) in the below deck berthing, and (2) 40-B:C located in the concession area outside of the Engine Room with (1) for responding to Engine Room fires and the other for fires in the Concession area from risk of fire from the furnace or appliances. Vessel must add two (2) 40-B:C extinguishers in the vicinity of the Concession area/access to the Engine Room and replace the 10-B:C in the Salon with a 2-A extinguisher. CITE: CG-CVC Policy Ltr 18-04, & 46 CFR §181.500(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2021
Resolved 2 September 2021
Resolution: Vessel added extinguisher to accommodation/salon area.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 28 April 2021 Resolved
Life Ring Buoy on upper deck by wheelhouse is in unserviceable condition. Vessel is required to have a USCG Approved Ring Buoy w/ Light in this location. Replace with new, approved Lighted Ring Life Buoy. CITE: 46 CFR §180.70
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2021
Resolved 2 September 2021
Resolution: Life buoy was replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 28 April 2021 Resolved
One older Kapok PFD unserviceable (Kapok cells leaking). Replace unserviceable PFD with new, USCG Approved PFD. CITE: 46 CFR §180.71
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2021
Resolved 14 May 2021
Resolution: Replaced prior to end of inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 April 2021 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Observed significant rusting and wastage of the end shell of the 15 gal combined air compressor/receiver in Compartment 2. Prove safe condition of or replace air receiver. CITE: 46 CFR §182.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2021
Resolved 3 May 2022
Resolution: Attended vsl, observed a new air receive mounted properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 28 April 2021 Resolved
Electronic propulsion control systems must be designed so that a loss of power to the control system does not result in increased shaft speed or propeller pitch, as per 184.620(c). A propulsion control system drawing should be submitted along with a ‘Test Protocol’ to verify this. The Test Protocol should consist of a limited Qualitative Failure Analysis (QFA) and Design Verification Test Procedure (DVTP), only including analysis of the loss of power to the control system. Please provide copies of the propulsion control system drawing with Test Protocol for review. CITE: CG-CVC_POL17-07, CG-CVC_POL17-07-RefB, & PRG.E2-23.2017.07.26
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2021
Resolved 14 July 2021
Resolution: Uploaded VOYAGER QFA-DVTP Appvl, MSC ltr E2-2102172.pdf MSC Approval Ltr of installed electronic propulsion control system's QFA/DVTP to MISLE Documents.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 1 May 2020 Resolved
Prove operation of the fire pump and bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 May 2020
Resolution: Observed sat test via facetime.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 1 May 2020 Resolved
Repair or replace engine room bilge visual alarm.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 May 2020
Resolution: Replaced LED.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 May 2020 Resolved
Label electrical breakers in the engine room with the circuits serviced.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 May 2020
Resolution: Labeled breakers
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 May 2020 Resolved
Provide a sign stating the upper deck is limited to 50 person in accordance with the stability letter. Remove sign that states 60 persons.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 May 2020
Resolution: Affixed new sign.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 10 April 2020 Resolved
Complete COI Renewal inspection prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 April 2020
Resolved 1 May 2020
Resolution: COI inspection completed #6939517
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 October 2019 Resolved
Vessel has two fire hydrants and only one spanner. Provide additional spanner. 16C 46 CFR 181.310(d).
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 October 2019
Resolution: Vessel purchased spanner wrench.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018 Resolved
Vsl is broadcasting: No static draft information.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2018
Resolved 6 November 2018
Resolution: AIS information updated.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 17 April 2018 Resolved
Place machinery guards around rotating machinery on the main propulsion engines.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 17 June 2018
Resolved 30 April 2018
Resolution: Guards were placed on the exposed belts.
Engineering › Fuel Oil Service System › Filter
Issued 17 April 2018 Resolved
PG02. Place plugs or caps on all fuel strainers in the engine room.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 June 2018
Resolved 20 April 2018
Resolution: The crew placed caps on the Racor fuel filters. Photos are in MISLE.
Construction/Loadline › Penetrations › Valve Flange
Issued 14 February 2017 Resolved
Replace sea chest valve on generator.
Condition: Improper/Lack of Maintenance
Due 9 March 2017
Resolved 8 March 2017
Resolution: Recieved pictures of new valve. Attached in documents.

Casualty record · 1

11 December 2020Routine · role: Involved in a Marine Investigation (non-casualty) · 1 dead · activity 7115163
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.